Temporary Use of Atlas Copco Diesel Compressor PTMS900 at Millstone Nuclear Power Station Unit 3 Maint of Svc Air Sys
ML20148K822
Person / Time
Site: Millstone Dominion icon.png
Issue date: 05/31/1997
From:
NORTHEAST UTILITIES SERVICE CO.
To:
Shared Package
ML20148K811 List:
References
NUDOCS 9706180440
Download: ML20148K822 (24)


Text

- - . . ... . . -. . - - __ _ -. .- - - .- __ -

4

. - MILLSTONE NUCLEAR POWER STATION UNIT 3 TEMPORARY USE OF ATLAS COPCO DIESEL COMPRESSOR l #PTMS900 AT MILLSTONE NUCLEAR POWER STATION UNIT 3 MAINTENANCE OF SERVICE AIR SYSTEM l

CRITERIA POLLUTANT EMISSION CALCULATIONS Corporate and Environmental Affairs Division Northeast Utilities Service Company May 1997 i

l 9706180440 970528 PDR ADOCK 05000423 P PDR

TAB E OF CONTENTS

(.

Table 1 - Assumptions Used in Emission Calculations Table 2 - Factors Used to Calculate Emissions Table 3 - Potential Emissions

Table 4 Actual Emissions i

f i

l t

  • TABLE 1 Assumptions Used in Emission Calculations Millstone Unit 3 Diesel Compressor Detroit Diesel Compressor Model PTMS 900
1. All emission factors used are as supplied by engine manufacturer.

Fuel sulfur content - Not to exceed 0.05%

2.

Fuel consumption rate - 15.7 gallons per hour (gph) 3.

140,000 BTUs per gallon

4. Fuel heat value-5 5.

Particulate emission rate (0.07 pounds / hour) meets the regulatory limit of 0.1 lb/10 BTU (0.07 pounds / hour) (1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> /15.7 gallons) (gallon /140,000 BTU) = 0.032 lb/10' BTU I

t

(

i l

l l

TABLE 2 ,

l Factors Used to Calculate Emissions Millstone Unit 3 Diesel Compressor -

Detroit Diesel Compressor Model PTMS 900 ;

Pollutant Pounds / Hour  !

Particulates 0.07 l NO, 3.43 i CO 0.21 SO 0.12*

l VOC 0.16  !

  • Burning 0.05% sulfur fuel

\

l i

l l

l l

I

1 l

TABLE 3 Potential Emissions Millstone Unit 3 Diesel Compressor Detroit Diesel Compressor Model PTMS 900 Based on operation at full load for 8760 hours0.101 days <br />2.433 hours <br />0.0145 weeks <br />0.00333 months <br /> per year l '

Pollutant Pounds / Hour Tons /vr*

l Particulates 0.07 0.31 NO, 3.43 15.02 ,

CO 0.21 0.92 SO2 0.12 0.53 VOC 0.16 0.70

  • (pounds / hour) (tons /2000 pounds) (8760 hours0.101 days <br />2.433 hours <br />0.0145 weeks <br />0.00333 months <br /> / year) i l

l 1

]

_ _ _ _ _ . . . . _ _ _ _ . _ . . . _ . . . _ . . . . _ . . . _.,m.. . _ _ _ . . _ _ . .

l l; .-

TABLE 4 Actual Emissions Millstone Unit 3 Diesel Compressor Detroit Diesel Compressor Model PTMS 900  !

Based on operation at full load for 240 hours0.00278 days <br />0.0667 hours <br />3.968254e-4 weeks <br />9.132e-5 months <br /> per year l

i

' Pollutant Pounds / Hour Tons /vr*

l i Particulates 0.07 0.008 i

NO, 3.43 0.412 i

CO 0.21 0.025 0.12 0.014 SO2 VOC. 0.16 0.019 l

  • (pounds / hour) (tons /2000 pounds) (hours / year) t i

l I

i l

l l

- . _ _ _ - _ . _ . ~.

ATTACHMENT 3 i l

l HAZARDOUS AIR POLLUTANT ANALYSIS TEMPORARY USE OF ATLAS COPCO DIESEL COMPRESSOR

  1. PTMS900 AT  ;

MILLSTONE NUCLEAR POWER STATION UNIT 3 MAINTENANCE OF SERVICE AIR SYSTEM l l

l 4

l

l.** l Hazardous Air Pollutant Analysis i

l Millstone Unit 3 Diesel Compressor l Detroit Diesel Compressor Model PTMS 900 l

l l 1. The analysis is conducted for emissions of sulfuric acid.

2. Sulfuric acid emission factor 2.45S lbs/1000 gallons obtained from DEP staff for similar previous applications
3. Hazard Limiting Value (HLV) from Sec. 22a-174-29 of Connecticut Regulations for sulfuric acid: 20 ug/m'
4. Stack flow rate (V): 2140 ft'/ min 2140 ft'/ min (m*/35.31 ft') (min /60 sec) = 1.010 m'/sec
5. Stack height (H): 2.5 meters
6. Fuel sulfur content: Not to exceed 0.05%
7. Fuel consumption rate: 15.7 gallons / hour I (15.7 gallons / hour) (hour /3600 sec) = 0.004 gallons /sec
8. Distance to the closest property boundary (X): 152.4 meters
9. Since the discharge point is less than 20 meters measured vertically, the following MASC equation was used:

MASC = [0.885(HLV)(X + 1.08*V*)* / V = 45,074ug/m'

10. ASC = [2.45 (0.5) Ibs/1000 gal)*(0.0071 gallsec)* (454 grams /lb)/1.62 m'/sec = 220 ug/m*

l r

bk+ '

SCALE 124000 s A'hd l

-)p'jo)

'w. . . _ .

- o S

.n - - rn m,

- ),LQ(

x y

[ b* Z' I b .-  ? ___ _ - '*" "

['>.k4.d!

h9'k. CONTOUR INTERVAL 10 FEET g) /

G  %;9 ' :j , g Q M ] @- :9 +:L WgW W W @ g "y:

O u.,  ;

yyg migts g. ,  ;

I n in 5 N ', '

gaggw'

, o .

&~, -

na kg Y , I' k. .

u s c I Q .

{

dp//  ! E s I

[ ,,'. br % i [k, hk "I" 7

~

"'8 ,

The s., \ / _

) . . . . .

( ,l gl

? l, \t MQ  ;

8.c

. 3,'. 9 , s -) .). . . m

v*y Lu"b t .g -

~" - ' -

/ U h (. q O .

t( y\;

  • N, - 'y [' :.. Kr fhc .f.j '
  • k y\

2k'"g/ .).,a $ g .q%

3

] g* c w

.)

gx., \\ '

p Q #

'N['I,)'[eg([i,h'k w ,. j.[h 5

(Saf L hr }3 @3'

~  ! .

i,  !

,at V

=

4 '

> c

  • m c

y G.\i.)..w.

ti. y.3 ,_ W..-(

l,) U\,,*,,fg.

A N T :I C smemaxw.

Bay Poietgp.

o l'[

Q

.a

\, au,gyy, ,, , ,,j

- Pleasure Beachhg. ,

.>.q -

y BA Y Qg t,

.g ' i_1 une

  • Q .

V k,M" a f.h~ N'8" ""

seh '

Millstone Nuclear Power Station

.f .

Lat: 41 deg /18 min / 20 see leng: 72 deg / 09 min / 53 see

$F-

. M'M5tW ri. n% 5 N! ANTIC' CONN Point -

N 4115-W 7207.5 / 7.5 a Little Roch

, White Poi

f. PHOTOREVlsED 1970 7av oq AMs eses i sw-stRits vai-fa r
    • m ww  %.  %% we w

. / .

/, '

--~

7" ,.

, e e

O l$I5i j

1. I  %

f i i.I' h!

" i

'l i

=

I fI 3 :

e 7 lf f

3

=

  • I .3 .

?$g$

I k \ a

~

O 5:bb I.

~Eti!

IfI' l - j :;

  • in>iN

~

a .., I i

~ .

E '<} ( ) as. .., \

=

l, j , est *

$h.i

! E

'!l/

I

I!c s N

\

!!!! la '"

i lh' l, f , i )

'  ?

l 4

y ;, ..

~ yy jg%f(y I

,g ^ ' j

,/

lf ll;ruil f i

t I -

I e l .( s}

uni s si is r.

7 -

=

g - _.__

sN.s. .

i

1
. 5 -

y, .

I.

s

(

aye i , >

n' . If,

  • g e./

l \

. . it .!.,i sI k' ,

5 iss i i

  • it

[l i.,

i

- w, .. g

- 0  :

.d '  ! I. $g. f h.

lll l ll,1 l i

  • 0 L1%, i ,'l i 1

Issl h{' l$ 9 .. nu

~ .

j

- . . - . - - . . . . - . . . - . . - . ..-. - .- - . -. - . _ .-. - - - - . - - - - - .-. - =.

1.

ATTACHMENT 5 i.

APPLICANT COMPLIANCE INFORMATION TEMPORARY USE OF ATLAS COPCO DIESEL COMPRESSOR -

  1. PTMS900 l AT i

l MILLSTONE NUCLEAR POWER STATION UNIT 3 MAINTENANCE OF SERVICE AIR SYSTEM t

l l

l I

I l

l I

Applicant Compliance Information

.i

. ,'. id:

  • /

4, . .,' _ , , .w.c .

1 g,Q%.T..  :::

vp, ypr... ~. .

N rtheast Nuclear Energy Co:npany Applicent Name:

1as indicated on the Permit Application TransmittelForm) l

If you answer yes to any the questions below, you must complete the Table of Enforcement Actions on

' the reverse side of this sheet as directed in the instructions for your permit application.

i

! A. During the five yes's immediately preceding submission of this application, has the applicant been convicted in any jurisdiction of a criminal violation of any environment.nllaw?

l O Yes fi No

! B. During the five years immediately preceding submission of this application, has a civil penalty been imposed upon the applicant in any state, including Connecticut, or federal judicla!

proceeding for any vioista. of an environmentallaw?

' O Yes X3 No J

l C. During the five years immediately preceding submission of this application, nas a civil pensity exceeding five thousand dollars been imposed on the applicant in any state, including i

Connecticut, or federal administrative proceeding for any vlotation of an environmentallaw?

E Yes O No D. During the five years immediately preceding submission of this application, has any state, including Connecticut, or federal court issued any order or entered any judgement to the applicant concerning a violation of any environmentallsw?

4 O Yes E No

(

E. During the five years immediately preceding submission of this application, has any state, inciqding Connecticut, or federal administrative egency issued any order to the applicant a concerning a violation of any environmentallaw?

)Q Yes

  • O No
  • Notice Of Violations Only 1of2 N. c2/27/95 . ,

DEP APP-002 .

Table of Enforcement Actions _

......3,....w.._- 1,,

g ... .g . g .., .

k' .h,?  ! . Jl;

... Type

~

Act 0 .k ':l5~ ef5 ,

. k~

h hb. if

'.0 t:4df)kf N,'sh fth I$ _ ;f1$k NkI - . kbi k . h See Attached .

Copies of this form may be duplicated for additional space. Please enter a check mark if additional sheets are etteched. O ,

2of2 flow. 02127#95

, DEP-APP-OO2

. _ _ . _ . . _ _ _ _ _ _ _ _ _ _ _ . . _ _ _ _ _ _ _ _ _ _ . _ _ _ _ _ _ _ . _ _ _ . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . _ _ _ ____ ___.__________._._._____________m

+ l A" Millst::ne Nuclear Pcwer Statirn l f' Subject, Letter, Date Notice of Violation, Hazardous Waste, NOV No. HM-441, February 11,

- i 1992,C04495 DEP, Bureau of Waste Management  ;

Issuing Agency and Branch Robin W. Bray I Agency Contact Issue As the result of a hazardous waste inspection on June 18,1991, the DEP issued the NOV for four areas:

  • Failure to conduct hazardous waste determinations on various paints.
  • Failure to close one 5-gallon container of waste paint.
  • Failure to properly label one 5-gallon container of waste paint.

Response Letter and Date J. F. Opeka to R W. Bray, April 10,1992 D05468 Response / Resolution NNECO responded as:

  • Prior to the time of the audit, NNECO personnel were collecting information (MSDS and analyses) on various points used at the site. l Analyses were submitted. l
  • The 5 gallon container has been eliminated.
  • The 5-gallon container has been eliminated. Also, all satellite containers are properly labeled.
  • NNECO contended that the secondary containment tank was addressed in the closure plan though in an indirect manner. An amendment to the closure plan was issued to better discuss the tank.

Response Letter and Date R W. Bray to J. F. Opeka, May 20,1992, C04632 Response / Resolution DEP requested information on the training of employees to properly identify and dispose of hazardous waste paint. Also, greater detail is required on the cleaning procedure for the secondary containment tank.

Response L(tter and Date W. D. Romberg to R. W. Bray, January 13,1993, D06106 Response / Resolution Responded to NOV HM-441. The training of personnel and the Training Manual were reviewed. Most of the painting and residual materials are turned over to painting contractors. If any additional questions are raised by either the paint contractor or station personnel on waste paint disposal, the station's Environmental Coordinator is contacted. A revision was made to the Appendix to the Millstone Nuclear Power Station Container Storage Area Closure Plan that included a new section on cleaning the sump tank for the container storage area.

- Millstone Nuclear Power Station (Continued)

,' Subject, Letter, Date Consent Order, January 14,1994, C05471 n.

Issuing Agency and Branch CT Department of Environmental Protection Agency Contact Timothy R. E. Keeney Issue Consent Order remove floating docks, finger piers and ramps that were installed without a permit or certificate. Civil penalty of $18,000 for the violations Response Letter and Date D. M. Gilbane to C. Evens, January 26,1994, D07294 Response / Resolution NNECO paid the fine.

! - Millstone Nuclear Power Station (Continusd) i j Subject, Letter, Date Notice of Violation, Hazardous Waste, NOV No. HM-684, September

$33 l U:d

  • 19,1994, C05860 i Issuing Agency and Branch DEP, Waste Management Bureau Agency Contact David A. Nash l Issue As a result of hazardous waste inspections on May 14,24, and 27,1994, the l l DEP issued the NOV for seven areas. l
  • Inspection schedule and log for two locations, Environmental Laboratory and Building 2-44, were missing information (date and time ofinspections, integrity evaluation, inspection of sump).
  • At least one employee had not received annual hazardous waste

" Refresher" training.

  • The facility hazardous waste contingency plan lacked descriptions and j capabilities of spill and personnel protective equipment.
  • The facility hazardous waste contingency plan did not include or did not properly reference the names, addresses, and telephone numbers of the emergency coordinators.
  • The facility hazardous waste closure plan indicated that three container areas would be closed under the plan (the actual number is six).
  • Six drums of hazardous waste had not been marked with the accumulation date.
  • Several hundred cubic feet of mixed waste had been stored for greater than  ;

one year.

Response Letter and Date D. B. Miller to R. Q. Bunnell, November 16,1994, D08100. I Response / Resolution NNECO responded as:

  • The Environmental Lab Building is not used as a CSA, thus is not subject i to the requirements of a CS A. The site will include an inspection of the Building 2-44 sump weekly with an updated inspection form.
  • Training was scheduled within the accepted period of one calendar year plus 90 days for all employees.
  • The Hazardous Waste Contingency Plan will be revised by January 31, 1995.
  • List 650 is located in the Control Room and the Contingency Plan will be revised to reference this information.

l l

  • The closure plan was corrected to indicate that six container storage areas will be closed l
  • Missing accumulation dates were put in drums.
  • Millstone is in compliance with EPA policy regarding mixed-waste storage.

_. _ _ _ _ _ . _ _ . . . _ _ . __.__.__.__._.._.-._..._._.4 . . _ . . _ _ _ _ _ . _ _ _ _ . - _ _ . _ . _ . _ .

DIREqTORS AND OFTICERS LIST http//nuwww 1.nu.com/ccieg$nneco.htm 3 Legal Department C)

Northeast Nuclear Energy Company j l

l l

r DIRECTORS (Quorum - One-third of Directors) i . Robert G. Abair William T. Frain, Jr. Bruce D. Kenyon Cheryl W. Grish Hugh C. MacKenzie Bernard M. Fox l

! John B. Reane OFFICERS l Chairman Bernard M. Fox

! President and Chief Executive Office Bruce D. Kenyon Executive Vice President and Chief Financial Officer John H. Forsgren  ;

j l Senior Vice President and l Chief Nuclear Officer Neil S. Carns Senior Vice President and Chief Administrative Officer Cheryl W. Gris6 l l

Senior Vice President-Governmental Affairs Francis L. Kinney l

! Senior Vice President, Secretary and ,

General Counsel Robert P. Max l l Vice President-Millstone Unit 3 Michael H. Brothers l

' Vice President-Nuclear oversight David M. Goebel Vice President-Corporate and l l

Barry Ilberman i Envirotunental Affairs

( Vice President and Treasurer John B. Keane Vice President-Purchasing and General Services Keith R. Harvin Vice President and Controller John J. Roman Vice President-Nuclear Work Services Frank C. Rothen Assistant Secretary Theresa H. Allsop Assistant Secretary O. Kay Comendul Assistant Treasurer-Treasury Operations Robert C. Aronson Assistant Treasurer-Finance David R. McHale (Last Revision 2/3/97) l l i i

I Last Updated: February 3,1997 by: Kay Comendul at comenoWinu.com I

C C Copyright Nonheast Utilities Service Company,1996,1997 All Rights Resened h

4 5'2097 3.30 PM 1 of I l

l i -

a . 4 -. _ - . -- ----4.----2.2 a- ...--__e-.. -_ ---. ~ .. --- ~_.- ~ ~ -.~.a-.-.--4.--..----i-.----.-------..

e

}l!!!!!!!!!!!! !!!

illilill!,i u m 11 ii l j i 1,ijp> n m a ill tj

!l all

  1. ) I $

in 11 i

lllIji] n!

1 il]i  !  !! $ !! .I lg  !] i er in it ,Ij'i  ! ,

ll

O llI l1lil1!$1III!I ii !l ll ll

.II imiljli! i I, !! m mn

!! ii l$

i  ! I in er ,,lli I

!ll! l! l I I

ATTACHMENT 6 l PREMISE NON-ATTAINMENT POLLUTANT

SUMMARY

l TEMPORARY USE OF ATLAS COPCO I DIESEL COMPRESSOR

  1. PTMS900

\ .

! AT I i MILLSTONE NUCLEAR POWER STATION UNIT 3 MAINTENANCE OF SERVICE AIR SYSTEM l

i I

l 2

l l

l l

l

Premise Non-attainment Pollutant Summarv

~

If,the premise on which the source seeking a permit is to be located on is, or will be a major stationary source as defined in Section 22a-174-1 of the Regulations of Connecticut State Agencies, the applicant shall supply the following information:

1) List any potential emissions increases of NO,and VOC (TPY) from unpermitted emission units constructed at the premise since January 1,1991. Potential emissions are based on 8760 hours0.101 days <br />2.433 hours <br />0.0145 weeks <br />0.00333 months <br /> of operation per year before the application of control equipment.

Potential Emissions (TPY)

-mmmmmmmmm Emission Unit ID Number Construction Date N O, VOC and Description u

2) List any potential emissions increases of NO, and VOC (TPY) from permitted emission units constructed at the premise since January 1,1991. Potential emissions are the emisalons allowed after federally enforceable permit limits have been applied.

Northeast Nuclear Energy Company Permitted Millstone Unit 3 Emissions (TPY) mummmmmmmmmmme ammmmmmmmmmum mummmmmu ammmmmmmmmmmemummmmm Emission Unit ID Construction Permit Permit Type (s) N O, VOC Number and Date No. (CP/OP)

Description Emergency Diesel 199-0017 CP/0P 4.95 0.23 Gen #645F4B Emergency Diesel 1 Gen #1750KW 199-0031 CP/oP 4.98 0.341 NSR #15 Rev 8/22/95 l

2 m j=. 4 _-J *mA-A A,4.o J_=2.L..--- ._m. __AAp 4 s. .h_J e._.Am.4 .J. mA4 .A,_,% 3 4,.-4,.4a.4-,J= a w J.-a&,,h, a m a.,a-s,,a e O

4' e a ATTACHMENT 7 PERMIT APPLICATION TRANSMITTAL FORM l TEMPORARY USE OF ATLAS COPCO l DIESEL COMPRESSOR

  1. PTMS900 AT MILLSTONE NUCLEAR POWER STATION UNIT 3 MAINTENANCE OF SERVICE AIR SYSTEM l

l i ,

l l

l l

l

1 i

  • ^

STATE OF CONNECTICUT DEPARTMENT OF ENVIRONMENTAL PROTECTION .

4  ! Central Permit Processing Unit

=s523 79 Elm Street

' Hartford, CT 06106 5127 Permit Application Transmittal Form Please complete this transmittal form in accordance with the . ~: Y* ' *N b instructions in order to ensure the proper handling of your i D******t h '

application (s) and the associated feels). Print legibly or type.  : Rec'd crPu - -

C Rec'd Program ' * ~

. Part 1: Applicant Information .

Northeast Nuclear Energy Company Company Name or, if applicant is an individual. write name in the following format:

Title (Mr, Ms. Dr) First Name %ddle initial Last Name Suffix (Jr, PE, PhD)

Mailing Address:

0270 City / Town:

State:

CT Z Code: 06141 665-5000 g , ,

Phone: ' i

~ 2335 Phone: ext.:

Contact Person:

O Check if any co-applicants, if so, attach additional sheet (s) with the required information as supplied above.

Applicant is a(n) (check one): D individual b company O federal O state D municipal if a Company, list company type (e.g., corporation, limited partnership, etc.)

P.O. Box 270 Applicant Billing Address:

Hartford CT 06141 - 0270 City / Town: State: Zip Code:

Paul Jacobson Phone: #860)447-1791 _ ext.: 2335 Billing Contact Name:

Part II: Project Information Brief Project

Description:

Millstone Nuclear Power Station - Unit 3 Temocrary use of comoressor for service air system Location (City / Town):

Waterford Other Project Permits (not included with this form):

r . ~ .e . . .. . < : m .. . . .. m Nuance' Date - } Denial D' ate.' . Perinit #1

% Permit Desoription?~ A + cissuin,g; i. SubrNt'tal  :

~

th '

' Authority 'Datsi +

1 of 3 Rev.11/02/95 DEP APP-OO1

i . .

"' Part til: Individuil Psrmit Application and Fae Information N, -

weet No.of Teel west Fees originsi +

M, Individual Permit Applications Fees Apps. Required RV, Copies

] R .

i f AIR 288lS510N5^

B i New Source Review $100.00 1+0 n

j Title V operating Permits none 1+0 j ' WATER DISCl4AftGES W i To Groundwater $ 700.00 1+2

! To Surface Water (NPDES) 8700.00 1+2 l To Sanitary Sewer (POTW) 8700.00 1+1

! RILAND WATBt RESOURCES '

i inland Wetlands and Watercourses no. e 1+$

Stroom Channel Encroachment Lines (

i j iniend 401 Water Queitty Certification none W.t.r oiseraion g i.1 j

Dem Construction none 1+2 j

i Flood Management Certification none 1+1 a

1

. OFFICE oF LONG ISLAND SOUND PROGMAMS i

Structures and Dredging I Marine Mining / Tidet Wettends $350.00 1+7 1

Coastel 401 Water Quality Certification none 1+7 1

i

. Certifieste of Permission $ 200.00 1+2 l WASTE MANAGEMENT Weste Transportation

  • 1+0 f

Solid Weste Focilities ( 1+2

$ 2500.00 1+0 RCRA Closure Plan

$2500.00 1+0 RCRA Post Closure 1

4 1+1 Section 22e 464 CGS Weste Faciities 1

Hezerdous Weste Treatment. Storage and Disposal Focilities 4 1+1 5 Aquatic Pesticide Application 8 25.00 1+0 Aerial Poetiende Application

  • 1+2 l

1 $ 125.00 1+0 i Marine Temenal License

.v4 d JA g'

  • 5

- J.H Sutrtotef 4 i

Q: GM?t%p h.-.v4: . N.:

+p f , "

J WWGJ ' ' K5 m<

{

GENERAL PERMITS and AUTHORIZATIONS 1 f500 Emw taals kom Pen IV, page 3 of this form 6 i "IIDW rc wq;e MT?% s , ,;'. g
.- ,

.: n.w 1

4  %.xv:n m wa:s w .: s.,e. +'-' ,;p c.;

.::j.4. gf ~ .; s. v

w. . ..

'f~.

j '.a '.' d. Ge t W r.t s . kA .

j m.w::Ak'p' p'f ngl', . 1 $ 500 M.~k,NhMMby'hj:x.-tjffQ;g/pg l v pg ::p;s,Q ,, q:gqh4 - . ,; ;4 ;w >

. ; QR y 4vi

~x l p sy .iL .p,f.3yan es

' %,,):' g.f,a

, f. ::l;i::.u m:;; e ...s_ (.}

g .,w .- f .. . .. ,

1 7. r-l:R #

4 .c ..s ,y. >

c g

MRsDUFh 24Rindicatophethw munidpol &caunt+ -or utste- -waiver . . ~ am -, appGes?

s

%. w w- -

> s.

$h M ' i

}.ym%.w ry w.4 RW mw @&y..w s um +c- $hY M hj.7..;

~ >

k,-, m.-[Q,j[:y e E!ly : Uss App i

um ; ; :g 1

i

' eg n,, .wyn_ 8 _ _.

4 .: $ 500

. [. [ @ f+ f0 ,' W % ~ ]~ ,.7, O AMOUNT REMITTED

+ . .

s .:4 <

4

'g7 , 4.- -

, s

s>

4

  • See fee Schedule on individual application. '

Rev.11/02/95 2 of 3 DEP-APP.001

i e

  • P;rt IV: Gsn:rci Parmit Rsglstrations and Requests for Other Authorizations e Applicstion cnd Feo Information

' .. Original +

' initial a of Totei initie: Fees Required

/ General Permits and Other Authorizations Fees Apps. Copies a

e

" AR EMISSIONS - '

l r- . y Authertretion ** 1 f500.00 1+0 gg j Temporary Authorisation 1+0 i

  • sWATER DISCHARGES ' " '

~

4 9- As - - I"

Car Wesh Westewater $437.50 -1+0 j Domestic Sewage $ 250.00 1+0 Groundwater Contamination Recovery System $2637.50 1+0 l

} , Hydrostatic Pressure Testing (Natural Gas Pipelines) 8500.00 1+1 4

Hydroetatic Pressure Testing $250.00 1+0 I blinor Non-Contact Cooling Water $ 500.00 1+1 5 R$inor Photographic Processing 8 50.00 1+0

) RAinor Pv6nting & Publishing Westoweter $ 250.00 1+0 l Beiner Tumbling or Cleaning of Ports Westewater $ 500.00 1+1

!)

Stormwater Associated with Commercist Activities $ 250.00 1+0

! Stormwater Associated with industrial Activities $ 250.00 1+0 stormwater & Dewstering Westewaters Construction Activities $250.00 1+o 4 Vehicle Service Floor Drain Westoweter 8 50.00 1+0 4

I Water Treatment Westewater $ 250.00 1+0 Emergency Authorization . Discharge to POTW $ 250.00 1+0 Emergency Authertretion . Discharge to Surf ace Water $ 500.00 1+0 Temporary Authorization . Discharge to POTW $ 250.00 1+0 i Temporary Authorisation . Discharge to Surface Wster $ 500.00 1+0

^

l SELAND WATER RESOURCES Emergency Authorisation ** **

Temporary Authorization WW WW

^ '-

' OFFICE oF LONG t$ LAND SOUNO PROGRAMS -

i Emergency Authodastion pg 1+0 t

Temporary Authorisation gg 1+0

,. -WASTE MANAGEMENT 5 %

? "/: ^ -

Asbestos Disposal Authertretion 4200.00 1+0 l

Drop site Recycling Feeliity $100.00 1+0 l

Urreted Processing Recycling Facility $250.00 1+0 Recyclables Transfer Facility $ 250.00 1+0 i

I S.;b Item Recycling Facility $ 250.00 1+0

$ 100.00 1+0 Special Weste Authodastion i Emergency Authodastion WW 4

l Temporary Authodsetson New uniisted General Permit l

)

1 U.W $ &E u7 s# ,

- s u God 1

$500.00 i

Dh:;

kfkhph(qhb[$k6%,

Carry totals over $a Part lit, page 2 of this form.'

I

^

^ ^ 7

. 1 Note:

) ** Contact the specific permit program for this information 4