NL-89-517, Monthly Operating Rept for May 1989 for Rancho Seco Nuclear Generating Station | Rancho Seco | 31 May 1989 | |
NL-23-0193, Request for License Amendment: Relocation of TS 3.7.9, Spent Fuel Pool Makeup Water Sources (LAR-23-003) | Vogtle | 24 March 2023 | |
NL-23-0152, License Amendment Request: Technical Specification Revision to Adopt TSTF-339-A, Relocate Technical Specification Parameters to the COLR Consistent with WCAP-14483 | Vogtle | 11 April 2023 | |
NL-22-0208, License Amendment Request for Alternative Source Term, TSTF-51, TSTF-471, and TSTF-490 | Vogtle | 30 June 2022 | |
NL-21-0912, 0 to Updated Final Safety Analysis Report, Chapter 6, Engineered Safety Features | Farley | 28 October 2021 | |
NL-21-0845, License Amendment Request: Revise Technical Specification 3.7.2 Limiting Condition for Operation to Remove One Main Steam Isolation Valve System | Vogtle | 30 September 2021 | |
NL-21-0265, 3 to Updated Final Safety Analysis Report, Bases for Improved Technical Specifications | Vogtle | 30 March 2021 | |
NL-21-0160, License Amendment Request to Remove Table of Contents from Technical Specifications | Hatch Vogtle Farley | 22 June 2021 | |
NL-20-033, Technical Specifications Proposed Change - Permanently Defueled Technical Specifications | Indian Point | 28 April 2020 | |
NL-20-0275, Application to Revise Technical Specifications to Adopt TSTF-567, Add Containment Sump TS to Address GSI-191 Issues | Farley | 29 May 2020 | |
NL-19-026, Technical Specifications Proposed Change - Permanently Defueled Technical Specifications | Indian Point | 15 April 2019 | |
NL-19-013, Proposed Technical Specifications Change - Administrative Controls for Permanently Defueled Condition | Indian Point | 15 April 2019 | |
NL-18-1302, License Amendment Request for Technical Specification Improvement to Revise Actions for One Steam Supply to Turbine Driven Auxiliary Feedwater Pump Inoperable Using the Consolidated Line ... | Vogtle | 19 December 2018 | |
NL-18-0815, Tornado Missile Risk Evaluator: SNC Response to NRC Request for Additional Information | Vogtle | 26 July 2018 | |
NL-18-0541, Response to Request for Additional Information for Alternative RR-V-11 Regarding Main Steam Safety Valve Testing Requirements | Hatch | 17 April 2018 | |
NL-18-0408, Proposed Alternative RR-V-12 Regarding Main Steam Safety Relief Valve Testing | Hatch | 9 April 2018 | |
NL-17-155, Re-Submittal of Supplemental Information Regarding the Service Water Integrity Aging Management Program for the Review of the Indian Point Nuclear Generating Unit Nos. 2 and 3 License Renewal Application (LRA) | Indian Point | 14 December 2017 | |
NL-17-1367, Response to the Second Request for Additional Information Regarding Alternative Source Term License Amendment Request | Farley | 7 September 2017 | |
NL-17-1197, Fourth Ten-Year Interval Lnservice Testing Program Update | Vogtle | 23 October 2017 | |
NL-17-0643, Response to Request for Additional Information Regarding Alternative Source Term License Amendment Request | Farley | 23 May 2017 | |
NL-17-0534, Joseph M. Farley Nuclear Plant, Updated Final Safety Analysis Report, Revision 27, Chapter 8 Through Chapter 10 | Farley | 20 April 2017 | |
NL-17-0534, Joseph M. Farley Nuclear Plant, Technical Specifications Bases | Farley | 20 April 2017 | |
NL-17-0190, Revise Actions for One Steam Supply to Turbine Driven Auxiliary Feedwater Pump Inoperable Using the Consolidate Line Item Improvement Process | Farley | 21 December 2017 | |
NL-17-0082, Submittal of the Lnservice Testing Program Alternatives for the Fifth Ten-Year Interval | Farley | 6 February 2017 | |
NL-17-002, Response to Request for Additional Information for Review of the License Renewal Application Environmental Review - Severe Accident Mitigation Alternatives | Indian Point | 1 February 2017 | |
NL-16-2384, Non-Voluntary License Amendment Request to Correct Non-Conservative Technical Specification 3.7.1 | Farley | 22 March 2017 | |
NL-16-2280, Vogtle Electric Generating Plant, Units 1 & 2, Updated Final Safety Analysis Report, Table 4.3-1 (Sheet 1 of 3) Through Figure 6-2.1-15 (Sheet 14 of 65) | Vogtle | 2 November 2016 | |
NL-16-2280, Vogtle Electric Generating Plant, Units 1 & 2, Updated Final Safety Analysis Report, Section 15.2 | Vogtle | 2 November 2016 | |
NL-16-2280, Vogtle Electric Generating Plant, Units 1 & 2, Updated Final Safety Analysis Report, Section 10.3 Through Section 15.1 | Vogtle | 2 November 2016 | |
NL-16-2280, Vogtle Electric Generating Plant, Units 1 & 2, Updated Final Safety Analysis Report, Bases for Improved Technical Specifications | Vogtle | 2 November 2016 | |
NL-16-1431, Notification of Full Compliance of Required Action for NRC Order EA-12-049 Mitigation Strategies for Beyond-Design-Basis External Events | Farley | 13 December 2016 | |
NL-16-1242, Submittal of the Inservice Testing Program Relief Request and Alternatives for Pumps and Valves - Fourth Ten-Year Interval | Vogtle | 28 July 2016 | |
NL-16-115, Response to Request for Additional Information Regarding Review of Compliance with Order EA-12-049 Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events,. | Indian Point | 2 December 2016 | |
NL-16-109, Indian Point Unit No. 2 Amendment Update to the Updated Final Safety Analysis Report (Ufsar), Revision 26, Chapter 14, Safety Analysis | Indian Point | 19 September 2016 | |
NL-16-109, Indian Point Unit No. 2 Amendment Update to the Updated Final Safety Analysis Report (Ufsar), Revision 26, Chapter 10, Steam and Power Conversion System | Indian Point | 19 September 2016 | |
NL-16-109, Indian Point 2 Improved Technical Specifications Bases | Indian Point | 19 September 2016 | |
NL-16-0388, Draft License Amendment Request Regarding Alternative Source Team | Farley | 15 October 2016 | |
NL-16-0388, Alternative Source Term License Amendment Request | Farley | 22 November 2016 | |
NL-16-0228, Notification of Full Compliance of Required Action for NRC Order EA-12-049, Mitigation Strategies for Beyond-Design-Basis External Events | Vogtle | 23 May 2016 | |
NL-15-183, Watts Bar Nuclear Plant, Unit 2, Amendment 114 to Final Safety Analysis Report, Section 9.0 - Auxiliary Systems, Pages 9.4-1 - 9.5-66 | Watts Bar | 11 September 2015 | |
NL-15-183, Watts Bar Nuclear Plant, Unit 2, Amendment 114 to Final Safety Analysis Report, Section 7.0 - Instrumentation and Controls | Watts Bar | 11 September 2015 | |
NL-15-183, Watts Bar Nuclear Plant, Unit 2, Amendment 114 to Final Safety Analysis Report, Section 5.0 - Reactor Coolant System | Watts Bar | 11 September 2015 | |
NL-15-183, Watts Bar Nuclear Plant, Unit 2, Amendment 114 to Final Safety Analysis Report, Section 15.0 - Accident Analyses, Pages 15-i - 15.3-76 | Watts Bar | 11 September 2015 | |
NL-15-183, Watts Bar Nuclear Plant, Unit 2, Amendment 114 to Final Safety Analysis Report, Section 14.0 - Initial Test Program | Watts Bar | 11 September 2015 | |
NL-15-183, Watts Bar Nuclear Plant, Unit 2, Amendment 114 to Final Safety Analysis Report, Section 10.0 - Main Steam and Power Conversion System | Watts Bar | 11 September 2015 | |
NL-15-183, Submittal of Watts Bar Nuclear Plant, Unit 2, Amendment 114 to Final Safety Analysis Report | Watts Bar | 11 September 2015 | |
NL-15-181, Watts Bar Unit 1, Revision to Essential Raw Cooling Water and Component Cooling System License Amendment Request Including Proposed Changes to Auxiliary Feedwater Pump Suction Transfer Instrumentation and Reactor Coolant System Loops - Mod | Watts Bar | 3 September 2015 | |
NL-15-156, Sequoyah Nuclear Plants, Units 1 and 2 - Technical Specifications Conversion to NUREG-1431, Rev. 4.0 (SQN-TS-11-10) - Supplement 3. Part 6 of 9 | Sequoyah | 24 July 2015 | |
NL-15-156, Sequoyah Nuclear Plants, Units 1 and 2 - Technical Specifications Conversion to NUREG-1431, Rev. 4.0 (SQN-TS-11-10) - Supplement 3. Part 5 of 9 | Sequoyah | 24 July 2015 | |
NL-15-156, Sequoyah Nuclear Plants, Units 1 and 2 - Technical Specifications Conversion to NUREG-1431, Rev. 4.0 (SQN-TS-11-10) - Supplement 3. Part 4 of 9 | Sequoyah | 24 July 2015 | |
NL-15-156, Sequoyah Nuclear Plants, Units 1 and 2 - Technical Specifications Conversion to NUREG-1431, Rev. 4.0 (SQN-TS-11-10) - Supplement 3. Part 2 of 9 | Sequoyah | 24 July 2015 | |
NL-15-1483, Refueling Outage 1R26 Inservice Inspection Report | Farley | 4 August 2015 | |
NL-15-128, Sequoyah Nuclear Plants, Units 1 and 2 Technical Specifications Conversion to NUREG-1431, Rev. 4.0 (SQN-TS-11-10) - Supplement 2. Part 7 of 8 | Sequoyah | 19 June 2015 | |
NL-15-128, Sequoyah Nuclear Plants, Units 1 and 2 Technical Specifications Conversion to NUREG-1431, Rev. 4.0 (SQN-TS-11-10) - Supplement 2. Part 2 of 8 | Sequoyah | 19 June 2015 | |
NL-15-081, Additional Information Regarding Entergy'S Expedited Seismic Evaluation Process Report (CEUS Sites), Response to NRC Request for Information, Per 10CFR50.54(f) Regarding Recommendation 2.1 of the Near-Term Task Force Review Of.. | Indian Point | 25 June 2015 | |
NL-15-062, Response to Request for Additional Information Regarding Extending the Containment Type a Leak Rate Testing Frequency to 15 Years | Indian Point | 20 May 2015 | |
NL-14-1996, Expedited Seismic Evaluation Process Report - Fukushima Near-Term Task Force Recommendation 2.1 | Vogtle | 30 December 2014 | |
NL-14-1703, Response to Request for Additional Information on LAR to Revise Technical Specifications to Implement NEI-06-09, Rev 0, Risk Informed Technical Specifications Initiative 4b, Risk-Managed Technical Specifications Guidelines. | Vogtle | 11 November 2014 | |
NL-14-152, Entergy'S Expedited Seismic Evaluation Process Report (CEUS Sites), Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights From... | Indian Point | 22 December 2014 | |
NL-14-121, Indian Point, Unit 2, Updated Final Safety Analysis Report, (Ufsar), Revision 25, Chapter 10, Steam and Power Conversion System | Indian Point | 17 September 2014 | |
NL-14-121, Indian Point, Unit 2, Updated Final Safety Analysis Report (Ufsar), Revision 25, Technical Specification Bases List of Effective Sections | Indian Point | 17 September 2014 | |
NL-14-121, Indian Point, Unit 2, Updated Final Safety Analysis Report (Ufsar), Revision 25, Chapter 14 - Safety Analysis | Indian Point | 17 September 2014 | |
NL-14-121, Indian Point, Unit 2, Updated Final Safety Analysis Report (Ufsar), Revision 25, Appendix a, Introduction | Indian Point | 17 September 2014 | |
NL-14-0706, Application to Revise Technical Specifications to Adopt Previously NRC-Approved Generic Technical Specification Changes | Vogtle | 18 July 2014 | |
NL-13-1540, Response to Request for Additional Information on License Amendment Request to Revise Technical Specifications to Implement NEI 06-09, Rev. 0, Risk-Informed Technical Specifications Initiative 4b, Risk-Managed Technical Specifications. | Vogtle | 2 August 2013 | |
NL-13-131, Amendment 14 to License Renewal Application (LRA) | Indian Point | 26 September 2013 | |
NL-13-130, Indian Point, Unit 2, Updated Final Safety Analysis Report (Ufsar), Revision 24, Chapter 10 - Steam and Power Conversion System | Indian Point | 26 September 2013 | |
NL-13-130, Indian Point, Unit 2, Updated Final Safety Analysis Report (Ufsar), Rev. 24, Chapter 14, Safety Analysis | Indian Point | 26 September 2013 | |
NL-13-130, Indian Point, Unit 2, Updated Final Safety Analysis Report (Ufsar), Rev. 24, Appendix a | Indian Point | 26 September 2013 | |
NL-13-098, Board Notification Buried Piping RAI Response | Indian Point | 25 July 2013 | |
NL-13-0213, Southern Nuclear Operating Co.'S Overall Integrated Plan in Response to 3/12/2012 Commission Order Modifying Licenses with Re to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (EA-12-049) | Farley | 27 February 2013 | |
NL-13-0081, Application to Revise Technical Specifications to Adopt TSTF-510, Revision to Steam Generator Program Inspection Frequencies and Tube Sample Selection,Using the Consolidated Line Item Improvement... | Vogtle Farley | 23 January 2013 | |
NL-12-1344, License Amendment Request to Revise Technical Specifications to Implement NEI 06-09, Revision 0, Risk-Informed Technical Specifications Initiative 4b, Risk-Managed Technical Specifications (Rmts) Guidelines. | Vogtle | 13 September 2012 | |
NL-12-123, Official Exhibit - ENT000580-00-BD01 - NL-12-123, Correction to Previous Responses Regarding Unit 1 Buried Piping and Unit 2 Auxiliary Feedwater Pump Room Fire Event (Sept. 26, 2012) | Indian Point | 26 September 2012 | |
NL-12-123, Indian Point Nuclear Generating Units 1, 2 & 3 - Correction to Previous Responses Regarding Unit 1 Buried Piping and Unit 2 Auxiliary Feedwater Pump Room Fire Event | Indian Point | 26 September 2012 | |
NL-12-123, Entergy Pre-Filed Evidentiary Hearing Exhibit ENT000580, NL-12-123, Correction to Previous Responses Regarding Unit 1 Buried Piping and Unit 2 Auxiliary Feedwater Pump Room Fire Event (Sept. 26, 2012) | Indian Point | 26 September 2012 | |
NL-12-039, Proposed License Amendment Regarding Atmospheric Dump Valves | Indian Point | 23 May 2012 | |
NL-11-1297, Methods to Be Used in the Implementation of Risk-Informed Technical Specifications Initiative 4b | Vogtle | 27 September 2011 | |
NL-11-087, Proposed License Amendment Regarding Travelers - TSTF-479-A and TSTF-497-A | Indian Point | 16 September 2011 | |
NL-10-2375, Page Numbering Scheme Clarification for License Amendment Request for Adoption of TSTF-425-A, Rev. 3, Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program | Vogtle | 7 January 2011 | |
NL-10-107, Indian Point 2 (IP2) Nuclear Power Plant Amendment Update to the Final Safety Analysis Report (Fsar), Revision 22, Improved Technical Specifications Bases | Indian Point | 6 October 2010 | |
NL-10-0272, License Amendment Request for Adoption of TSTF-425-A, Revision 3, Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program Using the Consolidated.. | Farley | 29 October 2010 | |
NL-09-1510, Vogtle Electric Generation Plant, Unit 2 - 3rd Interval VOGTLE-2 ISI Plan, Version 3.0 | Vogtle | 12 October 2009 | |
NL-09-1510, Vogtle Electric Generation Plant, Unit 1 - Third 10-Year Interval ISI Plan, Version 3.0 | Vogtle | 12 October 2009 | |
NL-09-079, Reply to Request for Additional Information Regarding Offsite Power, Refueling Cavity, and Unit 2 Auxiliary Feedwater Pump Room Fire Event | Indian Point | 12 June 2009 | |
NL-09-076, Indian Point, Units 2 and 3 - Application for Unit 2 Operating License Condition Change and Units 2 and 3 Technical Specification Changes to Add Inter-Unit Spent Fuel Transfer Requirements | Indian Point | 8 July 2009 | |
NL-09-076, Application for Unit 2 Operating License Condition Change and Units 2 and 3 Technical Specification Changes to Add Inter-Unit Spent Fuel Transfer Requirements | Indian Point | 8 July 2009 | |
NL-09-033, Response to Safety Evaluation Report with Open Items Related to the License Renewal | Indian Point | 12 March 2009 | |
NL-08-086, Supplemental Reply to Request for Additional Information Regarding License Renewal Application - Severe Accident Mitigation Alternatives Analysis | Indian Point | 22 May 2008 | |
NL-08-028, Official Exhibit - ENT000460-00-BD01 - NL-08-028, Letter from Fred Dacimo, Entergy, to NRC Reply to Request for Additional Information Regarding License Renewal Application - Severe Accident Mitigation Alternatives Analysis (Feb. 5, 2008) | Indian Point | 5 February 2008 | |
NL-07-2168, License Amendment Request to Revise Technical Specifications (TS) 3.3.2, ESFAS Instrumentation, and TS 3.5.4, Refueling Water Storage Tank (Rwst). | Vogtle | 9 January 2008 | |
NL-07-1760, J. M. Farley, Units 1 and 2 - Relief Request Q1/2B13-RR-V-2, Proposed Alternative in Accordance with 10 CFR 50.55a(a)(3)(i) | Hope Creek Farley | 17 September 2007 | |
NL-07-1418, Fourth Ten-Year Interval Inservice Testing Program Update | Farley | 14 August 2007 | |
NL-07-028, Inservice Testing Program Summary for 4th Interval, Revision 0 | Indian Point | 28 February 2007 | |
NL-07-0153, Third Interval Inservice Testing (IST) Program Update | Vogtle | 16 April 2007 | |
NL-06-1707, NRC Regulatory Conference July 26, 2006 Supplemental Information | Vogtle | 31 July 2006 | |
NL-06-089, Reply to Request for Additional Information Regarding Proposed License Amendment for Adoption of TSTF 449 | Indian Point | 30 August 2006 | |
NL-06-020, Application for a Technical Specification Change to Add Spent Fuel Cask Loading Requirements | Indian Point | 10 July 2006 | |
NL-06-0124, Application for Technical Specification Improvement Regarding Steam Generator Tube Integrity | Vogtle | 29 March 2006 | |
NL-05-0856, Request to Revise Technical Specifications Regarding Mode Change Limitations Using the Consolidated Line Item Improvement Process | Farley | 2 November 2005 | |
NL-05-045, March 2005 Monthly Operating Report for Indian Point Units, 2 and 3 | Indian Point | 15 April 2005 | |
NL-05-0211, Inservice Testing Program Summary for the Interval July 1, 1994 Through April 6.2006. Revision 3 | Indian Point | 22 February 2005 | |
NL-05-013, Reply to RAI Regarding Indian Point Unit 3 Amendment Application for Alternate Source Term | Indian Point | 28 January 2005 | |
NL-04-1746, Response to Request for Additional Information Related to Request to Revise Technical Specifications - Control Room Habitability | Farley | 27 September 2004 | |
NL-04-155, Supporting Information for License Amendment Request Regarding Indian Point 3 Stretch Power Uprate | Indian Point | 15 December 2004 | |
NL-04-145, Supporting Information for License Amendment Request Regarding Indian Point 3 Stretch Power Uprate | Indian Point | 18 November 2004 | |
NL-04-1408, Request for Technical Specifications Change Steam Generator Program - Revision I | Farley | 5 August 2004 | |
NL-04-095, Reply to Supplemental Request for Additional Information Regarding Indian Point 2 Stretch Power Uprate | Indian Point | 3 August 2004 | |
NL-04-069, Stretch Power Uprate License Amendment Request Package, Sections 6.4 Through 11.7 | Indian Point | 3 June 2004 | |
NL-04-068, Proposed Change to Technical Specifications Regarding Full Scope Adoption of Alternate Source Term | Indian Point | 2 June 2004 | |
NL-04-0564, Joseph M. Farley Nuclear Plant, and Vogtle Electric Generating Plant, Application for Technical Specification Amendment to Eliminate Requirements for Hydrogen Recombiners and Hydrogen/Oxygen Monitors | Hatch Vogtle Farley | 21 May 2004 | |
NL-04-0548, Request to Revise Technical Specifications Regarding Mode Change Limitations Using the Consolidated Line Item Improvement Process | Vogtle | 26 October 2004 | |
NL-04-005, Supporting Information for License Amendment Request Regarding Indian Point 2 Stretch Power Uprate (TAC Mc 1865) | Indian Point | 12 April 2004 | |
NL-03-154, to the Indian Point, Unit 2, License Amendment Request for Conversion to Improved Standard Technical Specifications | Indian Point | 8 October 2003 | |
NL-03-137, to the Indian Point 2 License Amendment Request for Conversion to Improved Standard Technical Specifications | Indian Point | 11 September 2003 | |
NL-03-1323, Request to Revise Technical Specifications, DC Sources and TSTF-360, Revision 1 | Vogtle | 13 October 2003 | |
NL-03-1140, Changes to Technical Specification Bases | Vogtle | 11 June 2003 | |
NL-03-103, Response to Request for Additional Information Regarding Section 3.7, Plant Systems, of the Improved Technical Specifications (ITS) | Indian Point | 23 June 2003 | |
NL-03-058, Reply to Request for Additional Information Regarding Proposed License Amendment for 1.4% Measurement Uncertainty Recapture Power Uprate | Indian Point | 3 April 2003 | |
NL-03-035, to Indian Point 2 License Amendment Request for Conversion to Improved Standard TS | Indian Point | 26 February 2003 | |
NL-02-052, Response to Request for Additional Information Indian Point 2 License Amendment Request for Power Limits with Inoperable Steam Line Safety Valves | Indian Point | 15 April 2002 | |
NL-02-016, License Amendment Request (LAR 02-005), Conversion to Improved Standard Technical Specifications | Indian Point | 27 March 2002 | |
NG-99-0598, Application for Amend to License DPR-49,revising TS Surveillance Requirement 3.4.3.1 to Implement More Appropriate Safety Valve & Safety Relief Valve Setpoint Tolerances | Duane Arnold | 30 April 1999 | |
NG-97-0059, Monthly Operating Rept for Dec 1996 for Duane Arnold Energy Center | Duane Arnold | 31 December 1996 | |
NG-94-0677, 1993 Annual Rept of Facility Changes,Tests,Experiments & Safety & Relief Valve Failures & Challenges | Duane Arnold | 31 December 1993 | |
NG-93-0222, Resubmits Relief Request VR-004 & Modifies VR-003 & VR-005 Re Inservice Testing | Duane Arnold | 29 January 1993 | |
NG-88-0424, 1987 Annual Rept of Facility Changes,Tests,Experiments & Safety & Relief Valve Failures & Challenges | Duane Arnold | 31 December 1987 | |
NG-03-0509, Inservice Inspection Report | Duane Arnold | 18 July 2003 | |
ND-23-0581, ITAAC Closure Notification on Completion of ITAAC 2.2.04.02a (Index Number 220) | Vogtle | 12 July 2023 | |
ND-22-0254, Submittal of Inservice Testing Program Plan - 1st Interval, Version 2.0 | Vogtle | 7 April 2022 | |
ND-21-0757, ITAAC Closure Notification on Completion of ITAAC 2.2.04.02a (Index Number 220) | Vogtle | 2 December 2021 | |
ND-20-0625, Report of 10 CFR 50.59 Changes, Tests and Experiments and 10 CFR 52 Appendix D Departure Report | Vogtle | 5 June 2020 | |
ND-20-0601, Submittal of Inservice Testing Program Plan - 1st Interval | Vogtle | 21 May 2020 | |
ND-20-0093, Supplement to Request for License Amendment: Tornado Missile Protection for Main Steam Vent Stacks and Wall 11 (LAR-19-014S1) | Vogtle | 14 February 2020 | |
ND-19-1416, Report of 10 CFR 50.59 Changes, Tests and Experiments and 10 CFR 52 Appendix D Departure Report | Vogtle | 9 December 2019 | |
ND-19-1388, Preliminary Amendment Request (Par): Tornado Missile Protection for Main Steam Vent Stacks and Wall 11 (PAR-19-014) | Vogtle | 13 November 2019 | |
ND-19-1095, (VEGP) Units 3 and 4 - Emergency Action Levels and Basis | Vogtle | 18 April 2019 | |
ND-19-0855, Request for License Amendment: Tornado Missile Protection for Main Steam Vent Stacks and Wall 11 (LAR-19-014) - Without Proprietary Enclosure 3 | Vogtle | 16 August 2019 | |
ND-19-0127, Supplement to Revision to Request for License Amendment and Exemption: Power Operated Relief Valve (PORV) Noise Mitigation (LAR-18-021R1S1) | Vogtle | 15 February 2019 | |
ND-18-1332, Preliminary Amendment Request (Par): Power Operated Relief Valve (PORV) Noise Mitigation (PAR-18-021) | Vogtle | 19 October 2018 | |
ND-18-1277, Revision to Request for License Amendment and Exemption: Power Operated Relief Valve (PORV) Noise Mitigation (LAR-18-021R1) | Vogtle | 11 October 2018 | |
ND-18-1037, Request for License Amendment and Exemption: Power Operated Relief Valve (PORV) Noise Mitigation (LAR-18-021) | Vogtle | 10 August 2018 | |
ND-18-0309, Unit 4 - Notice of Uncompleted ITAAC 225-days Prior to Initial Fuel Load Item 2.2.04.02a (Index Number 220) | Vogtle | 12 March 2018 | |
ND-17-2126, ITAAC Closure Notification on Completion of ITAAC 3.7.00.01 (Index Number 841) | Vogtle | 29 December 2017 | |
MNS-17-026, Submittal of License Amendment Request Proposing to Revise the Bases for Protection from Tornado-Generated Missiles | Mcguire McGuire | 8 December 2017 | |
MNS-14-103, Submittal of Emergency Plan, Revision 14-5 | Mcguire McGuire | 16 December 2014 | |
MNS-14-088, Technical Specification Bases TOC | McGuire | 4 November 2014 | |
MNS-14-016, Emergency Plan, Revision 14-1 | Mcguire McGuire | 30 January 2014 | |
ML993630482 | Point Beach | 23 December 1999 | |
ML24026A011 | Ginna | 26 January 2024 | |
ML23319A387 | Comanche Peak | 20 December 2023 | |
ML23319A080 | Farley | 31 October 2023 | |
ML23319A075 | Farley | 31 October 2023 | |
ML23319A068 | Farley | 31 October 2023 | |
ML23310A051 | Callaway | 6 November 2023 | |
ML23304A385 | 05200050 | 31 October 2023 | |
ML23304A365 | 05200050 | 31 October 2023 | |
ML23304A357 | 05200050 | 31 October 2023 | |
ML23304A318 | 05200050 | 31 October 2023 | |
ML23283A029 | Fermi | 9 October 2023 | |
ML23278A095 | Callaway | 5 October 2023 | |
ML23275A122 | Saint Lucie | 2 October 2023 | |
ML23275A119 | Saint Lucie | 2 October 2023 | |
ML23275A118 | Saint Lucie | 2 October 2023 | |
ML23275A114 | Saint Lucie | 2 October 2023 | |
ML23275A110 | Saint Lucie | 2 October 2023 | |
ML23268A057 | Vogtle | 7 November 2023 | |
ML23251A020 | | 31 August 2023 | |
ML23249A261 | Salem Hope Creek | 6 September 2023 | |
ML23241A586 | Diablo Canyon | 25 May 2023 | |
ML23241A546 | Diablo Canyon | 25 May 2023 | |
ML23241A340 | Diablo Canyon | 25 May 2023 | |
ML23241A338 | Diablo Canyon | 25 May 2023 | |
ML23214A221 | Vogtle | 30 July 2023 | |
ML23198A359 | Beaver Valley | 2 October 2023 | |
ML23193A897 | Millstone | 28 June 2023 | |
ML23193A896 | Millstone | 28 June 2023 | |
ML23193A895 | Millstone | 28 June 2023 | |
ML23193A894 | Millstone | 28 June 2023 | |
ML23193A890 | Millstone | 28 June 2023 | |
ML23193A885 | Millstone | 28 June 2023 | |
ML23193A884 | Millstone | 28 June 2023 | |
ML23193A882 | Millstone | 28 June 2023 | |
ML23193A880 | Millstone | 28 June 2023 | |
ML23193A874 | Millstone | 28 June 2023 | |
ML23193A873 | Millstone | 28 June 2023 | |
ML23180A108 | Arkansas Nuclear | 20 June 2023 | |
ML23177A252 | South Texas 07201041 | 26 June 2023 | |
ML23173A057 | Peach Bottom | 10 April 2023 | |
ML23166B088 | Callaway | 20 September 2023 | |
ML23165A219 | Vogtle | 13 June 2023 | |
ML23165A216 | Vogtle | 13 June 2023 | |
ML23165A215 | Vogtle | 13 June 2023 | |
ML23151A477 | | 28 November 1988 | |
ML23151A450 | Turkey Point | 24 May 2023 | |
ML23151A447 | Turkey Point | 24 May 2023 | |
ML23151A442 | Turkey Point | 24 May 2023 | |
ML23144A307 | Beaver Valley | 23 May 2023 | |
ML23144A306 | Beaver Valley | 23 May 2023 | |
ML23144A007 | Salem | 24 May 2023 | |
ML23135A185 | Wolf Creek | 8 May 2023 | |
ML23135A184 | Wolf Creek | 8 May 2023 | |
ML23135A180 | Wolf Creek | 8 May 2023 | |
ML23135A176 | Wolf Creek | 8 May 2023 | |
ML23135A173 | Wolf Creek | 8 May 2023 | |
ML23129A797 | Callaway | 9 May 2023 | |
ML23129A280 | Cooper | 20 April 2023 | |
ML23129A268 | Cooper | 20 April 2023 | |
ML23123A279 | Millstone | 2 May 2023 | |
ML23100A030 | Ginna | 10 April 2023 | |
ML23096A041 | Saint Lucie | 1 April 2023 | |
ML23096A039 | Saint Lucie | 1 April 2023 | |
ML23096A037 | Saint Lucie | 1 April 2023 | |
ML23096A030 | Saint Lucie | 1 April 2023 | |
ML23096A026 | Saint Lucie | 1 April 2023 | |
ML23095A019 | Turkey Point | 4 April 2023 | |
ML23095A016 | Turkey Point | 4 April 2023 | |
ML23095A008 | Turkey Point | 4 April 2023 | |
ML23088A254 | Callaway | 23 March 2023 | |
ML23067A184 | Callaway | 29 December 2022 | |
ML23067A183 | Callaway | 29 December 2022 | |
ML23067A181 | Callaway | 29 December 2022 | |
ML23067A174 | Callaway | 29 December 2022 | |
ML23067A166 | Callaway | 29 December 2022 | |
ML23067A156 | Callaway | 29 December 2022 | |
ML23067A152 | Callaway | 29 December 2022 | |
ML23062A650 | Callaway | 29 December 2022 | |
ML23062A644 | Callaway | 29 December 2022 | |
ML23062A642 | Callaway | 29 December 2022 | |
ML23062A635 | Callaway | 29 December 2022 | |
ML23062A618 | Callaway | 29 December 2022 | |
ML23062A419 | Peach Bottom | 3 March 2023 | |
ML23041A227 | Robinson | 13 February 2023 | |
ML23040A047 | Millstone | 22 June 2006 | |
ML23040A046 | Millstone | 1 August 1975 | |
ML23037A921 | Vogtle | 6 February 2023 | |
ML22365A010 | 99902078 05200050 | 31 December 2022 | |
ML22365A006 | 99902078 05200050 | 31 December 2022 | |
ML22365A002 | 99902078 05200050 | 31 December 2022 | |
ML22340A209 | Cook | 30 November 2022 | |
ML22340A202 | Cook | 30 November 2022 | |
ML22340A193 | Cook | 30 November 2022 | |
ML22340A167 | Cook | 30 November 2022 | |
ML22340A160 | Cook | 30 November 2022 | |
ML22340A146 | Cook | 30 November 2022 | |
ML22332A549 | Quad Cities | 21 December 2022 | |
ML22326A121 | Vogtle | 31 October 2022 | |
ML22326A116 | Vogtle | 31 October 2022 | |
ML22326A114 | Vogtle | 31 October 2022 | |
ML22326A065 | Vogtle | 31 October 2022 | |
ML22326A064 | Vogtle | 31 October 2022 | |
ML22326A062 | Vogtle | 31 October 2022 | |
ML22320A594 | Technical Specifications Task Force | 24 October 2022 | |
ML22307A312 | Callaway | 3 November 2022 | |
ML22303A036 | Turkey Point | 20 October 2022 | |
ML22303A033 | Turkey Point | 20 October 2022 | |
ML22303A032 | Turkey Point | 20 October 2022 | |
ML22303A028 | Turkey Point | 20 October 2022 | |
ML22303A027 | Turkey Point | 20 October 2022 | |
ML22292A104 | Nine Mile Point | 5 October 2022 | |
ML22292A091 | Nine Mile Point | 5 October 2022 | |
ML22292A070 | Nine Mile Point | 5 October 2022 | |
ML22285A125 | Callaway | 12 October 2022 | |
ML22285A124 | Callaway | 12 October 2022 | |
ML22278A203 | Limerick | 19 September 2022 | |
ML22272A041 | North Anna | 28 September 2022 | |
ML22270A317 | Salem | 27 September 2022 | |
ML22264A175 | Quad Cities | 28 September 2022 | |
ML22263A418 | Davis Besse | 20 September 2022 | |
ML22263A191 | Arkansas Nuclear | 9 December 2022 | |
ML22250A709 | Palo Verde | 7 September 2022 | |
ML22240A110 | | 18 November 2015 | |
ML22240A109 | | 18 November 2015 | |
ML22240A092 | | 25 June 2015 | |
ML22240A064 | | 27 May 2015 | |
ML22240A011 | | 2 June 2015 | |
ML22234A169 | Ginna | 22 August 2022 | |
ML22221A212 | South Texas | 9 August 2022 | |
ML22220A200 | Vogtle | 10 August 2022 | |
ML22220A199 | Vogtle | 10 August 2022 | |
ML22220A132 | Callaway | 21 October 2022 | |
ML22216A204 | Clinton | 1 January 2014 | |
ML22194A270 | Summer | 27 June 2022 | |
ML22194A192 | Summer | 27 June 2022 | |
ML22194A143 | Summer | 27 June 2022 | |
ML22193A295 | Surry | 26 August 2022 | |
ML22193A135 | Millstone | 23 June 2022 | |
ML22193A132 | Millstone | 23 June 2022 | |
ML22193A131 | Millstone | 23 June 2022 | |
ML22193A130 | Millstone | 23 June 2022 | |
ML22193A123 | Millstone | 23 June 2022 | |
ML22193A122 | Millstone | 23 June 2022 | |
ML22193A081 | Millstone | 23 June 2022 | |
ML22193A078 | Millstone | 23 June 2022 | |
ML22193A073 | Millstone | 23 June 2022 | |
ML22193A070 | Millstone | 23 June 2022 | |
ML22186A137 | Davis Besse | 29 December 2017 | |
ML22186A123 | Davis Besse | 15 February 2018 | |
ML22179A148 | Vogtle | 15 June 2022 | |
ML22179A146 | Vogtle | 15 June 2022 | |
ML22178A004 | Palo Verde | 11 August 2022 | |
ML22173A087 | Palo Verde | 21 June 2022 | |
ML22167A013 | Palisades | 23 January 2017 | |
ML22166A472 | Palisades | 22 February 2017 | |
ML22164A858 | Quad Cities | 13 June 2022 | |
ML22153A185 | Callaway | 2 June 2022 | |
ML22153A183 | Callaway | 2 June 2022 | |
ML22151A163 | | 30 June 2022 | |
ML22151A153 | Wolf Creek | 18 May 2022 | |
ML22151A147 | Wolf Creek | 18 May 2022 | |
ML22151A144 | Wolf Creek | 18 May 2022 | |
ML22151A142 | Wolf Creek | 18 May 2022 | |
ML22151A136 | Wolf Creek | 18 May 2022 | |
ML22144A131 | Beaver Valley | 18 May 2022 | |
ML22144A130 | Beaver Valley | 18 May 2022 | |
ML22144A127 | Beaver Valley | 18 May 2022 | |
ML22144A124 | Beaver Valley | 18 May 2022 | |
ML22140A140 | Point Beach | 20 May 2022 | |
ML22140A069 | South Texas | 28 April 2022 | |
ML22140A067 | South Texas | 28 April 2022 | |
ML22140A064 | South Texas | 28 April 2022 | |
ML22140A059 | South Texas | 28 April 2022 | |
ML22131A129 | Seabrook | 5 May 2022 | |
ML22131A126 | Seabrook | 5 May 2022 | |
ML22131A117 | Seabrook | 5 May 2022 | |
ML22131A107 | Seabrook | 5 May 2022 | |
ML22131A096 | Seabrook | 5 May 2022 | |
ML22131A092 | Seabrook | 5 May 2022 | |
ML22124A316 | Ginna | 27 May 2022 | |
ML22124A306 | Waterford | 8 May 2022 | |
ML22118B143 | Ginna | 28 April 2022 | |
ML22116A084 | Vogtle | 5 July 2022 | |
ML22112A086 | LaSalle 05200002 | 31 January 1997 | |
ML22112A081 | LaSalle 05200002 | 31 January 1997 | |
ML22112A077 | LaSalle 05200002 | 31 January 1997 | |
ML22112A076 | LaSalle 05200002 | 31 January 1997 | |
ML22112A075 | LaSalle 05200002 | 31 January 1997 | |
ML22112A050 | LaSalle 05200002 | 31 January 1997 | |
ML22112A049 | LaSalle 05200002 | 31 January 1997 | |
ML22112A043 | LaSalle 05200002 | 31 January 1997 | |
ML22112A037 | LaSalle 05200002 | 31 January 1997 | |
ML22111A113 | Saint Lucie | 4 March 2022 | |
ML22111A108 | Saint Lucie | 4 March 2022 | |
ML22111A107 | Saint Lucie | 4 March 2022 | |
ML22111A104 | Saint Lucie | 4 March 2022 | |
ML22108A248 | Ginna | 18 April 2022 | |
ML22098A004 | Ginna | 8 April 2022 | |
ML22089A210 | Turkey Point | 30 March 2022 | |
ML22089A207 | Turkey Point | 30 March 2022 | |
ML22089A202 | Turkey Point | 30 March 2022 | |
ML22077A412 | Quad Cities | 18 March 2022 | |
ML22068A147 | Three Mile Island | 26 January 2021 | |
ML22068A055 | Quad Cities | 9 March 2022 | |
ML22067A214 | | 5 April 2022 | |
ML22067A212 | | 8 March 2022 | |
ML22053A233 | Palo Verde | 22 February 2022 | |
ML22042B307 | Quad Cities | 21 October 2021 | |
ML22039A198 | Palisades | 13 May 2022 | |
ML22038A170 | Comanche Peak | 1 February 2022 | |
ML22038A164 | Comanche Peak | 1 February 2022 | |
ML22032A270 | Millstone | 28 January 2022 | |
ML22032A269 | Millstone | 28 January 2022 | |
ML22028A066 | Turkey Point | 24 May 2022 | |
ML22027A807 | Callaway | 27 January 2022 | |
ML22019A135 | Oconee | 21 January 2022 | |
ML22014A415 | Palo Verde | 14 January 2022 | |
ML22013A677 | Saint Lucie | 11 November 2021 | |
ML22013A674 | Saint Lucie | 11 November 2021 | |
ML22013A672 | Saint Lucie | 11 November 2021 | |
ML22013A664 | Saint Lucie | 11 November 2021 | |
ML22013A661 | Saint Lucie | 11 November 2021 | |
ML21350A426 | Saint Lucie | 21 December 2021 | |
ML21335A457 | Callaway | 1 December 2021 | |
ML21335A453 | Callaway | 1 December 2021 | |
ML21334A038 | Beaver Valley | 22 November 2021 | |
ML21334A035 | Beaver Valley | 22 November 2021 | |
ML21334A034 | Beaver Valley | 22 November 2021 | |
ML21334A033 | Beaver Valley | 22 November 2021 | |
ML21322A172 | | 14 December 2021 | |
ML21313A337 | Farley | 28 October 2021 | |
ML21313A327 | Farley | 28 October 2021 | |
ML21313A321 | Farley | 28 October 2021 | |
ML21313A318 | Farley | 28 October 2021 | |
ML21305A099 | Diablo Canyon | 11 October 2021 | |
ML21305A095 | Diablo Canyon | 11 October 2021 | |
ML21305A094 | Diablo Canyon | 11 October 2021 | |
ML21300A260 | Quad Cities | 21 October 2021 | |
ML21286A525 | Catawba | 13 October 2021 | |
ML21286A319 | Browns Ferry | 4 October 2021 | |
ML21286A199 | Browns Ferry | 4 October 2021 | |
ML21278A297 | Calvert Cliffs | 7 September 2021 | |
ML21278A277 | Calvert Cliffs | 7 September 2021 | |
ML21278A255 | Calvert Cliffs | 7 September 2021 | |
ML21278A240 | Calvert Cliffs | 7 September 2021 | |
ML21278A239 | Calvert Cliffs | 7 September 2021 | |
ML21278A128 | Calvert Cliffs | 7 September 2021 | |
ML21278A123 | Calvert Cliffs | 7 September 2021 | |
ML21278A108 | Calvert Cliffs | 7 September 2021 | |
ML21277A065 | Surry | 30 September 2021 | |
ML21272A173 | Callaway | 28 September 2021 | |
ML21272A170 | Callaway | 28 September 2021 | |
ML21265A383 | Turkey Point | 22 September 2021 | |
ML21265A380 | Turkey Point | 22 September 2021 | |
ML21265A379 | Turkey Point | 22 September 2021 | |
ML21265A375 | Turkey Point | 22 September 2021 | |
ML21265A297 | Saint Lucie | 15 September 2021 | |
ML21265A294 | Saint Lucie | 15 September 2021 | |
ML21265A289 | Saint Lucie | 15 September 2021 | |
ML21262A001 | Millstone | 9 November 2021 | |
ML21245A267 | Sequoyah | 27 October 2021 | |
ML21242A298 | Robinson | 21 September 2021 | |
ML21242A216 | Diablo Canyon | 21 December 2022 | |
ML21227A000 | Millstone | 5 October 2021 | |
ML21216A102 | Farley | 4 August 2021 | |
ML21210A136 | Surry | 30 September 2020 | |
ML21210A128 | Surry | 30 September 2020 | |
ML21210A126 | Surry | 30 September 2020 | |
ML21209A996 | Robinson | 2 August 2021 | |
ML21209A178 | Summer | 30 April 2021 | |
ML21209A126 | Summer | 30 April 2021 | |
ML21208A367 | Surry | 30 September 2020 | |
ML21203A152 | Palo Verde | 22 July 2021 | |
ML21203A138 | Palo Verde | 22 July 2021 | |
ML21201A185 | Millstone | 24 June 2021 | |
ML21201A182 | Millstone | 24 June 2021 | |
ML21201A181 | Millstone | 24 June 2021 | |
ML21201A180 | Millstone | 24 June 2021 | |
ML21201A172 | Millstone | 24 June 2021 | |
ML21201A171 | Millstone | 24 June 2021 | |
ML21201A165 | Millstone | 24 June 2021 | |
ML21201A158 | Millstone | 24 June 2021 | |
ML21201A157 | Millstone | 24 June 2021 | |
ML21201A155 | Millstone | 24 June 2021 | |
ML21201A153 | Millstone | 24 June 2021 | |
ML21195A297 | Callaway | 22 June 2021 | |
ML21194A288 | Callaway | 22 June 2021 | |
ML21194A284 | Callaway | 22 June 2021 | |
ML21194A270 | Callaway | 22 June 2021 | |
ML21194A269 | Callaway | 22 June 2021 | |
ML21194A267 | Callaway | 22 June 2021 | |
ML21194A261 | Callaway | 22 June 2021 | |
ML21193A206 | Callaway | 22 June 2021 | |
ML21193A202 | Callaway | 22 June 2021 | |
ML21193A197 | Callaway | 22 June 2021 | |
ML21193A193 | Callaway | 22 June 2021 | |
ML21188A332 | Summer | 10 August 2021 | |
ML21179A124 | Vogtle | 15 June 2021 | |
ML21179A123 | Vogtle | 15 June 2021 | |
ML21179A122 | Vogtle | 15 June 2021 | |
ML21179A118 | Vogtle | 15 June 2021 | |
ML21179A113 | Vogtle | 15 June 2021 | |
ML21179A112 | Vogtle | 15 June 2021 | |
ML21179A110 | Vogtle | 15 June 2021 | |
ML21179A108 | Vogtle | 15 June 2021 | |
ML21179A102 | Vogtle | 15 June 2021 | |
ML21179A101 | Vogtle | 15 June 2021 | |
ML21179A097 | Vogtle | 15 June 2021 | |
ML21179A028 | Dresden | 21 June 2021 | |
ML21179A027 | Dresden | 21 June 2021 | |
ML21168A116 | Wolf Creek | 7 June 2021 | |
ML21168A110 | Wolf Creek | 7 June 2021 | |
ML21168A108 | Wolf Creek | 7 June 2021 | |
ML21168A106 | Wolf Creek | 7 June 2021 | |
ML21168A100 | Wolf Creek | 7 June 2021 | |
ML21166A372 | Byron Braidwood | 15 June 2021 | |
ML21158A284 | Watts Bar | 17 September 2021 | |
ML21158A195 | Oconee | 7 June 2021 | |
ML21152A192 | | 31 December 2020 | |
ML21152A110 | Palisades | 1 June 2021 | |
ML21145A280 | Turkey Point | 12 May 2021 | |
ML21145A279 | Turkey Point | 12 May 2021 | |
ML21145A275 | Turkey Point | 12 May 2021 | |
ML21145A269 | Turkey Point | 12 May 2021 | |
ML21145A266 | Turkey Point | 12 May 2021 | |
ML21140A324 | Ginna | 20 May 2021 | |
ML21137A288 | Arkansas Nuclear | 8 April 2021 | |
ML21137A286 | Arkansas Nuclear | 8 April 2021 | |
ML21137A253 | Byron Braidwood | 17 May 2021 | |
ML21134A242 | Arkansas Nuclear | 8 April 2021 | |
ML21134A241 | Arkansas Nuclear | 8 April 2021 | |
ML21133A054 | Limerick | 29 April 2021 | |
ML21130A078 | Cooper | 21 April 2021 | |