Forwards LER 97-026-00 Re Inadequate Procedure for Insp of Shutdown Svc Water Pumps for Excess Slit Results in Shutdown Svc Water Pump Inoperability.Util Committing to Take Listed Actions as Documented in LER
ML20199E359
Person / Time
Site: Clinton Constellation icon.png
Issue date: 11/13/1997
From: Jackie Cook
ILLINOIS POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20199E363 List:
References
U-602862, NUDOCS 9711210175
Download: ML20199E359 (2)


LER-2097-026, Forwards LER 97-026-00 Re Inadequate Procedure for Insp of Shutdown Svc Water Pumps for Excess Slit Results in Shutdown Svc Water Pump Inoperability.Util Committing to Take Listed Actions as Documented in LER
Event date:
Report date:
4612097026R00 - NRC Website

text

- _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ - _ _ _ _ _ - - .

o .

g

, likrvss Power Company Chnton Power Station P O Dox678 Chnton,IL 61727

  • Tel 217 935-5623 Fax 217 935-4632 Sen or hce P esident U-602862 2C.220 November 13, 1997 E

Docket No. 50-461 10CFR50 73 Document Control Desk Nuclear Regult. tory Commission Washington, D.C. 20555

Subject:

Clinton Power Station - Unit 1 Licensee Event Report No. 97-026-00 Deu Madam or Sir:

, Enclosed is Licencee Event Report (LER) No. 97-026-00: Inadeauate Procedure for Inspection of Shutdown Service Water Pumps For Excess Silt Results in Shutdown Service Water Pumn Inocerability. This report is being submitted in accordance with the requirements of 10CFR50.73.

311inois Power is committing to take the following actions as documented in this LER:

  • Clean the Plant Service Water Intake Structure to achieve an acceptable level of silt.
  • Revise Clinton Power Station (CPS) Procedure 24001.01, " CPS Corbicula (Asiatic Clams) Control," to include an acceptance criteria for sili level, trending of silt accurr:alation, and require inspection of the Shutdown Service Water (SX) pump intake area.
  • Evaluate, test, or inspect the heat exchangers served by the Division I and II SX 3'

- pumps for operability due to silt accumulation.

7 Sincerely yours, I 1 c4n, e n /

)

. Cook

~'~

Menior Vice President g iago g {5000$61 l blhlNhll^

8 PM 4

l U-603862 -

Page 2 of 2 i

9 MRS/krk Enclosure cc: NRC Clinton Licensing Project Manager ,

NRC Resident Office, V-690 Regional Administrator, Region III, USiGC Illinois Department of Nuclear Sr.fety INPO Records Center

- _ _ _ - _ - _ - - - _ _ - - - - - - - _ - - - - - - - - _ - - - - - - - - - - -----------------J