Semantic search

Jump to navigation Jump to search
 SiteStart dateTitleTopic
ENS 57016Alton Steel7 March 2024 06:00:00Damaged GaugesMoisture Density Gauge
ENS 56999Ineos28 February 2024 06:00:00Agreement State - Stuck ShutterStuck Shutter
ENS 56947G.E. Healthcare2 February 2024 06:00:00Lost/Missing SourceMoisture Density Gauge
ENS 56942Rush University Medical Center31 January 2024 06:00:00Medical UnderdoseTheraSphere
Underdose
RS-24-004, Proposed Alternative to the Distribution Requirements of ASME Code Table IWC-2411-1 for the Steam GeneratorsBraidwood11 January 2024Proposed Alternative to the Distribution Requirements of ASME Code Table IWC-2411-1 for the Steam Generators
ENS 56911Advocate Lutheran General Hospital29 December 2023 06:00:00UnderdoseTheraSphere
Underdose
IR 05000254/2023403Quad Cities22 December 2023Public- Quad Cities Nuclear Power Station Security Baseline Inspection Report 05000254/2023403 and 05000265/2023403Affidavit
ML23356A007Zion22 December 2023Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications ImplementationTime of Discovery
Contraband
Condition Adverse to Quality
Safeguards Contingency Plan
Preemption Authority
Exemption Request
ENS 56895Sterigenics U.S. Llc17 December 2023 05:00:00Stuck Source Rack
ENS 56890G.E. Healthcare14 December 2023 06:00:00Agreement State - Lost PackageMoisture Density Gauge
RS-23-123, Emergency License Amendment Request - Increase Technical Specifications Completion Time in TS 3.8.1.B.4 from 7 Days to 30 DaysQuad Cities13 December 2023Emergency License Amendment Request - Increase Technical Specifications Completion Time in TS 3.8.1.B.4 from 7 Days to 30 DaysSafe Shutdown
Arc flash
FLEX
Missed surveillance
Surveillance Frequency Control Program
Offsite Circuit
U-604788, Fourth Ten-Year Interval Inservice Testing Program Plan Revision 3Clinton12 December 2023Fourth Ten-Year Interval Inservice Testing Program Plan Revision 3Safe Shutdown
Packing leak
Ultimate heat sink
Stroke time
Squib
Incorporated by reference
Missed surveillance
Surveillance Frequency Control Program
Scram Discharge Volume
Excess Flow Check Valve
Cold shutdown justification
Power-Operated Valves
Power Operated Valves
Grace period
Weak link
ENS 56923Sofie11 December 2023 06:00:00Potential OverexposureOverexposure
RS-23-122, Amendment No. 15 to Indemnity Agreement No. B-59Zion29 November 2023Amendment No. 15 to Indemnity Agreement No. B-59
ENS 56871G.E. Healthcare Dba/Medi+Physics21 November 2023 05:00:00Agreement State - Lost PackageMoisture Density Gauge
ML23321A044Braidwood17 November 2023Notification of Deviation from Electric Power Research Institute (EPRI) Topical Report MRP-227, Revision 1-A, Materials Reliability Program: Pressurized Water Reactor Internals Inspection and Evaluation Guideline
U-604780, Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications ImplementationClinton17 November 2023Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications ImplementationTime of Discovery
Fitness for Duty
Contraband
Condition Adverse to Quality
Safeguards Contingency Plan
Preemption Authority
Exemption Request
RS-23-104, Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications ImplementationQuad Cities17 November 2023Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications ImplementationTime of Discovery
Fitness for Duty
Contraband
Condition Adverse to Quality
Safeguards Contingency Plan
Preemption Authority
Exemption Request
05000457/LER-2023-001, Submittal of LER 2023-001-00 for Braidwood Station, Unit 2, Train B Auxiliary Feedwater Pump Was Inoperable Due to Degraded Oil in the Crank CaseBraidwood17 November 2023Submittal of LER 2023-001-00 for Braidwood Station, Unit 2, Train B Auxiliary Feedwater Pump Was Inoperable Due to Degraded Oil in the Crank Case
BYRON 2023-0065, Unit 2 - Notification of Deviation from Electric Power Research Institute (EPRI) Topical Report MRP-227, Revision 1-A, Materials Reliability Program: Pressurized Water Reactor Internals Inspection and Evaluation GuidelineByron17 November 2023Unit 2 - Notification of Deviation from Electric Power Research Institute (EPRI) Topical Report MRP-227, Revision 1-A, Materials Reliability Program: Pressurized Water Reactor Internals Inspection and Evaluation Guideline
IR 05000454/2023003Byron13 November 2023Integrated Inspection Report 05000454/2023003 and 05000455/2023003 and Exercise of Enforcement DiscretionCommercial Grade Dedication
Enforcement Discretion
Temporary Modification
VT-2
Functionality Assessment
FLEX
B.5.b
Significance Determination Process
Foreign Material Exclusion
Process Control Program
Operability Determination
Fire Protection Program
Hourly Fire Watch
Coast down
IR 05000237/2023003Dresden13 November 2023Integrated Inspection Report 05000237/2023003 and 05000249/2023003 and Exercise of Enforcement DiscretionSafe Shutdown
Ultimate heat sink
Internal Flooding
Enforcement Discretion
Temporary Modification
Functionality Assessment
FLEX
Significance Determination Process
Operability Determination
Spent Fuel Pool Instrumentation
Continuous fire watch
Fire Protection Program
Fire Watch
Substantial potential for an overexposure
Coast down
Overexposure
RS-23-117, Supplemental Information Letter for Part 73 Exemption Request - Responses to Request for Confirmatory InformationByron10 November 2023Supplemental Information Letter for Part 73 Exemption Request - Responses to Request for Confirmatory InformationTime of Discovery
Fitness for Duty
Contraband
Exemption Request
RS-23-119, Supplemental Information Letter for Part 73 Exemption Request - Responses to Request for Confirmatory InformationDresden10 November 2023Supplemental Information Letter for Part 73 Exemption Request - Responses to Request for Confirmatory InformationTime of Discovery
Fitness for Duty
Contraband
Exemption Request
RS-23-118, Supplemental Information Letter for Part 73 Exemption Request - Responses to Request for Confirmatory InformationBraidwood10 November 2023Supplemental Information Letter for Part 73 Exemption Request - Responses to Request for Confirmatory InformationTime of Discovery
Fitness for Duty
Contraband
Exemption Request
RS-23-120, Supplemental Information Letter for Part 73 Exemption Request - Responses to Request for Confirmatory InformationLaSalle10 November 2023Supplemental Information Letter for Part 73 Exemption Request - Responses to Request for Confirmatory InformationTime of Discovery
Fitness for Duty
Contraband
Exemption Request
IR 05000373/2023003LaSalle9 November 2023County Station Integrated Inspection Report 05000373/2023003, 05000374/2023003, and 07200070/2023001Packing leak
Post Accident Monitoring
Enforcement Discretion
Nondestructive Examination
Functionality Assessment
FLEX
Significance Determination Process
Process Control Program
Operability Determination
Spent Fuel Pool Instrumentation
Liquid penetrant
Fire Protection Program
IR 05000461/2023003Clinton8 November 2023Integrated Inspection Report 05000461/2023003Safe Shutdown
High Radiation Area
Half scram
Internal Flooding
Nondestructive Examination
Temporary Modification
Squib
Functionality Assessment
Locked High Radiation Area
FLEX
Foreign Material Exclusion
Scram Discharge Volume
Operability Determination
Fire Protection Program
Dissimilar Metal Weld
Power change
RS-23-116, Supplemental Information in Response to Order Consenting to License Transfers and Approval of Conforming License AmendmentsZion8 November 2023Supplemental Information in Response to Order Consenting to License Transfers and Approval of Conforming License Amendments
RS-23-114, Proposed Alternative for Examination of Pressurizer Circumferential and Longitudinal Shell-to-Head Welds and Nozzle-to-Vessel WeldsByron
Braidwood
1 November 2023Proposed Alternative for Examination of Pressurizer Circumferential and Longitudinal Shell-to-Head Welds and Nozzle-to-Vessel WeldsHydrostatic
VT-2
Finite Element Analysis
License Renewal
BW230048, Outage 23 and Unit 2 Refueling Outage 23 Steam Generator Tube Inspection Reports to Reflect TSTF-577 Reporting RequirementsBraidwood1 November 2023Outage 23 and Unit 2 Refueling Outage 23 Steam Generator Tube Inspection Reports to Reflect TSTF-577 Reporting Requirements
RS-23-102, Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications ImplementationDresden16 October 2023Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications ImplementationTime of Discovery
Contraband
Condition Adverse to Quality
Safeguards Contingency Plan
Preemption Authority
Exemption Request
RS-23-103, Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications ImplementationLaSalle13 October 2023Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications ImplementationTime of Discovery
Contraband
Condition Adverse to Quality
Safeguards Contingency Plan
Preemption Authority
Exemption Request
RS-23-100, Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications ImplementationByron13 October 2023Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications ImplementationTime of Discovery
Contraband
Condition Adverse to Quality
Safeguards Contingency Plan
Preemption Authority
Exemption Request
ENS 56791Ge Healthcare12 October 2023 05:00:00Missing Radiopharmaceutical Package ShipmentMoisture Density Gauge
RS-23-105, Proposed Alternative for Examinations of Examination Category C-B Steam Generator Nozzle-to-Shell Welds and Nozzle Inside Radius SectionsCalvert Cliffs
Byron
Braidwood
Ginna
10 October 2023Proposed Alternative for Examinations of Examination Category C-B Steam Generator Nozzle-to-Shell Welds and Nozzle Inside Radius SectionsFinite Element Analysis
Aging Management
License Renewal
Subsequent License Renewal
BW230046, 10 CFR 72.48 Evaluation Summary ReportBraidwood9 October 202310 CFR 72.48 Evaluation Summary Report
RS-23-094, Relief Request I4R-24, Alternative for Post-Peening Reexamination Frequency for Reactor Pressure Vessel Head Penetration Nozzle Number 75Byron29 September 2023Relief Request I4R-24, Alternative for Post-Peening Reexamination Frequency for Reactor Pressure Vessel Head Penetration Nozzle Number 75Boric Acid
VT-2
Finite Element Analysis
Liquid penetrant
Exclusive Use
RS-23-093, License Amendment to Braidwood Station, Units 1 and 2, and Byron Station, Units 1 and 2, Technical Specifications 3.7.15, Spent Fuel Pool Boron Concentration, 3.7.16, Spent Fuel.Byron
Braidwood
29 September 2023License Amendment to Braidwood Station, Units 1 and 2, and Byron Station, Units 1 and 2, Technical Specifications 3.7.15, Spent Fuel Pool Boron Concentration, 3.7.16, Spent Fuel.Boric Acid
Time to boil
Aging Management
Surveillance Frequency Control Program
Fuel cladding
Exclusive Use
ENS 56766Rush University Medical Center28 September 2023 05:00:00Underdose to PatientTheraSphere
RS-23-091, Relief Request I4R-25, Alternative Requirements for Reactor Pressure Vessel Inservice Inspection IntervalsByron26 September 2023Relief Request I4R-25, Alternative Requirements for Reactor Pressure Vessel Inservice Inspection IntervalsProbabilistic Risk Assessment
License Renewal
ENS 56745Clinton19 September 2023 01:07:00Offsite Notification
ENS 56734Irisndt, Inc.12 September 2023 21:27:00Failure of Source to Retract to Safe Position
ENS 56733Archer Daniels Midland Company11 September 2023 00:00:00Fire at Facility Containing Radioactive Gauges
ML23251A071Zion8 September 2023Confirmatory Survey Extent of Condition Review
ENS 56814Ge Precision Healthcare1 September 2023 05:00:00Lost and Found Radioactive SourceMoisture Density Gauge
ENS 56712G.E. Healthcare1 September 2023 05:00:00Missing PackagesMoisture Density Gauge
RS-23-080, Constellation Energy Generation, LLC, Application to Revise Technical Specifications to Adopt TSTF-264-A, Revision 0, 3.3.9 and 3.3.10 - Delete Flux Monitors Specific Overlap Requirement SRsDresden
Nine Mile Point
Clinton
Quad Cities
LaSalle
30 August 2023Constellation Energy Generation, LLC, Application to Revise Technical Specifications to Adopt TSTF-264-A, Revision 0, 3.3.9 and 3.3.10 - Delete Flux Monitors Specific Overlap Requirement SRsShutdown Margin
Surveillance Frequency Control Program
RS-23-071, Application to Adopt TSTF-564, Safety Limit MCPRDresden30 August 2023Application to Adopt TSTF-564, Safety Limit MCPRReactor Vessel Water Level
Safety Limit Minimum Critical Power Ratio
Anticipated operational occurrence
Annual Radiological Environmental Operating Report
Process Control Program
Fuel cladding
ENS 56701G.E. Healthcare Dba Medi Physics29 August 2023 05:00:00Lost Less than Cat 3 SourceMoisture Density Gauge