| | Q | CCA | Title |
|---|
| 05000282/FIN-2010504-01 | 2010Q1 | | Failure to Maintain a Standard Emergency Action Level Scheme |
| 05000282/FIN-2010503-01 | 2010Q1 | | Failure to Maintain a Standard Emergency Action Level Scheme |
| 05000282/FIN-2010002-01 | 2010Q1 | | Failure to Ensure Cooling Water and Fuel Oil Systems Were Protected from Flooding Impacts |
| 05000282/FIN-2010008-01 | 2010Q1 | P.3 | Failure to Determine the Minimum Cooling Water System Flow Required After a Design Basis Earthquake |
| 05000282/FIN-2010002-02 | 2010Q1 | H.13 | Failure to Adequately Implement Operability Procedure |
| 05000282/FIN-2010002-03 | 2010Q1 | P.2 | Failure to Have Adequate Procedure for Testing Valve CC-5-2 |
| 05000282/FIN-2010002-04 | 2010Q1 | H.11 H.12 | Failure to Accomplish Analog Protection Functional Test Per Procedure Instructions |
| 05000282/FIN-2010003-02 | 2010Q2 | H.11 H.12 | Lack of Operator Procedure Use During System Alignment |
| 05000282/FIN-2010003-03 | 2010Q2 | | Review of Licensee\'s Evaluation to Determine Whether Performance Deficiency Existed |
| 05000282/FIN-2010003-01 | 2010Q2 | | Failure to Address Design Vulnerability Results in Reactor Trip |
| 05000282/FIN-2010003-04 | 2010Q2 | H.5 | Inadequate Foreign Material Exclusion Controls Associated with Work on Emergency Diesel Generators |
| 05000282/FIN-2010010-01 | 2010Q2 | | Failure to Ensure Design Measures Were Appropriately Established for the Emergency Diesel Generator, Auxiliary Feedwater, and Safety-Related Battery Systems |
| 05000282/FIN-2010004-02 | 2010Q3 | | Failure to Ensure That RHR Would Be Capable to Respond During Mode 4 Events |
| 05000282/FIN-2010004-01 | 2010Q3 | | Review Licensees Evaluation of 122 Control Room Chiller Issue to Determine Whether Performance Deficiency Exists |
| 05000306/FIN-2010009-01 | 2010Q3 | | Failure to Design Diesels to Survive Tornado Borne Missiles |
| 05000306/FIN-2010009-02 | 2010Q3 | | Classification of CC Piping |
| 05000282/FIN-2010006-05 | 2010Q3 | | Errors Found in the Electrical Relay Setting Calculation |
| 05000282/FIN-2010006-04 | 2010Q3 | | PORV Stroke Timing Acceptance Criteria Failed to Include Instrument Response Time |
| 05000282/FIN-2010006-03 | 2010Q3 | | Inadequate Analysis Used to Determine PORV/LTOP Setpoint |
| 05000282/FIN-2010006-02 | 2010Q3 | P.6 | Failure to Evaluate the Adequacy of Voltage for Safety-Related Equipment |
| 05000282/FIN-2010006-01 | 2010Q3 | H.14 | Fuel Oil Storage Design Did Not Support EDGs 7-Day Supply |
| 05000282/FIN-2010006-06 | 2010Q3 | | No Full Flow Testing of PORV Air Supply Check Valves |
| 05000282/FIN-2010011-01 | 2010Q3 | | License Bases Requirments For Flooding In the Turbine Building And Preserving The Safety Function of the Emergency Diesel Generator, Auxiliary Feedwater, and Safety-Related Battery Systems |
| 05000282/FIN-2010005-02 | 2010Q4 | P.3 | Failure to Complete Operability Determinations in accordance with Procedural Requirements |
| 05000282/FIN-2010005-08 | 2010Q4 | H.5 | Failure to Properly Assess and Manage Risk During Planned Maintenance Activity |
| 05000282/FIN-2010005-07 | 2010Q4 | H.12 | Failure to Follow Procedure Results in Removing Incorrect Radiation Monitor From Service |
| 05000282/FIN-2010005-06 | 2010Q4 | P.5 | Failure to Include 121 MDCLP Coupling Hardness Information in Procurement Document |
| 05000306/FIN-2010005-04 | 2010Q4 | P.3 | Failure to Appropriately Complete an Operability Determination on D5 EDG |
| 05000282/FIN-2010005-03 | 2010Q4 | | Failure to Ensure Compliance with TS SR 3.8.1.10c |
| 05000282/FIN-2010005-01 | 2010Q4 | | Failure to Perform Adequate Post Modification Testing Following Battery Charger Replacement |
| 05000282/FIN-2010005-05 | 2010Q4 | | Potential for Common Mode Failure of Safety-Related Battery Chargers |
| 05000306/FIN-2010012-02 | 2010Q4 | P.2 | Inadequate 50.59 Evaluation for New Manual Operator Actions |
| 05000306/FIN-2010012-01 | 2010Q4 | P.2 | Inadequate 50.59 Evaluation for New Manual Operator Actions |