| 05000324/LER-1985-001, :on 850110,record File Verification of Plant Surveillance Test Scheduling & Tracking Sys Revealed Periodic Test Not Performed.Caused by Inadvertent Deletion from Data Base.Logging Program Instituted |
- on 850110,record File Verification of Plant Surveillance Test Scheduling & Tracking Sys Revealed Periodic Test Not Performed.Caused by Inadvertent Deletion from Data Base.Logging Program Instituted
| |
| 05000325/LER-1985-001, :on 850103,calibr of Reactor Vessel Shroud Level Instruments 1(2)-B21-LTM-N036-1 & N037-1,did Not Meet Design Intent.Caused by Inconsistency in Data Sheets. Instruments Properly Calibr |
- on 850103,calibr of Reactor Vessel Shroud Level Instruments 1(2)-B21-LTM-N036-1 & N037-1,did Not Meet Design Intent.Caused by Inconsistency in Data Sheets. Instruments Properly Calibr
| |
| 05000324/LER-1985-001-01, :on 850110,channel Calibr & Functional Test of Main Condenser Low Vacuum Instrumentation Discovered Not Performed within Specified Time.Caused by Deletion of Test from Data Base |
- on 850110,channel Calibr & Functional Test of Main Condenser Low Vacuum Instrumentation Discovered Not Performed within Specified Time.Caused by Deletion of Test from Data Base
| |
| 05000324/LER-1985-002-02, :on 850215,HPCI Sys Declared Inoperable Following Testing Which Revealed HPCI Pump Discharge.Valve E41-F006 Would Not Open.Caused by Pump Valve Not Functioning within Calibr Tolerances |
- on 850215,HPCI Sys Declared Inoperable Following Testing Which Revealed HPCI Pump Discharge.Valve E41-F006 Would Not Open.Caused by Pump Valve Not Functioning within Calibr Tolerances
| |
| 05000325/LER-1985-002-01, :on 850206,automatic Isolation of Common Control Bldg HVAC Sys Occurred.Caused by Spurious Actuation of Plenum Chlorine Detector 2X-AT-2977.Detector Returned to Svc After Functional Testing |
- on 850206,automatic Isolation of Common Control Bldg HVAC Sys Occurred.Caused by Spurious Actuation of Plenum Chlorine Detector 2X-AT-2977.Detector Returned to Svc After Functional Testing
| |
| 05000324/LER-1985-002, :on 850215,HPCI Sys & RHR LPCI Loop B Inoperable.Caused by Mispositioned HPCI Pump Discharge Valve E41-F006 & switch,E11-DPIS-N021B,outside Calibr Tolerances. DPIS-N021B Calibr & F006 Repositioned |
- on 850215,HPCI Sys & RHR LPCI Loop B Inoperable.Caused by Mispositioned HPCI Pump Discharge Valve E41-F006 & switch,E11-DPIS-N021B,outside Calibr Tolerances. DPIS-N021B Calibr & F006 Repositioned
| |
| 05000325/LER-1985-003-02, :on 850108,adequate Surveillance Testing Did Not Exist to Verify Operability of Degraded Voltage & Loss of Voltage Regulation Relay Circuitry.On 850110,master-slave Feeder Breakers to Bus Automatically Opened |
- on 850108,adequate Surveillance Testing Did Not Exist to Verify Operability of Degraded Voltage & Loss of Voltage Regulation Relay Circuitry.On 850110,master-slave Feeder Breakers to Bus Automatically Opened
| |
| 05000325/LER-1985-003, :on 850108,lack of Adequate Surveillance Test Procedures Discovered for Degraded Voltage & Loss of Voltage Actuation Relay Circuitry.On 850110,groups 3 & 6 Isolations Occurred Due to Loss of Emergency Bus E-1.W/undated Ltr |
- on 850108,lack of Adequate Surveillance Test Procedures Discovered for Degraded Voltage & Loss of Voltage Actuation Relay Circuitry.On 850110,groups 3 & 6 Isolations Occurred Due to Loss of Emergency Bus E-1.W/undated Ltr
| |
| 05000324/LER-1985-003-03, :on 850310,unexpected Primary Containment Group 1 Isolation Occurred During Response Time Testing of Main Turbine Stop Valves.Periodic Test PT-45.1.6-2 & Corresponding Response Time Test Revised |
- on 850310,unexpected Primary Containment Group 1 Isolation Occurred During Response Time Testing of Main Turbine Stop Valves.Periodic Test PT-45.1.6-2 & Corresponding Response Time Test Revised
| |
| 05000325/LER-1985-004, :on 850110,reactor Water Cleanup Sys Inlet Primary Containment Inboard Isolation Valve 1-G31-F001 Automatically Closed Due to Group 3 Primary Containment Isolation a Subsystem Trip |
- on 850110,reactor Water Cleanup Sys Inlet Primary Containment Inboard Isolation Valve 1-G31-F001 Automatically Closed Due to Group 3 Primary Containment Isolation a Subsystem Trip
| |
| 05000324/LER-1985-005-03, :on 850904,reactor Scram Manually Initiated Due to Multiple Control Rod Drift Indications Resulting from Inadvertent Isolation of Air Supply to Control Rod Scram Air Header.Caused by Personnel Error |
- on 850904,reactor Scram Manually Initiated Due to Multiple Control Rod Drift Indications Resulting from Inadvertent Isolation of Air Supply to Control Rod Scram Air Header.Caused by Personnel Error
| |
| 05000325/LER-1985-005-01, :on 850212,required Channel Functional Testing of Rod Block Monitors (RBM) Found Inadequate.Caused by Inadequate Plant Procedures.Rev Made to RBM Periodic Test 01.5.1.RBM Downscale Trip Function Tested |
- on 850212,required Channel Functional Testing of Rod Block Monitors (RBM) Found Inadequate.Caused by Inadequate Plant Procedures.Rev Made to RBM Periodic Test 01.5.1.RBM Downscale Trip Function Tested
| |
| 05000324/LER-1985-006-02, :on 850906,HPCI Rendered Inoperable Due to auto-closing of Sys Primary Containment Inboard Isolation Valve E41-F002.Caused by Alligator Clip from Test Equipment Leads Slipping Off Terminal Screw |
- on 850906,HPCI Rendered Inoperable Due to auto-closing of Sys Primary Containment Inboard Isolation Valve E41-F002.Caused by Alligator Clip from Test Equipment Leads Slipping Off Terminal Screw
| |
| 05000325/LER-1985-006, :on 850111,automatic Isolation of Units 1 & 2 Common Control Bldg HVAC Sys Occurred.Caused by Increased Sensitivity of Detector 1X Due to Lack of Electrolyte. Detector Cleaned |
- on 850111,automatic Isolation of Units 1 & 2 Common Control Bldg HVAC Sys Occurred.Caused by Increased Sensitivity of Detector 1X Due to Lack of Electrolyte. Detector Cleaned
| |
| 05000324/LER-1985-007-02, :on 850409,reactor Water Cleanup Sys Inlet Primary Containment Inboard & Outboard Isolation Valves 2-G31-F001 & F004 Closed on Primary Containment Group 3 Isolation Signal |
- on 850409,reactor Water Cleanup Sys Inlet Primary Containment Inboard & Outboard Isolation Valves 2-G31-F001 & F004 Closed on Primary Containment Group 3 Isolation Signal
| |
| 05000324/LER-1985-008-01, :on 850927,MSIVs F028A,F022C & F028C Did Not Fast Close During Surveillance Testing.Caused by disc-to- Seat Sticking of Valve Operator Double Solenoid Valves. Double Solenoid Valves Will Be Replaced |
- on 850927,MSIVs F028A,F022C & F028C Did Not Fast Close During Surveillance Testing.Caused by disc-to- Seat Sticking of Valve Operator Double Solenoid Valves. Double Solenoid Valves Will Be Replaced
| |
| 05000325/LER-1985-008, :on 850124,reactor Scram Automatically Occurred Due to Main Turbine Trip & Stop Valve Closure Resulting from Vacuum in Main Condenser.Caused by Demineralized Water in Offgas Filter |
- on 850124,reactor Scram Automatically Occurred Due to Main Turbine Trip & Stop Valve Closure Resulting from Vacuum in Main Condenser.Caused by Demineralized Water in Offgas Filter
| |
| 05000325/LER-1985-009, :on 850215,monthly Channel Functional Testing of Reactor Bldg Roof Ventilation Monitor Revealed Annunciator Card for Monitor Control Room Alarm Not Installed.Cause Unknown |
- on 850215,monthly Channel Functional Testing of Reactor Bldg Roof Ventilation Monitor Revealed Annunciator Card for Monitor Control Room Alarm Not Installed.Cause Unknown
| |
| 05000324/LER-1985-009-02, :on 850930,hi-hi Trip of Reactor Bldg Vent Exhaust Monitor D12-RM-N010B & Upward Spike of Redundant Monitor N010A Occurred.Caused by Crud Movement on Sys Line During Flush.Procedure to Be Revised |
- on 850930,hi-hi Trip of Reactor Bldg Vent Exhaust Monitor D12-RM-N010B & Upward Spike of Redundant Monitor N010A Occurred.Caused by Crud Movement on Sys Line During Flush.Procedure to Be Revised
| |
| 05000325/LER-1985-010-01, :on 850318,ventilation Exhaust Radiation Monitors 1(2)-D12-RM-N010A & B Inoperable.Caused by Inherent Problem in Periodic Test-04.1.1.Test Being Revised |
- on 850318,ventilation Exhaust Radiation Monitors 1(2)-D12-RM-N010A & B Inoperable.Caused by Inherent Problem in Periodic Test-04.1.1.Test Being Revised
| |
| 05000324/LER-1985-010-02, :on 851009,logic Sys Functional Test Did Not Verify Bypass of 40% Main Steam Isolation Function.Caused by Failure to Recognize Subj Testing Requirement.Function Verified on 851017.Review in Progress |
- on 851009,logic Sys Functional Test Did Not Verify Bypass of 40% Main Steam Isolation Function.Caused by Failure to Recognize Subj Testing Requirement.Function Verified on 851017.Review in Progress
| |
| 05000325/LER-1985-011-01, :on 850330,reactor Protection Sys Actuated During Refueling/Maint Outage.Caused by Monitor Circuitry Sensitivity to Cross Talk,Signal Noise & Spiking from Nearby Work.Personnel Advised of Monitor Sensitivity |
- on 850330,reactor Protection Sys Actuated During Refueling/Maint Outage.Caused by Monitor Circuitry Sensitivity to Cross Talk,Signal Noise & Spiking from Nearby Work.Personnel Advised of Monitor Sensitivity
| |
| 05000324/LER-1985-011, :on 851015,reactor Pressure Spiked & Unit Auto Scrammed on High Power When MSIV B21-FO22a Auto Closed. Caused by Failure of three-way Solenoid Valve Assembly.Valve Assembly Replaced |
- on 851015,reactor Pressure Spiked & Unit Auto Scrammed on High Power When MSIV B21-FO22a Auto Closed. Caused by Failure of three-way Solenoid Valve Assembly.Valve Assembly Replaced
| |
| 05000324/LER-1985-011-02, :on 851015,reactor Scrammed Following Closure of MSIV B21-FO22A.Caused by Dc Solenoid of three-way Valve Failing at Prior Indeterminate Time.Asco Valve Replaced |
- on 851015,reactor Scrammed Following Closure of MSIV B21-FO22A.Caused by Dc Solenoid of three-way Valve Failing at Prior Indeterminate Time.Asco Valve Replaced
| |
| 05000324/LER-1985-012-02, :on 851122,unit Scrammed & Automatic Initiation of Primary Containment Groups 2 & 6 Isolation Valves Occurred on Low Level.Possibly Caused by Real or Sensed Flow Perturbation |
- on 851122,unit Scrammed & Automatic Initiation of Primary Containment Groups 2 & 6 Isolation Valves Occurred on Low Level.Possibly Caused by Real or Sensed Flow Perturbation
| |
| 05000325/LER-1985-012, :on 850305 & 11,control Bldg Emergency Air Filtration Sys Train 2B Automatically Initiated Due to Fire Alarms.Caused by Personnel Plugging Smoke Detector in Base & Tobacco Smoke,Respectively |
- on 850305 & 11,control Bldg Emergency Air Filtration Sys Train 2B Automatically Initiated Due to Fire Alarms.Caused by Personnel Plugging Smoke Detector in Base & Tobacco Smoke,Respectively
| |
| 05000325/LER-1985-013, :on 850307 & 22,control Bldg HVAC Sys Manually Isolated Due to Receipt of High Chlorine Alarms at Chlorination Sys Storage Location.Cause Not Determined |
- on 850307 & 22,control Bldg HVAC Sys Manually Isolated Due to Receipt of High Chlorine Alarms at Chlorination Sys Storage Location.Cause Not Determined
| |
| 05000324/LER-1985-013-02, :on 851205,RWCU Sys Inlet Outboard Isolation Valve 2-G31-F004 Automatically Closed.Caused by Circuitry Fuse F18 Blowing Due to Undetectable Current Surge.Fuse Replaced & RWCU Sys Returned to Svc |
- on 851205,RWCU Sys Inlet Outboard Isolation Valve 2-G31-F004 Automatically Closed.Caused by Circuitry Fuse F18 Blowing Due to Undetectable Current Surge.Fuse Replaced & RWCU Sys Returned to Svc
| |
| 05000324/LER-1985-014-02, :on 851231 & 860101,testing of Mod to Automatic Depressurization Sys Revealed That Sys Logic Timing Relays Out of Timing.Cause Not Determined.Relays Replaced.Setpoint Drift Will Be Evaluated in Future Testing |
- on 851231 & 860101,testing of Mod to Automatic Depressurization Sys Revealed That Sys Logic Timing Relays Out of Timing.Cause Not Determined.Relays Replaced.Setpoint Drift Will Be Evaluated in Future Testing
| |
| 05000324/LER-1985-014, :on 851231 & 860101,discovered That Automatic Depressurization Sys a & B Logic Timing Relay K5A Out of Timing.Cause Undetermined.Relays Replaced |
- on 851231 & 860101,discovered That Automatic Depressurization Sys a & B Logic Timing Relay K5A Out of Timing.Cause Undetermined.Relays Replaced
| |
| 05000325/LER-1985-014, :on 850309,RCIC Sys Automatically Isolated Due to Actuation of RCIC Equipment Room Ventilation Differential High Temp Instrument 1-E51-DTS-N601A.Caused by Steam Leak on Valve 1-E51-V20.Valve Repaired |
- on 850309,RCIC Sys Automatically Isolated Due to Actuation of RCIC Equipment Room Ventilation Differential High Temp Instrument 1-E51-DTS-N601A.Caused by Steam Leak on Valve 1-E51-V20.Valve Repaired
| |
| 05000325/LER-1985-015, :on 850403,05,09,10,11,17 & 30,six Automatic & Three Manual Isolations of Units 1 & 2 Common Control Bldg (Cb) HVAC Sys Occurred.Caused by Chlorination Bldg Chlorine Alarms.No Evidence of Chlorine Leaks Found |
- on 850403,05,09,10,11,17 & 30,six Automatic & Three Manual Isolations of Units 1 & 2 Common Control Bldg (Cb) HVAC Sys Occurred.Caused by Chlorination Bldg Chlorine Alarms.No Evidence of Chlorine Leaks Found
| |
| 05000325/LER-1985-016-01, :on 850923,nonquantifiable Leakage Noted in Primary Containment Isolation Valves 6 1-E11-F020A,B, 1-E21-F001A,B & 1-E21-F031B.Caused by Faulty Seats,Jackings & Discs.Valves Repaired & Returned to Svc |
- on 850923,nonquantifiable Leakage Noted in Primary Containment Isolation Valves 6 1-E11-F020A,B, 1-E21-F001A,B & 1-E21-F031B.Caused by Faulty Seats,Jackings & Discs.Valves Repaired & Returned to Svc
| |
| 05000325/LER-1985-018, :on 850420,containment Atmosphere Control Sys Isolation Occurred.On 850426,reactor Water Cleanup Sys Inboard Primary Containment Valve Isolation Occurred |
- on 850420,containment Atmosphere Control Sys Isolation Occurred.On 850426,reactor Water Cleanup Sys Inboard Primary Containment Valve Isolation Occurred
| |
| 05000325/LER-1985-019, :on 850515,control Bldg Emergency Air Filtration Sys Train 2A Automatically Initiated.Caused by Accidental Shorting of Fire Detector by Auxiliary Operator. Work Request Initiated to Correct Detector |
- on 850515,control Bldg Emergency Air Filtration Sys Train 2A Automatically Initiated.Caused by Accidental Shorting of Fire Detector by Auxiliary Operator. Work Request Initiated to Correct Detector
| |
| 05000325/LER-1985-020, :on 850503 & 0620,problems Identified W/Logic Response Time Testing of Isolation Logic of Main Steam Line Drain Primary Containment Isolation Valves BF21-F016 & F019. Caused by Procedural Overlap |
- on 850503 & 0620,problems Identified W/Logic Response Time Testing of Isolation Logic of Main Steam Line Drain Primary Containment Isolation Valves BF21-F016 & F019. Caused by Procedural Overlap
| 10 CFR 50.73(a)(2)(i) |
| 05000325/LER-1985-021, :on 850501,02,10,14 & 16,automatic Isolations of Common Control Bldg HVAC Sys Occurred.Caused by Spurious Actuation of Sys Air Intake Detector.Reservoir Levels in Detectors Restored |
- on 850501,02,10,14 & 16,automatic Isolations of Common Control Bldg HVAC Sys Occurred.Caused by Spurious Actuation of Sys Air Intake Detector.Reservoir Levels in Detectors Restored
| |
| 05000325/LER-1985-022, :on 850502,primary Containment Group 6 & Reactor Bldg Ventilation Sys Isolated Due to Trouble Start Control Relay CR-4 Catching Fire.Caused by Relay Coil Insulation Breakdown.Relays Inspected |
- on 850502,primary Containment Group 6 & Reactor Bldg Ventilation Sys Isolated Due to Trouble Start Control Relay CR-4 Catching Fire.Caused by Relay Coil Insulation Breakdown.Relays Inspected
| |
| 05000325/LER-1985-023, :on 850502,primary Containment Group 8 Isolation of RHR Sys Shutdown Cooling Inboard Primary Containment Valve 1-E11-F009 Occurred.Caused by Spurious Interruption of Logic Circuitry |
- on 850502,primary Containment Group 8 Isolation of RHR Sys Shutdown Cooling Inboard Primary Containment Valve 1-E11-F009 Occurred.Caused by Spurious Interruption of Logic Circuitry
| |
| 05000325/LER-1985-024, :on 850621,common Control Bldg HVAC Sys Manually Isolated.Caused by Spurious Chlorine Alarm W/O Contributory Problems.Sys Returned to Normal Svc |
- on 850621,common Control Bldg HVAC Sys Manually Isolated.Caused by Spurious Chlorine Alarm W/O Contributory Problems.Sys Returned to Normal Svc
| |
| 05000325/LER-1985-025, :on 850510,routine Corporate QA Audit of Plant Periodic Test Performances Revealed That from 850128-0321, High Pressure CO2 Fire Extinguishing Sys of Units 1 & 2 Common Control Bldg Inoperable |
- on 850510,routine Corporate QA Audit of Plant Periodic Test Performances Revealed That from 850128-0321, High Pressure CO2 Fire Extinguishing Sys of Units 1 & 2 Common Control Bldg Inoperable
| |
| 05000325/LER-1985-026, :on 850718,92 Indications within Heat Affected Zones & Pinhole Leaks of Welds Revealed During Refuel/Maint Outage.Caused by IGSCC of Class 1,Type 304 Piping Matl. Weld Overlays Acceptable |
- on 850718,92 Indications within Heat Affected Zones & Pinhole Leaks of Welds Revealed During Refuel/Maint Outage.Caused by IGSCC of Class 1,Type 304 Piping Matl. Weld Overlays Acceptable
| |
| 05000325/LER-1985-027, :on 850513,emergency Diesel Generator 2 Automatically Started Due to Loss of Plant Emergency Ac Bus E-2.Caused by Actuation of Breaker Position Master Linkage. Plant Electricians Received Live Time Training |
- on 850513,emergency Diesel Generator 2 Automatically Started Due to Loss of Plant Emergency Ac Bus E-2.Caused by Actuation of Breaker Position Master Linkage. Plant Electricians Received Live Time Training
| |
| 05000325/LER-1985-028, :on 850514,design Error Determined in Standby Gas Treatment Sys Which Would Prevent Automatic Initiation Following Loss of Offsite Power.Plant Mods Will Be Implemented by 850708 |
- on 850514,design Error Determined in Standby Gas Treatment Sys Which Would Prevent Automatic Initiation Following Loss of Offsite Power.Plant Mods Will Be Implemented by 850708
| |
| 05000325/LER-1985-029, :on 850515,during Refueling Outage,Primary Containment Group 1 Isolation Occurred While MSIVs Closed. Caused by Shorting of Test Lead to Relay B21-K22,initiating Channel a Logic Trip Signal.Fuses Replaced |
- on 850515,during Refueling Outage,Primary Containment Group 1 Isolation Occurred While MSIVs Closed. Caused by Shorting of Test Lead to Relay B21-K22,initiating Channel a Logic Trip Signal.Fuses Replaced
| |
| 05000325/LER-1985-030, :on 850519,Groups 2,6 & 8 Containment Isolation Received When Breaker CB5B in Reactor Protection Sys Power Distribution Panel Opened.Caused by Loss of Power to Components Supplied by Breaker.Labels Revised |
- on 850519,Groups 2,6 & 8 Containment Isolation Received When Breaker CB5B in Reactor Protection Sys Power Distribution Panel Opened.Caused by Loss of Power to Components Supplied by Breaker.Labels Revised
| |
| 05000325/LER-1985-031, :on 850523,full Trip of Reactor Protection Sys Channels a & B Occurred.Caused by High Current in Induction Heat Stress Improvement (IHSI) Equipment.Trip Signal Reset. IHSI Cables Shielded & Relocated |
- on 850523,full Trip of Reactor Protection Sys Channels a & B Occurred.Caused by High Current in Induction Heat Stress Improvement (IHSI) Equipment.Trip Signal Reset. IHSI Cables Shielded & Relocated
| |
| 05000325/LER-1985-032, :on 850602,during Refueling/Maint Outage,Full Scram Occurred.Caused by Inoperative Signal to Intermediate Power Range Monitor A.Work Request Initiated & Monitor Observed W/No Problems Found |
- on 850602,during Refueling/Maint Outage,Full Scram Occurred.Caused by Inoperative Signal to Intermediate Power Range Monitor A.Work Request Initiated & Monitor Observed W/No Problems Found
| |
| 05000325/LER-1985-033, :on 850520,testing Revealed That 9 of 11 Safety Relief Valves Actuated at Higher than Allowed Setpoints. Caused by Friction in Valve Labyrinth Seal Guide Areas. Valves Refurbished,Recertified & Reinstalled |
- on 850520,testing Revealed That 9 of 11 Safety Relief Valves Actuated at Higher than Allowed Setpoints. Caused by Friction in Valve Labyrinth Seal Guide Areas. Valves Refurbished,Recertified & Reinstalled
| |
| 05000325/LER-1985-034, :on 850605,primary Containment Isolation of RHR Sys Occurred.Caused by Accidental Bumping of Circuit Fuse F15.Fuse Reinstalled & Isolation Reset |