05000395/LER-1982-034, Forwards LER 82-034/03L-0.Detailed Event Analysis Encl

From kanterella
Jump to navigation Jump to search
Forwards LER 82-034/03L-0.Detailed Event Analysis Encl
ML20070B001
Person / Time
Site: Summer South Carolina Electric & Gas Company icon.png
Issue date: 12/01/1982
From: Dixon O
SOUTH CAROLINA ELECTRIC & GAS CO.
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML20070B006 List:
References
NUDOCS 8212090422
Download: ML20070B001 (2)


LER-2082-034, Forwards LER 82-034/03L-0.Detailed Event Analysis Encl
Event date:
Report date:
3952082034R00 - NRC Website

text

- _ _ _ - _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

a

.g SOUTH CAROLINA ELECTRIC & GAS COMPANY POSr OPPICE 764 COLUMaiA. south CAROLINA 29218 O

O. W. DixON, JR. 3 vice PREllOENr M b Nucuam onaaric=8 December 1,1982 '

i ;.

e .

T.'

E' Mr. James P. O'Reilly, Director ,'?

U.S. Nuclear Regulatory Commission +

Region II, Suite 3100 101 Marietta Street, N.W.

T Atlanta, Georgia 30303

SUBJECT:

Virgil C. Summer Nuclear Station Docket No. 50/395 Operating License No. NPF-12 Thirty Day Written Report LER 82-034

Dear Mr. O'Reilly:

Please find attached Licensee Event Report #82-034 for Virgil C. Summer Nuclear Station. This Thirty Day Report is required by Technical Specification 6.9 1.13.(b) as a result of entry into Action Statement 30 of Technical Specification 3.3.'3 1,

" Radiation Monitoring Instrumentation, Table 3.3-6," on November 3, 1982.

Should there be any questions, please call us at your convenience.

Ver tru y yours, O. W. ixon, Jr.

4 HCF:0WD:dwr Attachment cc: V. C. Summer A. R. Koon T. C. Nichols, Jr. H. Radin G. H. Fischer Site QA

0. W. Dixon, Jr. C. L. Ligon (NSRC)

H. N. Cyrus G. J. Braddick H. T. Babb J. L. Skolds D. A. Nauman J. B. Knotts, Jr.

M. B. Whitaker, Jr. B. A. Bursey W. A. Williams, J r. I&E (Washington)

O. S. Bradham Document Management Branch R. B. Clary INPO Records Center . '

M. N. Browne NPCF File c'o p 8212090422 821201

  • d V

PDR ADOCK 05000395 S PDR

_________,g

, y 0, ,

v

/

8 J Mr. James P. O'ReillyJ '

/

LER No.82-034 '

Page Two .

December 1, 19P2 DETAILED DESCRIPTION OF EVENT On November 3,1982 with the Plant in Mode 4, Radiation f(onitor RM-0190 (Main Steam Line C monitor) failed upscale to,.tiho high radiation alarm setpoint. Radiation Monitoring is requi, red to be operable per Technical Specification 3.3 3 1. ,

PROBABLE CONSEQUENCES There was no adverse consequence as the Station pre-gilanned method of alternate monitoring was estaolished in accordance with 'Iec}pical !.pecifications. ,

i CAUSE(S)s P THE OCCURRENCE ,

The eveny is attributed to moisture ~ accumulation in the cable connectors between the detector and' pre-amp of the monitor.,

, t

, J '

< l IMMEr)IATE C0hilECTIVE ACTIONS TAKEN ,

The following corrective t.6tNons were taken:

a. The monitor t.was dedlared inoperable. .,
b. The Stat 19n pre-planned method of alternate monitoring was established.
c. 7 A Maintenance Work Request was issued for the

' investigation and ' repair of the monitor.

d .; The detector was replaced, and the cable connectors were cleaned and dried.

e. The applicable Surve111arice Test was performed satisfactorily, and RM-0190 was returned to operable status on November 4,1982. ,

ACTION TAKEN TO PREVENT RECURRENCE A modification has been approved to replace the existing monitors with a model more suited for their associated application. $'

RM-0190 is planned to be replaced prior ato January 1,1983 k I J

r

,7 E> / T 5 , , ,

~

t I

t'. _l < \

  • l' V

9

~

. . ,. y .

.-- _ . - , ,, _. _, _ _ _ _  ;. _ _ _ _ , . _ . _ _ _ __ , _ , -