Issue date | Title | Topic | |
---|---|---|---|
IR 05000317/2023004 | 1 February 2024 | Integrated Inspection Report 05000317/2023004 and 05000318/2023004 | Safe Shutdown Boric Acid Internal Flooding Enforcement Discretion Operating Basis Earthquake Functionality Assessment FLEX Significance Determination Process Surveillance Frequency Control Program Foreign Material Exclusion Operability Determination Spent Fuel Pool Instrumentation Fire Protection Program Power change |
ML24029A010 | 29 January 2024 | Request for Information and Notification of Conduct of IP 71111.21.N.04, Age-Related Degradation, Reference Inspection Report 05000317/2024010 and 05000318/2024010 | Commercial Grade Dedication Probabilistic Risk Assessment Aging Management |
ML24003A887 | 19 January 2024 | Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0033 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) | Time of Discovery Fitness for Duty Contraband Condition Adverse to Quality Safeguards Contingency Plan Exemption Request |
05000318/LER-2023-004, Submittal of LER 2023-004-00 for Calvert Cliffs Nuclear Power Plant, Unit 2, Submittal of Automatic Reactor Trip from Reactor Protection System Actuation Due to Loss of Unit Service Transformer | 16 January 2024 | Submittal of LER 2023-004-00 for Calvert Cliffs Nuclear Power Plant, Unit 2, Submittal of Automatic Reactor Trip from Reactor Protection System Actuation Due to Loss of Unit Service Transformer | |
ML24011A073 | 11 January 2024 | Proposed Alternative to the Requirements for Repair/Replacement of Saltwater (SW) System Buried Piping | |
05000318/LER-2023-002, Forward LER 2023-002-00 for Calvert Cliffs Nuclear Power Plant, Unit 2, Automatic Reactor Trip from Reactor Protection System Actuation Due to Loss of Unit Service Transformer | 8 January 2024 | Forward LER 2023-002-00 for Calvert Cliffs Nuclear Power Plant, Unit 2, Automatic Reactor Trip from Reactor Protection System Actuation Due to Loss of Unit Service Transformer | |
05000318/LER-2023-003, Forward LER 2023-003-00 for Calvert Cliffs Nuclear Power Plant, Unit 2, Manual Actuation of Auxiliary Feedwater System Due to 22 Steam Generator Feedwater Pump Trip | 8 January 2024 | Forward LER 2023-003-00 for Calvert Cliffs Nuclear Power Plant, Unit 2, Manual Actuation of Auxiliary Feedwater System Due to 22 Steam Generator Feedwater Pump Trip | |
ML24005A022 | 5 January 2024 | Revised Steam Generator Tube Inspection Reports | |
ML23304A064 | 2 January 2024 | Issuance of Amendment No. 349 to Modify the Long-Term Coupon Surveillance Program | |
RS-23-125, Request for Exemption from 10 CFR 2.109(b) | 7 December 2023 | Request for Exemption from 10 CFR 2.109(b) | License Renewal Exemption Request Subsequent License Renewal Fuel cladding |
ML23331A299 | 27 November 2023 | Submittal of Condition Prohibited by Technical Specifications Due to Failure to Sample Diesel Generator Fuel Oil Storage Tank | |
IR 05000317/2023010 | 20 November 2023 | Biennial Problem Identification and Resolution Inspection Report 05000317/2023010 and 05000318/2023010 | Offsite Dose Calculation Manual Cyber Security Condition Adverse to Quality Operability Determination |
ML23318A472 | 14 November 2023 | Supplement to License Amendment Request to Adopt TSTF-59-A | Internal Flooding Probabilistic Risk Assessment Large early release frequency |
ML23317A103 | 10 November 2023 | Supplemental Information Letter for Part 73 Exemption Request - Responses to Request for Confirmatory Information | Time of Discovery Fitness for Duty Contraband Exemption Request |
ML23317A119 | 10 November 2023 | Constellation Energy Generation, LLC - 2023 Annual Report - Guarantees of Payment of Deferred Premiums | Affidavit |
ML23310A044 | 7 November 2023 | Project Manager Assignment | |
IR 05000317/2023040 | 2 November 2023 | 95001 Supplemental Inspection Report 05000317/2023040 and Follow-Up Assessment Letter | Foreign Material Exclusion Preliminary White Finding |
IR 05000317/2023003 | 1 November 2023 | Integrated Inspection Report 05000317/2023003 and 05000318/2023003 | Past operability Enforcement Discretion Temporary Modification Functionality Assessment FLEX Significance Determination Process Operability Determination COVID-19 Through-Wall Leak Fire Protection Program |
IR 05000317/2023090 | 26 October 2023 | Final Significance Determination of a White Finding with Assessment Follow-Up and Notice of Violation; Inspection Report 05000317/2023090 | Preliminary White Finding |
ML23289A120 | 16 October 2023 | Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation | Time of Discovery Contraband Condition Adverse to Quality Safeguards Contingency Plan Preemption Authority Exemption Request |
RS-23-097, Constellation Energy Generation, LLC, Advisement of Leadership Changes and Submittal of Updated Standard Practice Procedures Plans | 12 October 2023 | Constellation Energy Generation, LLC, Advisement of Leadership Changes and Submittal of Updated Standard Practice Procedures Plans | |
RS-23-108, Proposed Alternative for Examinations of Examination Categories B-B, B-D, and C-A Steam Generator Pressure Retaining Welds and Full Penetration Welded Nozzles | 11 October 2023 | Proposed Alternative for Examinations of Examination Categories B-B, B-D, and C-A Steam Generator Pressure Retaining Welds and Full Penetration Welded Nozzles | Finite Element Analysis Aging Management License Renewal Subsequent License Renewal Power Uprate |
RS-23-105, Proposed Alternative for Examinations of Examination Category C-B Steam Generator Nozzle-to-Shell Welds and Nozzle Inside Radius Sections | 10 October 2023 | Proposed Alternative for Examinations of Examination Category C-B Steam Generator Nozzle-to-Shell Welds and Nozzle Inside Radius Sections | Finite Element Analysis Aging Management License Renewal Subsequent License Renewal |
ML23279A120 | 6 October 2023 | Response to NRC Inspection Report and Preliminary White Finding | Preliminary White Finding |
IR 05000317/2023050 | 29 September 2023 | Special Inspection Report 05000317/2023050 and Preliminary White Finding and Apparent Violation | High winds Mission time Probabilistic Risk Assessment Functionality Assessment FLEX Significance Determination Process Large early release frequency Preliminary White Finding |
ML23272A103 | 29 September 2023 | Condition Prohibited by Technical Specifications Due to Inoperable Nuclear Instrumentation at Very Low Power | |
IR 05000317/2023401 | 18 September 2023 | Cyber Security Inspection Report 05000317/2023401 and 05000318/2023401 | Cyber Security |
ML23254A001 | 5 September 2023 | Registration of Use of Casks to Store Spent Fuel | |
IR 05000317/2023005 | 31 August 2023 | Updated Inspection Plan for Calvert Cliffs Nuclear Power Plant, Units 1 and 2 (Report 05000317/2023005 and 05000318/2023005) | Enforcement Discretion Cyber Security |
ML23158A195 | 30 August 2023 | R. E. Ginna - Issuance of Amendments to Adopt TSTF-273-A, Revision 2, Safety Function Determination Program Clarifications | Fire Protection Program |
ML23241A841 | 29 August 2023 | Response to Request for Additional Information - Proposed Alternative to the Requirements for Repair/Replacement of Saltwater (SW) System Buried Piping | |
ML23240A387 | 28 August 2023 | Senior Reactor and Reactor Operator Initial License Examinations | |
ML23151A347 | 21 August 2023 | Issuance of Amendments to Adopt TSTF-295-A, Modify Note 2 to Actions of PAM Table to Allow Separate Condition Entry for Each Penetration | Reactor Vessel Water Level Post Accident Monitoring |
ML23219A166 | 16 August 2023 | Request for Additional Information Regarding Proposed Alternative to the Requirements for Repair/Replacement of Saltwater (SW) System Buried Piping (EPID: L-2023-LLR-0006) - Non-proprietary | Ultimate heat sink |
ML23228A100 | 15 August 2023 | Notification of Readiness for NRC 95001 Inspection | Foreign Material Exclusion Preliminary White Finding |
ML23188A040 | 8 August 2023 | Issuance of Amendment Nos. 346 and 324 Adoption of TSTF-577, Revised Frequencies for Steam Generator Tube Inspections, Revision 1 | Post Accident Monitoring Nondestructive Examination |
ML23214A157 | 7 August 2023 | Correction to the Renewed Facility Operating License Page 3 in Amendment No 345 | |
IR 05000317/2023002 | 3 August 2023 | Integrated Inspection Report 05000317/2023002 | Packing leak Enforcement Discretion Temporary Modification Functionality Assessment Significance Determination Process Operability Determination Fire Protection Program |
ML23188A051 | 13 July 2023 | Correction to the Renewed Facility Operating License Pages in Amendment Nos. 336 and 314 | |
ML23186A037 | 13 July 2023 | Correction to the Renewed Facility Operating License Pages in Amendment Nos. 340 and 318 | |
IR 05000317/2023301 | 12 July 2023 | Initial Operator Licensing Examination Report 05000317/2023301 and 05000318/2023301 | |
IR 05000317/2023012 | 10 July 2023 | Commercial Grade Dedication Report 05000317/2023012 and 05000318/2023012 | Commercial Grade Dedication |
ML23180A236 | 29 June 2023 | Correction of Errors on Technical Specification Pages | |
RS-23-083, Withdrawal - Proposed Alternatives Related to the Steam Generators | 27 June 2023 | Withdrawal - Proposed Alternatives Related to the Steam Generators | |
ML23156A675 | 20 June 2023 | Request for Withholding Information from Public Disclosure for Proposed Alternative to the Requirements for Repair/Replacement of Saltwater System Buried Piping |