05000361/FIN-2010003-10
From kanterella
Jump to navigation
Jump to search
Finding | |
---|---|
Title | Failure to Assure Circuit Breakers Were Qualified for Installation |
Description | A self-revealing noncited violation of 10 CFR Part 50, Appendix B, Criterion VII, Control of Purchased Material, Equipment, and Services, was identified for the failure of engineering personnel to assure that 4 kV vacuum circuit breakers supplied by NLI/Square D conformed to the procurement documents prior to installation in Unit 2 bus 2A06 train B. Specifically, on December 18, 2009, 4 kV bus 2A06 was restored to operable status following installation of 4 kV vacuum circuit breakers supplied by NLI/Square D that did not conform to the design requirements specified in the procurement documents. Engineering personnel failed to assure that 4 kV vacuum circuit breakers conformed to the requirements of Specification SO23-302-02A, 4kV Roll-in Replacement Circuit Breakers, Revision 1, and failed to identify that the vendor completed seismic qualification test deviated from the procurement specifications prior to installation in the plant. On March 18, 2010, an unexpected trip of component cooling water pump circuit breaker 2A0605 prompted an investigation that identified the design inadequacies. Operations personnel declared the associated circuit breakers inoperable following identification of the design inadequacies. Immediate actions to eliminate the design inadequacies were completed to return 4 kV bus 2A06 to operable on March 25, 2010. Apparent Cause Evaluation ACE 200845084 was initiated to identify additional corrective actions. This issue was entered into the licensees corrective action program as Nuclear Notification NN 200842716. The performance deficiency is more than minor because it is associated with the design control attribute of the Mitigating Systems Cornerstone and affects the cornerstone objective to ensure the availability, reliability and capability of systems that respond to initiating events to prevent undesirable consequences, and is therefore a finding. Using the Manual Chapter 0609, Appendix G, Shutdown Operations Significance Determination Process, Phase 1 guidance, the finding is determined to have very low safety significance because the finding did not result in an increase in the likelihood of a loss of reactor coolant system inventory, degrade the ability to add reactor coolant system inventory, or degrade the ability to recover decay heat removal. Since the lack of questioning attitude that contributed to an overreliance on the specifications occurred in 2005, and Procurement Specification Training was conducted in 2008 to close an identified gap in specification review and implementation, the inspectors determined that this was not reflective of current performance and therefore did not have a crosscutting aspect associated with it. |
Site: | San Onofre |
---|---|
Report | IR 05000361/2010003 Section 4OA3 |
Date counted | Jun 30, 2010 (2010Q2) |
Type: | NCV: Green |
cornerstone | Mitigating Systems |
Identified by: | Self-revealing |
Inspection Procedure: | IP 71153 |
Inspectors (proximate) | R Lantz P Elkmann J Reynoso G Warnick E Ruesch I Anchondo T Buchanan |
INPO aspect | |
' | |
Finding - San Onofre - IR 05000361/2010003 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Finding List (San Onofre) @ 2010Q2
Self-Identified List (San Onofre)
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||