Category:LICENSEE EVENT REPORT (SEE ALSO AO RO)
MONTHYEAR05000271/LER-1993-0121993-10-0707 October 1993 LER 93-012-00:on 930908,noted That Containment Air Valve & TIP Found to Have Seat Leakage Above That Permitted by Ts. Caused by Leakage Through Check Valve.C/As Will Be Reported in Suppl to LER.W/931007 Ltr 05000271/LER-1993-0101993-08-31031 August 1993 LER 93-010-00:on 930803,fire Protection Valve V76-420 Has Not Been Cycled Through Complete Cycle of Full Travel,Per TS 4.13.B.d.Caused by Human Error.Applicable Surveillance Procedure Revised to Include V76-420.W/930831 Ltr 05000271/LER-1993-0041993-08-19019 August 1993 LER 93-004-01:on 930225,discovered That Surveillance for Jet Pumps Not Performed During Single Loop Operations Due to Inadequate Plant Procedures.Procedures OP-4110 & OP-2428 revised.W/930819 Ltr 05000271/LER-1993-0051993-08-13013 August 1993 LER 93-005-01:on 930406,concluded Control Rod Scram Times Not in Compliance W/Ts Section 3.3.C.Caused by Faulty Scram Solenoid Pilot Valves.Solenoid Valves rebuilt.W/930813 Ltr 05000271/LER-1993-0091993-08-13013 August 1993 LER 93-009-00:on 930716,B Train of RHR Sys Declared Inoperable.Caused by Personnel Error Re Failure to Initiate Rev to Calibration Procedure OP 4347.Instrument re-calibrated & OP 4347 revised.W/930813 Ltr 05000271/LER-1990-0081990-06-29029 June 1990 LER 90-008-00:on 900529,identified That Cables Providing Power to post-accident Monitoring Instrument Loops Not Routed,Per Required Separation Criteria.Caused by Combination of Factors.Design Change prepared.W/900629 Ltr 05000271/LER-1987-003, :on 880412,personnel Found Functional Testing Not Been Tested in Accordance W/Tech Spec Requirements. Caused by Programmatic Tracking Program.Programmatic Tracking Sys Revised as Described in LER 87-031988-05-10010 May 1988
- on 880412,personnel Found Functional Testing Not Been Tested in Accordance W/Tech Spec Requirements. Caused by Programmatic Tracking Program.Programmatic Tracking Sys Revised as Described in LER 87-03
05000271/LER-1983-009, Followup LER 83-009/01T-0:on 830321,primary Containment Isolation Sys Isolation of Containment Ventilation Sys Occurred.Caused by Mods to Reactor Protection Sys Motor Generator.Fuel Handling Activities Suspended1983-04-0101 April 1983 Followup LER 83-009/01T-0:on 830321,primary Containment Isolation Sys Isolation of Containment Ventilation Sys Occurred.Caused by Mods to Reactor Protection Sys Motor Generator.Fuel Handling Activities Suspended 05000271/LER-1981-030, Updated LER 81-030/03L-1:cracks Found on Internal Surface of Valve Bodies & Seating Surfaces of Reactor Water Cleanup Valves Attributed to Surface Shrinking of Casting & Intergranular Stress Corrosion Cracking,Respectively1982-07-0101 July 1982 Updated LER 81-030/03L-1:cracks Found on Internal Surface of Valve Bodies & Seating Surfaces of Reactor Water Cleanup Valves Attributed to Surface Shrinking of Casting & Intergranular Stress Corrosion Cracking,Respectively 05000271/LER-1981-0261981-11-0303 November 1981 LER 81-026/03L-0:on 811005,during Weekly Review of Surveillance Test Data,Discovered That Max Monthly Interval for Functional Test of Atws/Rpt Sys Exceeded by 4 Days. Caused by Oversight in Scheduling ML20064H2211978-12-13013 December 1978 /03L-0 on 781113:during Weekly Surveillance Re Radiological Environ Prog,Air Pump Motor Was Found Inoper. Time Meter Indicated Pump Had Operated Only 0.4 Hours.Air Pump Replaced & New Weekly Air Sample Initiated ML20064E3281978-11-13013 November 1978 /03L-0 on 781014:during Surveillance Test of Main Steam Isolution Valves,V2-86C Closed in 2.6 Seconds Rather than 3-5 Seconds Req in Tech Spec 4.7.D.1.a.1.Caused by Closing Speed Control Valve Coming Loose from Actuator ML20064E3101978-11-13013 November 1978 /03L-0 on 781016:weekly Review of Completed Surveillance Test Following Plant Startup Noted That Monthly Hydrogen Detector Functional Test Was Not Performed Due to Personnel Error ML20064H2291978-08-10010 August 1978 /03L-1 on 780626:during Increase of Reactor Pwr, Noted That Critical Pwr Ratio in 4 Symmetrically Located Fuel Bundles Was Below Tech Spec Values.Caused by Pwr Increasing Xenon Transient ML20064H1681978-07-25025 July 1978 /03L-0 on 780629:during Steady State Oper Motor Control Ctr 893 Lost Voltage Because B Uninterruptible Pwr Supply (UP5) Tripped Due to Blown Inverter Leg Fuse.Failed Components Replaced & Operability Test Performed ML20064H2051978-07-24024 July 1978 /03L-0 on 780625:during Steady State Oper,Noted That Drywell Atmospheric Temp Recorder TR-1-149 Was Inoperable.Caused by Recorder Failure Due to Broken Cord on Chart Drive Mechanism ML20064H1741978-07-24024 July 1978 /03L-0 on 780626:during Reactor Pwr Increase Noted That Local Critical Pwr Ratio in 4 Symmetrically Located Fuel Bundles Was Lower than Tech Spec Levels.Caused by Pwr Increasing Xenon Transient ML20064H1321978-07-24024 July 1978 /03L-0 on 780612:during Steady State Oper,Noted That Drywell Atmospheric Temp Recorder TR-1-149 Was Inoperable.Recorder Failed Due to Failed Idler Assembly 05000271/LER-1976-005, Telecopy LER 76-005:on 760217,portion of Procedure Associated W/Securing Plant from Shutdown Cooling Mode Not Performed.Caused by Failure of Plant Personnel to Follow Appropriate Plant Procedure1976-02-18018 February 1976 Telecopy LER 76-005:on 760217,portion of Procedure Associated W/Securing Plant from Shutdown Cooling Mode Not Performed.Caused by Failure of Plant Personnel to Follow Appropriate Plant Procedure 05000271/LER-1975-003, Corrected LER 75-003:on 750204,core Spray Sys Pump Discharge Pressure Sensor PS-14-44A Actuated at 82 Psig.Caused by Setpoint Drift.Sensor replaced.W/750218 Ltr1975-02-14014 February 1975 Corrected LER 75-003:on 750204,core Spray Sys Pump Discharge Pressure Sensor PS-14-44A Actuated at 82 Psig.Caused by Setpoint Drift.Sensor replaced.W/750218 Ltr 1993-08-31
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20217L8831999-10-21021 October 1999 Safety Evaluation Supporting Proposed Alternatives to Code Requirements Described in RR-V17 & RR-V18 ML20217G2041999-10-13013 October 1999 Safety Evaluation Supporting Amend 179 to License DPR-28 BVY-99-127, Monthly Operating Rept for Sept 1999 for Vermont Yankee Nuclear Power Station.With1999-09-30030 September 1999 Monthly Operating Rept for Sept 1999 for Vermont Yankee Nuclear Power Station.With ML20212C2551999-09-17017 September 1999 Safety Evaluation Supporting Amend 175 to License DPR-28 BVY-99-112, Monthly Operating Rept for Aug 1999 for Vermont Yankee.With1999-08-31031 August 1999 Monthly Operating Rept for Aug 1999 for Vermont Yankee.With BVY-99-109, Ro:On 990812,stack Ng Effluent Instrumentation for PAM Was Declared Oos.Caused by Instrument Drift Due to Electronic Components Based on Insps by Instrumentation & Controls Dept.Detector & Preamplifier Will Be Replaced on 9908311999-08-19019 August 1999 Ro:On 990812,stack Ng Effluent Instrumentation for PAM Was Declared Oos.Caused by Instrument Drift Due to Electronic Components Based on Insps by Instrumentation & Controls Dept.Detector & Preamplifier Will Be Replaced on 990831 BVY-99-102, Monthly Operating Rept for July 1999 for Vermont Yankee. with1999-07-31031 July 1999 Monthly Operating Rept for July 1999 for Vermont Yankee. with ML20209J0081999-07-14014 July 1999 Special Rept:On 990615,diesel Driven Fire Pump Failed to Achieve Rated Flow of 2500 Gallons Per Minute.Pump Was Inoperable for Greater than 7 Days.Corrective Maint Was Performed to Reset Pump Lift Setting BVY-99-090, Monthly Operating Rept for June 1999 for Vermont Yankee Nuclear Power Station.With1999-06-30030 June 1999 Monthly Operating Rept for June 1999 for Vermont Yankee Nuclear Power Station.With ML20196G5071999-06-23023 June 1999 Vynp Assessment of On-Site Disposal of Contaminated Soil by Land Spreading BVY-99-077, Monthly Operating Rept for May 1999 for Vermont Yankee Nuclear Power Station.With1999-05-31031 May 1999 Monthly Operating Rept for May 1999 for Vermont Yankee Nuclear Power Station.With BVY-99-068, Monthly Operating Rept for Apr 1999 for Vynp.With1999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for Vynp.With ML20206E8741999-04-29029 April 1999 SER Determined That Flaw Evaluation Meets Rules of ASME Code & Assumed Crack Growth Rate Adequate for Application ML20206D9301999-04-27027 April 1999 1999 Emergency Preparedness Exercise 990427 Exercise Manual (Plume Portion) ML20205S4211999-04-16016 April 1999 Non-proprietary Version of Revised Page 4-3 of HI-981932 Technical Rept for Vermont Yankee Spent Fuel Pool Storage Expansion ML20205K7581999-04-0707 April 1999 Safety Evaluation Supporting Alternative Proposal for Reexamination of Circumferential Welds with Detected Flaw Indications in Plant RPV BVY-99-046, Monthly Operating Rept for Mar 1999 for Vermont Yankee Nuclear Power Station.With1999-03-31031 March 1999 Monthly Operating Rept for Mar 1999 for Vermont Yankee Nuclear Power Station.With ML20205F6631999-03-0404 March 1999 Jet Pump Riser Weld Leakage Evaluation BVY-99-035, Monthly Operating Rept for Feb 1999 for Vermont Yankee Nuclear Station.With1999-02-28028 February 1999 Monthly Operating Rept for Feb 1999 for Vermont Yankee Nuclear Station.With ML20205P8241999-02-28028 February 1999 Rev 2 to Vermont Yankee Cycle 20 Colr ML20203H9881999-02-18018 February 1999 SER Accepting Alternative to 10CFR50.55a(g)(6)(ii)(A) Augmented Reactor Vessel Exam at Vermont Yankee Nuclear Power Station.Technical Ltr Rept Encl ML20203A6951999-02-0404 February 1999 Revised Rev 2,App B to Vermont Yankee Operational QA Manual (Voqam) ML20199K7151999-01-21021 January 1999 Corrected Safety Evaluation Supporting Amend 163 Issued to FOL DPR-28.Pages 2 & 3 Required Correction & Clarification ML20199K6991999-01-20020 January 1999 Safety Evaluation Concluding That Request to Use YAEC-1339, Yankee Atomic Electric Co Application of FIBWR2 Core Hydraulics Code to BWR Reload Analysis, at Vermont Yankee Acceptable ML20199L5951999-01-14014 January 1999 Safety Evaluation Accepting Licensee Proposed Alternative to Code Requirement,Described in Rev 2 to Pump Relief Request RR-P10 Pursuant to 10CFR50.55a(a)(3)(i) BVY-99-071, Corp 1998 Annual Rept. with1998-12-31031 December 1998 Corp 1998 Annual Rept. with BVY-99-001, Monthly Operating Rept for Dec 1998 for Vermont Yankee Nuclear Power Station1998-12-31031 December 1998 Monthly Operating Rept for Dec 1998 for Vermont Yankee Nuclear Power Station ML20198H5481998-12-23023 December 1998 Rev 2 to Vermont Operational QA Manual,Voqam ML20196H8641998-12-0101 December 1998 Cycle 19 Operating Rept BVY-98-163, Monthly Operating Rept for Nov 1998 for Vermont Yankee Nuclear Power Station.With1998-11-30030 November 1998 Monthly Operating Rept for Nov 1998 for Vermont Yankee Nuclear Power Station.With ML20195C4161998-11-0909 November 1998 SER Accepting Request That NRC Approve ASME Code Case N-560, Alternative Exam Requirement for Class 1,Category B-J Piping Welds BVY-98-154, Monthly Operating Rept for Oct 1998 for Vermont Yankee Nuclear Power Station.With1998-10-31031 October 1998 Monthly Operating Rept for Oct 1998 for Vermont Yankee Nuclear Power Station.With ML20155B6471998-10-26026 October 1998 Safety Evaluation Accepting Jet Pump Riser Insp Results & Flaw Evaluation,Conducted During 1998 Refueling Outage ML20154N0891998-10-16016 October 1998 Rev 1 to Vermont Operational QA Program Manual (Voqam) ML20154B6951998-10-0101 October 1998 SER Re Licensee Response to GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power-Operated Gate Valves, for Vermont Yankee Nuclear Power Station BVY-98-149, Monthly Operating Rept for Sept 1998 for Vermont Yankee Nuclear Power Station.With1998-09-30030 September 1998 Monthly Operating Rept for Sept 1998 for Vermont Yankee Nuclear Power Station.With ML20239A1361998-09-0202 September 1998 SER Re License Request for NRC Review & Concurrence W/Changes to NRC-approved Fire Protection Program BVY-98-135, Monthly Operating Rept for Aug 1998 for Vermont Yankee Nuclear Power Station.With1998-08-31031 August 1998 Monthly Operating Rept for Aug 1998 for Vermont Yankee Nuclear Power Station.With ML20151U0361998-08-28028 August 1998 Non-proprietary Rev 1 to Holtec Rept HI-981932, Vermont Yankee Nuclear Power Station Spent Storage Expansion Project ML20237E9221998-08-20020 August 1998 Vynp 1998 Form NIS-1 Owners Summary Rept for ISI, 961103-980603 BVY-98-122, Monthly Operating Rept for July 1998 for Vermont Yankee Nuclear Power Station1998-07-31031 July 1998 Monthly Operating Rept for July 1998 for Vermont Yankee Nuclear Power Station ML20205F6491998-07-31031 July 1998 Rev 1 to GE-NE-B13-01935-02, Jet Pump Assembly Welds Flaw Evaluation Handbook for Vermont Yankee ML20236G0011998-06-30030 June 1998 Individual Plant Exam External Events BVY-98-098, Monthly Operating Rept for June 1998 for Vermont Yankee Nuclear Power Station1998-06-30030 June 1998 Monthly Operating Rept for June 1998 for Vermont Yankee Nuclear Power Station ML20248C5081998-05-31031 May 1998 Rev 2 to 24A5416, Supplemental Reload Licensing Rept for Vermont Yankee Nuclear Power Station Reload 19 Cycle 20 ML20248C4951998-05-31031 May 1998 Rev 1 to Vermont Yankee Nuclear Power Station Cycle 20 Colr BVY-98-081, Monthly Operating Rept for May 1998 for Vermont Yankee Nuclear Power Station1998-05-31031 May 1998 Monthly Operating Rept for May 1998 for Vermont Yankee Nuclear Power Station ML20247J8341998-05-31031 May 1998 Peak Suppression Pool Temp Analyses for Large Break LOCA Scenarios, for May 1998 ML20247G4001998-05-12012 May 1998 Interview Rept of Ej Massey ML20247E6351998-04-30030 April 1998 Rev 1 to GE-NE-B13-01935-LTR, Jet Pump Riser Welds Allowable Flaw Sizes Ltr Rept for Vermont Yankee 1999-09-30
[Table view] |
Text
- - - _ .
RRC FORM 363 U. S. RUCLE AR REGULATORY COWIMISSION 87 77)
LICENSEE EVENT REPORT LER 78-31/3L (PLEASE PRINT OR TYPE ALL REQUIRED INFORMATION)
CONTROL 8 LOCK: l 1
l l l l l lh 6
7 o i 8 9 lVlTlVlYlS]ll@l0l0l-]0lOl0l0l01-l0l0l@l4l1]1l1l1l@l LICENSEE CODE 14 15 LICENSE NUMBER 25 26 LICENSE TYPE J0 l
5 7 CA F $8 l@
cOvT l!LI._1 ]
7 8 s$RC60 l L@] 0l 5l 010] 0l 2! 7l 1@l 61 DOCK ET NUMBE R 68 69 1lEVENT 0] ilDATE6l 7l 8 @l 1l REPORT 74 75 ll 1l DATE 3l 7l 8l@ 80 EVENT DESCRIPTION AND PROBABLE CONSEQUENCES h 1
10121 l
[o la! l See attached sheet I l
lo Iil I I
10151 l l
10161 l l
[ O J l I
1 o 18 I I 80 OE CO E SU8C E COMPONENT CODE SUB ode SU E lol91 I Zl Zl@ d@ l Cl@ l Z l Z l Z ] Z j Z l Z l@ ]@ ]@
12 13 18 19 20 7 8 9 to 11 OCCURRENCE REPORT R EVISION SEQUE NTI AL I REPORT NO. COOE TYPE NO.
LE R RO
@ag _ 21 l VENT 7l8l YEAR 22 l_l 23 l0l3l1l 24 26 l/l 27 l0 l3 l 28 29 lL l 30 l_l 31 l0 l 32 N A ON PL NT ME HOURS 22 58 IT FOR 8. SUPPL) MANUF CTURER 7 ON l33X lglJ4Zlg gg l36Z l@ l0]Ol0l 37 40 l g g 41 lNlg 42 lZlg 43 lZl9l9l9lg 44 47 JS CAUSE DESCRIPTION AND CORRECTIVE ACTIONS I
IiIoil I
g i ij [ See attached sheet
( I l i 121 1 I
li t al i l
t i l 41 1 7 8 9
% POWER OTHER STATUS IS OV Y DISCOVERY OESCRIPTION A S NA l I1 I 5' l lE l@ l 0 l 7 l 5' l@l" l l A l@l Review of Surveillance Records AETIVITY CO TENT AMOUNT OF ACTIVITY LOCATION OF RELE ASE RELEASED OF RELE ASE NA l l NA ~l Z
l1 I 6' l'[Z } @ l' Z !@l PERSONNEt EXPOSURES NUMBER TvPE cESCRiPTiON @ l NA l i ( 7 l l 0 l 0 l 0 l@l Zl@l" "
PE RSONsE L insu'R'iES NuMeER DESCRiPfiON@ l NA li la 8I 9101010 l@l12 7 11 80
' " ^"
W5'E SC 'Aio'N '' " @
NA l l i l o I LZ_j@l 80 7 8 9 10 ISSUE 12101 LN_f@ l DESCRIPTION NA l llllIllIIIIIl5 68 69 80 "
7 8 9 to 781116OMd,,ns,AR,R N
- w. r. conway
~
psOs,. 802-257-n21 i
I*
- VTVYS1 05000271 LER 78-31/3L EVENT DESCRIPTION AND PROBABLE CONSEQUENCES During the weekly review of completed surveillance tests, following the plant startup of October 13, 1978, it was discovered that the monthly 4 hydrogen detector functional test as required by Technical Specification 3.9.2.b was not performed. The test cannot be accomplished without pro-cess steam and should have been completed upon returning to power opera-tions.
Since the functional test was performed immediately following dis-covery and completed satisfactorily, it is concluded that there were no
. consequences or potential consequences to the health and safety of the public. There have been no previous reportable occurrences of this type.
CAUSE DESCRIPTION AND CORRECTIVE ACTIONS c The test was overlooked because of the activities associated with the plant startup and return to power. The functional test was success- -
fully completed on October 16, 1978, and will be conducted in accordance with the surveillance schedule in the future.
a j
4
^~ = , _ , _