05000247/FIN-2015003-02
From kanterella
Jump to navigation
Jump to search
Finding | |
---|---|
Title | Incorrect Operability Determination Results in Failure to Comply with Technical Specification for Containment Integrity |
Description | The inspectors identified a Green NCV for Unit 2 Technical Specification (TS) 3.6.1, Containment, because between August 11 and August 14, 2015, containment out-leakage during accident conditions would have exceeded the containment leakage rate testing program limit specified in TS 5.5.14.c. Specifically, the 24 fan cooler unit (FCU) SW piping developed a hole and Entergys immediate operability determination (IOD) incorrectly concluded that it did not impact operability. Entergy entered this issue into their corrective action program (CAP) as CR-IP2-2015-3550, completed a prompt operability determination (POD) that required compensatory measures, and implemented those compensatory measures on August 14, 2015. This finding is more than minor because it was associated with the configuration control attribute of the Barrier Integrity cornerstone, and adversely affected the cornerstone objective to provide reasonable assurance that physical design barriers, such as containment, protect the public from radionuclide releases caused by accidents or events. In accordance with IMC 0609.04, Initial Characterization of Findings, and Exhibit 3 of IMC 0609, Appendix A, The Significance Determination Process for Findings At-Power, issued June 19, 2012, the inspectors determined that the finding was of very low safety significance (Green), because it did not represent an actual open pathway in the physical integrity of reactor containment or heat removal components. For the duration of the violation, SW system pressure remained higher than containment pressure, preventing out-leakage. This finding had a cross-cutting aspect in the area of Human Performance, Conservative Bias, because Entergy did not demonstrate a conservative bias when they assumed the opening in the pipe was too small to impact containment integrity. |
Site: | Indian Point |
---|---|
Report | IR 05000247/2015003 Section 1R15 |
Date counted | Sep 30, 2015 (2015Q3) |
Type: | NCV: Green |
cornerstone | Barrier Integrity |
Identified by: | NRC identified |
Inspection Procedure: | IP 71111.15 |
Inspectors (proximate) | A Bolger A Burritt B Pinson G Newman H Gray J Furia J Stewart O Masnyk-Bailey S Barr S Rich |
Violation of: | Technical Specification |
CCA | H.14, Conservative Bias |
INPO aspect | DM.2 |
' | |
Finding - Indian Point - IR 05000247/2015003 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Finding List (Indian Point) @ 2015Q3
Self-Identified List (Indian Point)
| ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||