Title | Inadequate Acceptance Criteria for the Class 1E Station Battery Service Capacity Test Procedure |
Description | The team identified a non-cited violation of 10 CFR Part 50, Appendix B, Criterion XI, Test Control, for the licensees failure to incorporate adequate acceptance criteria in the Class 1E station battery service test procedures. This failure to incorporate adequate acceptance criteria was a performance deficiency. The licensee entered this issue into their corrective action program as nuclear condition reports 632998 and 630621. The licensee performed a prompt determination of operability to verify that the batteries would be capable of supplying the necessary voltage to safety-related direct current loads at the required time intervals specified in design bases calculations. The performance deficiency was determined to be more than minor because it was associated with the Design Control attribute of the Mitigating Systems cornerstone and adversely affected the cornerstone objective of ensuring the availability, reliability, and capability of systems that respond to initiating events to prevent undesirable consequences. Specifically, using an acceptance criterion of 105 volts direct current during the service test could result in incorrectly declaring a Class 1E station battery operable when greater terminal voltages, as specified in design bases calculations, were necessary for safety-related equipment to operate during the first minute of a design basis accident. The team determined the finding to be of very low safety significance (Green) because the finding was a deficiency affecting the design or qualification of a mitigating structure, system, or component which maintained its operability or functionality. The team determined that no cross-cutting aspect was applicable because the finding was not indicative of current licensee performance. |
Site: | Brunswick |
---|---|
Report | IR 05000324/2013007 Section 1R21 |
Date counted | Dec 31, 2013 (2013Q4) |
Type: | NCV: Green |
cornerstone | Mitigating Systems |
Identified by: | NRC identified |
Inspection Procedure: | IP 71111.21 |
Inspectors (proximate) | E Stamm G Ottenberg G Skinner J Eargle M Catts M Riley M Yeminy N Coovert R Nease |
Violation of: | 10 CFR 50 Appendix B Criterion XI |
INPO aspect | |
' | |