05000324/FIN-2013003-08
From kanterella
Jump to navigation
Jump to search
Finding | |
---|---|
Title | |
Description | A self-revealing Green NCV of TS 5.4.1a, Procedures, was identified for the failure of the licensee to have an adequate procedure incorporating a preventative maintenance schedule which specifies inspection or replacement of the RPS coil contactor 2-C72B-K1A that had a specific recommended lifetime. The licensee took action to manually open valve 2-E11-F009 and entered this issue into the CAP as NCR 599641. The inspectors determined that the failure of the licensee to have an adequate procedure incorporating a preventative maintenance schedule which specifies inspection or replacement of contactor 2-C72B-K1A was a performance deficiency. The finding was more than minor because if left uncorrected, the failure of the GE CR105 contactors could result in the failure of the Unit 1 and Unit 2 A and B RPS buses. The finding was also associated with the configuration control attribute of the Barrier Integrity Cornerstone. Specifically, the failure to perform a PM on contactor coil 2-C72B-K1A resulted in a loss of decay heat removal to the SFP on April 5, 2013. Using IMC 0609, Attachment 4, issued June 19, 2012, Initial Characterization of Findings, the inspectors determined that since this issue occurred during a refueling outage, that the finding should be processed in accordance with IMC 0609, Appendix G, issued February 28, 2005, Shutdown Operations Significance Determination Process. Using IMC 0609, Appendix G, Table 1, Losses of Control, the inspectors determined that the finding was of very low safety significance (Green) because the inadvertent change in RCS temperature due to loss of RHR divided by the change in temperature that would cause boiling was less than 0.2 (temperature margin to boil). The finding does not have a cross-cutting aspect since the performance deficiency is not indicative of current plant performance. The PM was not implemented per vendor recommendations in 1990. |
Site: | Brunswick |
---|---|
Report | IR 05000324/2013003 Section 1R19 |
Date counted | Jun 30, 2013 (2013Q2) |
Type: | NCV: Green |
cornerstone | Barrier Integrity |
Identified by: | Self-revealing |
Inspection Procedure: | IP 71111.19 |
Inspectors (proximate) | M Catts M Schwieg R Taylor G Hopper J Dodson |
Violation of: | Technical Specification - Procedures Technical Specification |
INPO aspect | |
' | |
Finding - Brunswick - IR 05000324/2013003 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Finding List (Brunswick) @ 2013Q2
Self-Identified List (Brunswick)
| ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||