ENS 57016 | Alton Steel | 7 March 2024 06:00:00 | Damaged Gauges | Moisture Density Gauge |
ENS 56999 | Ineos | 28 February 2024 06:00:00 | Agreement State - Stuck Shutter | Stuck Shutter |
ENS 56947 | G.E. Healthcare | 2 February 2024 06:00:00 | Lost/Missing Source | Moisture Density Gauge |
ENS 56942 | Rush University Medical Center | 31 January 2024 06:00:00 | Medical Underdose | TheraSphere Underdose |
RS-24-004, Proposed Alternative to the Distribution Requirements of ASME Code Table IWC-2411-1 for the Steam Generators | Braidwood | 11 January 2024 | Proposed Alternative to the Distribution Requirements of ASME Code Table IWC-2411-1 for the Steam Generators | |
ENS 56911 | Advocate Lutheran General Hospital | 29 December 2023 06:00:00 | Underdose | TheraSphere Underdose |
IR 05000254/2023403 | Quad Cities | 22 December 2023 | Public- Quad Cities Nuclear Power Station Security Baseline Inspection Report 05000254/2023403 and 05000265/2023403 | Affidavit |
ML23356A007 | Zion | 22 December 2023 | Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation | Time of Discovery Contraband Condition Adverse to Quality Safeguards Contingency Plan Preemption Authority Exemption Request |
ENS 56895 | Sterigenics U.S. Llc | 17 December 2023 05:00:00 | Stuck Source Rack | |
ENS 56890 | G.E. Healthcare | 14 December 2023 06:00:00 | Agreement State - Lost Package | Moisture Density Gauge |
RS-23-123, Emergency License Amendment Request - Increase Technical Specifications Completion Time in TS 3.8.1.B.4 from 7 Days to 30 Days | Quad Cities | 13 December 2023 | Emergency License Amendment Request - Increase Technical Specifications Completion Time in TS 3.8.1.B.4 from 7 Days to 30 Days | Safe Shutdown Arc flash FLEX Missed surveillance Surveillance Frequency Control Program Offsite Circuit |
U-604788, Fourth Ten-Year Interval Inservice Testing Program Plan Revision 3 | Clinton | 12 December 2023 | Fourth Ten-Year Interval Inservice Testing Program Plan Revision 3 | Safe Shutdown Packing leak Ultimate heat sink Stroke time Squib Incorporated by reference Missed surveillance Surveillance Frequency Control Program Scram Discharge Volume Excess Flow Check Valve Cold shutdown justification Power-Operated Valves Power Operated Valves Grace period Weak link |
ENS 56923 | Sofie | 11 December 2023 06:00:00 | Potential Overexposure | Overexposure |
RS-23-122, Amendment No. 15 to Indemnity Agreement No. B-59 | Zion | 29 November 2023 | Amendment No. 15 to Indemnity Agreement No. B-59 | |
ENS 56871 | G.E. Healthcare Dba/Medi+Physics | 21 November 2023 05:00:00 | Agreement State - Lost Package | Moisture Density Gauge |
ML23321A044 | Braidwood | 17 November 2023 | Notification of Deviation from Electric Power Research Institute (EPRI) Topical Report MRP-227, Revision 1-A, Materials Reliability Program: Pressurized Water Reactor Internals Inspection and Evaluation Guideline | |
U-604780, Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation | Clinton | 17 November 2023 | Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation | Time of Discovery Fitness for Duty Contraband Condition Adverse to Quality Safeguards Contingency Plan Preemption Authority Exemption Request |
RS-23-104, Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation | Quad Cities | 17 November 2023 | Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation | Time of Discovery Fitness for Duty Contraband Condition Adverse to Quality Safeguards Contingency Plan Preemption Authority Exemption Request |
05000457/LER-2023-001, Submittal of LER 2023-001-00 for Braidwood Station, Unit 2, Train B Auxiliary Feedwater Pump Was Inoperable Due to Degraded Oil in the Crank Case | Braidwood | 17 November 2023 | Submittal of LER 2023-001-00 for Braidwood Station, Unit 2, Train B Auxiliary Feedwater Pump Was Inoperable Due to Degraded Oil in the Crank Case | |
BYRON 2023-0065, Unit 2 - Notification of Deviation from Electric Power Research Institute (EPRI) Topical Report MRP-227, Revision 1-A, Materials Reliability Program: Pressurized Water Reactor Internals Inspection and Evaluation Guideline | Byron | 17 November 2023 | Unit 2 - Notification of Deviation from Electric Power Research Institute (EPRI) Topical Report MRP-227, Revision 1-A, Materials Reliability Program: Pressurized Water Reactor Internals Inspection and Evaluation Guideline | |
IR 05000454/2023003 | Byron | 13 November 2023 | Integrated Inspection Report 05000454/2023003 and 05000455/2023003 and Exercise of Enforcement Discretion | Commercial Grade Dedication Enforcement Discretion Temporary Modification VT-2 Functionality Assessment FLEX B.5.b Significance Determination Process Foreign Material Exclusion Process Control Program Operability Determination Fire Protection Program Hourly Fire Watch Coast down |
IR 05000237/2023003 | Dresden | 13 November 2023 | Integrated Inspection Report 05000237/2023003 and 05000249/2023003 and Exercise of Enforcement Discretion | Safe Shutdown Ultimate heat sink Internal Flooding Enforcement Discretion Temporary Modification Functionality Assessment FLEX Significance Determination Process Operability Determination Spent Fuel Pool Instrumentation Continuous fire watch Fire Protection Program Fire Watch Substantial potential for an overexposure Coast down Overexposure |
RS-23-117, Supplemental Information Letter for Part 73 Exemption Request - Responses to Request for Confirmatory Information | Byron | 10 November 2023 | Supplemental Information Letter for Part 73 Exemption Request - Responses to Request for Confirmatory Information | Time of Discovery Fitness for Duty Contraband Exemption Request |
RS-23-119, Supplemental Information Letter for Part 73 Exemption Request - Responses to Request for Confirmatory Information | Dresden | 10 November 2023 | Supplemental Information Letter for Part 73 Exemption Request - Responses to Request for Confirmatory Information | Time of Discovery Fitness for Duty Contraband Exemption Request |
RS-23-118, Supplemental Information Letter for Part 73 Exemption Request - Responses to Request for Confirmatory Information | Braidwood | 10 November 2023 | Supplemental Information Letter for Part 73 Exemption Request - Responses to Request for Confirmatory Information | Time of Discovery Fitness for Duty Contraband Exemption Request |
RS-23-120, Supplemental Information Letter for Part 73 Exemption Request - Responses to Request for Confirmatory Information | LaSalle | 10 November 2023 | Supplemental Information Letter for Part 73 Exemption Request - Responses to Request for Confirmatory Information | Time of Discovery Fitness for Duty Contraband Exemption Request |
IR 05000373/2023003 | LaSalle | 9 November 2023 | County Station Integrated Inspection Report 05000373/2023003, 05000374/2023003, and 07200070/2023001 | Packing leak Post Accident Monitoring Enforcement Discretion Nondestructive Examination Functionality Assessment FLEX Significance Determination Process Process Control Program Operability Determination Spent Fuel Pool Instrumentation Liquid penetrant Fire Protection Program |
IR 05000461/2023003 | Clinton | 8 November 2023 | Integrated Inspection Report 05000461/2023003 | Safe Shutdown High Radiation Area Half scram Internal Flooding Nondestructive Examination Temporary Modification Squib Functionality Assessment Locked High Radiation Area FLEX Foreign Material Exclusion Scram Discharge Volume Operability Determination Fire Protection Program Dissimilar Metal Weld Power change |
RS-23-116, Supplemental Information in Response to Order Consenting to License Transfers and Approval of Conforming License Amendments | Zion | 8 November 2023 | Supplemental Information in Response to Order Consenting to License Transfers and Approval of Conforming License Amendments | |
RS-23-114, Proposed Alternative for Examination of Pressurizer Circumferential and Longitudinal Shell-to-Head Welds and Nozzle-to-Vessel Welds | Byron Braidwood | 1 November 2023 | Proposed Alternative for Examination of Pressurizer Circumferential and Longitudinal Shell-to-Head Welds and Nozzle-to-Vessel Welds | Hydrostatic VT-2 Finite Element Analysis License Renewal |
BW230048, Outage 23 and Unit 2 Refueling Outage 23 Steam Generator Tube Inspection Reports to Reflect TSTF-577 Reporting Requirements | Braidwood | 1 November 2023 | Outage 23 and Unit 2 Refueling Outage 23 Steam Generator Tube Inspection Reports to Reflect TSTF-577 Reporting Requirements | |
RS-23-102, Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation | Dresden | 16 October 2023 | Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation | Time of Discovery Contraband Condition Adverse to Quality Safeguards Contingency Plan Preemption Authority Exemption Request |
RS-23-103, Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation | LaSalle | 13 October 2023 | Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation | Time of Discovery Contraband Condition Adverse to Quality Safeguards Contingency Plan Preemption Authority Exemption Request |
RS-23-100, Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation | Byron | 13 October 2023 | Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation | Time of Discovery Contraband Condition Adverse to Quality Safeguards Contingency Plan Preemption Authority Exemption Request |
ENS 56791 | Ge Healthcare | 12 October 2023 05:00:00 | Missing Radiopharmaceutical Package Shipment | Moisture Density Gauge |
RS-23-105, Proposed Alternative for Examinations of Examination Category C-B Steam Generator Nozzle-to-Shell Welds and Nozzle Inside Radius Sections | Calvert Cliffs Byron Braidwood Ginna | 10 October 2023 | Proposed Alternative for Examinations of Examination Category C-B Steam Generator Nozzle-to-Shell Welds and Nozzle Inside Radius Sections | Finite Element Analysis Aging Management License Renewal Subsequent License Renewal |
BW230046, 10 CFR 72.48 Evaluation Summary Report | Braidwood | 9 October 2023 | 10 CFR 72.48 Evaluation Summary Report | |
RS-23-094, Relief Request I4R-24, Alternative for Post-Peening Reexamination Frequency for Reactor Pressure Vessel Head Penetration Nozzle Number 75 | Byron | 29 September 2023 | Relief Request I4R-24, Alternative for Post-Peening Reexamination Frequency for Reactor Pressure Vessel Head Penetration Nozzle Number 75 | Boric Acid VT-2 Finite Element Analysis Liquid penetrant Exclusive Use |
RS-23-093, License Amendment to Braidwood Station, Units 1 and 2, and Byron Station, Units 1 and 2, Technical Specifications 3.7.15, Spent Fuel Pool Boron Concentration, 3.7.16, Spent Fuel. | Byron Braidwood | 29 September 2023 | License Amendment to Braidwood Station, Units 1 and 2, and Byron Station, Units 1 and 2, Technical Specifications 3.7.15, Spent Fuel Pool Boron Concentration, 3.7.16, Spent Fuel. | Boric Acid Time to boil Aging Management Surveillance Frequency Control Program Fuel cladding Exclusive Use |
ENS 56766 | Rush University Medical Center | 28 September 2023 05:00:00 | Underdose to Patient | TheraSphere |
RS-23-091, Relief Request I4R-25, Alternative Requirements for Reactor Pressure Vessel Inservice Inspection Intervals | Byron | 26 September 2023 | Relief Request I4R-25, Alternative Requirements for Reactor Pressure Vessel Inservice Inspection Intervals | Probabilistic Risk Assessment License Renewal |
ENS 56745 | Clinton | 19 September 2023 01:07:00 | Offsite Notification | |
ENS 56734 | Irisndt, Inc. | 12 September 2023 21:27:00 | Failure of Source to Retract to Safe Position | |
ENS 56733 | Archer Daniels Midland Company | 11 September 2023 00:00:00 | Fire at Facility Containing Radioactive Gauges | |
ML23251A071 | Zion | 8 September 2023 | Confirmatory Survey Extent of Condition Review | |
ENS 56814 | Ge Precision Healthcare | 1 September 2023 05:00:00 | Lost and Found Radioactive Source | Moisture Density Gauge |
ENS 56712 | G.E. Healthcare | 1 September 2023 05:00:00 | Missing Packages | Moisture Density Gauge |
RS-23-080, Constellation Energy Generation, LLC, Application to Revise Technical Specifications to Adopt TSTF-264-A, Revision 0, 3.3.9 and 3.3.10 - Delete Flux Monitors Specific Overlap Requirement SRs | Dresden Nine Mile Point Clinton Quad Cities LaSalle | 30 August 2023 | Constellation Energy Generation, LLC, Application to Revise Technical Specifications to Adopt TSTF-264-A, Revision 0, 3.3.9 and 3.3.10 - Delete Flux Monitors Specific Overlap Requirement SRs | Shutdown Margin Surveillance Frequency Control Program |
RS-23-071, Application to Adopt TSTF-564, Safety Limit MCPR | Dresden | 30 August 2023 | Application to Adopt TSTF-564, Safety Limit MCPR | Reactor Vessel Water Level Safety Limit Minimum Critical Power Ratio Anticipated operational occurrence Annual Radiological Environmental Operating Report Process Control Program Fuel cladding |
ENS 56701 | G.E. Healthcare Dba Medi Physics | 29 August 2023 05:00:00 | Lost Less than Cat 3 Source | Moisture Density Gauge |