Category:LICENSEE EVENT REPORT (SEE ALSO AO RO)
MONTHYEAR05000324/LER-1999-008-02, :on 990920,condenser Pressure Sensing Line Drain Activities Resulted in ESF & RPS Actuation.Caused by Inadequate Implementation of C/A to Previously Identified Condition.Procedures Were Revised.With1999-10-20020 October 1999
- on 990920,condenser Pressure Sensing Line Drain Activities Resulted in ESF & RPS Actuation.Caused by Inadequate Implementation of C/A to Previously Identified Condition.Procedures Were Revised.With
05000325/LER-1999-008, :on 990809,electric Motor Driven & Diesel Driven Fire Pump Concurrent Inoperability Occurred.Caused by Human Performance Error.Diesel Fire Pump Jacket Water Temp Switch Replaced.With1999-10-0101 October 1999
- on 990809,electric Motor Driven & Diesel Driven Fire Pump Concurrent Inoperability Occurred.Caused by Human Performance Error.Diesel Fire Pump Jacket Water Temp Switch Replaced.With
05000325/LER-1999-007-01, :on 990731,CB Emergency Air Filtration Sys Actuation During Chlorine Car Replacement Was Noted.Caused by Small Amount of Residual Chlorine Gas Which Escaped. Evaluated to Determine Enhancements Needed.With1999-08-30030 August 1999
- on 990731,CB Emergency Air Filtration Sys Actuation During Chlorine Car Replacement Was Noted.Caused by Small Amount of Residual Chlorine Gas Which Escaped. Evaluated to Determine Enhancements Needed.With
05000324/LER-1999-007, :on 990714,noted That Overlapping of Safety Systems Outages Resulted in TS Prohibited Operation.Caused by Inadequate Training/Communications Re Implementation of Its.Training Will Be Provided to Operators.With1999-08-13013 August 1999
- on 990714,noted That Overlapping of Safety Systems Outages Resulted in TS Prohibited Operation.Caused by Inadequate Training/Communications Re Implementation of Its.Training Will Be Provided to Operators.With
05000324/LER-1999-006-02, :on 990628,automatic Reactor SD Occurred.Caused by Condenser Low Vacuum Main Turbine Trip.Reviewed Operational Guidance & Development of Operational Strategy CWIP Trips.With1999-07-28028 July 1999
- on 990628,automatic Reactor SD Occurred.Caused by Condenser Low Vacuum Main Turbine Trip.Reviewed Operational Guidance & Development of Operational Strategy CWIP Trips.With
05000324/LER-1999-005-02, :on 990511,determined That as-found Lift Settings for Two SRVs Exceeded TS Setpoint Limits.Cause Indeterminate.Srv Pilot Valve Assemblies Were Replaced with Certified Spares Prior to Startup of Plant.With1999-06-0707 June 1999
- on 990511,determined That as-found Lift Settings for Two SRVs Exceeded TS Setpoint Limits.Cause Indeterminate.Srv Pilot Valve Assemblies Were Replaced with Certified Spares Prior to Startup of Plant.With
05000324/LER-1999-004-02, :on 990502,noted That Reactor Recirculation Sys Pump Discharge Bypass Valve 2-B32-F032B Was Inoperable. Caused by Valve Internal Component Tolerances & Missing Wedge Spring.Subject Valve Was Rebuilt.With1999-06-0101 June 1999
- on 990502,noted That Reactor Recirculation Sys Pump Discharge Bypass Valve 2-B32-F032B Was Inoperable. Caused by Valve Internal Component Tolerances & Missing Wedge Spring.Subject Valve Was Rebuilt.With
05000325/LER-1999-006, :on 990423,operation Prohibited by TS Was Noted Due to Missed Srs.Caused by Ineffective Change Mgt During Procedure Development.Revised Procedure OPT-01.14b.With1999-05-24024 May 1999
- on 990423,operation Prohibited by TS Was Noted Due to Missed Srs.Caused by Ineffective Change Mgt During Procedure Development.Revised Procedure OPT-01.14b.With
05000324/LER-1999-003-02, :on 990418,inadequate Augmented Inservice Weld Insps Were Noted.Caused by Incorrect Assumptions by Personnel.Inspected Affected Weld During Current Unit 2 Ro. with1999-05-18018 May 1999
- on 990418,inadequate Augmented Inservice Weld Insps Were Noted.Caused by Incorrect Assumptions by Personnel.Inspected Affected Weld During Current Unit 2 Ro. with
05000325/LER-1999-005-01, :on 990408,CR Emergency Ventilation Sys Surveillance Inadequacy Was Noted.Caused by Human Performance Error.Revised Surveillance Procedure & Tested Standby Train Time Delay Start Function.With1999-05-10010 May 1999
- on 990408,CR Emergency Ventilation Sys Surveillance Inadequacy Was Noted.Caused by Human Performance Error.Revised Surveillance Procedure & Tested Standby Train Time Delay Start Function.With
05000324/LER-1999-002-02, :on 990329,reactor Tripped.Caused by Failed Electrical Connections on Vibration Detector for Number 9 Main Turbine Bearing.Vibration Detectors for Main Turbine Number 9 Bearing Replaced.With1999-04-28028 April 1999
- on 990329,reactor Tripped.Caused by Failed Electrical Connections on Vibration Detector for Number 9 Main Turbine Bearing.Vibration Detectors for Main Turbine Number 9 Bearing Replaced.With
05000325/LER-1999-004-01, On 990325,drywell Pressure Instrumentation Sensing Line Deficiency,Was Determined.Caused by Incorrect Design & Installation of Instrument Sensing Lines.Associated Sensing Lines Were Purged.With1999-04-26026 April 1999 On 990325,drywell Pressure Instrumentation Sensing Line Deficiency,Was Determined.Caused by Incorrect Design & Installation of Instrument Sensing Lines.Associated Sensing Lines Were Purged.With 05000324/LER-1999-001-02, :on 990317,RCIC Sys Declared Inoperable.Caused by Inadequate Packing Compression on live-load Packing.Valve 2-E51-F008 Repacked & Tested in Accordance with Plant Procedures.With1999-04-16016 April 1999
- on 990317,RCIC Sys Declared Inoperable.Caused by Inadequate Packing Compression on live-load Packing.Valve 2-E51-F008 Repacked & Tested in Accordance with Plant Procedures.With
05000325/LER-1999-003-01, :on 970724,chlorinator Flange Leak Resulted in Cb Emergency Air Filtration Sys Actuation.Caused by Inadequately Manufactured Gas Inlet Line Spool Piece. Chlorinator Flange Inlet Line Spool Piece 2 Was Replaced1999-03-10010 March 1999
- on 970724,chlorinator Flange Leak Resulted in Cb Emergency Air Filtration Sys Actuation.Caused by Inadequately Manufactured Gas Inlet Line Spool Piece. Chlorinator Flange Inlet Line Spool Piece 2 Was Replaced
05000324/LER-1998-004-03, :on 981216,HPCI Sys Was Rendered Inoperable to Support Scheduled Maint Activity.Caused by Deficiencies in Scheduling & Planning of 2-E41-F079 Valve Work Activity. Personnel Have Been Briefed on Event.With1999-01-15015 January 1999
- on 981216,HPCI Sys Was Rendered Inoperable to Support Scheduled Maint Activity.Caused by Deficiencies in Scheduling & Planning of 2-E41-F079 Valve Work Activity. Personnel Have Been Briefed on Event.With
05000324/LER-1998-005-02, :on 981123,chlorine Leak Results in CREVS & Suspended Fire Watches,Occurred.Caused by through-wall Perforation in Cast steel/neoprene-lined Piping T Section. Event Review Team Formed to Investigate.With1998-12-22022 December 1998
- on 981123,chlorine Leak Results in CREVS & Suspended Fire Watches,Occurred.Caused by through-wall Perforation in Cast steel/neoprene-lined Piping T Section. Event Review Team Formed to Investigate.With
BSEP-98-0228, :on 980708,excessive Feedwater Temperature Reduction as Result of Loss of Stator Cooling Water with Main Turbine,Was Determined.Caused by Failure to Analyze Worst Case Lfwh Transient.Databank Updated.With1998-12-0404 December 1998
- on 980708,excessive Feedwater Temperature Reduction as Result of Loss of Stator Cooling Water with Main Turbine,Was Determined.Caused by Failure to Analyze Worst Case Lfwh Transient.Databank Updated.With
05000324/LER-1998-002-01, :on 980708,excessive FW Temp Reduction Was Noted as Result of Loss of Stator Cw with Main Turbine. Caused by Failure to Analyze Worst Case Lfwh Transient. Process Computer Databank Was Updated.With1998-12-0404 December 1998
- on 980708,excessive FW Temp Reduction Was Noted as Result of Loss of Stator Cw with Main Turbine. Caused by Failure to Analyze Worst Case Lfwh Transient. Process Computer Databank Was Updated.With
05000324/LER-1998-003-03, :on 980829,MSIV Closures Were Noted.Caused by Procedure Deficiency.Reviewed Lessons Learned from Occurrence with Operations Personnel & Revised Affected Operating Procedures1998-09-28028 September 1998
- on 980829,MSIV Closures Were Noted.Caused by Procedure Deficiency.Reviewed Lessons Learned from Occurrence with Operations Personnel & Revised Affected Operating Procedures
05000325/LER-1998-006-01, :on 980815,ESF Actuations Due to Main Stack Wide Range Gas Monitor Failure Was Noted.Caused by end-of- Life Failure of Low Range Detector.Vendor Tested Components Removed from Wrgm.With1998-09-14014 September 1998
- on 980815,ESF Actuations Due to Main Stack Wide Range Gas Monitor Failure Was Noted.Caused by end-of- Life Failure of Low Range Detector.Vendor Tested Components Removed from Wrgm.With
05000324/LER-1998-002-03, :on 980708,excessive FW Temp Reduction as Result of Loss of Stator Cw W/Main Turbine Runback Was Noted.Caused by Failure to Analyze at Time of Plant Design. Established Control to Limit Max Average Planar Ratio Limit1998-08-0707 August 1998
- on 980708,excessive FW Temp Reduction as Result of Loss of Stator Cw W/Main Turbine Runback Was Noted.Caused by Failure to Analyze at Time of Plant Design. Established Control to Limit Max Average Planar Ratio Limit
05000325/LER-1998-004-01, :on 980627,determined That Testing Performed on SBGT Systems Had Not Satisfied air-aerosol Mixing Uniformity Test Per Reg Guide 1.52,Rev 1.Caused by Misinterpretation of Procedure.Completed Test & Revised Procedures1998-07-27027 July 1998
- on 980627,determined That Testing Performed on SBGT Systems Had Not Satisfied air-aerosol Mixing Uniformity Test Per Reg Guide 1.52,Rev 1.Caused by Misinterpretation of Procedure.Completed Test & Revised Procedures
05000324/LER-1998-001-03, :on 980610,reactor Core Isolation Cooling Sys Isolation Instrumentation Setpoint Shift,Was Determined. Caused by Failure to Establish Comprehensive Actions. Affected Pressure Switch Setpoints Calibrated1998-07-10010 July 1998
- on 980610,reactor Core Isolation Cooling Sys Isolation Instrumentation Setpoint Shift,Was Determined. Caused by Failure to Establish Comprehensive Actions. Affected Pressure Switch Setpoints Calibrated
05000325/LER-1998-003-02, :on 980515,identified That Four of Eleven SRVs Exceeded TS Setpoint Limits.Cause of Setpoint Drift Being Evaluated.Srv Pilot Valve Assemblies Replaced W/Certified Spares Prior to Startup of Unit 11998-06-15015 June 1998
- on 980515,identified That Four of Eleven SRVs Exceeded TS Setpoint Limits.Cause of Setpoint Drift Being Evaluated.Srv Pilot Valve Assemblies Replaced W/Certified Spares Prior to Startup of Unit 1
05000325/LER-1998-002-01, :on 980426,operation Prohibited by Tech Spec 3.0.4 Occurred.Caused by Human Error.Senior Reactor Operator Responsible for Evolution Counseled1998-06-0909 June 1998
- on 980426,operation Prohibited by Tech Spec 3.0.4 Occurred.Caused by Human Error.Senior Reactor Operator Responsible for Evolution Counseled
05000325/LER-1997-003-01, ,Re List of Equipment for Which Response Time Testing Was Not Performed within Time Allowed by Ts.Ler 97-003-01 Retracted1998-05-21021 May 1998 ,Re List of Equipment for Which Response Time Testing Was Not Performed within Time Allowed by Ts.Ler 97-003-01 Retracted 05000325/LER-1998-001-02, :on 980416,RB Roof Vent Ng Activity Monitor Surveillance Deficiency Was Noted.Caused by Procedure Deficiency.Counseled Individuals Responsible for Development of Defective Procedure1998-05-15015 May 1998
- on 980416,RB Roof Vent Ng Activity Monitor Surveillance Deficiency Was Noted.Caused by Procedure Deficiency.Counseled Individuals Responsible for Development of Defective Procedure
05000324/LER-1997-004, :on 971003,results Identified That Five of Eleven Valves Were Found to Lift at Pressures Outside TS Limits.Caused by Oxide Accumulation on Pilot Disc Seat. Replaced SRV Pilot Valve Assemblies1998-05-11011 May 1998
- on 971003,results Identified That Five of Eleven Valves Were Found to Lift at Pressures Outside TS Limits.Caused by Oxide Accumulation on Pilot Disc Seat. Replaced SRV Pilot Valve Assemblies
05000325/LER-1997-010, :on 970919,failure to Comply W/Sr to Test EDG During Shutdown Was Noted.Caused by Personnel Error. Established Controls Necessary to Ensure That Procedures Used to Satisfy TSs Are Performed1998-04-0101 April 1998
- on 970919,failure to Comply W/Sr to Test EDG During Shutdown Was Noted.Caused by Personnel Error. Established Controls Necessary to Ensure That Procedures Used to Satisfy TSs Are Performed
05000325/LER-1997-003, :on 970321,personnel Determined That Testing Was Not Being Performed IAW Ts.Caused by Failure on Part of Personnel Reviewing Response Time Testing Requirements.Ts Rtt Requirements Were Issued by NRC on 9704181998-04-0101 April 1998
- on 970321,personnel Determined That Testing Was Not Being Performed IAW Ts.Caused by Failure on Part of Personnel Reviewing Response Time Testing Requirements.Ts Rtt Requirements Were Issued by NRC on 970418
05000324/LER-1997-004-02, :on 971003,safety Relief Valves Exceeded TS Setpoint Limits,Was Identified.Caused by Formation of Oxide Bond Between Pilot Seat & Disc.Valves Will Be Disassembled & Inspected During First Quarter 19981997-11-0303 November 1997
- on 971003,safety Relief Valves Exceeded TS Setpoint Limits,Was Identified.Caused by Formation of Oxide Bond Between Pilot Seat & Disc.Valves Will Be Disassembled & Inspected During First Quarter 1998
05000325/LER-1997-013-01, :on 971003,reactor Core Isolation Cooling Sys Surveillance Procedure Inadequacy Was Identified.Caused by Personnel Error.Procedure 1MST-RCIC23Q Was Revised to Ensure That LSFT Overlap Was Restored1997-11-0303 November 1997
- on 971003,reactor Core Isolation Cooling Sys Surveillance Procedure Inadequacy Was Identified.Caused by Personnel Error.Procedure 1MST-RCIC23Q Was Revised to Ensure That LSFT Overlap Was Restored
05000325/LER-1997-010-02, :on 970919,discovered Failure to Comply W/ Surveillance Requirements to Test EDGs During Shutdown. Caused by Personnel Error.Review of TSs Will Be Performed to Identify Surveillances Required to Be Performed1997-10-22022 October 1997
- on 970919,discovered Failure to Comply W/ Surveillance Requirements to Test EDGs During Shutdown. Caused by Personnel Error.Review of TSs Will Be Performed to Identify Surveillances Required to Be Performed
05000325/LER-1997-011-01, :on 970912,identified Unanalyzed Pressure Suppression Flow Due to Simultaneous Drywell & Suppression of Chamber Valve Lineups.Caused by Insufficient Detailed Documentation.Completed Revs to Operating Procedures1997-10-13013 October 1997
- on 970912,identified Unanalyzed Pressure Suppression Flow Due to Simultaneous Drywell & Suppression of Chamber Valve Lineups.Caused by Insufficient Detailed Documentation.Completed Revs to Operating Procedures
05000324/LER-1997-003-03, :on 970908,HPCI Declared Inoperable.Caused by Incorrect Evaluation of Procedure Requirements.Temporary Air Piping Removed & HPCI Sys Operability Restored1997-10-0808 October 1997
- on 970908,HPCI Declared Inoperable.Caused by Incorrect Evaluation of Procedure Requirements.Temporary Air Piping Removed & HPCI Sys Operability Restored
05000325/LER-1997-012-01, :on 970908,SBGTS FPS Deluge Valve Surveillance Interval Exceeded.Caused by Inadequate Procedure Revs. Definition of Testable Valves Developed1997-10-0808 October 1997
- on 970908,SBGTS FPS Deluge Valve Surveillance Interval Exceeded.Caused by Inadequate Procedure Revs. Definition of Testable Valves Developed
05000325/LER-1997-008-02, :on 970819,identified That Main Stack Radiation Monitor Surveillance Interval Exceeded.Caused by Inadequate Reviews of UFSAR Change.Administrative Action Taken W/ Personnel Responsible1997-09-18018 September 1997
- on 970819,identified That Main Stack Radiation Monitor Surveillance Interval Exceeded.Caused by Inadequate Reviews of UFSAR Change.Administrative Action Taken W/ Personnel Responsible
05000324/LER-1997-002-03, :on 970724,core Spray Sys Minimum Bypass Flow MOV Declared Inoperable.Caused by non-conservative Calculated Motor Torque.Valve 2-E21-F031B & 2B Loop of CS Was Returned to Operability1997-08-25025 August 1997
- on 970724,core Spray Sys Minimum Bypass Flow MOV Declared Inoperable.Caused by non-conservative Calculated Motor Torque.Valve 2-E21-F031B & 2B Loop of CS Was Returned to Operability
05000325/LER-1997-009-02, :on 970714,missed Increased Frequency IST Requirement Was Discovered.Caused by Failure of IST Program. Enhancements to IST Program Procedures & Review of Recently Completed IST Surveillance Tests1997-08-13013 August 1997
- on 970714,missed Increased Frequency IST Requirement Was Discovered.Caused by Failure of IST Program. Enhancements to IST Program Procedures & Review of Recently Completed IST Surveillance Tests
05000324/LER-1997-001-03, :on 970627,containment Atmospheric Control Monitor Was Inoperable Due to Thermoelectric Cooler Failure. Replaced Thermoelectric Coolers W/Improved Seal Design1997-07-28028 July 1997
- on 970627,containment Atmospheric Control Monitor Was Inoperable Due to Thermoelectric Cooler Failure. Replaced Thermoelectric Coolers W/Improved Seal Design
05000325/LER-1997-004-01, :on 970506,determined That Spent Fuel Shipping Cask Handling Activities Conducted Outside Design Bases. Caused by Misunderstanding of Vendor Procedures.Site Procedures Placed on Administrative Hold1997-06-0505 June 1997
- on 970506,determined That Spent Fuel Shipping Cask Handling Activities Conducted Outside Design Bases. Caused by Misunderstanding of Vendor Procedures.Site Procedures Placed on Administrative Hold
05000325/LER-1997-005-01, :on 970402,discrepancy in Feedwater Flow Indication Was Identified.Research Into Cause for Discrepancy Is Ongoing.Evaluation in Progress to Establish Proper FW Flow1997-05-0202 May 1997
- on 970402,discrepancy in Feedwater Flow Indication Was Identified.Research Into Cause for Discrepancy Is Ongoing.Evaluation in Progress to Establish Proper FW Flow
05000325/LER-1997-003-02, :on 970321,response Time Test Elimination Occurred.Caused by Personnel Error.Procedure Changes Required to Implement TS Amend Will Be Completed1997-04-21021 April 1997
- on 970321,response Time Test Elimination Occurred.Caused by Personnel Error.Procedure Changes Required to Implement TS Amend Will Be Completed
05000325/LER-1997-002-02, :on 970313,Unit 2 Spray Nozzle Differential Pressure Switch Observed & Questioned.Caused by bi-stable Condition Where Voiding of in-vessel Core Spray Piping Triggered.Setpoint Changed1997-04-14014 April 1997
- on 970313,Unit 2 Spray Nozzle Differential Pressure Switch Observed & Questioned.Caused by bi-stable Condition Where Voiding of in-vessel Core Spray Piping Triggered.Setpoint Changed
05000325/LER-1997-001-02, :on 970129,rod Block Monitor Surveillance Inadequacy Discovered.Caused by Inadequate Administrative Review of Reformatting Changes Affecting Procedure Step Refs.Temporary Procedure Revised1997-02-27027 February 1997
- on 970129,rod Block Monitor Surveillance Inadequacy Discovered.Caused by Inadequate Administrative Review of Reformatting Changes Affecting Procedure Step Refs.Temporary Procedure Revised
05000324/LER-1996-003, :on 960317,units Declared Inoperable & Reactor Shutdown of Units Initiated.Caused by Corrosion Induced by Galvanic Coupling of Retainer Bolting.Corroded Bolting Replaced1997-02-18018 February 1997
- on 960317,units Declared Inoperable & Reactor Shutdown of Units Initiated.Caused by Corrosion Induced by Galvanic Coupling of Retainer Bolting.Corroded Bolting Replaced
05000325/LER-1996-017-01, :on 961213,invalid Loss of Coolant Accident Logic Actuation Occurred.Caused by Personnel Error.Briefed Maint I&C Technicians on Event Prior to Further Field Work & Provided Mgt Expectations to Personnel1997-01-10010 January 1997
- on 961213,invalid Loss of Coolant Accident Logic Actuation Occurred.Caused by Personnel Error.Briefed Maint I&C Technicians on Event Prior to Further Field Work & Provided Mgt Expectations to Personnel
05000325/LER-1996-007, :on 960609,high Pressure Coolant Injection Sys Declared Inoperable Due to Steam Supply Valve Packing Leak. Refurbished Valve & Corrected Off Center Condition1996-12-13013 December 1996
- on 960609,high Pressure Coolant Injection Sys Declared Inoperable Due to Steam Supply Valve Packing Leak. Refurbished Valve & Corrected Off Center Condition
05000325/LER-1996-015, :on 961019,determined Suppression Chamber Water Level Operating Range of -27 to -31 Inches Required by TS 3.6.2.1 Was Not Equivalent to Water Vols.Caused by Inadequate Calculations.Controls Established1996-12-11011 December 1996
- on 961019,determined Suppression Chamber Water Level Operating Range of -27 to -31 Inches Required by TS 3.6.2.1 Was Not Equivalent to Water Vols.Caused by Inadequate Calculations.Controls Established
05000325/LER-1996-013-01, :on 961031,safety Relief Valves Tested at Wyle Labs Exceeded TS Setpoint Limits.Caused by Oxygen Induced Pilot disc-to-seat Bonding.Srv Pilot Valve Assemblies Were Replaced W/Certified Spares1996-11-18018 November 1996
- on 961031,safety Relief Valves Tested at Wyle Labs Exceeded TS Setpoint Limits.Caused by Oxygen Induced Pilot disc-to-seat Bonding.Srv Pilot Valve Assemblies Were Replaced W/Certified Spares
1999-08-30
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20217N3271999-10-21021 October 1999 Part 21 Rept Re non-linear Oxygen Readings with Two (2) Model 225 CMA-X Containment Monitoring Sys at Bsep.Caused by High Gain Produced by 10K Resistor Across Second Stage Amplifier.Engineering Drawings Will Be Revised 05000324/LER-1999-008-02, :on 990920,condenser Pressure Sensing Line Drain Activities Resulted in ESF & RPS Actuation.Caused by Inadequate Implementation of C/A to Previously Identified Condition.Procedures Were Revised.With1999-10-20020 October 1999
- on 990920,condenser Pressure Sensing Line Drain Activities Resulted in ESF & RPS Actuation.Caused by Inadequate Implementation of C/A to Previously Identified Condition.Procedures Were Revised.With
ML20217D7371999-10-0505 October 1999 Safety Evaluation Supporting Amends 206 & 236 to Licenses DPR-71 & DPR-62,respectively 05000325/LER-1999-008, :on 990809,electric Motor Driven & Diesel Driven Fire Pump Concurrent Inoperability Occurred.Caused by Human Performance Error.Diesel Fire Pump Jacket Water Temp Switch Replaced.With1999-10-0101 October 1999
- on 990809,electric Motor Driven & Diesel Driven Fire Pump Concurrent Inoperability Occurred.Caused by Human Performance Error.Diesel Fire Pump Jacket Water Temp Switch Replaced.With
BSEP-99-0168, Monthly Operating Repts for Sept 1999 for Bsep,Units 1 & 2. with1999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Bsep,Units 1 & 2. with ML20212D0431999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Brunswick Steam Electric Plant,Units 1 & 2 05000325/LER-1999-007-01, :on 990731,CB Emergency Air Filtration Sys Actuation During Chlorine Car Replacement Was Noted.Caused by Small Amount of Residual Chlorine Gas Which Escaped. Evaluated to Determine Enhancements Needed.With1999-08-30030 August 1999
- on 990731,CB Emergency Air Filtration Sys Actuation During Chlorine Car Replacement Was Noted.Caused by Small Amount of Residual Chlorine Gas Which Escaped. Evaluated to Determine Enhancements Needed.With
05000324/LER-1999-007, :on 990714,noted That Overlapping of Safety Systems Outages Resulted in TS Prohibited Operation.Caused by Inadequate Training/Communications Re Implementation of Its.Training Will Be Provided to Operators.With1999-08-13013 August 1999
- on 990714,noted That Overlapping of Safety Systems Outages Resulted in TS Prohibited Operation.Caused by Inadequate Training/Communications Re Implementation of Its.Training Will Be Provided to Operators.With
ML20210P9181999-08-10010 August 1999 Safety Evaluation Authorizing Request for Reliefs CIP-01,02, 06,07,08,09,10 & 11 (with Certain Exceptions) & 12-18,for Second 10-year ISI Interval.Request CIP-04 & 05 Would Result in hardship,CIP-03 Not Required & CIP-11 Denied in Part ML20210P9441999-08-10010 August 1999 Safety Evaluation Accepting Licensee Assessment of Impact on Operation of Plant,Unit 1,with Crack Indications of 2.11, 6.36 & 1.74 Inches in Three Separate Jet Pump Risers ML20210N2341999-08-0505 August 1999 SER Accepting Response to NRC GL 87-02, Verification of Seismic Adequacy of Mechanical & Electrical Equipment in Operating Reactors,Unresolved Safety Issues (USI) A-46 ML20210R1191999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Bsep,Units 1 & 2 05000324/LER-1999-006-02, :on 990628,automatic Reactor SD Occurred.Caused by Condenser Low Vacuum Main Turbine Trip.Reviewed Operational Guidance & Development of Operational Strategy CWIP Trips.With1999-07-28028 July 1999
- on 990628,automatic Reactor SD Occurred.Caused by Condenser Low Vacuum Main Turbine Trip.Reviewed Operational Guidance & Development of Operational Strategy CWIP Trips.With
ML20210R1311999-06-30030 June 1999 Revised Monthly Operating Rept for June 1999 for Bsep,Unit 2 BSEP-99-0118, Monthly Operating Repts for June 1999 for Bsep,Units 1 & 2. with1999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Bsep,Units 1 & 2. with 05000324/LER-1999-005-02, :on 990511,determined That as-found Lift Settings for Two SRVs Exceeded TS Setpoint Limits.Cause Indeterminate.Srv Pilot Valve Assemblies Were Replaced with Certified Spares Prior to Startup of Plant.With1999-06-0707 June 1999
- on 990511,determined That as-found Lift Settings for Two SRVs Exceeded TS Setpoint Limits.Cause Indeterminate.Srv Pilot Valve Assemblies Were Replaced with Certified Spares Prior to Startup of Plant.With
05000324/LER-1999-004-02, :on 990502,noted That Reactor Recirculation Sys Pump Discharge Bypass Valve 2-B32-F032B Was Inoperable. Caused by Valve Internal Component Tolerances & Missing Wedge Spring.Subject Valve Was Rebuilt.With1999-06-0101 June 1999
- on 990502,noted That Reactor Recirculation Sys Pump Discharge Bypass Valve 2-B32-F032B Was Inoperable. Caused by Valve Internal Component Tolerances & Missing Wedge Spring.Subject Valve Was Rebuilt.With
BSEP-99-0095, Monthly Operating Repts for May 1999 for Brunswick Steam Electric Plant,Units 1 & 2.With1999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Brunswick Steam Electric Plant,Units 1 & 2.With 05000325/LER-1999-006, :on 990423,operation Prohibited by TS Was Noted Due to Missed Srs.Caused by Ineffective Change Mgt During Procedure Development.Revised Procedure OPT-01.14b.With1999-05-24024 May 1999
- on 990423,operation Prohibited by TS Was Noted Due to Missed Srs.Caused by Ineffective Change Mgt During Procedure Development.Revised Procedure OPT-01.14b.With
05000324/LER-1999-003-02, :on 990418,inadequate Augmented Inservice Weld Insps Were Noted.Caused by Incorrect Assumptions by Personnel.Inspected Affected Weld During Current Unit 2 Ro. with1999-05-18018 May 1999
- on 990418,inadequate Augmented Inservice Weld Insps Were Noted.Caused by Incorrect Assumptions by Personnel.Inspected Affected Weld During Current Unit 2 Ro. with
ML20210M8581999-05-14014 May 1999 B214R1 RPV Hydrotest Bolted Connection Corrective Action Evaluation, Rev 0 05000325/LER-1999-005-01, :on 990408,CR Emergency Ventilation Sys Surveillance Inadequacy Was Noted.Caused by Human Performance Error.Revised Surveillance Procedure & Tested Standby Train Time Delay Start Function.With1999-05-10010 May 1999
- on 990408,CR Emergency Ventilation Sys Surveillance Inadequacy Was Noted.Caused by Human Performance Error.Revised Surveillance Procedure & Tested Standby Train Time Delay Start Function.With
ML20211L3711999-05-10010 May 1999 Rev 0 to ESR 98-00333, Unit 2 Invessel Feedwater Sparger Evaluation ML20206G1871999-05-0404 May 1999 Safety Evaluation Approving Third 10-year ISI Program Requests for Relief (RR) RR-08,RR-15 & RR-17 BSEP-99-0075, Monthly Operating Repts for Apr 1999 for Brunswick Steam Electric Plant,Unit 1 & 2.With1999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Brunswick Steam Electric Plant,Unit 1 & 2.With 05000324/LER-1999-002-02, :on 990329,reactor Tripped.Caused by Failed Electrical Connections on Vibration Detector for Number 9 Main Turbine Bearing.Vibration Detectors for Main Turbine Number 9 Bearing Replaced.With1999-04-28028 April 1999
- on 990329,reactor Tripped.Caused by Failed Electrical Connections on Vibration Detector for Number 9 Main Turbine Bearing.Vibration Detectors for Main Turbine Number 9 Bearing Replaced.With
05000325/LER-1999-004-01, On 990325,drywell Pressure Instrumentation Sensing Line Deficiency,Was Determined.Caused by Incorrect Design & Installation of Instrument Sensing Lines.Associated Sensing Lines Were Purged.With1999-04-26026 April 1999 On 990325,drywell Pressure Instrumentation Sensing Line Deficiency,Was Determined.Caused by Incorrect Design & Installation of Instrument Sensing Lines.Associated Sensing Lines Were Purged.With ML20206N1791999-04-23023 April 1999 Rev 0 to 2B21-0554, Brunswick Unit 2,Cycle 14 Colr 05000324/LER-1999-001-02, :on 990317,RCIC Sys Declared Inoperable.Caused by Inadequate Packing Compression on live-load Packing.Valve 2-E51-F008 Repacked & Tested in Accordance with Plant Procedures.With1999-04-16016 April 1999
- on 990317,RCIC Sys Declared Inoperable.Caused by Inadequate Packing Compression on live-load Packing.Valve 2-E51-F008 Repacked & Tested in Accordance with Plant Procedures.With
BSEP-99-0059, Monthly Operating Repts for Mar 1999 for Brunswick Steam Electric Plant,Units 1 & 2.With1999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Brunswick Steam Electric Plant,Units 1 & 2.With ML20205F9031999-03-30030 March 1999 Safety Evaluation Supporting Proposed Rev to BSEP RERP to Licenses DPR-62 & DPR-71,respectively 05000325/LER-1999-003-01, :on 970724,chlorinator Flange Leak Resulted in Cb Emergency Air Filtration Sys Actuation.Caused by Inadequately Manufactured Gas Inlet Line Spool Piece. Chlorinator Flange Inlet Line Spool Piece 2 Was Replaced1999-03-10010 March 1999
- on 970724,chlorinator Flange Leak Resulted in Cb Emergency Air Filtration Sys Actuation.Caused by Inadequately Manufactured Gas Inlet Line Spool Piece. Chlorinator Flange Inlet Line Spool Piece 2 Was Replaced
BSEP-99-0043, Monthly Operating Repts for Feb 1999 for Brunswick Steam Electric Plant,Units 1 & 2.With1999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Brunswick Steam Electric Plant,Units 1 & 2.With ML20206N1831999-02-28028 February 1999 Rev 0 to Suppl Reload Licensing Rept for Bsep,Unit 2 Reload 13 Cycle 14 ML20203D7061999-02-0909 February 1999 SER Accepting Proposed Alternatives Contained in Relief Requests PRR-04,VRR-04,VRR-13,PRR-01,PRR-03,VRR-01.VRR-07, VRR-08 & VRR-09 Denied 05000324/LER-1998-004-03, :on 981216,HPCI Sys Was Rendered Inoperable to Support Scheduled Maint Activity.Caused by Deficiencies in Scheduling & Planning of 2-E41-F079 Valve Work Activity. Personnel Have Been Briefed on Event.With1999-01-15015 January 1999
- on 981216,HPCI Sys Was Rendered Inoperable to Support Scheduled Maint Activity.Caused by Deficiencies in Scheduling & Planning of 2-E41-F079 Valve Work Activity. Personnel Have Been Briefed on Event.With
BSEP-99-0005, Monthly Operating Repts for Dec 1998 for Brunswick Steam Electric Plant,Units 1 & 2.With1998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Brunswick Steam Electric Plant,Units 1 & 2.With 05000324/LER-1998-005-02, :on 981123,chlorine Leak Results in CREVS & Suspended Fire Watches,Occurred.Caused by through-wall Perforation in Cast steel/neoprene-lined Piping T Section. Event Review Team Formed to Investigate.With1998-12-22022 December 1998
- on 981123,chlorine Leak Results in CREVS & Suspended Fire Watches,Occurred.Caused by through-wall Perforation in Cast steel/neoprene-lined Piping T Section. Event Review Team Formed to Investigate.With
05000324/LER-1998-002-01, :on 980708,excessive FW Temp Reduction Was Noted as Result of Loss of Stator Cw with Main Turbine. Caused by Failure to Analyze Worst Case Lfwh Transient. Process Computer Databank Was Updated.With1998-12-0404 December 1998
- on 980708,excessive FW Temp Reduction Was Noted as Result of Loss of Stator Cw with Main Turbine. Caused by Failure to Analyze Worst Case Lfwh Transient. Process Computer Databank Was Updated.With
BSEP-98-0228, :on 980708,excessive Feedwater Temperature Reduction as Result of Loss of Stator Cooling Water with Main Turbine,Was Determined.Caused by Failure to Analyze Worst Case Lfwh Transient.Databank Updated.With1998-12-0404 December 1998
- on 980708,excessive Feedwater Temperature Reduction as Result of Loss of Stator Cooling Water with Main Turbine,Was Determined.Caused by Failure to Analyze Worst Case Lfwh Transient.Databank Updated.With
BSEP-98-0231, Monthly Operating Repts for Nov 1998 for Brunswick Steam Electric Plant,Units 1 & 2.With1998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Brunswick Steam Electric Plant,Units 1 & 2.With BSEP-98-0218, Monthly Operating Repts for Oct 1998 for Bsep,Units 1 & 2. with1998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Bsep,Units 1 & 2. with BSEP-98-0210, Special Rept:On 980824,temp Element 2-CAC-TE-1258-22 Failed. Cause of Failed Temp Element Cannot Be Conclusively Determined.Temp Element Will Be Replaced & Cable Connections Repaired1998-10-30030 October 1998 Special Rept:On 980824,temp Element 2-CAC-TE-1258-22 Failed. Cause of Failed Temp Element Cannot Be Conclusively Determined.Temp Element Will Be Replaced & Cable Connections Repaired ML20154P8151998-10-16016 October 1998 SER Accepting Revised Safety Analysis of Operational Transient of 920117,for Plant,Unit 1 ML20154P8591998-10-16016 October 1998 SER Accepting Equivalent Margins Analysis for N-16A/B Instrument Nozzles for Plant,Units 1 & 2 BSEP-98-0202, Monthly Operating Repts for Sept 1998 for Brunswick Steam Electric Plant,Units 1 & 2.With1998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for Brunswick Steam Electric Plant,Units 1 & 2.With 05000324/LER-1998-003-03, :on 980829,MSIV Closures Were Noted.Caused by Procedure Deficiency.Reviewed Lessons Learned from Occurrence with Operations Personnel & Revised Affected Operating Procedures1998-09-28028 September 1998
- on 980829,MSIV Closures Were Noted.Caused by Procedure Deficiency.Reviewed Lessons Learned from Occurrence with Operations Personnel & Revised Affected Operating Procedures
05000325/LER-1998-006-01, :on 980815,ESF Actuations Due to Main Stack Wide Range Gas Monitor Failure Was Noted.Caused by end-of- Life Failure of Low Range Detector.Vendor Tested Components Removed from Wrgm.With1998-09-14014 September 1998
- on 980815,ESF Actuations Due to Main Stack Wide Range Gas Monitor Failure Was Noted.Caused by end-of- Life Failure of Low Range Detector.Vendor Tested Components Removed from Wrgm.With
ML20151Y6371998-09-14014 September 1998 Changes to QA Program, for Bsep,Units 1 & 2 ML20151Y6211998-09-14014 September 1998 BSEP Rept Describing Changes,Tests & Experiments, for Bsep,Units 1 & 2 1999-09-30
[Table view] |