Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
IR 05000454/2023004 | 2 February 2024 | Integrated Inspection Report 05000454/2023004 and 05000455/2023004 | |
ML24022A272 | 23 January 2024 | Request for Information for an NRC Post-Approval Site Inspection for License Renewal Inspection Report 05000454/2024011 | License Renewal |
ML24018A036 | 17 January 2024 | Paragon Energy Solutions, Defect with Detroit Diesel/Mtu Fuel Injectors P/N R5229660 Cat Id 0001390618 | |
ML23320A176 | 13 December 2023 | Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0027 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) | Time of Discovery Fitness for Duty Contraband Condition Adverse to Quality Safeguards Contingency Plan Exemption Request |
ML23277A003 | 11 December 2023 | Issuance of Amendments Regarding Adoption of TSTF-370 | Probabilistic Risk Assessment |
ML23318A510 | 1 December 2023 | Relief from the Requirements of the ASME Code | Probabilistic Risk Assessment |
IR 05000454/2023301 | 27 November 2023 | NRC Initial License Examination Report 05000454/2023301 and 05000455/2023301 | Job Performance Measure |
BYRON 2023-0065, Unit 2 - Notification of Deviation from Electric Power Research Institute (EPRI) Topical Report MRP-227, Revision 1-A, Materials Reliability Program: Pressurized Water Reactor Internals Inspection and Evaluation Guideline | 17 November 2023 | Unit 2 - Notification of Deviation from Electric Power Research Institute (EPRI) Topical Report MRP-227, Revision 1-A, Materials Reliability Program: Pressurized Water Reactor Internals Inspection and Evaluation Guideline | |
BYRON 2023-0063, Day Inservice Inspection Report for Interval 4, Period 3, (B2R24) | 16 November 2023 | Day Inservice Inspection Report for Interval 4, Period 3, (B2R24) | |
IR 05000454/2023003 | 13 November 2023 | Integrated Inspection Report 05000454/2023003 and 05000455/2023003 and Exercise of Enforcement Discretion | Commercial Grade Dedication Enforcement Discretion Temporary Modification VT-2 Functionality Assessment FLEX B.5.b Significance Determination Process Foreign Material Exclusion Process Control Program Operability Determination Fire Protection Program Hourly Fire Watch Coast down |
RS-23-117, Supplemental Information Letter for Part 73 Exemption Request - Responses to Request for Confirmatory Information | 10 November 2023 | Supplemental Information Letter for Part 73 Exemption Request - Responses to Request for Confirmatory Information | Time of Discovery Fitness for Duty Contraband Exemption Request |
ML23317A119 | 10 November 2023 | Constellation Energy Generation, LLC - 2023 Annual Report - Guarantees of Payment of Deferred Premiums | Affidavit |
ML23313A085 | 9 November 2023 | Submittal of 2023-301 Byron Initial License Examination Post-Examination Comments | |
RS-23-114, Proposed Alternative for Examination of Pressurizer Circumferential and Longitudinal Shell-to-Head Welds and Nozzle-to-Vessel Welds | 1 November 2023 | Proposed Alternative for Examination of Pressurizer Circumferential and Longitudinal Shell-to-Head Welds and Nozzle-to-Vessel Welds | Hydrostatic VT-2 Finite Element Analysis License Renewal |
ML23297A235 | 26 October 2023 | Information Request for the Cyber Security Baseline Inspection, Notification to Perform Inspection | Cyber Security |
RS-23-100, Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation | 13 October 2023 | Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation | Time of Discovery Contraband Condition Adverse to Quality Safeguards Contingency Plan Preemption Authority Exemption Request |
RS-23-097, Constellation Energy Generation, LLC, Advisement of Leadership Changes and Submittal of Updated Standard Practice Procedures Plans | 12 October 2023 | Constellation Energy Generation, LLC, Advisement of Leadership Changes and Submittal of Updated Standard Practice Procedures Plans | |
RS-23-108, Proposed Alternative for Examinations of Examination Categories B-B, B-D, and C-A Steam Generator Pressure Retaining Welds and Full Penetration Welded Nozzles | 11 October 2023 | Proposed Alternative for Examinations of Examination Categories B-B, B-D, and C-A Steam Generator Pressure Retaining Welds and Full Penetration Welded Nozzles | Finite Element Analysis Aging Management License Renewal Subsequent License Renewal Power Uprate |
RS-23-105, Proposed Alternative for Examinations of Examination Category C-B Steam Generator Nozzle-to-Shell Welds and Nozzle Inside Radius Sections | 10 October 2023 | Proposed Alternative for Examinations of Examination Category C-B Steam Generator Nozzle-to-Shell Welds and Nozzle Inside Radius Sections | Finite Element Analysis Aging Management License Renewal Subsequent License Renewal |
ML23278A027 | 5 October 2023 | Operator Licensing Examination Approval - Byron Station, October 2023 | |
RS-23-093, License Amendment to Braidwood Station, Units 1 and 2, and Byron Station, Units 1 and 2, Technical Specifications 3.7.15, Spent Fuel Pool Boron Concentration, 3.7.16, Spent Fuel. | 29 September 2023 | License Amendment to Braidwood Station, Units 1 and 2, and Byron Station, Units 1 and 2, Technical Specifications 3.7.15, Spent Fuel Pool Boron Concentration, 3.7.16, Spent Fuel. | Boric Acid Time to boil Aging Management Surveillance Frequency Control Program Fuel cladding Exclusive Use |
ML23251A162 | 29 September 2023 | Steam Generator Tube Inspection Reports to Reflect TSTF-577 Reporting Requirements | |
RS-23-094, Relief Request I4R-24, Alternative for Post-Peening Reexamination Frequency for Reactor Pressure Vessel Head Penetration Nozzle Number 75 | 29 September 2023 | Relief Request I4R-24, Alternative for Post-Peening Reexamination Frequency for Reactor Pressure Vessel Head Penetration Nozzle Number 75 | Boric Acid VT-2 Finite Element Analysis Liquid penetrant Exclusive Use |
RS-23-091, Relief Request I4R-25, Alternative Requirements for Reactor Pressure Vessel Inservice Inspection Intervals | 26 September 2023 | Relief Request I4R-25, Alternative Requirements for Reactor Pressure Vessel Inservice Inspection Intervals | Probabilistic Risk Assessment License Renewal |
ML23226A006 | 19 September 2023 | Review of License Renewal Commitment Number 10 Submittal | License Renewal |
ML23180A169 | 11 September 2023 | Calvert Cliff Units 1 & 2, and R.E. Ginna Plant - Withdrawal of Proposed Alternatives to American Society of Mechanical Engineers (ASME) Requirements (Epids L-2022-LRR-0074, 0076, 0079, 0091, 0092, 0093 and 0094) | |
ML23242A328 | 1 September 2023 | Amendment No. 233 Correction | |
IR 05000454/2023501 | 31 August 2023 | Emergency Preparedness Biennial Exercise Inspection Report 05000454/2023501 and 05000455/2023501 | |
IR 05000454/2023005 | 30 August 2023 | Updated Inspection Plan for Byron Station (Report 05000454/2023005 and 05000455/2023005) | |
IR 05000454/2023002 | 3 August 2023 | Integrated Inspection Report 05000454/2023002 and 05000455/2023002 | High winds Commercial Grade Dedication Past operability Temporary Modification Functionality Assessment FLEX B.5.b Foreign Material Exclusion Operability Determination Spent Fuel Pool Instrumentation Fire Protection Program Downpower |
ML23209A724 | 31 July 2023 | Request for Information on the NRC Quadrennial Comprehensive Engineering Team Inspection: Inspection Report 05000454/2024010 and 05000455/2024010 | Stroke time Probabilistic Risk Assessment Temporary Modification Aging Management Large early release frequency COVID-19 |
ML23192A036 | 25 July 2023 | Review of the Spring 2022 Steam Generator Tube Inspection Report | |
ML23122A302 | 20 July 2023 | Issuance of Amendments Technical Specifications 2.1.1 and 4.2.1 to Allow a Previously Irradiated Accident Tolerant Fuel Lead Test Assembly to Be Further Irradiated in Unit No. 2 | Anticipated operational occurrence |
IR 05000454/2023402 | 18 July 2023 | Baseline Security Inspection Document; 05000454/2023402; 05000455/2023402 | |
ML23198A037 | 17 July 2023 | Information Request to Support Upcoming Problem Identification and Resolution (PIR) Inspection at Byron Nuclear Plant | Temporary Modification Aging Management Maintenance Rule Program |
ML23178A242 | 28 June 2023 | Reassignment of the U.S. Nuclear Regulatory Commission Branch Chief in the Division of Operating Reactor Licensing for Plant Licensing Branch III | |
RS-23-083, Withdrawal - Proposed Alternatives Related to the Steam Generators | 27 June 2023 | Withdrawal - Proposed Alternatives Related to the Steam Generators | |
ML23172A117 | 22 June 2023 | Notification of NRC Fire Protection Team Inspection Request for Information | Safe Shutdown Fire Barrier Probabilistic Risk Assessment Fire impairment Job Performance Measure Fire Protection Program |
RS-23-077, Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations | 16 June 2023 | Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations | |
ML23159A130 | 8 June 2023 | Day Inservice Inspection Report for Interval 4, Period 3, (B1R25) | |
ML23159A154 | 8 June 2023 | 2022 Regulatory Commitment Change Summary Report | |
RS-23-075, Application for Technical Specification Improvement to Extend the Completion Time for Condition B of Technical Specification 3.5.1, Accumulators, Using the Consolidated Line Item Improvement Process | 7 June 2023 | Application for Technical Specification Improvement to Extend the Completion Time for Condition B of Technical Specification 3.5.1, Accumulators, Using the Consolidated Line Item Improvement Process | Probabilistic Risk Assessment Incorporated by reference Surveillance Frequency Control Program |
ML23157A283 | 6 June 2023 | Notification of NRC Baseline Inspection and Request for Information | Boric Acid Non-Destructive Examination Aging Management Foreign Material Exclusion Dissimilar Metal Weld Scaffolding |
BYRON 2023-0029, Response to Request for Additional Information Regarding Steam Generator Tube Inspection Reports to Reflect TSTF-577 Reporting Requirements | 1 June 2023 | Response to Request for Additional Information Regarding Steam Generator Tube Inspection Reports to Reflect TSTF-577 Reporting Requirements | Nondestructive Examination |
ML23138A134 | 18 May 2023 | Information Meeting with a Question and Answer Session to Discuss NRC 2022 End-Of-Cycle Plant Performance Assessment of Braidwood Station and Byron Station | |
ML23003A788 | 11 May 2023 | Report for December 12-16, 2022, Regulatory Audit Regarding Reinsertion of a High Burnup Accident Tolerant Fuel Lead Test Assembly | Anticipated operational occurrence |