ML22013A288

From kanterella
Jump to navigation Jump to search

Trp 23 & 147.8 St. Lucie SLRA - Breakout Questions Cranes AMP-TLAA
ML22013A288
Person / Time
Site: Saint Lucie  NextEra Energy icon.png
Issue date: 12/21/2021
From:
Office of Nuclear Reactor Regulation
To:
Rodriguez-Luccioni H
References
EPID L-2021-SLR-0002, L-2021-SLR-0002
Download: ML22013A288 (2)


Text

St. Lucie SLRA: Breakout Questions SLRA Section B.2.3.13, Inspection of Overhead Heavy Load and Light Load (Related to Refueling) Handling Systems TRP 023 TLAA: 4.7.6 Crane Load Cycle Limits.

TRP: 147.8 Note: Breakout Questions are provided to the applicant and will be incorporated into the publicly-available audit report.

Technical Reviewer Ata Istar 12/14/2021 Technical Branch Chief Joseph Colaccino 12/17/21 Breakout Session Date/Time To be filled in by PM Applicant Staff NRC staff To be filled out by PM during breakout Question SLRA SLRA Background / Issue Discussion Question / Request Outcome of Discussion Number Section Page (As applicable/needed) 1 B.2.3.13 B-113 SLRA Section B.2.3.13 states The PSL Clarify whether all the load Inspection of Overhead Heavy Load and handling systems are Light Load (Related to Refueling) considered for periodic Handling Systems AMP is an existing structural monitoring in ADM-AMP that was evaluated as a portion of 17.32.

the PSL Structures Monitoring (Section B.2.3.33) AMP in the initial license renewal application.

SLRA AMP basis document NEESL00008-REPT-063, Revision 0, Section 4.1 Scope of Program, lists the load handling systems for Units 1 and 2.

ADM-17.32, Structures Monitoring Program, Revision 7, Attachment 1, License Renewal Scope: Structural System/Components, lists some of the load handling systems under Component/Commodity, It is not clear whether all the load handling systems listed in SLRA AMP basis document, NEESL00008-REPT-063, Revision 0, are considered for periodic monitoring in ADM-17.32, Structures Monitoring Program, Revision 7.