Site: | Mcguire, McGuire |
Issue date: | 11/12/2018 |
From: | Ray T D Duke Energy Carolinas |
To: | Document Control Desk, Office of Nuclear Reactor Regulation |
References | |
RA-18-0233 | |
Download: ML18324A581 (2) | |
Category:Emergency Preparedness-Emergency Plan
MONTHYEARRA-23-0325, Submittal of Procedures CSD-EP-HNP-0101-01, 02, CSD-EP-ONS-0101-01, CSD-EP-RNP-0101-01, and EP-RNP-EPLAN-ANNEX2024-01-0808 January 2024
[Table view]Submittal of Procedures CSD-EP-HNP-0101-01, 02, CSD-EP-ONS-0101-01, CSD-EP-RNP-0101-01, and EP-RNP-EPLAN-ANNEX RA-23-0281, Procedure EP-ALL-EPLAN, Duke Energy Common Emergency Plan, Revision 5, Summary of Changes2023-11-0101 November 2023 Procedure EP-ALL-EPLAN, Duke Energy Common Emergency Plan, Revision 5, Summary of Changes RA-23-0117, Report of Changes to Duke Energy McGuire Emergency Plan Annex2023-05-0101 May 2023 Report of Changes to Duke Energy McGuire Emergency Plan Annex RA-23-0065, Report of Changes to McGuire EAL Technical Basis Document2023-02-23023 February 2023 Report of Changes to McGuire EAL Technical Basis Document RA-22-0312, Report of Changes to McGuire Emergency Plan Annex2022-10-26026 October 2022 Report of Changes to McGuire Emergency Plan Annex RA-22-0151, Duke Energy Common Emergency Plan, Revision 2, Summary of Changes2022-05-24024 May 2022 Duke Energy Common Emergency Plan, Revision 2, Summary of Changes ML22040A2222022-02-10010 February 2022 EP-MNS-EPLAN-ANNEX, Revision 1, 10 CFR 50.54(q) Summary of Changes RA-22-0060, CSD-EP-MNS-0101-01, Revision 2, and CSD-EP-MNS-0101-02, Revision 3, 10 CFR 50.54(q) Summary of Changes2022-02-10010 February 2022 CSD-EP-MNS-0101-01, Revision 2, and CSD-EP-MNS-0101-02, Revision 3, 10 CFR 50.54(q) Summary of Changes RA-21-0197, William, Units 1 and 2, License Amendment Request to Relocate the Duke Energy Emergency Operations Facility2021-12-14014 December 2021 William, Units 1 and 2, License Amendment Request to Relocate the Duke Energy Emergency Operations Facility RA-21-0304, Emergency Plan Revision 21-2 and 21-32021-11-23023 November 2021 Emergency Plan Revision 21-2 and 21-3 RA-21-0276, Duke Energy Common Emergency Plan and Brunswick Steam Electric Plant and Catawba Nuclear Station Emergency Plan Annexes, Revision 1 Summary of Changes2021-11-0202 November 2021 Duke Energy Common Emergency Plan and Brunswick Steam Electric Plant and Catawba Nuclear Station Emergency Plan Annexes, Revision 1 Summary of Changes RA-21-0136, Supplemental Information Regarding License Amendment Request for Common Emergency Plan2021-05-0404 May 2021 Supplemental Information Regarding License Amendment Request for Common Emergency Plan RA-21-0105, Emergency Plan Revision 21-1 and Associated 10 CFR 50.54(q) Review Forms2021-03-31031 March 2021 Emergency Plan Revision 21-1 and Associated 10 CFR 50.54(q) Review Forms RA-21-0063, 1, 2; Catawba Nuclear Station 1, 2; H. B. Robinson Steam Electric Plant 2; Mcgguire Nuclear Station 1, 2; Oconee Nuclear Station 1, 2, 3; Shearon Harris Nuclear Power Plant 1 - Response to RAI Re Amend for Emergency Plan2021-03-11011 March 2021 1, 2; Catawba Nuclear Station 1, 2; H. B. Robinson Steam Electric Plant 2; Mcgguire Nuclear Station 1, 2; Oconee Nuclear Station 1, 2, 3; Shearon Harris Nuclear Power Plant 1 - Response to RAI Re Amend for Emergency Plan RA-20-0360, Emergency Plan Revised 10 CFR 50.54(q) Screen and Evaluation2020-11-10010 November 2020 Emergency Plan Revised 10 CFR 50.54(q) Screen and Evaluation RA-20-0264, Emergency Plan Revised 10 CFR 50.54(q) Screens and Evaluations2020-08-20020 August 2020 Emergency Plan Revised 10 CFR 50.54(q) Screens and Evaluations RA-18-0325, Submittal of Revision 19-1 to Emergency Plan2019-08-20020 August 2019 Submittal of Revision 19-1 to Emergency Plan RA-18-0233, Site Emergency Plan, Revision 18-32018-11-30030 November 2018 Site Emergency Plan, Revision 18-3 ML18324A5812018-11-12012 November 2018 Emergency Plan, Revision 18-3 MNS-18-038, Revision 18-2 to Emergency Plan, and Revision 28 to Emergency Plan Implementing Procedure Ep Grp Maual 1.12018-05-22022 May 2018 Revision 18-2 to Emergency Plan, and Revision 28 to Emergency Plan Implementing Procedure Ep Grp Maual 1.1 MNS-18-009, McGuire Nuclear Station, Units 1 and 2, Submittal of Emergency Plan, Revision 18-12018-01-31031 January 2018 McGuire Nuclear Station, Units 1 and 2, Submittal of Emergency Plan, Revision 18-1 ML18036A5322018-01-31031 January 2018 Submittal of Emergency Plan, Revision 18-1 MNS-18-009, Site Emergency Plan2018-01-26026 January 2018 Site Emergency Plan MNS-16-013, Emergency Plan, Revision 16-12016-02-0101 February 2016 Emergency Plan, Revision 16-1 MNS-15-053, Emergency Plan, Revision 15-22015-07-21021 July 2015 Emergency Plan, Revision 15-2 RA-15-0024, Transmits Emergency Plan Implementing Procedures2015-06-15015 June 2015 Transmits Emergency Plan Implementing Procedures MNS-14-103, Submittal of Emergency Plan, Revision 14-52014-12-16016 December 2014 Submittal of Emergency Plan, Revision 14-5 MNS-14-072, Emergency Plan, Revision 14-32014-09-17017 September 2014 Emergency Plan, Revision 14-3 MNS-14-047, Emergency Plan, Revision 14-22014-06-23023 June 2014 Emergency Plan, Revision 14-2 ML1104507242008-02-26026 February 2008 FEMA McGuire Final Exercise Report, Drill Date - October 16, 2007 2024-01-08 Category:Letter MONTHYEARIR 05000369/20230042024-01-31031 January 2024
[Table view]Integrated Inspection Report 05000369/2023004 and 05000370/2023004 ML24019A1392024-01-25025 January 2024 TSTF 505 and 50.69 Audit Summary ML24019A2002024-01-24024 January 2024 Notification of Inspection and Request for Information for NRC Problem Identification and Resolution Inspection IR 05000369/20234022023-12-14014 December 2023 Material Control and Accounting Program Inspection Report 05000369/2023402 and 05000370/2023402 ML23317A2272023-11-17017 November 2023 William B. McGuire Nuclear Station, Units 1 and 2 - Transmittal of Dam Inspection Report - Non-Proprietary ML23317A3462023-11-14014 November 2023 Duke Fleet - Correction Letter to License Amendment Nos. 312 & 340 Issuance of Amendments Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-554, Revision 1 IR 05000369/20230032023-10-24024 October 2023 Integrated Inspection Report 05000369/2023003 and 05000370/2023003; and Inspection Report 07200038/2023001 IR 05000369/20240102023-10-13013 October 2023 Notification of McGuire Nuclear Station Comprehensive Engineering Team Inspection U.S. Nuclear Regulatory Commission Inspection Report 05000369, 370/2024010 IR 05000369/20230102023-10-13013 October 2023 Age Related Degradation Inspection Report 05000369/2023010 and 05000370/2023010 ML23256A0882023-09-25025 September 2023 Issuance of Alternative to Steam Generator Welds IR 05000369/20233012023-09-20020 September 2023 William B. McGuire Nuclear Station - NRC Examination Report 05000369/2023301 and 05000370/2023301 ML23230A0652023-08-31031 August 2023 William B. McGuire Nuclear Station, Units 1 and 2 - Relief Request Use of Later Edition of ASME Code ML23195A0782023-08-29029 August 2023 Issuance of Amendments Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-554, Revision 1 IR 05000369/20230052023-08-25025 August 2023 Updated Inspection Plan for McGuire Nuclear Station Units 1 and 2 (Report 05000369/2023005 and 05000370/2023005) IR 05000369/20230022023-07-28028 July 2023 Integrated Inspection Report 05000369/2023002 and 05000370/2023002 IR 05000369/20234202023-07-24024 July 2023 Security Baseline Inspection Report 050003692023420 and 050003702023420 ML23206A0092023-07-24024 July 2023 William B. McGuire Nuclear Station Operator Licensing Written Examination Approval 05000369/2023301 and 05000370/2023301 ML23207A0762023-07-14014 July 2023 EN 56557 - Update to Part 21 Report Re Potential Defect with Trane External Auto/Stop Emergency Stop Relay Card Pn: XI2650728-06 ML23159A2712023-06-20020 June 2023 William B. McGuire Nuclear Station, Unit 1 - Relief Request Impractical Reactor System Welds ML23237A2672023-06-13013 June 2023 June 13, 2002 - Meeting Announcement - McGuire and Catawba Nuclear Stations 50-369, 50-370 and 50-413, 50-414 ML23159A0052023-06-0505 June 2023 56557-EN 56557 - Paragon - Redlined IR 05000369/20230012023-05-0101 May 2023 Integrated Inspection Report 05000369/2023001 and 05000370/2023001 ML23115A2122023-05-0101 May 2023 Review of the Spring 2022 Steam Generator Tube Inspection Report ML23118A0762023-05-0101 May 2023 Approval for Use of Specific Provision of a Later Edition of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section XI ML23094A1832023-04-18018 April 2023 Audit Plan TSTF-505, Rev. 2, RITSTF Initiative 4B & 10 CFR 50.69, Risk-Informed Categorization & Treatment of Structures, Systems & Components for Nuclear Power Reactors (EPIDs L-2023-LLA-0021 & L-2023-LLA-0022) ML22332A4932023-03-10010 March 2023 William States Lee III 1 and 2 - Issuance of Amendments Regarding the Relocation of the Emergency Operations Facility IR 05000369/20220062023-03-0101 March 2023 Annual Assessment Letter for McGuire Nuclear Station Units 1 and 2 (NRC Inspection Report 05000369/2022006 and 05000370 2022006) IR 05000369/20220042023-01-30030 January 2023 Mcguire Nuclear Station - Integrated Inspection Report 05000369/2022004 and 05000370/2022004 IR 05000369/20224202023-01-11011 January 2023 Security Baseline Inspection Report 05000369/2022420 and 05000370/2022420 ML22356A0512022-12-14014 December 2022 Curtiss-Wright Nuclear Division, Letter Regarding Potential Efect in a Configuration of the 11/2 Inch Quick Disconnect Connector Cable Assemblies Supplied to Duke Energy (See Attached Spreadsheet) for a Total of 460 of Connectors Only Suppl ML22347A1512022-12-13013 December 2022 William B. Mcguire Nuclear Station Notification of Licensed Operator Initial Examination 05000369/2023301 and 05000370/2023301 ML22340A6662022-12-0808 December 2022 Summary of November 30, 2022, Public Meeting with Duke Energy Carolinas, LLC for McGuire Nuclear Station, Units 1 & 2 Proposed LAR to Adopt TSTF-505, Rev. 2 and 10 CFR 50.69 Risk-Informed Categorization and Treatment of Structures, Systems ML22290A1012022-11-29029 November 2022 Issuance of Amendment Nos. 326 and 305, Regarding Changes to Technical Specification 3.4.3, Reactor Coolant System Pressure Temperature Limits ML22096A0032022-11-18018 November 2022 McGuire Nuclear Station and Shearon Harris Nuclear Power Plant Authorization of RA-19-0352 Regarding Use of Alternative for RPV Head Closure Stud Examinations ML22256A2532022-11-14014 November 2022 Issuance of Amendments Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-541, Rev. 2 IR 05000369/20220032022-10-27027 October 2022 Integrated Inspection Report 05000369/2022003 and 05000370/2022003 IR 05000369/20220112022-09-29029 September 2022 Biennial Problem Identification and Resolution Inspection Report 05000369/2022011 and 05000370/2022011 ML22266A0782022-09-26026 September 2022 William B. Mcguire Nuclear Station, Unit 2 Pressurizer Power Operated Relief Valve Relief Request ML22258A0302022-09-15015 September 2022 Evacuation Time Estimate Reports IR 07200038/20220012022-09-12012 September 2022 Operation of an Independent Spent Fuel Storage Installation Report 07200038/2022001 ML22242A0022022-09-12012 September 2022 Issuance of Amendments to Adopt TSTF 569, Revision 2, Revise Response Time Testing Definition ML22230B6132022-09-0101 September 2022 Review of the Draft Environmental Assessment and Finding of No Significant Impact for Brunswick Steam Electric Plant and McGuire Nuclear Station Independent Spent Fuel Storage Installations Decommissioning Funding Plans IR 05000369/20220052022-08-29029 August 2022 Updated Inspection Plan for McGuire Nuclear Station Units 1 and 2 NRC Inspection Report 05000369/2022005 and 05000370/2022005 IR 05000369/20220022022-07-26026 July 2022 Integrated Inspection Report 05000369/2022002 and 05000370/2022002 ML22215A2502022-07-25025 July 2022 EN 55960 - Update - Curtiss Wright ML22164A0362022-07-19019 July 2022 Mcguire Nuclear Station, Units 1 and 2; Issuance of Amendments to Revise the Conditional Exemption of the End-Of-Cycle Moderator Temperature Coefficient Measurement Methodology (EPID L-2021-LLA-0198) Public ML22175A0162022-06-24024 June 2022 Notification of Inspection and Request for Information for NRC Problem Identification and Resolution Inspection ML22046A0222022-06-14014 June 2022 Issuance of Amendments to Adopt TSTF-439, Eliminate Second Completion Times Limiting Time from Discovery of Failure to Meet an LCO ML22111A3112022-05-16016 May 2022 Letter Issuing Exemption to McGuire IR 05000369/20224012022-05-12012 May 2022 Cyber Security Inspection Report 05000369/2022401 and 05000370/2022401 2024-01-31 |
Text
e(,DUKE ~;ENERGY November 12, 2018. Serial No: RA-18-0233 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C. 20555-0001
Subject:
Duke Energy Carolinas, LLC McGuire Nuclear Station, Units 1 and 2 Docket Nos. 50-369, 50-370 Renewed License Nos. NPF-9 and NPF-17 Emergency Plan, Revision 18-3 Thomas D. Ray, P.E. Site Vice President McGuire Nuclear Station Duke Energy MG01VP 112700 Hagers Ferry Road Huntersville, NC 28078 o: 980.875.4805 f: 980.875.4809 Tom.Ray@duke-energy.com 10 CFR 50.54(q) Please find attached Revision 1 S:-3 to the McGuire Nuclear Station Emergency Plan. This revision.
is submitted in accordance with the requirements of 10 CFR 50.54(q) and does not result in a reduction in the effectiveness of the Emergency Plan or the Emergency Plan Implementing Procedures.
Questions regarding this submittal should be directed to Jeff Thomas, McGuire Regulatory Affairs Manager, at (980) 875-4499.
~J). Thomas D. Ray, P.E
- Site Vice President McGuire Nuclear Station Attachments www.duke-energy .com )X-~5 rJI<
U. S. Nuclear Regulatory Commission November 12, 2017 Page2 (Two Copies) cc: Catherine Haney, Regional Administrator, Region II
- U. S. Nuclear Regulatory Commission
- Marquis One Tower 245 Peachtree Center Ave., NE, Suite 1200 Atlanta, GA 30303-1257 (One Copy) Director Office of Nuclear Material Safety and Safeguards Mail Stop 14 A12 Washington, D. C. 20555-0001 (w/o attachments)
Michael Mahoney, Project Manager U.S. Nuclear Regulatory Commission 11555 Rockville Pike Mail Stop 0-8G9A Rockville, MD 20852-2738 Mr. Andy Hutto NRC Senior Resident Inspector McGuire Nuclear Station