05000325/LER-1985-001, :on 850103,calibr of Reactor Vessel Shroud Level Instruments 1(2)-B21-LTM-N036-1 & N037-1,did Not Meet Design Intent.Caused by Inconsistency in Data Sheets. Instruments Properly Calibr

From kanterella
(Redirected from 05000325/LER-1985-001)
Jump to navigation Jump to search
:on 850103,calibr of Reactor Vessel Shroud Level Instruments 1(2)-B21-LTM-N036-1 & N037-1,did Not Meet Design Intent.Caused by Inconsistency in Data Sheets. Instruments Properly Calibr
ML20105B667
Person / Time
Site: Brunswick Duke Energy icon.png
Issue date: 02/01/1985
From: Dietz C, Pastva M
CAROLINA POWER & LIGHT CO.
To:
NRC OFFICE OF ADMINISTRATION (ADM)
References
BSEP-85-0102, BSEP-85-102, LER-85-001, LER-85-1, NUDOCS 8502070485
Download: ML20105B667 (3)


LER-1985-001, on 850103,calibr of Reactor Vessel Shroud Level Instruments 1(2)-B21-LTM-N036-1 & N037-1,did Not Meet Design Intent.Caused by Inconsistency in Data Sheets. Instruments Properly Calibr
Event date:
Report date:
3251985001R00 - NRC Website

text

s U.S. NUCLEd] REGULATORY Gi=EitGB404 asRC pere see APPROVED Oass NO. 3130(Jt04

""'8''**

LICENSEE EVENT REPORT (LER)

PACBLITY 8sAA88 09 DOCKET #suasBER (2)

PAGE G

~

Brunswick Steam Electric Plant Unit 1 o l5 l 0 l0 l 0131215 1l0Fl0l2 TITLE let Inadeauate Calibration of the Units I and 2 Reactor Shroud' Level Instrumentation EVENT OATS (Si LER NUneSER (m REPORT DATE 17)

OTHER F ACILITIES INVOLVED 18)

MONTH Day YEAR PAQUTV NAdts DOCKET NUMSERis)

MONTM DAY YEAR YEAR J

Brunswick Unit 2 0 l 5 l 0 g o l o 1312 14 0l1 0l 3 85 8l5 0l 0l 1 0l 0 l

l l

0g5l0 oiog i i THIS REPORT 18 SueMITTED PUROUANT TO THE REQUIREMENTS OF to CPR {: IChect one er more of the fe#e=*tl Ull OPERAUNG MODE W j

20.402M 20.asstel 00.73deltJHivl 73 71M R

30.40SteH1HS 90.38teHil 00.73deH2)M 73.711e1 t,.,

O i 919 30..esMmm X

00.7MQHvel gE

,,de e0.3eMel 20.405{eH1HW) 90.73teH2HG 30.734eH2Hv611HA)

Js5AJ s

20.40SieH1HM 90.73M2 Hill 00.73(eH2HutaHel 30.40BieH11M 30.73deH2Hal 30.73(eH2Hal LICENSEE CONTACT FOR THIS LER (12)

NAME TELEPHONE NUMBER AREA CODE M. J. Pastva, Jr., Regulatory Technician 91 1 9 4 l5l7 1 -l 2 l 3 1 l 5 1

1 COaAPLETE ONS LINE FOR EACH COMPONENT FAILURE DESCRISED IN TMi$ REPORT (13)

"A

"'N M8 "T

LE yji;

CAUSE

$YSTEM COMPONENT

[

pf

CAUSE

SYSTEM COMPONENT TU P

I I I I I I l l

t i I I I I E

I I I I I I I I

I I I l l I N

AUPPLEMENTAL REPORT EXPECTED (14 MONTH DAY Y[AR SUOM15810N VES (If oe, seneente EXPECTED $UcutSSION DATEI NO l

l l

P A TRACT rus.,e

,a Mees, e., s.0, e.P anees eye essee,P,e n

.se., H o On 01/03/85, a determination was made that the calibration of the Units 1 and 2 reacter veccci chroud level inctru=cnto, 1(2)-E21-LTM-NO36-1 and NO37-1, did not meet the design intent. This was based on a discovered inconsistency,

between the plant instrument calibration procedure for the subject instruments and the Instrument Data Sheet of the instruments' manufacturer. Use of the subject calibration procedure resulted in the instruments providing a permissive to allow manual initiation of primary containment spray when vessel level has been restored above the technical specifications of >/= -53" reactor level following a loss of coolant accident. After correspondence with General Electric, the system designer, a determination was made that the design intent of the NO36-1 and NO37-1 is to prohibit a containment spray permissive on reactor level >/= -53".

Following a determination of the design intent of the NO36-1 and NO37-1 instruments, appropriate calibration procedure for the instruments was rewritten and the instruments were properly calibrated.

4 6, n ']-

8502070485 850201 PDR ADOCK 05000325 k

S PDR

\\

m,'- =

e B0RC foran 3BSA UA NUCLEA3 kEIULATORY COnehets580N LICENSEE EVENT REPORT (LER) TEXT CONTINUATION Aremovfo ous NO sino-oio.

)

EXPtRES. S/3i /05 FACsLITV Naast Hi DOCKET NUndSER (21 LER Nun 8SER 468 PAGEIS

20'..FP : - l'#.?ll n'a Brunswick Steam Electric Plant Unit I o l5 l0 j o lo l 3l2 l5 8l5 0 l0 l 1

- 0l0 0l2 OF 0 l2 rExt n-- = w

==.,w awe s asiaw nn On January 3, 1985, a determination was made that the calibration method employed to establish the actuation setpoints of the Units l'and 2 reactor vessel shroud level inst'ruments resulted in failure to meet the design intent of the instruments. These instruments, 1(2)-B21-LTM-N036-1 and NO37-1, provide reactor shroud level permissive logic input to the primary containment spray mode of the unit Residual Heat Removal (RHR) System. The calibration method based the instruments' actuation setpoints as a function of the reset setpoints by utilizing an increasing input signal and verifying that containment spray could not be initiated prior to reaching >/= -53".

The calibration method was developed from an interpretation that the purpose of the instruments is to provide a permissive to initiate primary containment spray after a loss of coolant accident following restoration of reactor level above the technical specifications setpoint. The actual design intent is to prohibit containment spray prior to and below a setpoint, >/= -53".

The initial interpretation was based on the plant Final Safety Analysis Report and sheet 8, revision 1, of Instrument Data Sheet 234A9301RL in Volume V, Book 1, GEK-16654, of the instruments' Technical Manual, GEK-9693. Revision 1 to the sheet did not specify a direction for the setpoint.

However, revision 9 to the Instrument Datt Sheet specified the setpoint in the decreasing level direction.

Due to the instrument reset band inherent in the instruments, the capability

- existed to manually initiate primary containment spray'on a decreasing reactor level until -53.44" without use of the permissive interlock manual override.

Following correspondence with General Electric concerning the design intent of the NO36-1 and NO37-1, a determination was made that the instruments are designed to prohibit containment spray on decreasing reactor level at a value of >/=' -53".

Appropriate changes to the calibration procedures for the NO36-1 and NO37-1 instruments of both units were made, and the instruments were calibrated and returned to service.

=mgromu seem a

l CP&L Carolina Power & Light Company Brunswick Steam Electric Plant P. O. Box 10429 Southport, NC 28461-0429 February 1, 1985 FILE: B09-135100 SERIAL: BSEP/85-0102 NRC Document Control Desk U.S. Nuclear Regulatory Commission

. Washington, DC 20555 BRUNSWICK STEAM ELECTRIC PLANT UNIT 1 DOCKET NO. 50-325 LICENSE NO. DPR-71 LICENSEE EVENT REPORT 1-85-1 Gentlemen:

In accordance with Title 10 to the Code of Federal Regulations, the enclosed Licensee Event Report is submitted. This report fulfills the requirement for a written report within thirty (30) days of a reportable occurrence and is in

- accordance with the format set forth in NUREG-1022, September.1983.

Very-truly yours, bi

.C. R. Dietz, General Manager Brunswick Steam Electric Plant