July 1, 2018 Thru June 30, 2019 Summary of Changes, Tests, and Experiments
ML19198A060
Person / Time
Site: Aerotest
Issue date: 07/12/2019
From: Slaughter D
Aerotest
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
Download: ML19198A060 (1)


Text

AEROTEST OPERATIONS, INC.

3455 FOSTORIA WAY* SAN RAMON, CA 94583 * (925) 866~1212

  • FAX (925) 866-1716 July 12, 2019 AEROTEST RADIOGRAPHY AND RESEARCH REACTOR DOCK.ET NO. 50-228/LICENSE NO. R-98.

ATTENTION: Document Control Desk Director.of Inspection and Enforcement U.S. Nuclear Regulatory Commission White Flint North 11555 Rockville Pike Rockville, MD 20852-2738

Subject:

July 1, 2018 thru June 30, 2019 Summary of Changes, Tests, and Experiments Ladies and Gentlemen:

This letter summarizes ARRR operations from July 1, 2018 through June 30 2019 .. This submittal complies with the requirements set forth in 10 CFR 50.59, "Authorization of Changes, Tests, and Experiments". fa this_

time period, there were no reactor operations or experiments performed. Monthly operational characteristics normally reported (Operating-hrs., Monthly kW-h, Accumulated kW-h, Unscheduled shutdowns, etc.) do not exist given the circumstances. The ARRR core structure has been defueled since 2012. As part of the ARRR restart activities, the only change to the facility was the addition of clamps for the securing the top core plate to the structure. (J'he clamps replaced the bolts that sheared offwheri removing.stuck fuel elements in 2012.)

A declaration of permanent *shutdown leading to the decommissioning -of the ARRR reactor was sent to _the USNRC in a letter dated December 6, 2018. In that communication, a request was made to t~rminate all ongoing review activities conducted by the USNRC not related to the new declared direction. The proposed

. amendments to the existing license and technical specifications that reflect the situation of permanent shutdown and possession-only status were submitted in a March 21, 2019 writteifcorrimunication .

a

. Supplemental information for the license amendment application was jncluded in letter (with.attachments)*

da~ed June 28, 20*19. ..

Should you have any questions or require additional information regarding this submission, please contact

. AO President David M. Slaughter, Ph.D. at (801) 631 5919 or dmsraven@gmail.com. I declare under penalty of perjury that the statements above are c*orrect and truthful. . . .

~"'~

  • 1 yours, . * . . .

David M. Slaughter, Ph.D.

President, Reactor Administrator, Manager Aerotest Operations, Inc. .