05000282/FIN-2009005-03 | 2009Q4 | H.4 H.5 | Failure to Provide Complete and Accurate Information for LER 05000306/2008-001-00 |
05000282/FIN-2009404-02 | 2009Q4 | H.8 | Security |
05000282/FIN-2009404-01 | 2009Q4 | H.7 | Security |
05000282/FIN-2009005-05 | 2009Q4 | H.13 | Failure to Follow Procedures Results in Failure to Identify Adverse Trend Regarding Cooling Water Pump Right Angle Drive Fouling. |
05000282/FIN-2009005-04 | 2009Q4 | H.14 | 12 Circulating Water Pump Trip and Unit 1 Automatic Reactor Trip |
05000282/FIN-2009005-02 | 2009Q4 | P.2 | Radioactive waste building ventilation system and the associated radiation detector being out of service for extended periods of time without instituting compensatory actions. |
05000282/FIN-2009005-01 | 2009Q4 | H.8 | Valve technician became internally and externally contaminated when he breached the RH-2-1 valve contrarty to the requirements of the RWP. |
05000282/FIN-2010008-01 | 2010Q1 | P.3 | Failure to Determine the Minimum Cooling Water System Flow Required After a Design Basis Earthquake |
05000282/FIN-2010504-01 | 2010Q1 | | Failure to Maintain a Standard Emergency Action Level Scheme |
05000282/FIN-2010503-01 | 2010Q1 | | Failure to Maintain a Standard Emergency Action Level Scheme |
05000282/FIN-2010002-04 | 2010Q1 | H.11 H.12 | Failure to Accomplish Analog Protection Functional Test Per Procedure Instructions |
05000282/FIN-2010002-03 | 2010Q1 | P.2 | Failure to Have Adequate Procedure for Testing Valve CC-5-2 |
05000282/FIN-2010002-02 | 2010Q1 | H.13 | Failure to Adequately Implement Operability Procedure |
05000282/FIN-2010002-01 | 2010Q1 | | Failure to Ensure Cooling Water and Fuel Oil Systems Were Protected from Flooding Impacts |
05000282/FIN-2010003-04 | 2010Q2 | H.5 | Inadequate Foreign Material Exclusion Controls Associated with Work on Emergency Diesel Generators |
05000282/FIN-2010010-01 | 2010Q2 | | Failure to Ensure Design Measures Were Appropriately Established for the Emergency Diesel Generator, Auxiliary Feedwater, and Safety-Related Battery Systems |
05000282/FIN-2010003-01 | 2010Q2 | | Failure to Address Design Vulnerability Results in Reactor Trip |
05000282/FIN-2010003-03 | 2010Q2 | | Review of Licensee\'s Evaluation to Determine Whether Performance Deficiency Existed |
05000282/FIN-2010003-02 | 2010Q2 | H.11 H.12 | Lack of Operator Procedure Use During System Alignment |
05000282/FIN-2010004-02 | 2010Q3 | | Failure to Ensure That RHR Would Be Capable to Respond During Mode 4 Events |
05000282/FIN-2010004-01 | 2010Q3 | | Review Licensees Evaluation of 122 Control Room Chiller Issue to Determine Whether Performance Deficiency Exists |
05000282/FIN-2010006-05 | 2010Q3 | | Errors Found in the Electrical Relay Setting Calculation |
05000282/FIN-2010006-04 | 2010Q3 | | PORV Stroke Timing Acceptance Criteria Failed to Include Instrument Response Time |
05000282/FIN-2010006-03 | 2010Q3 | | Inadequate Analysis Used to Determine PORV/LTOP Setpoint |
05000282/FIN-2010006-02 | 2010Q3 | P.6 | Failure to Evaluate the Adequacy of Voltage for Safety-Related Equipment |
05000282/FIN-2010006-01 | 2010Q3 | H.14 | Fuel Oil Storage Design Did Not Support EDGs 7-Day Supply |
05000282/FIN-2010006-06 | 2010Q3 | | No Full Flow Testing of PORV Air Supply Check Valves |
05000306/FIN-2010009-02 | 2010Q3 | | Classification of CC Piping |
05000282/FIN-2010011-01 | 2010Q3 | | License Bases Requirments For Flooding In the Turbine Building And Preserving The Safety Function of the Emergency Diesel Generator, Auxiliary Feedwater, and Safety-Related Battery Systems |
05000306/FIN-2010009-01 | 2010Q3 | | Failure to Design Diesels to Survive Tornado Borne Missiles |