| | Q | CCA | Title |
|---|
| 05000306/FIN-2010009-01 | 2010Q3 | | Failure to Design Diesels to Survive Tornado Borne Missiles |
| 05000306/FIN-2010009-02 | 2010Q3 | | Classification of CC Piping |
| 05000282/FIN-2010004-02 | 2010Q3 | | Failure to Ensure That RHR Would Be Capable to Respond During Mode 4 Events |
| 05000282/FIN-2010004-01 | 2010Q3 | | Review Licensees Evaluation of 122 Control Room Chiller Issue to Determine Whether Performance Deficiency Exists |
| 05000282/FIN-2010006-05 | 2010Q3 | | Errors Found in the Electrical Relay Setting Calculation |
| 05000282/FIN-2010006-04 | 2010Q3 | | PORV Stroke Timing Acceptance Criteria Failed to Include Instrument Response Time |
| 05000282/FIN-2010006-03 | 2010Q3 | | Inadequate Analysis Used to Determine PORV/LTOP Setpoint |
| 05000282/FIN-2010006-02 | 2010Q3 | P.6 | Failure to Evaluate the Adequacy of Voltage for Safety-Related Equipment |
| 05000282/FIN-2010006-01 | 2010Q3 | H.14 | Fuel Oil Storage Design Did Not Support EDGs 7-Day Supply |
| 05000282/FIN-2010006-06 | 2010Q3 | | No Full Flow Testing of PORV Air Supply Check Valves |
| 05000282/FIN-2010011-01 | 2010Q3 | | License Bases Requirments For Flooding In the Turbine Building And Preserving The Safety Function of the Emergency Diesel Generator, Auxiliary Feedwater, and Safety-Related Battery Systems |
| 05000306/FIN-2010012-01 | 2010Q4 | P.2 | Inadequate 50.59 Evaluation for New Manual Operator Actions |
| 05000282/FIN-2010005-08 | 2010Q4 | H.5 | Failure to Properly Assess and Manage Risk During Planned Maintenance Activity |
| 05000306/FIN-2010012-02 | 2010Q4 | P.2 | Inadequate 50.59 Evaluation for New Manual Operator Actions |
| 05000282/FIN-2010005-07 | 2010Q4 | H.12 | Failure to Follow Procedure Results in Removing Incorrect Radiation Monitor From Service |
| 05000282/FIN-2010005-05 | 2010Q4 | | Potential for Common Mode Failure of Safety-Related Battery Chargers |
| 05000282/FIN-2010005-06 | 2010Q4 | P.5 | Failure to Include 121 MDCLP Coupling Hardness Information in Procurement Document |
| 05000306/FIN-2010005-04 | 2010Q4 | P.3 | Failure to Appropriately Complete an Operability Determination on D5 EDG |
| 05000282/FIN-2010005-03 | 2010Q4 | | Failure to Ensure Compliance with TS SR 3.8.1.10c |
| 05000282/FIN-2010005-02 | 2010Q4 | P.3 | Failure to Complete Operability Determinations in accordance with Procedural Requirements |
| 05000282/FIN-2010005-01 | 2010Q4 | | Failure to Perform Adequate Post Modification Testing Following Battery Charger Replacement |
| 05000282/FIN-2011002-04 | 2011Q1 | | Evaluation of Equipment Stored near Safety-Related Equipment |
| 05000282/FIN-2011002-03 | 2011Q1 | P.2 | Failure to Appropriately Complete an Operability Recommendation on the Unit 1 Fuel Oil System |
| 05000282/FIN-2011002-02 | 2011Q1 | P.3 | Failure to Appropriately Complete an Operability Recommendation for the Unit 1 Battery Calculations |
| 05000282/FIN-2011002-01 | 2011Q1 | H.4 H.5 | Flammable Gas Cylinders Stored in Safety-Related Area |
| 05000282/FIN-2011010-01 | 2011Q2 | | Failure to Ensure that the Train A and Train B DC Electrical Power Subsystems Remained Operable in Modes 1 through 4 |
| 05000282/FIN-2011003-06 | 2011Q2 | | No Full Flow Testing of PORV Air Supply Check Valves |
| 05000282/FIN-2011502-01 | 2011Q2 | | Incomplete and Inaccurate Emergency Action Level Change Submittal |
| 05000282/FIN-2011003-01 | 2011Q2 | H.2 | Failure to Maintain Reactor Head Height/Distance Limitation From Reactor Vessel |
| 05000282/FIN-2011003-02 | 2011Q2 | | Failure to Assess the Impact of Changes in the Plants Isotopic Profile |
| 05000306/FIN-2011003-04 | 2011Q2 | | Multiple SAMG Procedures not Consistent with Industry Guidance |
| 05000306/FIN-2011003-03 | 2011Q2 | | Unit 2 Reactor Trip during Severe Weather |
| 05000282/FIN-2011003-05 | 2011Q2 | | Evaluation of Equipment Stored near Safety-Related Equipment |
| 05000282/FIN-2011403-01 | 2011Q2 | H.8 | Security |
| 05000282/FIN-2011003-10 | 2011Q2 | H.5 | Failure To Prescribe Appropriate Procedure For In-Service Testing of Check Valves |
| 05000282/FIN-2011003-09 | 2011Q2 | H.2 | Alternate Methods Were Not Developed for Monitoring Inaccessible Susceptible Locations |
| 05000282/FIN-2011003-08 | 2011Q2 | P.5 | Failure to Evaluate the Effects of Dynamic Loads at the CS Discharge Piping |
| 05000282/FIN-2011003-07 | 2011Q2 | P.5 | GL 2008-01 Evaluations Did Not Adequately Verify the Design for Susceptible Locations of Gas Accumulation in Piping Systems |