Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
IR 05000237/2023004 | 2 February 2024 | Integrated Inspection Report 05000237/2023004 and 05000249/2023004 | |
ML24032A020 | 31 January 2024 | NPDES Biocide/Corrosion Treatment Plan Annual Report, Cy 2023 | |
ML23319A245 | 29 January 2024 | Issuance of Amendment Nos. 366 and 360; 164 and 71 Regarding the Adoption of TSTF-567, Revision 1, Add Containment Sump TS to Address GSI-191 Issues | Cyber Security Surveillance Frequency Control Program Safeguards Contingency Plan Fire Protection Program |
ML24018A014 | 17 January 2024 | Engine Systems, Inc., Report No. 10CFR21-0137, Rev. 1, 56913-EN 56913 | |
CNL-24-017, Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure and Emergency Preparedness Department Procedure Revisions | 17 January 2024 | Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure and Emergency Preparedness Department Procedure Revisions | |
IR 05000010/2023001 | 17 January 2024 | NRC Inspection Report 05000010/2023001 (Drss) | |
ML24011A318 | 11 January 2024 | Submittal of Discharge Monitoring Report (Dmr), October 2023 | |
ML24011A319 | 11 January 2024 | Submittal of Discharge Monitoring Report (Dmr), November 2023 | |
ML24011A320 | 11 January 2024 | Submittal of Discharge Monitoring Report (Dmr), December 2023 | |
ML24011A317 | 11 January 2024 | Submittal of Discharge Monitoring Report (Dmr), September 2023 | |
ML24011A316 | 11 January 2024 | Submittal of Discharge Monitoring Report (Dmr), August 2023 | |
IR 05000327/2023442 | 11 January 2024 | 95001 Supplemental Inspection Report 05000327/2023442 and 05000328/2023442 and Follow-Up Assessment Letter | |
ML24010A213 | 10 January 2024 | CFR 21.21 Final Report Regarding Siemens Medium Voltage Circuit Breakers | |
ML24018A095 | 4 January 2024 | Engine Systems, Inc., 10CFR21 Reporting of Defects and Non-Compliance Report No. 10CFR21-0137, Rev. 0 | |
ML23354A281 | 4 January 2024 | Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0031 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) | |
ML24004A040 | 3 January 2024 | Response to NRCs November 8, 2023, Request for Additional Information - Related to Independent Spent Fuel Storage Installation | |
ML24004A033 | 3 January 2024 | Interim Report of a Deviation or Failure to Comply Crompton Instruments Type 077 Ammeter | |
CNL-23-068, Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation | 21 December 2023 | Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation | |
CNL-23-036, Application to Revise Function 5 of Technical Specification Table 3.3.2-1, Engineered Safety Feature Actuation System Instrumentation, for the Sequoyah Nuclear Plant and Watts Bar Nuclear Plant (SQN-TS-23-02 and WBN-TS-23-08) | 18 December 2023 | Application to Revise Function 5 of Technical Specification Table 3.3.2-1, Engineered Safety Feature Actuation System Instrumentation, for the Sequoyah Nuclear Plant and Watts Bar Nuclear Plant (SQN-TS-23-02 and WBN-TS-23-08) | Safe Shutdown Anticipated operational occurrence |
ML23305A140 | 13 December 2023 | Units 1 & 2; Nine Mile Point, Unit 2; Peach Bottom, Units 2 & 3; and Quad Cities, Units 1 and 2 - Issuance of Amendments to Adopt Traveler TSTF-580 | Hydrostatic Cyber Security Surveillance Frequency Control Program Safeguards Contingency Plan |
ML23346A122 | 12 December 2023 | Annual Non-Radiological Environmental Operating Report - 2023 | |
RS-23-121, Sixth Ten-Year Interval Inservice Testing Program | 30 November 2023 | Sixth Ten-Year Interval Inservice Testing Program | Safe Shutdown Packing leak High Radiation Area Grab sample Stroke time Squib Incorporated by reference Locked High Radiation Area Surveillance Frequency Control Program Scram Discharge Volume Excess Flow Check Valve Cold shutdown justification Power-Operated Valves Power Operated Valves |
SVPLTR 23-0037, Core Operating Limits Report for Cycle 29 | 29 November 2023 | Core Operating Limits Report for Cycle 29 | |
IR 05000327/2023420 | 28 November 2023 | Security Baseline Inspection Report 05000327/2023420 and 05000328/2023420 | Affidavit |
CNL-23-067, Central Emergency Control Center Emergency Plan Implementing Procedure Revisions | 27 November 2023 | Central Emergency Control Center Emergency Plan Implementing Procedure Revisions | |
RS-23-119, Supplemental Information Letter for Part 73 Exemption Request - Responses to Request for Confirmatory Information | 10 November 2023 | Supplemental Information Letter for Part 73 Exemption Request - Responses to Request for Confirmatory Information | Time of Discovery Fitness for Duty Contraband Exemption Request |
ML23317A119 | 10 November 2023 | Constellation Energy Generation, LLC - 2023 Annual Report - Guarantees of Payment of Deferred Premiums | Affidavit |
ML23324A436 | 9 November 2023 | Exam Corporate Notification Letter Aka 210-day Letter | |
ML23307A082 | 8 November 2023 | Request for Additional Information August 4, 2022, Exemption Request for Deviating from the Conditions of Certificate of Compliance No. 1032, Amendment No. 3, Related to Sequoyah Nuclear Plant Independent Spent Fuel Storage Installation | Exemption Request |
RS-23-107, Relief Request I5R-22, Inservice Inspection Program Relief Request Regarding Examination Coverage for the Fifth Inservice Inspection Interval | 8 November 2023 | Relief Request I5R-22, Inservice Inspection Program Relief Request Regarding Examination Coverage for the Fifth Inservice Inspection Interval | Non-Destructive Examination Nondestructive Examination VT-2 |
IR 05000327/2023003 | 3 November 2023 | Integrated Inspection Report 05000327/2023003 and 05000328/2023003 | Temporary Modification Functionality Assessment Operability Determination Fire Protection Program |
ML23306A159 | 2 November 2023 | Enforcement Action EA-22-129 Inspection Readiness Notification | |
ML23292A079 | 19 October 2023 | Tennessee Valley Authority - Emergency Plan Implementing Procedure Revision, Includes EPIP-5, Revision 58, General Emergency | |
IR 05000327/2023011 | 16 October 2023 | Triennial Fire Protection Inspection Report 05000327/2023011 and 05000328/2023011 | Hot Short Safe Shutdown Fire Barrier Operator Manual Action Emergency Lighting Fire Protection Program Fire Watch |
RS-23-102, Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation | 16 October 2023 | Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation | Time of Discovery Contraband Condition Adverse to Quality Safeguards Contingency Plan Preemption Authority Exemption Request |
ML23285A234 | 13 October 2023 | Confirmation of Initial License Examination | |
RS-23-097, Constellation Energy Generation, LLC, Advisement of Leadership Changes and Submittal of Updated Standard Practice Procedures Plans | 12 October 2023 | Constellation Energy Generation, LLC, Advisement of Leadership Changes and Submittal of Updated Standard Practice Procedures Plans | |
ML23285A088 | 12 October 2023 | Submittal of Sequoyah Nuclear Plant, Units 1 and 2, Submittal of Updated Final Safety Analysis Report Amendment 31 | Aging Management |
ML23284A425 | 11 October 2023 | 10 CFR 50.59 and 10 CFR 72.48 Changes, Tests, and Experiments Summary Report; Commitment Summary Report; and Update to the Fire Protection Report | Shutdown Margin Anticipated operational occurrence Temporary Modification Incorporated by reference FLEX Fuel cladding |
ML23283A279 | 10 October 2023 | Revisions to the Sequoyah Nuclear Plant Units 1 and 2 Technical Requirements Manual | Unanalyzed Condition Boric Acid Time of Discovery High winds Shutdown Margin Anticipated operational occurrence Safe Shutdown Earthquake Probabilistic Risk Assessment Operating Basis Earthquake Functionality Assessment Incorporated by reference Pressure and Temperature Limits Report Design basis earthquake Operability Determination Earthquake Maintenance Rule Program |
ML23279A071 | 6 October 2023 | Response to NRC Dresden Nuclear Power Station, Units 2 and 3 - Comprehensive Engineering Team Inspection Report 05000237/2023011 and 05000249/2023011 | Anticipated operational occurrence Condition Adverse to Quality |
ML23279A061 | 5 October 2023 | Paragon Energy Solutions LLC, Part 21 Final Report Re Potential Defect with Eaton Jd and Hjd Series Molded Case Circuit Breakers (Mccbs) | Commercial Grade Dedication |
ML23277A046 | 4 October 2023 | Revisions to the Sequoyah Nuclear Plant Units 1 and 2 Technical Specification Bases | |
ML23275A027 | 29 September 2023 | Submittal of Discharge Monitoring Report (DMR) Quality Assurance Study 43 Final Report 2023 |