ML20148C085

From kanterella
Jump to navigation Jump to search
Provides NRR Concurrence to Extend SALP Evaluation Period for Plant Facility Until Six Months After Restart of Unit from Current Extended Shutdown
ML20148C085
Person / Time
Site: Crystal River Duke energy icon.png
Issue date: 05/07/1997
From: Collins S
NRC (Affiliation Not Assigned)
To: Reyes L
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML20148C089 List:
References
NUDOCS 9705150055
Download: ML20148C085 (1)


Text

_ _ _ . . - _ _ ._ . - . . _ - - - . .

May 7, 1997 hD 0h i i i i

MEMORANDUM T0: Luis A. Reyes, Regional Administrator, Region II  ;

. FROM: Samuel J. Collins, Director Office of Nuclear Reactor Regulation SamuelJ.005ns DMk i

SUBJECT:

EXTENSION OF CRYSTAL RIVER SALP l

The purpose of this memorandum is to provide NRR concurrence to extend i.

the SALP evaluation period for the Crystal River facility until six months l

after the restart of the unit from the current extended shutdown. Your

' justification (attached) was consistent with the guidance in NRC Management l

Directive 8.6.

Attachment:

As stated Distribution: (YT #0970058)

Central Files PIPB R/F LJCallan '

HLThompson SJCollins FJMiraglia RPZimmerman TTMartin MMSlosson SCVarga g JWRoe j gg g hhh i DOCUMENT NAME: G:\SECY2\SALPMEMO. HUP . /

To receive e copy of this document, indicate in the box: "C" = Copy without enclosures "E" = Copy w' e losures "N* = No copy 0FFICE PIPB: DISP M l E PIPB:DISPs l E - DISP;fLQ l h/ JD:N/tA ) l l NAME DLGamberon N RWBorchardWA FPGil M pie '-&SJddllins DATE 05/0 7 /97 05/1/97 W 05/ m /97 /g05/ J /97 0FFICIAL RECORD COPY 9705150055 970507 PDR ADOCK 05000302 G PDR ,