|
---|
Category:LICENSEE EVENT REPORT (SEE ALSO AO RO)
MONTHYEAR05000271/LER-1993-0121993-10-0707 October 1993 LER 93-012-00:on 930908,noted That Containment Air Valve & TIP Found to Have Seat Leakage Above That Permitted by Ts. Caused by Leakage Through Check Valve.C/As Will Be Reported in Suppl to LER.W/931007 Ltr 05000271/LER-1993-0101993-08-31031 August 1993 LER 93-010-00:on 930803,fire Protection Valve V76-420 Has Not Been Cycled Through Complete Cycle of Full Travel,Per TS 4.13.B.d.Caused by Human Error.Applicable Surveillance Procedure Revised to Include V76-420.W/930831 Ltr 05000271/LER-1993-0041993-08-19019 August 1993 LER 93-004-01:on 930225,discovered That Surveillance for Jet Pumps Not Performed During Single Loop Operations Due to Inadequate Plant Procedures.Procedures OP-4110 & OP-2428 revised.W/930819 Ltr 05000271/LER-1993-0051993-08-13013 August 1993 LER 93-005-01:on 930406,concluded Control Rod Scram Times Not in Compliance W/Ts Section 3.3.C.Caused by Faulty Scram Solenoid Pilot Valves.Solenoid Valves rebuilt.W/930813 Ltr 05000271/LER-1993-0091993-08-13013 August 1993 LER 93-009-00:on 930716,B Train of RHR Sys Declared Inoperable.Caused by Personnel Error Re Failure to Initiate Rev to Calibration Procedure OP 4347.Instrument re-calibrated & OP 4347 revised.W/930813 Ltr 05000271/LER-1990-0081990-06-29029 June 1990 LER 90-008-00:on 900529,identified That Cables Providing Power to post-accident Monitoring Instrument Loops Not Routed,Per Required Separation Criteria.Caused by Combination of Factors.Design Change prepared.W/900629 Ltr 05000271/LER-1987-003, :on 880412,personnel Found Functional Testing Not Been Tested in Accordance W/Tech Spec Requirements. Caused by Programmatic Tracking Program.Programmatic Tracking Sys Revised as Described in LER 87-031988-05-10010 May 1988
- on 880412,personnel Found Functional Testing Not Been Tested in Accordance W/Tech Spec Requirements. Caused by Programmatic Tracking Program.Programmatic Tracking Sys Revised as Described in LER 87-03
05000271/LER-1983-009, Followup LER 83-009/01T-0:on 830321,primary Containment Isolation Sys Isolation of Containment Ventilation Sys Occurred.Caused by Mods to Reactor Protection Sys Motor Generator.Fuel Handling Activities Suspended1983-04-0101 April 1983 Followup LER 83-009/01T-0:on 830321,primary Containment Isolation Sys Isolation of Containment Ventilation Sys Occurred.Caused by Mods to Reactor Protection Sys Motor Generator.Fuel Handling Activities Suspended 05000271/LER-1981-030, Updated LER 81-030/03L-1:cracks Found on Internal Surface of Valve Bodies & Seating Surfaces of Reactor Water Cleanup Valves Attributed to Surface Shrinking of Casting & Intergranular Stress Corrosion Cracking,Respectively1982-07-0101 July 1982 Updated LER 81-030/03L-1:cracks Found on Internal Surface of Valve Bodies & Seating Surfaces of Reactor Water Cleanup Valves Attributed to Surface Shrinking of Casting & Intergranular Stress Corrosion Cracking,Respectively 05000271/LER-1981-0261981-11-0303 November 1981 LER 81-026/03L-0:on 811005,during Weekly Review of Surveillance Test Data,Discovered That Max Monthly Interval for Functional Test of Atws/Rpt Sys Exceeded by 4 Days. Caused by Oversight in Scheduling ML20064H2211978-12-13013 December 1978 /03L-0 on 781113:during Weekly Surveillance Re Radiological Environ Prog,Air Pump Motor Was Found Inoper. Time Meter Indicated Pump Had Operated Only 0.4 Hours.Air Pump Replaced & New Weekly Air Sample Initiated ML20064E3281978-11-13013 November 1978 /03L-0 on 781014:during Surveillance Test of Main Steam Isolution Valves,V2-86C Closed in 2.6 Seconds Rather than 3-5 Seconds Req in Tech Spec 4.7.D.1.a.1.Caused by Closing Speed Control Valve Coming Loose from Actuator ML20064E3101978-11-13013 November 1978 /03L-0 on 781016:weekly Review of Completed Surveillance Test Following Plant Startup Noted That Monthly Hydrogen Detector Functional Test Was Not Performed Due to Personnel Error ML20064H2291978-08-10010 August 1978 /03L-1 on 780626:during Increase of Reactor Pwr, Noted That Critical Pwr Ratio in 4 Symmetrically Located Fuel Bundles Was Below Tech Spec Values.Caused by Pwr Increasing Xenon Transient ML20064H1681978-07-25025 July 1978 /03L-0 on 780629:during Steady State Oper Motor Control Ctr 893 Lost Voltage Because B Uninterruptible Pwr Supply (UP5) Tripped Due to Blown Inverter Leg Fuse.Failed Components Replaced & Operability Test Performed ML20064H2051978-07-24024 July 1978 /03L-0 on 780625:during Steady State Oper,Noted That Drywell Atmospheric Temp Recorder TR-1-149 Was Inoperable.Caused by Recorder Failure Due to Broken Cord on Chart Drive Mechanism ML20064H1741978-07-24024 July 1978 /03L-0 on 780626:during Reactor Pwr Increase Noted That Local Critical Pwr Ratio in 4 Symmetrically Located Fuel Bundles Was Lower than Tech Spec Levels.Caused by Pwr Increasing Xenon Transient ML20064H1321978-07-24024 July 1978 /03L-0 on 780612:during Steady State Oper,Noted That Drywell Atmospheric Temp Recorder TR-1-149 Was Inoperable.Recorder Failed Due to Failed Idler Assembly 05000271/LER-1976-005, Telecopy LER 76-005:on 760217,portion of Procedure Associated W/Securing Plant from Shutdown Cooling Mode Not Performed.Caused by Failure of Plant Personnel to Follow Appropriate Plant Procedure1976-02-18018 February 1976 Telecopy LER 76-005:on 760217,portion of Procedure Associated W/Securing Plant from Shutdown Cooling Mode Not Performed.Caused by Failure of Plant Personnel to Follow Appropriate Plant Procedure 05000271/LER-1975-003, Corrected LER 75-003:on 750204,core Spray Sys Pump Discharge Pressure Sensor PS-14-44A Actuated at 82 Psig.Caused by Setpoint Drift.Sensor replaced.W/750218 Ltr1975-02-14014 February 1975 Corrected LER 75-003:on 750204,core Spray Sys Pump Discharge Pressure Sensor PS-14-44A Actuated at 82 Psig.Caused by Setpoint Drift.Sensor replaced.W/750218 Ltr 1993-08-31
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20217L8831999-10-21021 October 1999 Safety Evaluation Supporting Proposed Alternatives to Code Requirements Described in RR-V17 & RR-V18 ML20217G2041999-10-13013 October 1999 Safety Evaluation Supporting Amend 179 to License DPR-28 BVY-99-127, Monthly Operating Rept for Sept 1999 for Vermont Yankee Nuclear Power Station.With1999-09-30030 September 1999 Monthly Operating Rept for Sept 1999 for Vermont Yankee Nuclear Power Station.With ML20212C2551999-09-17017 September 1999 Safety Evaluation Supporting Amend 175 to License DPR-28 BVY-99-112, Monthly Operating Rept for Aug 1999 for Vermont Yankee.With1999-08-31031 August 1999 Monthly Operating Rept for Aug 1999 for Vermont Yankee.With BVY-99-109, Ro:On 990812,stack Ng Effluent Instrumentation for PAM Was Declared Oos.Caused by Instrument Drift Due to Electronic Components Based on Insps by Instrumentation & Controls Dept.Detector & Preamplifier Will Be Replaced on 9908311999-08-19019 August 1999 Ro:On 990812,stack Ng Effluent Instrumentation for PAM Was Declared Oos.Caused by Instrument Drift Due to Electronic Components Based on Insps by Instrumentation & Controls Dept.Detector & Preamplifier Will Be Replaced on 990831 BVY-99-102, Monthly Operating Rept for July 1999 for Vermont Yankee. with1999-07-31031 July 1999 Monthly Operating Rept for July 1999 for Vermont Yankee. with ML20209J0081999-07-14014 July 1999 Special Rept:On 990615,diesel Driven Fire Pump Failed to Achieve Rated Flow of 2500 Gallons Per Minute.Pump Was Inoperable for Greater than 7 Days.Corrective Maint Was Performed to Reset Pump Lift Setting BVY-99-090, Monthly Operating Rept for June 1999 for Vermont Yankee Nuclear Power Station.With1999-06-30030 June 1999 Monthly Operating Rept for June 1999 for Vermont Yankee Nuclear Power Station.With ML20196G5071999-06-23023 June 1999 Vynp Assessment of On-Site Disposal of Contaminated Soil by Land Spreading BVY-99-077, Monthly Operating Rept for May 1999 for Vermont Yankee Nuclear Power Station.With1999-05-31031 May 1999 Monthly Operating Rept for May 1999 for Vermont Yankee Nuclear Power Station.With BVY-99-068, Monthly Operating Rept for Apr 1999 for Vynp.With1999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for Vynp.With ML20206E8741999-04-29029 April 1999 SER Determined That Flaw Evaluation Meets Rules of ASME Code & Assumed Crack Growth Rate Adequate for Application ML20206D9301999-04-27027 April 1999 1999 Emergency Preparedness Exercise 990427 Exercise Manual (Plume Portion) ML20205S4211999-04-16016 April 1999 Non-proprietary Version of Revised Page 4-3 of HI-981932 Technical Rept for Vermont Yankee Spent Fuel Pool Storage Expansion ML20205K7581999-04-0707 April 1999 Safety Evaluation Supporting Alternative Proposal for Reexamination of Circumferential Welds with Detected Flaw Indications in Plant RPV BVY-99-046, Monthly Operating Rept for Mar 1999 for Vermont Yankee Nuclear Power Station.With1999-03-31031 March 1999 Monthly Operating Rept for Mar 1999 for Vermont Yankee Nuclear Power Station.With ML20205F6631999-03-0404 March 1999 Jet Pump Riser Weld Leakage Evaluation BVY-99-035, Monthly Operating Rept for Feb 1999 for Vermont Yankee Nuclear Station.With1999-02-28028 February 1999 Monthly Operating Rept for Feb 1999 for Vermont Yankee Nuclear Station.With ML20205P8241999-02-28028 February 1999 Rev 2 to Vermont Yankee Cycle 20 Colr ML20203H9881999-02-18018 February 1999 SER Accepting Alternative to 10CFR50.55a(g)(6)(ii)(A) Augmented Reactor Vessel Exam at Vermont Yankee Nuclear Power Station.Technical Ltr Rept Encl ML20203A6951999-02-0404 February 1999 Revised Rev 2,App B to Vermont Yankee Operational QA Manual (Voqam) ML20199K7151999-01-21021 January 1999 Corrected Safety Evaluation Supporting Amend 163 Issued to FOL DPR-28.Pages 2 & 3 Required Correction & Clarification ML20199K6991999-01-20020 January 1999 Safety Evaluation Concluding That Request to Use YAEC-1339, Yankee Atomic Electric Co Application of FIBWR2 Core Hydraulics Code to BWR Reload Analysis, at Vermont Yankee Acceptable ML20199L5951999-01-14014 January 1999 Safety Evaluation Accepting Licensee Proposed Alternative to Code Requirement,Described in Rev 2 to Pump Relief Request RR-P10 Pursuant to 10CFR50.55a(a)(3)(i) BVY-99-071, Corp 1998 Annual Rept. with1998-12-31031 December 1998 Corp 1998 Annual Rept. with BVY-99-001, Monthly Operating Rept for Dec 1998 for Vermont Yankee Nuclear Power Station1998-12-31031 December 1998 Monthly Operating Rept for Dec 1998 for Vermont Yankee Nuclear Power Station ML20198H5481998-12-23023 December 1998 Rev 2 to Vermont Operational QA Manual,Voqam ML20196H8641998-12-0101 December 1998 Cycle 19 Operating Rept BVY-98-163, Monthly Operating Rept for Nov 1998 for Vermont Yankee Nuclear Power Station.With1998-11-30030 November 1998 Monthly Operating Rept for Nov 1998 for Vermont Yankee Nuclear Power Station.With ML20195C4161998-11-0909 November 1998 SER Accepting Request That NRC Approve ASME Code Case N-560, Alternative Exam Requirement for Class 1,Category B-J Piping Welds BVY-98-154, Monthly Operating Rept for Oct 1998 for Vermont Yankee Nuclear Power Station.With1998-10-31031 October 1998 Monthly Operating Rept for Oct 1998 for Vermont Yankee Nuclear Power Station.With ML20155B6471998-10-26026 October 1998 Safety Evaluation Accepting Jet Pump Riser Insp Results & Flaw Evaluation,Conducted During 1998 Refueling Outage ML20154N0891998-10-16016 October 1998 Rev 1 to Vermont Operational QA Program Manual (Voqam) ML20154B6951998-10-0101 October 1998 SER Re Licensee Response to GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power-Operated Gate Valves, for Vermont Yankee Nuclear Power Station BVY-98-149, Monthly Operating Rept for Sept 1998 for Vermont Yankee Nuclear Power Station.With1998-09-30030 September 1998 Monthly Operating Rept for Sept 1998 for Vermont Yankee Nuclear Power Station.With ML20239A1361998-09-0202 September 1998 SER Re License Request for NRC Review & Concurrence W/Changes to NRC-approved Fire Protection Program BVY-98-135, Monthly Operating Rept for Aug 1998 for Vermont Yankee Nuclear Power Station.With1998-08-31031 August 1998 Monthly Operating Rept for Aug 1998 for Vermont Yankee Nuclear Power Station.With ML20151U0361998-08-28028 August 1998 Non-proprietary Rev 1 to Holtec Rept HI-981932, Vermont Yankee Nuclear Power Station Spent Storage Expansion Project ML20237E9221998-08-20020 August 1998 Vynp 1998 Form NIS-1 Owners Summary Rept for ISI, 961103-980603 BVY-98-122, Monthly Operating Rept for July 1998 for Vermont Yankee Nuclear Power Station1998-07-31031 July 1998 Monthly Operating Rept for July 1998 for Vermont Yankee Nuclear Power Station ML20205F6491998-07-31031 July 1998 Rev 1 to GE-NE-B13-01935-02, Jet Pump Assembly Welds Flaw Evaluation Handbook for Vermont Yankee ML20236G0011998-06-30030 June 1998 Individual Plant Exam External Events BVY-98-098, Monthly Operating Rept for June 1998 for Vermont Yankee Nuclear Power Station1998-06-30030 June 1998 Monthly Operating Rept for June 1998 for Vermont Yankee Nuclear Power Station ML20248C5081998-05-31031 May 1998 Rev 2 to 24A5416, Supplemental Reload Licensing Rept for Vermont Yankee Nuclear Power Station Reload 19 Cycle 20 ML20248C4951998-05-31031 May 1998 Rev 1 to Vermont Yankee Nuclear Power Station Cycle 20 Colr BVY-98-081, Monthly Operating Rept for May 1998 for Vermont Yankee Nuclear Power Station1998-05-31031 May 1998 Monthly Operating Rept for May 1998 for Vermont Yankee Nuclear Power Station ML20247J8341998-05-31031 May 1998 Peak Suppression Pool Temp Analyses for Large Break LOCA Scenarios, for May 1998 ML20247G4001998-05-12012 May 1998 Interview Rept of Ej Massey ML20247E6351998-04-30030 April 1998 Rev 1 to GE-NE-B13-01935-LTR, Jet Pump Riser Welds Allowable Flaw Sizes Ltr Rept for Vermont Yankee 1999-09-30
[Table view] |
LER-2093-004, |
Event date: |
|
---|
Report date: |
|
---|
2712093004R00 - NRC Website |
|
text
-.- . . . . . . . - ~ _. . -.-
't VERMONT YANKEE NUCLEAR-POWER CORPORATION l
W.
r S P O. Box 157, Governor Hunt Road
)
\
.\ 7((
V
\ ;,' -} Vernon Vermont 05354-0157 !
(602) 257-7711 i
%:_x t X
~,\j]' ') l August 19, 1993 4
l U.S. Nuclear Regulatory Commission' i Document Control Desk )
Washington, D.C. 20555
REFERENCES:
Operating License DPR-28 ,
4 Docket No. 50-271 Reportable Occurrence No. LER 93-004, Supplement 1 l BVY 93-069, VYNPC Letter to NRC Dated July 2, 1993
Dear Sirs:
I As defined by 10 CFR 50.73, we are reporting the attached Reportable Occurrence as LER 93-004, Supplement 1. This supplement is submitted to provide :
an update on our root cause assessment and planned course of action. l I
e l i
very truly yours, j
, VERMONT YANKEE NUCLEAR POWER CORPORATION l MT . e r- ,
Robert Wanczyk ,
Plant Manager j t
cc: Regional Administrator USNRC Region I i 475 Allendale Road King of Prussia, PA 19406 l 0
i i i i
r i
l I
l i.'4001- gJP
/ l) 9308240014 930819 j- L PDR ADOCK 05000271 ;
S PDR u <
b
s
'WRC Fore 366 U.S. C]UCLEQR REGULATORY COMMISSION APPR0trED OMS No. 3150-0104 (6-89)* EXPIRES 4/30/92 ESTIMATED BURDEN PER RESPONSE TO COMPLY WITH THIS INFORMATION COLLECTION REQUEST: 50.0 HRS. FORWARD COMMENTS REGARDING BURDEN ESTI M TE TO THE RECORDS AND REPORTS MANAGEMENT BRANCH (P-350), U.S. NUCLEAR REGULATORY COMMIS$10N, WASHINGTON DC 20555, AND TO THE PAPERbORK REDUCTION PROJECT (3160 0104), OFFICE OF MANAGEMCNT AND BUDGET, WASHINGTON, DC 20603. ,
FACILITY KAME (1) DOCKET No. (2) PAGE (3)
VERMONT YAhKEE NUCLEAR POWER STATION Ol5l0l0l0l2l7l1 0 1 0F 0 3 TITLE (4) Jet Pmp Operability Surveillance not Performed during Single loop Operations as Required by Technical Specifications Due to inadequate plant procedures.
f EVENT LATE (5) LER NUMEER (6) REPORT DATE (7) OTHER FACILITIES INVOLVED (B) )
MONTH DAY YEAR YEAR SEQ # REV # MONTH DAY YEAR FACILITY NAMES DOCKET NO. (S) 0 5 0 0 0 0 2 2 5 9 3 9 3 -
0 0 4 -
0 1 0 8 1 9 9 3 0 5 0 0 0 OPERATING THIS REPORT IS SUEMITTED PURSUANT TO REC'MTS OF 10 CFR 1: CHECK ONE OR MORE (11) i MT>E (9) W 20.402(b) 20.405(c) 50.73(a)(2)(iv) 73.71(b) ,
POWER 20.405(s)(1)(1) 50.36(c)(1) 50.73(a)(2)(v) 73.71(c) '
LEVEL (10) 0l9l9 20.405(a)(1)(ii) 50.36(c)(2) 50.73(a)(2)(vii) OTHER:
.. ... ......... 20.405(a)(1)(iii) x 50.73(a)(2)(1) 50.73(a)(2)(viii)(A)
-e
........ . .. . .. 20.405(a)(1)(iv) 50.73(a)(2)(ii) 50.73(a)(2)(viii)(B)
..... . . .... 20.405(a)(1)(v) 50.73(a)(2)(iii) 50.73(a)(2)(x)
LICEhSEE CONTACT FOR THIS LER (12)
NAME TELEPHONE NO.
AREA CODE ROBERT J. WANCZYK, PLANT MAkAGER Bl0l2 2l5l7l-l7l7l1l1 COMPLETE ONE LINE FOR EACH COMPONENT FAILURE DESCRIEED IN THIS REPORT (13)
CAUSE SYST COMP 0hEhi MFR REPORTABLE CAUSE SYST COMPOWENT MFR REPORTABLE To hPRDS .... TO WPRDS ....
I
-- " l 1 I I ! I I I I I I I I I Ii l I ! l I i ll Ii --
SUPPLEMENTAL REPORT EXFtCTED (14) EXPECTED MO DAY YR SURMIS$10N DATE (15)
YES (if yes, conplete EXPECTED SUBMISSION DATE) X NO l l l ABSTRACT (Limit to 1400 spaces, i.e., approx. fif teen single-space typewntten lines) (16)
On 11/9/92 at 1429 hours0.0165 days <br />0.397 hours <br />0.00236 weeks <br />5.437345e-4 months <br />, with the reactor at approxirnately 99% power, the "A* Recirculation Pump Motor Generator (EltS = AD MG) Set tripped due to electrical proolems. From 11/9/92 at 1429 hours0.0165 days <br />0.397 hours <br />0.00236 weeks <br />5.437345e-4 months <br /> until 11/13/92 at 1130 hours0.0131 days <br />0.314 hours <br />0.00187 weeks <br />4.29965e-4 months <br /> the plant was in single loop operation. On 2/25/93, during a review of the surveillance, it was discovered that the required surveillance for the Jet Pumps (Ells = AC P) in the idle loop, during single loop operation was not performed in accordance with Technical Specification 4.6.F.2 The root cause of this event was our failure to ensure that Technical Secifications requirements were appropriately incorporated into the plant procedures.
The plant had returned to two loop operation prior to the time of discovery of the event. The immediate corrective action was to revise OP-4110, " Reactor Recirc Surveillance" and OP-2428,
- Single Loop Operations *, to provide specific instructions to correct this problem. Additionalty, Procedure OP-4110 has been revised to include OP-2428 as a reference.
No similar events have been reported to the Commission in the last five years.
CIRC Form 366 (6 89)
f f
, ERC Form 366A U.S. NUCLEAR DEGULATORY COMMISSION APPROVED OMS NO. 3150-0104 (6-BP) EXPIRES 4/30/92 i EST!nATED BURDEN PER RESPONSE TO COMPLY WITH THIS f INFORMATION COLLECTION REQUEST: 50.0 HRS. FORWARD }
LICENSEE EVENT REPORT (LER) COMMENTS REGARDING BURDEN ESTIMATE 10 THE RECORDS AND TEXT CONTINUATION REPORTS MANAGEMENT BRANCH (P-350), U.S. NUCLEAR REGULATORY COMMISSION, WASHINGTON DC 20555, AND TO THE PAPERWORK REDUCTION PROJECT (3160-0104), OFFICE OF MANAGEMENT AND j BUDGET, WASHINGTON, DC 20603. ,
FACILITY NAME (1) DOCKET NO (2) LER WUMBER (6) PAGE (3)
TEAR SEQ # REV #
9 3 4 0 0 0 0l2 0F 0l3 VERMONT YANKEE NUCLEAR POWER CORPORATION 0l5l0l0j0l2l7l1 1 TEXT (if more space is required, use additional NRC Form 366A) (17)
DESCRIPTION On 11/9/92 at 1429 hours0.0165 days <br />0.397 hours <br />0.00236 weeks <br />5.437345e-4 months <br />, with the reactor at approximately 99% power, the *A* Recirculation Pump Motor i Generator (Ells = AD MG) tripped due to electrical problems. On 2/26/93, it was discovered that the required surveillance for '
the Jet Pumps (Ells = AC P) in the idle loop during single loop operation was not performed in accordance with Technical Specification 4.6.F.2. From 11/9/92 at 1429 hours0.0165 days <br />0.397 hours <br />0.00236 weeks <br />5.437345e-4 months <br /> until 11/13/92 at 1130 hours0.0131 days <br />0.314 hours <br />0.00187 weeks <br />4.29965e-4 months <br /> the plant was in single loop operation to !
facilitate repair of the MG set. During this period the data for jet pump surveillance was acquired on a daily basis, as required I by procedure, and operability was determined to be satisf actory for the active loop, however, although data was also taken for ]
the idle loop, no specific evaluation was made concerning the jet pumps in the idle loop. On 11/13/92, the *A* Recirc Pump ]
MG Set was returned to service and jet pump operability was determined to be satisf actory for both recirculation loops. !
CAUSE OF EVENT The root cause of this event was a f ailure to ensure that Technical Secifications requirements were appropriately incorporated into the t 'nt procedures.
ANALYSIS OF EVENT Prior to the trip and following restart of the *A* Recirc MG Set, iet pump operability surveillance was completed on a daily basis for both recirc loops. The data taken was within the Technical Specification limits which proved the operability and integrity of the jet pumps in both loops. During the period of single loop operation, data was taken and operability and integrity was confirmed for the active loop in accordance with Technical Specification 4.6 F.1. Following start-up of the "A" Recirc MG Set, Jet pump operability surveillance was completed for both loops and operability and integrity was again confirmed . During single loop operations, there was flow indication in each of the idle loop jet pumps. This is a further indication of operability.
j GE SIL No. 517, issued on July 26,1990, specifically addresses single loop operation and jet pump integnty. It states that "dunng single loop operation, the inactive loop jet pumps are not operating and the stress applied to the jet pump beam, that holds the removable portion of the iet pump in place, is much less than it is when the pumps are operating. Consequently, if the jet pump is intact before entering single loop operation, it is not likely to degrade during single loop operation and surveiitance of the inactive loop jet pumps is not necessary*
Based on the above, there was no threat to the health and safety of the public due to this event.
1 CORRECTIVE ACTIONS
- immediate Corrective Actionj There was no immediate corrective actions required as the date of discovery occurred af ter the plant returned to two loop operation.
Subsecuent Corrective Actions OP 4110, " Reactor Recirc Surveillance" and OP-2428, ' Single Loop Operations", have been revised to provide specific
- instructions to correct this problem. Additionally, Procedure OP-4110 has been revised to include OP-2428 as a reference. l z
Lono Term Corrective Actions A review of procedures that implement Technical Specification surveillance requirements will be performed to ensure that Technical Specification requirements are being met. This review will address such items as the intent of the Technical Specifications survei!!ance requirements, assumptions, trending, administrative limits, and the clarity of procedure insrtuctions.
hRC Form 366 (6-89)
i h2C Form 366A U.S. 05UCLEAR REGULATORY COMMIS$10N APPROVED OMS NO. 3150-0104
-(6.89) EXPlaES 4/30/92 l ESTIMATED BURDEN PER DESPONSE TO COMPLY WITH THIS i i
INFORMATION COLLECTION REQUEST: 50.0 HRS. FORWARD COMMENTS REGARDING BURDEN ES11 MATE TO THE RECORDS AND
- LICEk%EE EVENT REPORT (LER) ,
TEXT CONTINUATION REPORTS MANAGEMENT BRANCH (P-350), U.S. NUCLEAR REGULATORY COMMISSION, WASHINGTON DC 20555, AND TO THE PAPERWORK .
REDUCTION FROJECT (3160-01D4), OFFICE OF MANAGEMENT AND !
BUDGET, WASHINGTON, DC 20603.
FACILITY hAME (1) DOCKET NO (2) LER WUMBER (6) PAGE (3)
YEAR SEQ # REV #
VERMONT YANKEE NJCLEAR POWER CORPORATION 0l5l0l0l0l2l7l1 9 3 -
0 0 4 -
0 1 0l3 CF 0l3 TEXT fit more space is required, use additional NRC Form 366A) (17)
Lona Term Corrective Actions (CONT.)
{
Based on the information from GE SIL No. 517, Vermont Yankee will request a revision to the Technical Specifications l l to delete the requirements of Section 4.6.F.2. This is expected to be submitted by November 1993.
ADDITIONAL INFORMATION There have been no similar events at Vermont Yankee reported to the Commission in the past five years. '{
i i
1 I
3 i
t L
f l
t i
s s
CIRC Form 366A (6-89) ,
. . -
|
---|
|
|
| | Reporting criterion |
---|
05000271/LER-1993-004 | LER 93-004-01:on 930225,discovered That Surveillance for Jet Pumps Not Performed During Single Loop Operations Due to Inadequate Plant Procedures.Procedures OP-4110 & OP-2428 revised.W/930819 Ltr | | 05000271/LER-1993-005 | LER 93-005-01:on 930406,concluded Control Rod Scram Times Not in Compliance W/Ts Section 3.3.C.Caused by Faulty Scram Solenoid Pilot Valves.Solenoid Valves rebuilt.W/930813 Ltr | | 05000271/LER-1993-009 | LER 93-009-00:on 930716,B Train of RHR Sys Declared Inoperable.Caused by Personnel Error Re Failure to Initiate Rev to Calibration Procedure OP 4347.Instrument re-calibrated & OP 4347 revised.W/930813 Ltr | | 05000271/LER-1993-010 | LER 93-010-00:on 930803,fire Protection Valve V76-420 Has Not Been Cycled Through Complete Cycle of Full Travel,Per TS 4.13.B.d.Caused by Human Error.Applicable Surveillance Procedure Revised to Include V76-420.W/930831 Ltr | | 05000271/LER-1993-012 | LER 93-012-00:on 930908,noted That Containment Air Valve & TIP Found to Have Seat Leakage Above That Permitted by Ts. Caused by Leakage Through Check Valve.C/As Will Be Reported in Suppl to LER.W/931007 Ltr | |
|