Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML17056A97730 August 1990Forwards Semiannual Radioactive Effluent Release Rept for Jan-June 1990 & Revs 4 & 5 to Odcm.
ML18038A32330 August 1990Forwards Semiannual Radioactive Effluent Release Rept Jan- June 1990 & Revs 6-8 to Odcm. Radioactive Effluent Release Rept Includes Summary of Liquid,Gaseous & Solid Effluents & Justification for Revs to ODCMGrab sample
Annual Radiological Environmental Operating Report
Process Control Program
ML18038A32224 August 1990Forwards NRC Form 474, Simulation Facility Certification & Supporting DocumentationEmergency Lighting
Job Performance Measure
Fuel cladding
Coast down
ML18038A32021 August 1990Discusses Status of Completion of Generic Safety Issue 75, Item 2.2.2 Re Vendor Interface for safety-related Components
ML18038A32520 August 1990Forwards Rev 3 to Nine Mile Point Requalification Program Action Plan, Certifying That All short-term Corrective Actions Completed
ML20058Q11515 August 1990Forwards Response to Regulatory Effectiveness Review on 900604-08.Response Withheld (Ref 10CFR73.21)
ML20055G52618 July 1990Forwards Decommissioning Rept Indicating Reasonable Assurance That Funds Available to Decommission Facility. Financial Assurance of Cotenants Also Encl
ML17058A58427 June 1990Forwards Rev 8 to Updated FSAR for Nine Mile Point Unit 1. Changes Re Findings Noted in Insp Rept 50-220/88-201 Included in Rev.Rev Does Not Reflect Changes Re Reg Guide 1.97,Rev 2
ML18038A30526 June 1990Responds to Generic Ltr 90-04 Re Status of Implementation of Generic Safety Issue Requirements.Tabulated Info Re Generic Safety Issue Title,Applicability,Status & Remarks EnclScram Discharge Volume
ML20042E37411 April 1990Lists Info Re Unit Containment Vent & Purge Valves,Per NRC 900315 Request
ML20012F61330 March 1990Forwards Changes to Security Training & Qualification Plan. Plan Rewritten & Revised to Incorporate performance-oriented Training Program.Plan Withheld (Ref 10CFR2.790(d))
ML17056A6722 March 1990Forwards Semiannual Radioactive Effluent Release Rept for Jul-Dec 1989 & Rev 3 to Administrative Procedure AP-3.7.1, Unit 2 Radwaste Process Control Program.Offsite Dose Calculation Manual
Process Control Program
ML18038A7075 February 1990Forwards Rev 5 to NMPC-QATR-1, QA Topical Rept for Nine Mile Point Nuclear Station Operations.
ML18038A70610 January 1990Forwards Rev 21 to Emergency Plan,Revised Emergency Action Procedures,Including Rev 7 to S-EAP-1,Rev 11 to S-EAP-2,Rev 8 to S-EAP-3 & Epips,Including Rev 13 to S-EPP-4 & Rev 13 to S-EPP-20
ML20042D19828 December 1989Informs of Delay in Response to Generic Ltr 89-10, Safety-Related Motor-Operated Valve Testing & Surveillance, Until BWR Owner Group Generic Program Completed & NRC Appraisal of Program Reviewed by Util
ML18038A70228 November 1989Responds to Generic Ltr 89-21 Re Status of Implementation of USI Requirements.Usi A-5,A-6 & A-7 Inapplicable to FacilityHydrostatic
Control of Heavy Loads
Backfit
ML18038A77128 November 1989Responds to Generic Ltr 89-21 Re Status of Implementation of USI Requirements.Requirements for NUREG-0612 Re Control of Heavy Loads Near Spent Fuel Completed.Usi A-40 Re Seismic Design Criteria Being Resolved as Part of USI A-46Safe Shutdown
Control of Heavy Loads
Backfit
ML18038A77025 October 1989Forwards Rev 1 to Updated SAR for Nine Mile Point Unit 2. All Errata Items Identified in Attachment 1 to Previous Updated SAR Transmittal Ltr of 890428 Resolved.Programs to Resolve Setpoint Issues Will Be Established by 891130Safe Shutdown
Fire Barrier
Scram Discharge Volume
ML18038A76129 September 1989Forwards Addl Info Re Simulator Certification for Facility, Per 890803 Request.Schedule Extension Verbally Granted Until 890930Emergency Lighting
Scram Discharge Volume
Fuel cladding
Power change
ML18038A6648 September 1989Forwards Restart Readiness Rept. Rept Submitted in Fulfillment of Util Third Action Required by Confirmatory Action Ltr CAL-88-17,dtd 880724
ML17056A27030 August 1989Forwards Nine Mile Point Nuclear Station - Unit 2 Semiannual Radioactive Effluent Release Rept Jan-June 1989 & Rev 1 to Administrative Procedure AP-3.7.1 Process Control Program.Offsite Dose Calculation Manual
Process Control Program
ML20245E8457 August 1989Forwards Rev 6 to Training & Qualification Plan.Rev Withheld (Ref 10CFR73.21 & 10CFR2.790(d))
ML20247M27725 July 1989Forwards Issue 2,Rev 0 to Physical Security Plan.Specific Changes Set Forth in Attachment A.Supporting Info Set Forth in Attachment B.Master Acronym & Abbreviation List Also Encl.Encls Withheld (Ref 10CFR73.21)
ML20246N90413 July 1989Forwards Vital Area Evaluation for Plant Screenhouse.Encl Withheld (Ref 10CFR73.21(b))
ML18038A66111 July 1989Provides Response to Generic Ltr 89-06, Task Action Plan Item I.D.2 - Spds. Certification Stating Plant Unit 1 SPDS Sys Meets Requirements of NUREG-0737,Suppl 1 & Plant Unit 2 SPDS Sys Will Be Modified to Meet NUREG-0737,Suppl 1 Encl
ML18038A65923 June 1989Forwards Util Response to 890522 Salp.Util Agrees W/Need to Improve Surveillance Testing Data & Upgrading Design Basis for Core Spray & HPCI SysInternal Flooding
Locked High Radiation Area
Systematic Assessment of Licensee Performance
ML20244E36315 June 1989Forwards Revised Application for Amend to License DPR-63, Incorporating Request to Limit Reactor Power Level at Which Blocking Valve in Feedwater May Be Closed
ML18038A47331 May 1989Forwards Emergency Preparedness Exercise/Drill Scenario 12 1989 Annual Exercise, Vols 1 & 2
ML18038A45828 April 1989Forwards Rev 0 to Updated SAR for Nine Mile Point Unit 2. Emergency Plan,Formerly Included in Fsar,Not Included in Updated Sar.Portions of Util Responses to NRC FSAR Questions Incorporated Into Body of Initial Updated SARSafe Shutdown
Boric Acid
Reactor Vessel Water Level
Ultimate heat sink
Grab sample
Safe Shutdown Earthquake
Reserve Station Service Transformer
Emergency Lighting
Incorporated by reference
Earthquake
ML20246Q00728 April 1989Forwards Proprietary Section 6A of Updated FSAR for Nine Mile Point Unit 2.Section 6A Withheld (Ref 10CFR2.790)
ML20246B54528 April 1989Advises That Util Will Submit Rev to Restart Action Plan After Receipt of Repts from NRC Special Team Insp & INPO Reassessment of Facility
ML18038A45623 March 1989Forwards Addl Info Supporting Application to Use Alternative to 10CFR50.55a Requirements.W/Two Oversize DrawingsHydrostatic
ML18038A45521 March 1989Provides Util Plans for Future Exam & Evaluation of Four Feedwater Nozzles Per NUREG-0619.Indications Conservatively Evaluated as Cracks Not Scratch Marks.During 1993 Refueling Outage,Sparger from Nozzle a Will Be RemovedNondestructive Examination
Scaffolding
05000410/LER-1989-003, Forwards Corrected Copy of LER 89-003-00 Submitted on 890320.Typo Identified on Page 5 of 7 Corrected21 March 1989Forwards Corrected Copy of LER 89-003-00 Submitted on 890320.Typo Identified on Page 5 of 7 Corrected
ML18038A4522 March 1989Forwards Responses to NRC Questions Re Licensee Restart Action Plan & Nuclear Improvement Program.Replacement Pages for Action Plan EnclSafe Shutdown
Fire Barrier
Nondestructive Examination
Systematic Assessment of Licensee Performance
Exemption Request
ML20245J5522 March 1989Forwards Rept of Physical Security Event,Reported Via Emergency Notification Sys on 890203
ML18038A45122 February 1989Forwards Rev 4 to NMPC-QATR-1, QA Program Topical Rept for Nine Mile Point Nuclear Station Operations. Revs Include Corporate Reporting & Responsibility Changes as Well as Descriptions for Organizations Not Previously Identified
ML18038A45014 February 1989Forwards Rev 1 to TR-6801-2, Mark I Torus Shell & Vent Sys Thickness Requirements Nine Mile Point Unit 1 Nuclear Station. Requests Approval to Use Certified Matl Test Repts for Most of Torus MatlsCoatings
ML18038A43418 January 1989Forwards Revised,Second 10-yr Interval Inservice Testing Program Plan for Plant & Supporting Documentation,Per 881220 Commitment.Interim Approval of Program as Submitted to Spent Fuel Loading Scheduled for Apr 1989 RequestedSafe Shutdown
Stroke time
Power Operated Valves
ML18038A42029 September 1988Advises That No Unresolved Safety Issues Re Flow Fluctuations & Neutron Flux Noise Exist,Per NRC 880527 Ltr Requesting Summary of Plans to Mitigate Oscillations in APRM Signals & Total Core Flow
ML20154C4229 September 1988Informs That Contracted Vendor to Present Courses Will Not Be Able to Commence Training Until Later in Month of Oct or Early Nov 1988.Schedule Revised to Have Instrumentation & Control Initial Training Implemented by Nov 1988
ML20154B4308 September 1988Forwards Security & Safeguards Contingency Plan.Definition of Security Force Member Discussed.Plan Withheld
ML17055E24730 August 1988Forwards Semiannual Radioactive Effluent Release Rept, Jan-Jun 1988, & Revs 4 & 6 to Offsite Dose Calculation Manual.Offsite Dose Calculation Manual
ML18038A41228 July 1988Forwards Info Re Implementation of NUREG-0131,Rev 2, Technical Rept on Matl Selection & Process Guidelines for BWR Coolant Pressure Boundary Piping.
ML18038A41028 July 1988Forwards Comments,Clarifications & Agreements Re Implementation Re 880506 SER Concerning 10CFR50,App J.Info Submitted Per Commitment Resulting from 880609 Meeting W/ NRC.W/15 Oversize DrawingsNon-Destructive Examination
Stroke time
Hydrostatic
Overtravel
Exemption Request
ML18038A41128 July 1988Forwards Licensee Response to Generic Ltr 88-01 Re Austenitic Stainless Steel Piping at Facility.Application for Amend to Incorporate Requirements of Generic Ltr Will Be Submitted Later
ML20151A29715 July 1988Forwards Changes to Physical Security Plan.Supporting Info Also Encl.Encls Withheld (Ref 10CFR73.21)
ML20151A27515 July 1988Forwards Changes to Security Training & Qualification Plan. Changes Withheld (Ref 10CFR2.790)
ML18038A4087 July 1988Submits Listed Changes to Util 880609 Comments on SALP, Including Advisal That Review of Nonradiological Chemistry Program Revised to More Accurately Describe How Review PerformedSystematic Assessment of Licensee Performance
ML18038A4066 July 1988Responds to Request for Addl Info on ATWS Review Re Alternate Rod Injection & Recirculation Pump Trip Sys.W/ Seven Oversize Drawings