MONTHYEARML20205K6141999-04-30030 April 1999 Non-proprietary Version of Rev 2 to Holtec Rept HI-971843, Licensing Rept for Reclassification of Discharge in Millstone Unit 3 Spent Fuel Pool ML20206T3991999-03-31031 March 1999 First Quarter 1999 Performance Rept, Dtd May 1999 ML20205E2361999-03-31031 March 1999 Mnps,Units 1,2 & 3 Decommissioning Funding Status Rept ML20204K1031999-03-19019 March 1999 Non-proprietary Licensing Rept for Spent Fuel Rack Installation at Mnps,Unit 3 ML20207B2271999-02-22022 February 1999 Rev 0 to SIR-99-021, Evaluation of Stratification Loadings in LBB Analysis for Mnps,Unit 2 Surge Line ML20199D4571999-01-0808 January 1999 Progress Toward Restart Readiness at Millstone Unit 2 - Nu Briefing for Nrc ML20197H5871998-12-31031 December 1998 Independent Corrective Action Verification Program, Final Rept,Vol 1 ML20198G7161998-11-30030 November 1998 Rev 0 to EMF-2145, Millstone Unit 2 Large Break Loca/Eccs Analysis with Replacement SGs & Plant Modifications ML20195H7401998-11-30030 November 1998 Station/Unit 3 Third Quarter Performance Rept ML20195C8091998-11-0909 November 1998 Request for Permission to Apply LBB Methodology to Pressurizer Surge Piping, Plant Specific Info Fo Pressurizer Surge Piping ML20195C7731998-10-13013 October 1998 Rev 0 to SIR-98-096, Pressurizer Surge Line LBB Evaluation Mnps,Unit 2 ML20198G7041998-09-30030 September 1998 Rev 0 to EMF-2079, Millstone Unit 2 Large Break Loca/Eccs Analysis with Replacement Sgs ML20154P9541998-09-30030 September 1998 Simulator Quadrennial Certification Rept ML20237B4781998-07-31031 July 1998 Station/Unit 3,Second Quarter Performance Rept for Jul 1998 ML20237B2801998-07-31031 July 1998 Rev 1 to EMF-98-036, Post-Scram Main Steam Line Break Analysis for Millstone Unit 2 ML20236V7541998-07-0101 July 1998 Rev 0 to Little Harbor Consultants,Inc, Evaluation of Millstone Self-Assessment & Independent Oversight Programs ML20236U6361998-07-0101 July 1998 Rev 0 to Leak-Before-Break Evaluation High Energy Safety Injection Piping,Mnps,Unit 2 ML20236F5221998-06-30030 June 1998 Independent Assessment of Upper Guide Structure (Ugs) Personnel Contamination Event at Millstone Station Unit 2, Final Rept ML20236F5051998-06-25025 June 1998 Rev 1 to Event Review Team Rept Root Cause Investigation Upper Guide Structure (Ugs) Personnel Contamination Event ML20249C3911998-06-22022 June 1998 Simulator Quadrennial Certification Rept ML20248F4071998-06-0101 June 1998 Final Rept SL-5192, Independent Corrective Action Verification Program for Millstone Unit 3 ML20236P4341998-05-22022 May 1998 Progress Toward Restart Readiness at Millstone Station - Northeast Utilities Briefing for Nrc ML20236F6411998-05-11011 May 1998 Rev 0 to Justification of Continued LBB Compliance for Nu MP2 ML20203H3531998-02-24024 February 1998 Transport of Small Air Pocket ML20216E0961998-02-17017 February 1998 Redacted Safety Conscious Work Environment (Assessment of Nuclear Oversight 980121 Statement) ML20199G8031998-01-31031 January 1998 Radiological Survey for Waterford Town Landfill,Waterford, Ct ML20199D9111998-01-23023 January 1998 Independent Corrective Action Verification Program Status Rept, for Period Ending 980123 ML20203H3961997-12-31031 December 1997 Integrated Sys Functional Review for Mnps,Unit 3, Engineering Self Assessment Rept ML20217C2201997-12-16016 December 1997 Exam of Concrete Cores Millstone III Subcontainment Porous Concrete ML20202H2981997-12-0202 December 1997 Independent Corrective Action Verification Program Status Rept ML20203H3661997-11-30030 November 1997 Transient Clearing of Air in Loop Seal ML20199G8091997-11-30030 November 1997 Radiological Survey for Equestrian Ctr Harkness State Park Waterford,Ct ML20211F7171997-09-29029 September 1997 Rev 0 to Critical Design Characteristics Radiological Events for Millstone 2 ML20217F9481997-08-31031 August 1997 Non-proprietary Version of Bases for Millstone Unit 3 ECCS Current & Future Ts ML20217Q7101997-08-29029 August 1997 Rev 0 to Critical Design Characteristics Reactivity Events ML20217Q7181997-08-29029 August 1997 Rev 0 to Critical Design Characteristics Undercooling Events & Reactor Coolant Flow Reduction Events ML20210H0051997-08-0505 August 1997 Rev 0 to Critical Design Characteristics Reactor Coolant Pressure Boundary Events & Mslb/Loca Containment Analyses ML20149F0971997-07-18018 July 1997 Rev 0 to Critical Design Characteristics Overcooling Events,Millstone 2 ML20148Q2901997-06-24024 June 1997 Simulator Quadrennial Rept for 1993-1997 ML20148K8221997-05-31031 May 1997 Temporary Use of Atlas Copco Diesel Compressor PTMS900 at Millstone Nuclear Power Station Unit 3 Maint of Svc Air Sys ML20148R7151997-05-30030 May 1997 Progress Toward Restart Readiness at Millstone Station ML20210S3711997-04-29029 April 1997 Margin of Immunity Determination for SRV Electric Lift for Neut,Millstone Nucelar Site,Unit 1 ML20138E6391997-04-11011 April 1997 Investigation of Possible Deterioration of Porous Concrete Millstone 3 Nuclear Reactor ML20217C2121997-04-0707 April 1997 Rev 2 to S3-EV-9700574, SE for Containment Structure Porous Concrete Drainage Sys ML20137H3031997-03-31031 March 1997 Rev 2 to Nuclear Training Loit/Lout Audit Reviews ML20138E6471997-03-14014 March 1997 Porous Concrete Investigation Millstone 3 Waterford,Ct ML20137C6281997-03-14014 March 1997 Redacted Version of Rev 1 to Nuclear Training Loit/Lout Audit Reviews ML20141D2881997-02-17017 February 1997 Rev 3 to Maint Rule Unit Basis Document ML20135E3221997-02-13013 February 1997 Independent Review Team Rept 1996 MP -1 Lout NRC Exam Failures ML20133C1451996-12-31031 December 1996 Porous Concrete Mock-Up Testing Phase III W/Containment Mat Concrete 1999-04-30
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20217P5391999-10-25025 October 1999 Rev 0,Change 1 to Millstone Unit 1 Northeast Utils QA Program ML20217C8721999-10-0606 October 1999 Rev 21,change 3 to MP-02-OST-BAP01, Nuqap Topical Rept, App F & G Only B17896, Monthly Operating Rept for Sept 1999 for Millstone Nuclear Power Station,Unit 1.With1999-09-30030 September 1999 Monthly Operating Rept for Sept 1999 for Millstone Nuclear Power Station,Unit 1.With B17894, Monthly Operating Rept for Sept 1999 for Millstone Nuclear Power Station,Unit 2.With1999-09-30030 September 1999 Monthly Operating Rept for Sept 1999 for Millstone Nuclear Power Station,Unit 2.With B17898, Monthly Operating Rept for Sept 1999 for Millstone Nuclear Power Station,Unit 3.With1999-09-30030 September 1999 Monthly Operating Rept for Sept 1999 for Millstone Nuclear Power Station,Unit 3.With ML20216J4341999-09-24024 September 1999 Mnps Unit 3 ISI Summary Rept,Cycle 6 ML20211N8401999-09-0202 September 1999 Rev 21,change 1 to Northeast Utils QA TR, Including Changes Incorporated Into Rev 20,changes 9 & 10 B17878, Monthly Operating Rept for Aug 1999 for Mnps,Unit 1.With1999-08-31031 August 1999 Monthly Operating Rept for Aug 1999 for Mnps,Unit 1.With B17874, Monthly Operating Rept for Aug 1999 for Millstone Nuclear Power Station,Unit 3.With1999-08-31031 August 1999 Monthly Operating Rept for Aug 1999 for Millstone Nuclear Power Station,Unit 3.With ML20216F5141999-08-31031 August 1999 Rept on Status of Public Petitions Under 10CFR2.206 B17879, Monthly Operating Rept for Aug 1999 for Millstone Nuclear Power Station,Unit 2.With1999-08-31031 August 1999 Monthly Operating Rept for Aug 1999 for Millstone Nuclear Power Station,Unit 2.With ML20211G9631999-08-30030 August 1999 SER Accepting Licensee Response to GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Motor-Operated Valves ML20211A6561999-07-31031 July 1999 Monthly Operating Rept for July 1999 for Millstone Nuclear Power Station,Unit 2 B17858, Monthly Operating Rept for July 1999 for Millstone Nuclear Power Station,Unit 3.With1999-07-31031 July 1999 Monthly Operating Rept for July 1999 for Millstone Nuclear Power Station,Unit 3.With B17856, Monthly Operating Rept for July 1999 for Millstone Nuclear Power Station,Unit 1.With1999-07-31031 July 1999 Monthly Operating Rept for July 1999 for Millstone Nuclear Power Station,Unit 1.With ML20210J0311999-07-21021 July 1999 Rev 20,Change 10 to QAP 1.0, Organization ML20210E5931999-07-19019 July 1999 Revised Page 16 of 21,to App F of Northeast Util QA Program Plan ML20210C5911999-07-15015 July 1999 Revised Rev 20,change 10 to Northeast Util QA Program TR, Replacing Summary of Changes ML20210A0411999-07-15015 July 1999 Rev 20,change 10 to Northeast Util QA Program Tr B17814, Special Rept:On 990612 B Train EDG Failed to Restart within 5 Minutes Following Completion of 18 Month 24 H Endurance Run Required by TS 4.8.1.1.2.g.7.Caused by Procedural inadequacy.Re-performed Hot Restart Via Manual Start1999-07-12012 July 1999 Special Rept:On 990612 B Train EDG Failed to Restart within 5 Minutes Following Completion of 18 Month 24 H Endurance Run Required by TS 4.8.1.1.2.g.7.Caused by Procedural inadequacy.Re-performed Hot Restart Via Manual Start ML20209D1881999-07-0101 July 1999 Rev 20,change 9 to Northeast Util QA Program Tr ML20196J2191999-06-30030 June 1999 SER Concluding That Licensee USI A-46 Implementation Program,In General,Met Purpose & Intent of Criteria in GIP-2 & Staff Sser 2 for Resolution of USI A-46 ML20211A6751999-06-30030 June 1999 Revised Monthly Operating Rept for June 1999 for Millstone Nuclear Power Station,Unit 2,providing Revised Average Daily Unit Power Level & Operating Data Rept ML20196A8451999-06-30030 June 1999 Post Shutdown Decommissioning Activities Rept ML20209J0541999-06-30030 June 1999 Monthly Operating Rept for June 1999 for Millstone Unit 2 B17830, Monthly Operating Rept for June 1999 for Millstone Nuclear Power Station,Unit 3.With1999-06-30030 June 1999 Monthly Operating Rept for June 1999 for Millstone Nuclear Power Station,Unit 3.With ML20196K1791999-06-30030 June 1999 Addendum 6 to Millstone Unit 2 Annual Rept, ML20196J1821999-06-30030 June 1999 Rev 21,Change 0 to Northeast Utilities QAP (Nuqap) Tr B17833, Monthly Operating Rept for June 1999 for Millstone Power Station,Unit 1.With1999-06-30030 June 1999 Monthly Operating Rept for June 1999 for Millstone Power Station,Unit 1.With ML20195H1011999-06-11011 June 1999 Rev 20,change 8 to Northeast Utilities QAP (Nuqap) TR ML20207G6411999-06-0303 June 1999 Safety Evaluation Supporting Amends 105,235 & 171 to Licenses DPR-21,DPR-65 & NPF-49,respectively ML20211A6631999-05-31031 May 1999 Revised Monthly Operating Rept for May 1999 for Millstone Nuclear Power Station,Unit 2,providing Revised Average Daily Unit Power Level,Operating Data Rept & Unit Shutdowns & Power Reductions B17808, Monthly Operating Rept for May 1999 for Millstone Nuclear Power Station,Unit 3.With1999-05-31031 May 1999 Monthly Operating Rept for May 1999 for Millstone Nuclear Power Station,Unit 3.With ML20211B7351999-05-31031 May 1999 Cycle 7 Colr B17804, Monthly Operating Rept for May 1999 for Mnps,Unit 2.With1999-05-31031 May 1999 Monthly Operating Rept for May 1999 for Mnps,Unit 2.With B17807, Monthly Operating Rept for May 1999 for Mnps,Unit 1.With1999-05-31031 May 1999 Monthly Operating Rept for May 1999 for Mnps,Unit 1.With ML20209J0661999-05-31031 May 1999 Revised Monthly Operating Rept for May 1999 for Millstone Unit 2 ML20206M4631999-05-11011 May 1999 Safety Evaluation Supporting Alternative Proposed by Licensee to Perform Ultrasonic Exam on Inner Surface of Nozzle to safe-end Weld ML20206J8351999-05-0707 May 1999 Rev 20,Change 7 to QAP-1.0, Northeast Utls QA Program (Nuqap) Tr ML20206G6221999-05-0404 May 1999 SER Accepting Util Request to Apply leak-before-break Status to Pressurizer Surge Line Piping for Millstone Nuclear Power Station,Unit 2 B17782, Monthly Operating Rept for Apr 1999 for Millstone Nuclear Power Station,Unit 1.With1999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for Millstone Nuclear Power Station,Unit 1.With ML20205R3531999-04-30030 April 1999 Addendum 4 to Annual Rept, B17775, Monthly Operating Rept for Apr 1999 for Millstone Nuclear Power Station Unit 3.With1999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for Millstone Nuclear Power Station Unit 3.With ML20205K6141999-04-30030 April 1999 Non-proprietary Version of Rev 2 to Holtec Rept HI-971843, Licensing Rept for Reclassification of Discharge in Millstone Unit 3 Spent Fuel Pool ML20206E2971999-04-30030 April 1999 Rev 1 to Millstone Nuclear Power Station,Unit 2 COLR - Cycle 13 B17777, Monthly Operating Rept for Apr 1999 for Millstone Unit 2. with1999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for Millstone Unit 2. with ML20205Q5891999-04-0909 April 1999 Rev 20,change 6 to QAP-1.0,Northeast Utils QA Program TR ML20205R8751999-04-0909 April 1999 Provides Commission with Staff Assessment of Issues Related to Restart of Millstone Unit 2 & Staff Recommendations Re Restart Authorization for Millstone Unit 2 ML20206T3991999-03-31031 March 1999 First Quarter 1999 Performance Rept, Dtd May 1999 B17747, Monthly Operating Rept for Mar 1999 for Millstone Nuclear Power Station,Unit 1.With1999-03-31031 March 1999 Monthly Operating Rept for Mar 1999 for Millstone Nuclear Power Station,Unit 1.With 1999-09-30
[Table view] |
Text
e
. WESTINGHOUSE NON PROPRIETARY CLASS 3 s
l 1
1 BASES FOR MILLSTONE UNIT 3 ECCS CURRENT AND FUTURE TECHNICAL SPECIFICATIONS August 1997
- 0. O. Konopka WESTINGHOUSE ELECTRIC CORPORATION Nuclear Senices Disision P.O. Box 355 Pittsburgh, Pennsylvania 15230 C 1997 Westinghouse Electric Corporation All Rights Resened 9710090111 971001 PDR- ADOCK 05000423 P PDR
e m
Bases " t Millstone Unit 3 ECCS Current and Future Technical Specifications References
- 1. [ ] *,c. This PO is for engineering and design of orifices to be fabricated under [ ] ** c. This PO is based on Westinghouse proposal letter ( ) *> c.
- 2. Calculation [ ] ** c " Millstone Unit 3 CCP/ SIP /RSS PECISYS Model Development" ( ) *< c.
- 3. Calculation [ _ ] ** c ' Millstone Unit 3 ECCS Evaluation Future Tech.
Specs Change Basis"( ) *, c. . .
- 4. Calculation ( ) *, c ' Millstone Unit 3 SIP Rethrottling to Address Pump Runout During Rectreulation Considering Revised Tech Specs" [
] a, e,
- 5. Westinghouse Intemal Letter [ ] *> c " Millstone 3 FSAR Input Data"
[ ] 8 c.
- 6. Calculation [ ] *, c " Safeguards Pump NPSH with Open RWST l- Line', [ ] *< c.
- 7. letter [ ] ** c, ' Technical Specification Sections", to R. W.
Ackley, Stone and Webster Engineering Corp., [ ] ** c.
- 8. letter [ ] ** c, Emergency Core Cooling System Pump Runout Limit issues,
[ ] ** c.
Background
Millstone Unit 3 requested Westinghouse to perform an evaluation of the Emergency Core Cooling System (ECCS) branchline throttle valves. This evaluation was to address the potential throttle valve erosion concem desenbed in Westinghouse notification letter [ ] *> c. Briefly, this task determined the maximum pressure drop across the presertl installed branchline throttle valves and splits that pressure drop between an onfice and the present installed throttle valve. In the scoping evaluations, it was determined that the head boost provid by the Recirculation S stay Pumps was not previously evaluated, and it was necessary to evaluate and address runout of tw High Head Safety injection (HHSI) pumps and Centrifugal Charging Pumps (CCP) prior to designing the branchline orifices. Westinghouse performed CCP and F HS1 puma runout calculations (References 2, 3 and 4) to establish the system performance requirements for the iHSI and Chargmg/ Safety injection (CHG/SI) systems. While performing these suction boost / runout calculations it was determined to be beneficial to revise the Technical Specifications' surveillance and flow balancing requirements. These changes will rectablish pump performance degradation margin, which was used for system rethrotteling to prevent suction boost runout without a Technical Specification -
change.
Page 1 of 5
i I l Purpose This letter only addresses the Technical Specification data associated with minimum safeguards flow
' data that is input to the Updated Final Safety Analysis Report (UFSAR) accident analyses. The maximum safeguards UFSAR input data was not affected by this effort nor is maximum safeguards data provided in the Technical Specifications. The intent of this letter is to provide the revised
' Technical Specification limits and to document the bases for the present and revised Technical Specification limits.
Bases for the Present Technical Specification The Millstone Unit 3 present Technical Specification limits and the associated Westinghouse ECCS -
calculations / references are as follows:
Survedlance Requirements Pump Current value Reference T/S Section CCP A,B & C t 2411 psid ( ) 8, c 4.5.2.f.1 B1348 psid ( } ", c 4.5.2.f.2 SIP A & B 4.5.2.h.1.a CCP A,B & C 3 339.0 gpm ( ) "< c 4.5.2.h.1.b CCP A,B & C 5560 gpm ( } ** c g 442.5 gpm [ ] 8, c 4.5.2.h.2.a S1P A&B 4.5.2.h.2.b StP A 5 670 gpm
- Reference 7 SIP B 5 650 gpm
- Reference 7 indicates that Stone and Webster established these values. NEU to verify with Stone and Webster, A brief discussion of referenced calculations as it applies to the current Technical Specification values follows:
[ ]
- C " Performance of Modified 4 Loop ECCS" ( ) ** c This calculation evaluated the four loop ECCS. 'The mini flow surveillance criteria of >
2411 psid at 50 gom (for the " standard 4 loop plant") was a limiting value based on an ECCS review ofo loop plants.
[ }
- c " Millstone Unit 3 Minimum Safeguards Reanalysis"
( ) ** c.
Page 2 of 5
s l ., ' .
)= i i . i
) This calculation evaluated the HHSI minimum safeguards. This calculation replaced the l HHSI results in calculation [ } *< c. [
l l
l
! } *, c. The Technical Specification results of this calculation are a mini flow j surveillance criteria (4.5.2.f.2) of E 1348 psid at 50 gpm, and a corresponding analysis
- - flow value (4.5.2.h.1.b) of > 423.4 apm. The results of this calculation are in reference 5
- letter. Note: The present Technica Specification value of i 2 442.5 gpm, from [ ] 8,c, is a higher flow limit based on analysis system .
resistances and a nominal minimum vendor (B) HHSI pump curve and thus is a l j conservative flow value.
- c ' Millstone TAC 01 and ECCS Analysis" [
[ [
] *, c i 4 This calculation documented changes to the TAC 01 arocedure and generated new
! minimum ECCS flow rates. The B CHG/SI pump fie d test data fell directly on the
[ minimum acceptance TAC curve at higher flows and no margin was available. [
i ) e,c. The results of this calculation are a mini flow surveillance criteria of 2 2338 psid at 50 gpm, and a corresponding analysis value (4.5.2.h.1.a) of g 339.0 gpm.
- c " Millstone Unit 3 ECCS Reanalysis" [ ] *< c
[
This calculation documented CHG/SI, HHSI and Residual Heat Removal System (RHRS) changes to the TAC 01 procedure and generated minimum ECCS flow rates. The
- CHG/SI and HHSI minimum and maximum branchline resistances were evaluated to provide the lirr.iting ECCS flowrates. [
] ** c. The results of this calculation are a CCP mini flow surveillance enteria of 2 2298 psid at 50 gpm which is an analysis value based on a corresponding 4.5.2.h.1.a flow of1310.5 gpm.ne HHSI flows from this calculation were revised in Calculation
[ ]* c summarized above.
Bases for the Revised Technical Specification limits The Millstone Unit 3 ECC5 Technical Specification ihnits have been revised based on Westinghouse ECCS calculations References 3 and 4 as follows:
Surveillance Requirements ,
T/S Section Current value Revised value Reference 4.5.2.f.1 g 2411 psid 5676 ft. (2464 psid) Reference 3 Page 3 of 5
I 4
4.5.2.f.2 11348 psid 3240 ft. (1406 psid) Reference 4 )
45.2.h.1.a E 339.0 gpm 1310.5 gpm [ ] *> c 4.5.2.h.1.b $ 560 gpm
- Reference 6 4.5.2.h.2.a 2 442.5 gpm 1423.4 gpm [ ]*, c Reference 4 l 4.5.2.h.2.b $ 670 gpm 5 675 gpm
l 5 650 gpm 5 675 gpm
- Reference 6 Note that Reference 6 evaluated the Safeguards Pumps' NPSH considering revised i
CCP and HHS1 pump runout limits (note the CCP limit did not change), an open l test line in the RHR/ low head Si system and pumping from the refueling water storage tank. The CCPs are limited to [ ] *, c gpm from the Refueling Water Storage Tank (RWST) if both RHR pumps are operating along with both CCPs and HHSI pumps. References 3 and 4 show that the rethrottled CHG/SI system flow is less than [ ] a, c gpm from the RWST with one CCP operating therefore adequate l NPSH is provided to the CCPs. It should be noted that the Reference 6 evaluation is l
based on revised pump runout limits provided in Reference 8
+
[ ] *> c
- Millstone Unit 3 SIP Rethrottling to Address Pump Runout During Recirculation Considering Revised Tech Specs" [ ] *, c This calculation evaluated the HHS1 system performance in meeting the proposed Technical Specification revision and pump boost / runout issue. [
] a, c. The Technical Specification results of this calculation are a mini flow surveillance criteria of 2 3240 ft (1406 psid) at 50 gpm based on TAC pump curve data and a corresponding analysis flow value (4.5.2.h.2.a) of 2 423.4 gpm.The results of this calculation are consistent with the data in Reference 5 letter.
+
[ ) *, c ' Millstone Unit 3 ECCS Evaluation Future Tech. Spec. Change Basis" [ ]* c This calculation evaluated the CHG/S1 system performance in meeting the proposed Technical Specification revision and pump boost / runout issue. [
)*>c.The Technical Specification results of this calculation are a mini flow surveillance criteria of 2 5676 ft (24M psid) at 50 gpm based on TAC / analysis pump curve data and a corresponding analysis flow value (4.5.2.h.1.a) of1310.5 gpm. The results of this calculation are consistent with the data in Reference 5 letter.
[ ]
- c ' Millstone 3 FSAR Input Data' Evaluation Page 4 of 5
4 4
4 Westinghouse internal Letter [ ] *.c " Millstone 3 FSAR Input Data", Reference 5, transmitted the revised safety analpis ECCS flow data used for the current accident analysis.
References 3 and 4 evaluated the rethrottled system relative to Reference 5 data. Except for the all lines injecting ase for the CHC pumps, which has been evaluated by the appropriate safety analysis group through the Technical Specification change review process, there were no adverse flow deviations.
Page 5 of 5