Title | Failure to Correct Problems with Emergency Diesel Generator Train B |
Description | The inspectors identified a noncited violation of 10 CFR Part 50, Appendix B, Criterion XVI, Corrective Action, for the licensee\'s failure to take adequate corrective actions for conditions adverse to quality associated with Unit 3 emergency diesel generator train B. Specifically, in May 2009, corrective actions were inadequate following an unexpected fuse failure in the emergency diesel generator train B annunciator system. These inadequate corrective actions enabled the pre-existing ground condition to continue until it ultimately rendered the emergency diesel generator train B inoperable on December 11, 2009. This finding was entered into the licensees corrective action program as Nuclear Notification NN 200722170. The finding is greater than minor because the failure to correct conditions adverse to quality for the emergency diesel generators is associated with the equipment performance attribute of the Mitigating Systems Cornerstone and affects the associated cornerstone objective to ensure the availability, reliability, and capability of systems that respond to initiating events to prevent undesirable consequences. Using the Manual Chapter 0609, Significance Determination Process, Phase 1 Worksheets, the finding is determined to have very low safety significance because it did not represent an actual loss of safety function, and did not screen as potentially risk significant due to a seismic, flooding, or severe weather initiating event. This finding has a crosscutting aspect in the area of problem identification and resolution associated with corrective action program since the licensee failed to thoroughly evaluate problems such that the resolutions address the causes and extent of conditions P.1(c) (Section 1R12) |
Site: | San Onofre |
---|---|
Report | IR 05000361/2009005 Section 1R12 |
Date counted | Dec 31, 2009 (2009Q4) |
Type: | NCV: Green |
cornerstone | Mitigating Systems |
Identified by: | NRC identified |
Inspection Procedure: | IP 71111.12 |
Inspectors (proximate) | L Ricketson G Guerra R Lantz P Elkmann J Adams J Reynoso G Warnick C Osterholtz A Fairbanks M Bloodgood R Schmitt |
CCA | P.2, Evaluation |
INPO aspect | PI.2 |
' | |