ML21166A372
| ML21166A372 | |
| Person / Time | |
|---|---|
| Site: | Byron, Braidwood |
| Issue date: | 06/15/2021 |
| From: | NRC/RGN-III |
| To: | |
| Shared Package | |
| ML21050A252, ML21050A277 | List: |
| References | |
| 7300217 | |
| Download: ML21166A372 (19) | |
Text
For Audio, dial:
1-888-603-9743 Passcode: 7300217#
Microphones will be muted and cameras turned off.
During the presentation, your phones will be muted.
2020 Annual Assessment Webinar Braidwood and Byron
Nuclear Regulatory Commission Region III, Lisle, IL.
2020 End of Cycle Annual Assessment Webinar Braidwood and Byron
NRC Regional Staff 3
Hironori Peterson Branch Chief Division of Reactor Projects, Branch 3 Nirodh Shah Senior Project Engineer Division of Reactor Projects, Branch 3 Ashley Demeter Project Engineer Division of Reactor Projects, Branch 3
Agenda
- Presentation
- NRC Mission
- Reactor Oversight Process (ROP)
- NRC COVID-19 Actions
- 2020 Safety Performance Overview
- Braidwood
- Byron
- Question-and-Answer Session 4
To license and regulate the nations civilian use of radioactive materials to provide reasonable assurance of adequate protection of public health and safety and to promote the common defense and security and protect the environment.
OUR MISSION Region III Office, Lisle, IL 5
How do we meet our Mission?
Licensing Oversight (Inspections)
Enforcement Incident Response 6
Muzammil at Braidwood Ashley at Byron NRC Main Operations Center
Reactor Oversight Process www.nrc.gov/reactors/operating/oversight.html 7
Action Matrix Columns Increasing:
Safety Significance Inspection Management Involvement Regulatory Action Licensee
Response
Regulatory
Response
Degraded Performance Multiple/Repetitive Degraded Cornerstone Unacceptable Performance www.nrc.gov/reactors/operating/oversight.html 8
NRC Response to COVID-19 Senior Resident Inspector Diana Betancourt at Byron Senior Resident Inspector Dan Kimble at Braidwood Resident Inspector Phil Smagacz at Braidwood Resident Inspector Jamie Weigandt at Byron More detailed information on NRC actions can be found on the NRC webpage: https://www.nrc.gov/about-nrc/covid-19/reactors/
9
So how did the sites do?
Byron Braidwood
Braidwood Resident Inspectors Daniel Kimble Senior Resident Inspector Phillip Smagacz Resident Inspector 11
Operated safely and in a manner that preserved the public health and safety and protected the environment Licensee Response Column 2555 hours0.0296 days <br />0.71 hours <br />0.00422 weeks <br />9.721775e-4 months <br /> of direct inspection All Green Performance Indicators One non-cited, Severity Level IV violation for the failure to follow procedures during blowdown of a multi-purpose cannister.
One Green finding with an associated non-cited violation for the main steam safety valves lift pressure setpoints not within Technical Specification.
https://www.nrc.gov/reactors/operating/oversight/listofasmrpt.html Braidwood 2020 Assessment Summary 12
Byron Resident Inspectors Diana Betancourt Senior Resident Inspector Jamie Weigandt Resident Inspector 13
Operated safely and in a manner that preserved the public health and safety and protected the environment Licensee Response Column 2303 hours0.0267 days <br />0.64 hours <br />0.00381 weeks <br />8.762915e-4 months <br /> of direct inspection All Green Performance Indicators One Green finding and associated non-cited violation for the failure to have appropriate work order instructions to replace the flexible hoses on the 1B auxiliary feedwater pump One Green finding and associated non-cited violation for performing incorrect valve manipulation during component cooling pump ASME surveillance testing One Green finding and associated non-cited violation for entering a high radiation area prior to dose rates having been determined.
https://www.nrc.gov/reactors/operating/oversight/listofasmrpt.html Byron 2020 Assessment Summary 14
For more information Inspection Reports
- https://www.nrc.gov/reactors/operating/oversight/listofrpts-body.html Reactor Oversight Process
- https://www.nrc.gov/reactors/operating/oversight.html Fact Sheets and Brochures
- https://www.nrc.gov/reading-rm/doc-collections/fact-sheets/
NRC Information Digest
- https://www.nrc.gov/reading-rm/doc-collections/nuregs/staff/sr1350/
Regulations
- https://www.nrc.gov/reading-rm/doc-collections/cfr/
15
NRC Social Media Channels Facebook: https://www.facebook.com/nrcgov/
Twitter: https://twitter.com/#!/nrcgov YouTube: http://www.youtube.com/user/NRCgov Linkedin: https://www.linkedin.com/company/u-s--nuclear-regulatory-commission/
Flickr: https://www.flickr.com/photos/nrcgov/
Meeting Feedback On Any Device or Computer:
Go to the Public Meeting Schedule at (www.nrc.gov/pmns/mtg?do=recent30days)
Locate this meeting using the sorting buttons and click on the Meeting Feedback Form Link.
Note: Meetings are sorted by date and time. Use last to get to the most recently completed meeting.
Region III Public Affairs Officers Viktoria Mitlyng Office: 630-829-9662 Cell: 630-201-1345 Viktoria.mitlyng@nrc.gov Prema Chandrathil Office: 630-829-9663 Cell: 630-515-6145 Prema.chandrathil@nrc.gov 18
QUESTIONS?
To ask a question either:
Questions submitted by phone will be answered in the order received.
Press *1 and inform the operator that you wish to ask a question or make a statement.
You may also email your questions after the Webinar to the PAOs.
Viktoria.mitlyng@nrc.gov Prema.chandrathil@nrc.gov 19