Letter Sequence Other |
---|
|
|
MONTHYEARML22077A4122022-03-18018 March 2022 NRR E-mail Capture - Quad Cities Nuclear Power Station, Units 1 and 2 - Acceptance of Alternative RV-06 Related to MSSV Setpoint Testing Project stage: Acceptance Review ML22264A1752022-09-28028 September 2022 Proposed Alternative to the Requirements of the ASME OM Code Project stage: Other 2022-03-18
[Table View] |
|
---|
Category:Code Relief or Alternative
MONTHYEARML23125A0612023-05-0808 May 2023 Proposed Alternative to the Requirements of the ASME Code ML23041A4262023-02-14014 February 2023 Proposed Alternative to the Requirements of the ASME OM Code ML23033A0982023-02-0303 February 2023 Authorization and Safety Evaluation for Alternative Request I6R-09, Revision 0, ML22332A5492022-12-21021 December 2022 Proposed Alternative to the Requirements of the ASME OM Code ML22327A2632022-11-30030 November 2022 Authorization and Safety Evaluation for Alternative Request No. I6R-01, Rev. 0 ML22256A1152022-09-29029 September 2022 Proposed Alternative to the Requirements of the ASME OM Code ML22265A0862022-09-28028 September 2022 Proposed Alternative to the Requirements of the ASME OM Code ML22264A1752022-09-28028 September 2022 Proposed Alternative to the Requirements of the ASME OM Code ML21230A2062021-09-0303 September 2021 Proposed Alternative to Use ASME OM Code Case OMN-28 ML21216A2202021-08-0505 August 2021 Proposed Alternative to Eliminate Certain Documentation Requirements for Pressure Retaining Bolting ML20269A2002020-09-30030 September 2020 Request to Use a Provision of Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI (EPID L2020-LLR-0117 ML20169A5842020-07-15015 July 2020 Relief from the Requirements of the ASME Code ML20113F0412020-04-30030 April 2020 Proposed Alternative to the Submittal Schedule for Certain Reports (COVID-19) ML20099D9552020-04-17017 April 2020 Request to Use Provisions in the 2013 Edition of the ASME Boiler and Pressure Vessel Code for Performing Non-Destructive Examinations ML20036D9622020-02-0404 February 2020 Dresden Nuclear Power Station, Nine Mile Point Nuclear Station, Peach Bottom Atomic Power Station, & Quad Cities Nuclear Power Station - Proposed Alternative to Extend Reactor Pressure Vessel Safety Relief Valve Testing Frequency RS-20-006, Submittal of Relief Request for Revision to RV-03 Associated with Fifth Inservice Testing Interval2020-01-0202 January 2020 Submittal of Relief Request for Revision to RV-03 Associated with Fifth Inservice Testing Interval ML19269C5342019-09-27027 September 2019 Proposed Alternative to Use Encoded Phased Array Ultrasonic Examination Techniques ML19161A2572019-06-0404 June 2019 BWR Fleet Msv/Srv - Testing Frequency Relief Request NRC Pre-Application Meeting June 4, 2019 ML19098A0342019-04-30030 April 2019 Units 1 and 2; Limerick, Units 1 and 2; Peach Bottom, Units 2 and 3, and Quad Cities, Units 1 and 2 - Revision to Approved Alternative to Use BWR Vessel and Internal Proj Guidelins JAFP-19-0023, Relief Request Associated with the Use of Encoded Phased Array Ultrasonic Examination Techniques in Lieu of Radiography for Ferritic and Austenitic Piping Welds2019-02-15015 February 2019 Relief Request Associated with the Use of Encoded Phased Array Ultrasonic Examination Techniques in Lieu of Radiography for Ferritic and Austenitic Piping Welds JAFP-18-0052, Proposed Alternative to Utilize Code Case N-8792018-05-30030 May 2018 Proposed Alternative to Utilize Code Case N-879 JAFP-18-0053, Proposed Alternative to Utilize Code Cases N-878 and N-8802018-05-30030 May 2018 Proposed Alternative to Utilize Code Cases N-878 and N-880 ML18022A6162018-01-24024 January 2018 Approval of Alternatives to the ASME Code Regarding Reactor Vessel Penetration N-11B - Relief Request 15R-11, Revision 3 (CAC No. MF9286; EPID L-2017-LLR-0004) (RS-17-014) RS-18-004, Additional Information Supporting Reactor Pressure Vessel Penetration N-11B Repair Relief Request I5R-112018-01-0404 January 2018 Additional Information Supporting Reactor Pressure Vessel Penetration N-11B Repair Relief Request I5R-11 ML17221A2642017-08-25025 August 2017 Alternative to the Requirements of the ASME Code Regarding Reactor Pressure Vessel Nozzle Assemblies; Relief Request I5R-07 (CAC Nos. MF8989 and MF8990) (RS-16-256) ML17170A0132017-06-26026 June 2017 Proposed Alternative to Eliminate Examination of Threads in Reactor Pressure Vessel Flange (CAC Nos. MF8712-MF8729 and MF9548) ML16230A2372016-09-0606 September 2016 Fleet Request for Proposed Alternative to Use ASME Code Case N-513-4 (CAC Nos. MF7301-MF7322) ML14055A2272014-02-28028 February 2014 Safety Evaluation in Support of Request for Relief Associated with the Fifth 10 Year Interval Inservice Testing Program MF1462 ML12121A6372012-05-10010 May 2012 Request to Use Code Case N-789 ML0928602592010-02-0202 February 2010 Relief, Alternative to Nozzle to Vessel Weld and Inner Radius Examinations ML0907700142009-03-26026 March 2009 Request to Partially Implement Subsequent Edition of ASME Code for Operation and Maintenance of Nuclear Power Plants (OM Code), Section ISTC-522, Condition-Monitoring Program & Mandatory Appendix... ML0828201712008-11-25025 November 2008 Relief Request No. RV-30G from Main Steam Electrometric Relief Valve 0203-3C Test Interval ML0813305572008-06-27027 June 2008 Dresden/Quad Cities Relief Requests from 5-Year Test Interval for Main Steam Safety Valves ML0809803112008-04-30030 April 2008 Relief Request to Use Boiling Water Reactor Vessel & Internals Project Guidelines.. ML0731300522007-11-20020 November 2007 Relief from 5-Year Test Interval for Main Steam Safety Valves ML0716300312007-08-0606 August 2007 Relief Request 14R-16 to Extend the First Period of the Fourth 10-year Inservice Inspection Interval for Twenty Reactor Pressure Vessel Welds ML0508303142005-05-10010 May 2005 Relief, Relief Request CR-39 for Third 10-Year Inservice Inspection Interval ML0426005632004-10-19019 October 2004 Amendments, Main Steam Line Relief Valves and Associated Relief Requests. TAC Nos. MC1792, MC1793, MC1794, and MC1795 ML0403307562004-02-20020 February 2004 Relief, Fourth 10-Year Inservice Testing Program Interval ML0335603862004-01-28028 January 2004 Fourth 10-Year Interval Inservice Inspection Relief Requests Nos.14R-01 Through 14R-01 Through 14R-09 (TAC Nos. MB7695 Through MB7712) RS-03-194, Fourth Interval Inservice Inspection Program Plan2003-10-10010 October 2003 Fourth Interval Inservice Inspection Program Plan SVP-03-096, Submittal of Proposed Relief Requests to the Requirements of 10 CFR 50.55a Concerning the Fourth Ten-Year Interval Inservice Testing Program2003-09-11011 September 2003 Submittal of Proposed Relief Requests to the Requirements of 10 CFR 50.55a Concerning the Fourth Ten-Year Interval Inservice Testing Program ML0319201482003-07-24024 July 2003 Relief Request, Witholding Information from Public Disclosure, ML0314208182003-05-28028 May 2003 Relief Request RV-30E, Inservice Testing Program Relief Regarding Main Steam Electronic Relief Valves and Safety/Relief Valves RS-03-099, Relief Request for Alternative Reactor Pressure Vessel Circumferential Weld Examinations for Fourth Interval Inservice Inspection Program2003-05-16016 May 2003 Relief Request for Alternative Reactor Pressure Vessel Circumferential Weld Examinations for Fourth Interval Inservice Inspection Program ML0312500182003-05-0808 May 2003 Relief, Inservice Testing Program Relief Regarding Main Steam Power Operated Relief Valves, MB8713 RS-03-091, Additional Information Regarding Relief Request RV-30E2003-05-0202 May 2003 Additional Information Regarding Relief Request RV-30E SVP-02-033, Code Relief Request CR-38, Inservice Inspection Program Relief Re 10 Hour Annual Training Requirements of ASME Section XI, 1995 Edition with 1996 Addenda, Appendix VII2002-04-0808 April 2002 Code Relief Request CR-38, Inservice Inspection Program Relief Re 10 Hour Annual Training Requirements of ASME Section XI, 1995 Edition with 1996 Addenda, Appendix VII ML0204200152002-02-21021 February 2002 Relief Request CR-37, Inservice Inspection Program Relief Regarding Examination of Pressure Retaining Welds in Piping Subject to Appendix Viii, Supplement 11 SVP-02-001, Request for Code Relief, Examination of Pressure Retaining Welds in Piping Subject to Appendix Viii, Supplement 11, Examination2002-01-0404 January 2002 Request for Code Relief, Examination of Pressure Retaining Welds in Piping Subject to Appendix Viii, Supplement 11, Examination 2023-05-08
[Table view] Category:Letter
MONTHYEARRS-24-080, Request to Replace Formerly Submitted Documents Available in the Agency Documents Access and Management System (ADAMS) with Documents Redacted in .2024-10-16016 October 2024 Request to Replace Formerly Submitted Documents Available in the Agency Documents Access and Management System (ADAMS) with Documents Redacted in . RS-24-093, Response to Request for Additional Information - Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests2024-10-10010 October 2024 Response to Request for Additional Information - Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests SVP-24-059, Correction to Registration of Use of Casks to Store Spent Fuel2024-10-0404 October 2024 Correction to Registration of Use of Casks to Store Spent Fuel ML24275A2442024-10-0303 October 2024 Reassignment of the U.S. Nuclear Regulatory Commission Branch Chief, Division of Operating Reactor Licensing ML24247A1642024-09-30030 September 2024 Alternative Request RP-01 IR 05000254/20244022024-09-12012 September 2024 Material Control and Accounting Program Inspection Report 05000254/2024402 and 05000265/2024402 (Public) SVP-24-054, Deviation from BWR Vessel and Internals Project (BWRVIP) Guidelines - Inspection of Top Guide Rim Welds2024-09-11011 September 2024 Deviation from BWR Vessel and Internals Project (BWRVIP) Guidelines - Inspection of Top Guide Rim Welds ML24249A1362024-09-0404 September 2024 EN 57304 - Westinghouse Electric Company, LLC, Final Report - No Embedded Files. Notification of the Potential Existence of Defects Pursuant to 10 CFR Part 21 IR 05000254/20240052024-08-28028 August 2024 Updated Inspection Plan and Assessment Follow-Up Letter for Quad Cities Nuclear Power Station (Report 05000254/2024005; 05000265/2024005) RS-24-078, Alternative Request RV-08, Revision 1, Associated with Safety Relief Valve Testing Interval2024-08-20020 August 2024 Alternative Request RV-08, Revision 1, Associated with Safety Relief Valve Testing Interval ML24183A1082024-08-0808 August 2024 – Issuance of Amendment Nos. 302 and 298 Adoption of Tstf-505, Provide Risk Informed Extended Completion Times – RITSTF Initiative 4b SVP-24-049, Owners Activity Report Submittal Sixth 10-Year Interval 2024 Refueling Outage Activities2024-08-0707 August 2024 Owners Activity Report Submittal Sixth 10-Year Interval 2024 Refueling Outage Activities IR 05000254/20243012024-08-0101 August 2024 NRC Initial License Examination Report 05000254/2024301; 05000265/2024301 SVP-24-048, Registration of Use of Casks to Store Spent Fuel2024-07-31031 July 2024 Registration of Use of Casks to Store Spent Fuel SVP-24-046, Turbine Trip and Automatic Scram Due to Digital EHC Power Supply Intermittent Failure2024-07-22022 July 2024 Turbine Trip and Automatic Scram Due to Digital EHC Power Supply Intermittent Failure RS-24-070, Independent Spent Fuel Storage Installation, Nine Mile Point, Units 1 and 2, Quad Cities, Units 1 and 2, R. E. Ginna - Nuclear Radiological Emergency Plan Document Revisions2024-07-12012 July 2024 Independent Spent Fuel Storage Installation, Nine Mile Point, Units 1 and 2, Quad Cities, Units 1 and 2, R. E. Ginna - Nuclear Radiological Emergency Plan Document Revisions SVP-24-041, Regulatory Commitment Change Summary Report2024-07-0505 July 2024 Regulatory Commitment Change Summary Report SVP-24-043, Registration of Use of Casks to Store Spent Fuel2024-07-0505 July 2024 Registration of Use of Casks to Store Spent Fuel ML24162A0982024-07-0303 July 2024 – Issuance of Amendment Nos. 301 and 297 Adoption of 10 CFR 50.69 Risk Informed Categorization and Treatment of Structures, Systems, and Components for Nuclear Power Reactors SVP-24-040, Registration of Use of Casks to Store Spent Fuel2024-06-25025 June 2024 Registration of Use of Casks to Store Spent Fuel RS-24-061, Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations2024-06-14014 June 2024 Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations SVP-24-039, Ile Post Exam Package Letter2024-06-12012 June 2024 Ile Post Exam Package Letter RS-24-053, Response to Request for Additional Information Related to License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed2024-06-0606 June 2024 Response to Request for Additional Information Related to License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed ML24110A0492024-05-28028 May 2024 Audit Report Related to the TSTF-505 and 10 CFR 50.59 Amendments ML24079A0762024-05-23023 May 2024 Issuance of Amendments to Adopt TSTF 264 ML24142A3352024-05-21021 May 2024 Quad Cities—Information Request to Support the NRC Annual Baseline Emergency Action Level and Emergency Plan Changes ML24141A2102024-05-20020 May 2024 Operator Licensing Examination Approval - Quad Cities Nuclear Power Station, May 2024 RS-24-055, 2023 Corporate Regulatory Commitment Change Summary Report2024-05-17017 May 2024 2023 Corporate Regulatory Commitment Change Summary Report IR 05000254/20240012024-05-14014 May 2024 Integrated Inspection Report Nos. 05000254/2024001 and 05000265/2024001 SVP-24-034, Annual Radiological Environmental Operating Report2024-05-10010 May 2024 Annual Radiological Environmental Operating Report RS-24-042, Response to Request for Additional Information Related to License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion2024-05-10010 May 2024 Response to Request for Additional Information Related to License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion SVP-24-031, Automatic Actuation of Reactor Protection System During Scram Discharge Volume Leak Rate Testing2024-05-10010 May 2024 Automatic Actuation of Reactor Protection System During Scram Discharge Volume Leak Rate Testing RS-24-046, 10 CFR 50.46 Annual Report2024-05-0606 May 2024 10 CFR 50.46 Annual Report ML24109A0662024-05-0202 May 2024 – Relief Request I5R-26, Revision 0 RS-24-041, Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests2024-04-30030 April 2024 Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests SVP-24-029, Radioactive Effluent Release Report for 20232024-04-26026 April 2024 Radioactive Effluent Release Report for 2023 SVP-24-028, Independent Spent Fuel Storage Installation Annual Radioactive Effluent Release Report2024-04-26026 April 2024 Independent Spent Fuel Storage Installation Annual Radioactive Effluent Release Report ML24114A1712024-04-23023 April 2024 State of Illinois (IEMA-OHS) Comment Quad Cities HI-STORM Exemption Environmental Assessment IR 05000254/20245012024-04-0505 April 2024 Emergency Preparedness Biennial Exercise Inspection Report 05000254/2024501 and 05000265/2024501 RS-24-032, Response to Request for Additional Information Related to License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion2024-04-0505 April 2024 Response to Request for Additional Information Related to License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion SVP-24-024, Corrected Radioactive Effluent Release Report for 20222024-04-0505 April 2024 Corrected Radioactive Effluent Release Report for 2022 RS-24-002, Constellation Energy Generation, LLC - Annual Property Insurance Status Report2024-04-0101 April 2024 Constellation Energy Generation, LLC - Annual Property Insurance Status Report SVP-24-023, Ile Outline Submittal Letter2024-03-29029 March 2024 Ile Outline Submittal Letter RS-24-019, Response to Request for Additional Information Related to License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Completion Times TSTF2024-03-19019 March 2024 Response to Request for Additional Information Related to License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Completion Times TSTF ML23340A1552024-03-15015 March 2024 – Issuance of Amendment Nos. 299 and 295 Adoption of TSTF-564, Safety Limit MCPR RS-24-020, Request for Exemption from Certain Requirements of 10 CFR 72.212 and 10 CFR 72.214 for Quad Cities Nuclear Power Station - Holtec MPC-68MCBS2024-03-15015 March 2024 Request for Exemption from Certain Requirements of 10 CFR 72.212 and 10 CFR 72.214 for Quad Cities Nuclear Power Station - Holtec MPC-68MCBS SVP-24-018, Ile Proposed Exam Submittal Letter2024-03-13013 March 2024 Ile Proposed Exam Submittal Letter RS-24-015, Submittal of RP-01 Relief Request Associated with the Sixth Inservice Testing Interval2024-02-29029 February 2024 Submittal of RP-01 Relief Request Associated with the Sixth Inservice Testing Interval IR 05000254/20230062024-02-28028 February 2024 Annual Assessment Letter for Quad Cities Nuclear Power Station, Units 1 and 2 (Report 05000254/2023006 and 05000265/2023006) ML24053A1192024-02-22022 February 2024 Request for Information for the NRC Age-Related Degradation Inspection: Inspection Report 05000265/2024010 and 05000254/2024010 2024-09-04
[Table view] Category:Safety Evaluation
MONTHYEARML24247A1642024-09-30030 September 2024 Alternative Request RP-01 ML24183A1082024-08-0808 August 2024 – Issuance of Amendment Nos. 302 and 298 Adoption of Tstf-505, Provide Risk Informed Extended Completion Times – RITSTF Initiative 4b ML24162A0982024-07-0303 July 2024 – Issuance of Amendment Nos. 301 and 297 Adoption of 10 CFR 50.69 Risk Informed Categorization and Treatment of Structures, Systems, and Components for Nuclear Power Reactors ML24109A0662024-05-0202 May 2024 – Relief Request I5R-26, Revision 0 ML23340A1552024-03-15015 March 2024 – Issuance of Amendment Nos. 299 and 295 Adoption of TSTF-564, Safety Limit MCPR ML23349A1622023-12-17017 December 2023 Issuance of Amendment Nos. 298 and 294 Increase Completion Time in Technical Specification 3.8.1.B.4 (Emergency Circumstances) ML23305A1402023-12-13013 December 2023 Units 1 & 2; Nine Mile Point, Unit 2; Peach Bottom, Units 2 & 3; and Quad Cities, Units 1 and 2 - Issuance of Amendments to Adopt Traveler TSTF-580 ML23206A0382023-09-21021 September 2023 Proposed Alternative to the Requirements of the ASME Code ML23178A0742023-08-0707 August 2023 Issuance of Amendment Nos. 296 and 292 Adoption of TSTF-416 Low Pressure Coolant Injection (LPCI) Valve Alignment Verification Note Location ML23125A0612023-05-0808 May 2023 Proposed Alternative to the Requirements of the ASME Code ML23114A2522023-04-28028 April 2023 Request to Use a Provision of a Later Edition of the ASME Boiler & Pressure Vessel Code, Section XI ML23081A0382023-04-25025 April 2023 County, 1 & 2; Nine Mile Point, 2; and Quad Cities, 1 & 2 - Issuance of Amendments to Adopt TSTF-306, Rev. 2, Add Action to LCO 3.3.6.1 to Give Option to Isolate the Penetration ML23041A4262023-02-14014 February 2023 Proposed Alternative to the Requirements of the ASME OM Code ML22347A2412023-02-0606 February 2023 Issuance of Amendment Nos. 294 and 290 Control Rod Scram Times (Public) - ML22332A5492022-12-21021 December 2022 Proposed Alternative to the Requirements of the ASME OM Code ML22298A0022022-12-15015 December 2022 Issuance of Amendment Nos. 293 and 289 Transition to GNF3 Fuel (EPID L-2021-LLA-0159) (Public) ML22217A0442022-12-0707 December 2022 Issuance of Amendment Nos. 292 and 288 Control Rod Scram Times ML22308A1602022-12-0202 December 2022 Issuance of Amendment Nos. 291 and 287 New Fuel Vault and Spent Fuel Storage Pool Criticality Methodologies ML22293B8052022-11-30030 November 2022 Constellation Energy Generation, Llc_Fleet - Request to Authorize Use Honeywell Mururoa V4F1 R Supplied Air Suits ML22311A0032022-11-0909 November 2022 Proposed Alternative to the Requirements of the ASME OM Code ML22256A1152022-09-29029 September 2022 Proposed Alternative to the Requirements of the ASME OM Code ML22265A0862022-09-28028 September 2022 Proposed Alternative to the Requirements of the ASME OM Code ML22264A1752022-09-28028 September 2022 Proposed Alternative to the Requirements of the ASME OM Code ML22090A0862022-04-29029 April 2022 Amendments to Adopt TSTF-541,Rev.2,Add Exceptions to Surveillance Requirements for Valves,Dampers Locked in Actuated Position ML22094A0012022-04-15015 April 2022 Constellation Energy Generation, LLC - Proposed Alternative for Repair of Water Level Instrumentation Partial Penetration Nozzles (Epids L-2021-LLR-0057 and L-2021-LLR-0058) ML21347A0382022-01-13013 January 2022 Issuance of Amendments to Revise Reactor Coolant Leakage Requirements ML21267A3172021-12-13013 December 2021 Proposed Alternative to Eliminate Certain Documentation Requirements for Pressure Retaining Bolting (6th ISI Interval) (Epids L-2021-LLR 0029, 0030) ML21307A3422021-12-0707 December 2021 Issuance of Amendments to Adopt Reactor Pressure Vessel Water Inventory Control Enhancements (EPIDs L-2020-LLA-0253 and L-2020-LLA-0254) ML21277A2482021-11-16016 November 2021 Letter with Enclosure 4, Safety Evaluation for Transfer of Licenses and Draft Conforming License Amendments (Public Version) ML21230A2062021-09-0303 September 2021 Proposed Alternative to Use ASME OM Code Case OMN-28 ML21216A2202021-08-0505 August 2021 Proposed Alternative to Eliminate Certain Documentation Requirements for Pressure Retaining Bolting ML21166A1682021-06-25025 June 2021 ML21033A5302021-04-0101 April 2021 Issuance of Amendments to Adopt Technical Specifications Task Force TSTF-566, Revise Actions for Inoperable RHR Shutdown Cooling Subsystems ML21013A0052021-02-0404 February 2021 Issuance of Amendments to Adopt Technical Specifications Task Traveler TSTF-568, Revise Applicability of BWR/4 TS 3.6.2.5 and TS 3.6.3.2 ML21028A6732021-02-0303 February 2021 Request to Use a Provision of Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI (EPID L-2020-LLR-011 ML21005A0612021-01-14014 January 2021 Proposed Alternatives to Extend the Safety Relief Valve Testing Interval (EPID L-2020-LLR-0014 Through L-2020-LLR-0018) ML20287A1302020-11-0505 November 2020 Review of Quality Assurance Program Changes ML20269A2002020-09-30030 September 2020 Request to Use a Provision of Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI (EPID L2020-LLR-0117 ML20153A8042020-07-31031 July 2020 Co. - Issuance of Amendments Revising Emergency Action RA3 ML20169A5842020-07-15015 July 2020 Relief from the Requirements of the ASME Code ML20141L6362020-07-10010 July 2020 Issuance of Amendments Based on TSTF-427,Allowance for Nontechnical Specification Barrier Degradation on Supported System Operability,Rev 2 ML20134H9402020-07-0808 July 2020 Issuance of Amendments Revising the High Radiation Area Administrative Controls ML20150A3282020-06-26026 June 2020 Issuance of Amendment Nos. 281 and 277 to Increase Allowable Main Steam Isolation Leakage ML20113F0412020-04-30030 April 2020 Proposed Alternative to the Submittal Schedule for Certain Reports (COVID-19) ML20094F8332020-04-0909 April 2020 Issuance of Amendment No. 276, Revise Technical Specification 3.6.1.3 Related to Increased Allowed Main Steam Isolation Valve Leakage (Emergency Circumstances) ML20021A0702020-04-0606 April 2020 Issuance of Amendments to Delete License Conditions for Decommissioning Trusts ML19331A7252020-02-14014 February 2020 Issuance of Amendments Revising Emergency Action Levels ML19301A3392019-12-0404 December 2019 Issuance of Amendments to Revise Technical Specification 2.1.1, Reactor Core Safety Limits, the Minimum Critical Power Ration Safety Limits ML19269C5342019-09-27027 September 2019 Proposed Alternative to Use Encoded Phased Array Ultrasonic Examination Techniques ML19192A2442019-07-18018 July 2019 Proposed Alternative to Use ASME Code Cases N-878 and N-880 2024-09-30
[Table view] |
Text
September 28, 2022 Mr. David P. Rhoades Senior Vice President Constellation Energy Generation, LLC President and Chief Nuclear Officer Constellation Nuclear 4300 Winfield Road Warrenville, IL 60555
SUBJECT:
QUAD CITIES NUCLEAR POWER STATION, UNITS 1 AND 2 - PROPOSED ALTERNATIVE TO THE REQUIREMENTS OF THE ASME OM CODE (EPID L-2022-LLR-0015)
Dear Mr. Rhoades:
By letter dated February 17, 2022 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML22048B569), Constellation Energy Generation, LLC, (the licensee) submitted an alternative request to the U.S. Nuclear Regulatory Commission (NRC) to the requirements of the American Society of Mechanical Engineers (ASME) Code for Operation and Maintenance of Nuclear Power Plants (OM Code), associated with valve inservice testing (IST) at Quad Cities Nuclear Power Station, Units 1 and 2 (QCNPS).
Specifically, pursuant to Title 10 of the Code of Federal Regulations (10 CFR), Part 50 Section 55a, paragraph (z), subparagraph (2) (10 CFR 50.55a(z)(2)), to implement alternative request RV-06 for the frequency of the testing of certain pressure isolation valves at QCNPS on the basis that the proposed alternative provides an acceptable level of quality and safety.
Although the licensee referred to this submittal as a relief request, this submittal represents an alternative request in accordance with 10 CFR 50.55a(z)(2).
The NRC staff has reviewed the subject request and concludes, as set forth in the enclosed safety evaluation, that that compliance with the sample expansion requirements in ASME OM Code, Mandatory Appendix I, and Code Case OMN-17 if a single main steam safety valve (MSSV) fails its set-pressure test, it would result in a hardship without a compensating increase in the level of quality and safety in light of the licensees proposal in alternative request RV-06 to conduct a set-pressure test of at least four of the eight MSSVs each refueling outage at QCNPS, and to expand the sample if at least two MSSVs failed their set-pressure tests.
Accordingly, the NRC staff concludes that the licensee has adequately addressed the regulatory requirements set forth in 10 CFR 50.55a(z)(2). Therefore, the NRC staff authorizes the use of alternative request RV-06 for the sixth 10-year IST interval at QCNPS, which will begin on February 18, 2023, and is scheduled to end on February 17, 2033.
All other ASME OM Code requirements as incorporated by reference in 10 CFR 50.55a for which a relief or an alternative was not specifically requested, and granted or authorized (as appropriate), in the subject request remain applicable.
D. Rhoades If you have any questions, please contact the Project Manager, Robert Kuntz at 301-415-3733 or via e-mail at Robert.Kuntz@nrc.gov.
Sincerely, Digitally signed by Nancy Nancy L. L. Salgado Date: 2022.09.28 Salgado 12:26:34 -04'00' Nancy L. Salgado, Chief Plant Licensing Branch III Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-254 and 50-265
Enclosure:
Safety Evaluation cc: Listserv
SAFETY EVALUATION BY THE OFFICE OF NUCLEAR REACTOR REGULATION RELATED TO ALTERNATIVE REQUEST RV-06 CONSTELLATION ENERGY GENERATION, LLC QUAD CITIES NUCLEAR POWER STATION, UNITS 1 AND 2 DOCKET NOS. 50-254 AND 50-265
1.0 INTRODUCTION
By letter dated February 17, 2022 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML22048B569), Constellation Energy Generation, LLC (the licensee) submitted alternative request RV-06 to the U.S. Nuclear Regulatory Commission (NRC) for use of an alternative to specific inservice testing (IST) requirements in the 2017 Edition of the American Society of Mechanical Engineers (ASME) Operation and Maintenance of Nuclear Power Plants, Division 1, OM Code: Section IST (OM Code) at the Quad Cities Nuclear Power Station, Units 1 and 2 (QCNPS) for the sixth 10-year IST interval.
Specifically, RV-06 proposed an alternative to modify the sample expansion requirements for set-pressure testing of the main steam safety valves (MSSVs) at QCNPS pursuant to Title 10 of the Code of Federal Regulations (10 CFR), Part 50, section 55a, paragraph (z),
subparagraph (2) (10 CFR 50.55a(z)(2)), on the basis that compliance with the applicable ASME OM Code requirements would result in hardship or unusual difficulty without a compensating increase in the level of quality and safety. Although the licensee referred to this submittal as a relief request, this submittal represents an alternative request in accordance with 10 CFR 50.55a(z)(2).
The QCNPS sixth 10-year IST interval will begin on February 18, 2023, and is scheduled to end on February 17, 2033.
2.0 REGULATORY EVALUATION
The regulations in 10 CFR 50.55a(f)(4), Inservice testing standards requirement for operating plants, state that throughout the service life of a boiling or pressurized-water-cooled nuclear power facility, pumps and valves that are within the scope of the ASME OM Code must meet the IST requirements (except design and access provisions) set forth in the ASME OM Code and addenda that become effective subsequent to editions and addenda specified in 10 CFR 50.55a(f)(2) and (3) and that are incorporated by reference in 10 CFR 50.55a(a)(1)(iv),
Enclosure
to the extent practical within the limitations of design, geometry, and materials of construction of the components.
In proposing an alternative to IST requirements in the applicable edition or addenda of the ASME OM Code as incorporated by reference in 10 CFR 50.55a, a licensee must demonstrate that (1) the proposed alternative provides an acceptable level of quality and safety in accordance with 10 CFR 50.55a(z)(1), or (2) compliance with the specified requirements would result in hardship or unusual difficulty without a compensating increase in the level of quality and safety in accordance with 10 CFR 50.55a(z)(2).
The applicable OM Code of Record for the sixth 10-year IST interval at QCNPS is the 2017 Edition of ASME OM Code as incorporated by reference in 10 CFR 50.55a. The IST requirements in the 2017 Edition of the ASME OM Code, subsection ISTC, Inservice Testing of Valves in Water-Cooled Reactor Nuclear Power Plants, related to this alternative request are as follows:
Division 1, Mandatory Appendix I, Inservice Testing of Pressure Relief Devices in Water-Cooled Reactor Nuclear Power Plants, paragraph I-1320, Test Frequencies, Class 1 Pressure Relief Devices, paragraph (c), Requirements for Testing Additional Valves, states:
Additional valves shall be tested in accordance with the following requirements:
(1) For each valve tested for which the as-found set-pressure (first test actuation) exceeds the greater of either the plus/minus tolerance limit of the Owner established set-pressure acceptance criteria of subpara. I-1310(e) or +/-3% of valve nameplate set-pressure, two additional valves shall be tested from the same valve group.
(2) If the as-found set-pressure of any of the additional valves tested in accordance with subpara. (c)(1) exceeds the criteria noted therein, then all remaining valves of that same valve group shall be tested.
(3) The Owner shall evaluate the cause and effect of valves that fail to comply with the set-pressure acceptance criteria established in subpara. (c)(1) or the Owner established acceptance criteria for other required tests, e.g., the acceptance of auxiliary actuating devices, compliance with Owners seat-tightness criteria, etc. Based upon this evaluation, the Owner shall determine the need for testing in addition to the minimum tests specified in subpara. (c) to address any generic concerns that could apply to valves in the same or other valve groups.
ASME OM Code Case OMN-17, Alternative Rules for Testing ASME Class 1 Pressure Relief/Safety Valves, paragraph 1, Test Frequencies, Class 1 Pressure Relief Valves, paragraph (c), Requirements for Testing Additional Valves, states:
Additional valves shall be tested in accordance with the following requirements:
(1) For each valve tested for which the as-found set-pressure (first test actuation) exceeds the greater of either the plus/minus tolerance limit of the Owner-established set-pressure acceptance criteria or +/-3% of valve
nameplate set-pressure, two additional valves shall be tested from the same valve group.
(2) If the as-found set-pressure of any of the additional valves tested in accordance with subpara. (c)(1) exceeds the criteria noted therein, then all remaining valves of that same valve group shall be tested.
(3) The Owner shall evaluate the cause and effect on system capability of valves that fail to comply with the set-pressure acceptance criteria established in subpara. (c)(1), or the acceptance criteria for other required tests (e.g., acceptance of auxiliary actuating devices, compliance with Owners seat tightness criteria). Based upon this evaluation, to address any generic concerns, the Owner shall determine the need for testing in addition to the minimum tests specified.
3.0 TECHNICAL EVALUATION
3.1 Alternative Request RV-06 3.1.1 ASME Code Components Affected The components affected by the alternative request are provided on page 1 of 3 of 10 CFR 50.55a Request Number RV-06 included in the Attachment to the February 17, 2022, letter under item 1, ASME Code Components Affected.
3.1.2 Reason for Request Alternative request RV-06 describes the reason for the request pursuant to 10 CFR 50.55a(z)(2) to implement an alternative to the provisions of ASME OM Code, Mandatory Appendix I, paragraph I-1320(c), and ASME OM Code Case OMN-17, paragraph 1(c). QCNPS does not have the facilities necessary to perform setpoint tests on large relief and safety valves. In the event that expanded testing is required by a leakage test failure of one MSSV, the MSSVs in the expanded sample would need to be shipped to an off-site vendor facility for as-found testing.
Because of the lengthy time period required for removal, transportation, testing and re-installation, the removal and testing of additional valves due to sample expansion might delay startup following a refueling outage by several days.
3.1.3 Licensees Proposed Alternative and Basis for Use Alternative request RV-06 proposes to remove and test at least half of the eight MSSVs during each reactor refueling outage. If only one of the four MSSVs removed for testing fails its setpoint test, additional MSSVs will not be tested. However, if more than one MSSV fails its as-found initial setpoint test, then the sample expansion criteria of ASME OM Code, Appendix I, paragraph I-1320(c)(2), and ASME OM Code Case OMN-17, paragraph 1(c)(2), will be implemented. The request asserts that this proposed alternative testing of the MSSVs provides reasonable assurance of MSSV operational readiness. The licensee considers that complying with the sample expansion provisions in ASME OM Code, Appendix I, and Code Case OMN-17, would result in a hardship or unusual difficulty without a compensating increase in the level of quality and safety pursuant to 10 CFR 50.55a(z)(2).
3.2 NRC Staff Evaluation ASME OM Code, Mandatory Appendix I, paragraph I-1320(a), 5-Yr Test Interval, requires, in part, that Class 1 pressure relief valves shall be tested at least once every 5 years, and that a minimum of 20 percent of the valves from each valve group shall be tested within a 24-month interval. NRC Regulatory Guide 1.192 (Revision 4), Operation and Maintenance Code Case Acceptability, ASME OM Code, as incorporated by reference in 10 CFR 50.55a, accepts Revision 1 to ASME OM Code Case OMN-17 for use by nuclear power plant licensees without conditions. ASME OM Code Case OMN-17, Revision 1, in paragraph 1(a), specifies, in part, that Class 1 pressure relief valves shall be tested at least once every 6 years, and that a minimum of 20 percent of the valves from each valve group shall be tested within a 24-month interval. For each valve tested per ASME OM Code, Mandatory Appendix l, or ASME OM Code Case OMN-17 that fails its set-pressure test, an additional two valves must be tested as specified in ASME OM Code, Mandatory Appendix I, paragraph I-1320(c), or Code Case OMN-17, paragraph 1(c), as applicable.
Alternative request RV-06, asserts that complying with the sample expansion requirements in ASME OM Code, Mandatory Appendix I, and Code Case OMN-17 for the MSSVs at QCNPS would result in a hardship or unusual difficulty without a compensating increase in the level of quality and safety pursuant to 10 CFR 50.55a(z)(2). Therefore, alternative proposes to remove and test at least half of the eight MSSVs during each reactor refueling outage. If only one of the four MSSVs removed for testing fails its setpoint test, additional MSSVs will not be tested.
However, if more than one MSSV fails its as-found setpoint test, then the sample expansion criteria of ASME OM Code, Mandatory Appendix I, paragraph I-1320(c)(2) and ASME OM Code Case OMN-17, paragraph (1)(c)(2), will be implemented. The licensee considers that this proposed alternative testing of the MSSVs provides reasonable assurance of adequate valve operational readiness.
The NRC staff has reviewed alternative request RV-06, to conduct a set-pressure test of at least four of the eight MSSVs each refueling outage at QCNPS, without testing additional MSSVs if only one of those four MSSVs fails its set-pressure test. The proposal provides for testing half of the MSSVs each outage compared to the ASME OM Code requirement and OMN-17 provision to test only 20 percent of the MSSVs within any 24-month interval. As indicated in the request, QCNPS does not have the facilities necessary to perform set-pressure tests on large relief and safety valves such that the sampled MSSVs must be removed, decontaminated, transported, tested, return transported, and reinstalled. Based on the proposal in alternative request RV-06 to test four of eight MSSVs each outage, the NRC staff considers the requirement in ASME OM Code, Mandatory Appendix I, paragraph I-1320(c), and Code Case OMN-17, paragraph 1(c), to expand the test sample if only one MSSV fails its set-pressure test to represent a hardship because of the extensive effort needed to set-pressure test each MSSV without a compensating increase in the level of quality and safety.
Based on its review, the NRC staff finds that compliance with the sample expansion requirements in ASME OM Code, Mandatory Appendix I, and Code Case OMN-17 if a single MSSV fails its set-pressure test would result in a hardship without a compensating increase in the level of quality and safety based on alternative request RV-06 to conduct a set-pressure test of at least four of the eight MSSVs each refueling outage at QCNPS, and to expand the sample if at least two MSSVs failed their set-pressure test.
4.0 CONCLUSION
As indicated above, the NRC staff finds that compliance with the sample expansion requirements in ASME OM Code, Mandatory Appendix I, and Code Case OMN-17 if a single MSSV fails its set-pressure test would result in a hardship without a compensating increase in the level of quality and safety based on alternative request RV-06 to conduct a set-pressure test of at least four of the eight MSSVs each refueling outage at QCNPS, and to expand the sample if at least two MSSVs failed their set-pressure test. Accordingly, the NRC staff concludes that the licensee has adequately addressed the regulatory requirements set forth in 10 CFR 50.55a(z)(2). Therefore, the NRC staff authorizes the use of alternative request RV-06 for the sixth 10-year IST interval at QCNPS, which will begin on February 18, 2023, and is scheduled to end on February 17, 2033.
All other ASME OM Code requirements as incorporated by reference in 10 CFR 50.55a for which relief or an alternative was not specifically requested, and granted or authorized (as appropriate), in the subject request remain applicable.
Principal Contributors: K. Hsu, NRR T. Scarbrough, NRR Date: September 28, 2022
ML22264A175 OFFICE NRR/DORL/LPL3/PM NRR/DORL/LPL3/LA NRR/DEX/EMIB/BC NRR/DORL/LPL3/BC NAME RKuntz SRohrer SBailey (RLi for) NSalgado DATE 9/20/2022 9/22/2022 9/6/2022 9/28/2022