MONTHYEARML24024A1372024-01-24024 January 2024 NRR E-mail Capture - Final Snsb RAI Regarding FitzPatrick Amendment to Modify Safety Relief Valves Setpoint Lower Tolerance ML24017A1112024-01-17017 January 2024 NRR E-mail Capture - Acceptance of Requested Licensing Action Amendment Request to Adopt TSTF-529, Clarifyuse and Applicaion Rules, Revision 4 ML23348A1222023-12-14014 December 2023 NRR E-mail Capture - Grand Gulf, River Bend, and Waterford, Unit 3 - 2nd Round of Official RAIs for RR EN-RR-22-001, Use ASME Code Case N-752, Risk Informed Categorization for Class 2 and 3 Systems ML23335A0652023-12-0101 December 2023 NRR E-mail Capture - GGNS - Audit Questions for LARs Associated with TSTF-505, Provide Risk-Informed Extended Completion Times - RITSTF Init. 4b and 50.69, Risk-Informed Cat. and Treatment of SSCs for Nuclear Pwr Rx (L-2023-LLA-0081/0080) ML23269A0232023-09-22022 September 2023 NRR E-mail Capture - Arkansas Nuclear One, Unit 2 - TSTF-505 Audit Questions ML23264A7992023-09-21021 September 2023 NRR E-mail Capture - Final RAI - Constellation Energy Generation, LLC Fleet Request License Amendment Request to Adopt TSTF-580, Revision 1 ML23261C3982023-09-0808 September 2023 Acceptance Review of Amendment to Update the Fuel Handling Accident Analysis ML23244A2662023-09-0101 September 2023 Acceptance of Requested Licensing Action Amendment Request to Modify Surveillance Requirement 3.4.3.1, Safety Relief Valves Setpoint Lower Tolerance ML23240A3412023-08-28028 August 2023 NRR E-mail Capture - ANO-2, Grand Gulf, and River Bend - Acceptance Review of LAR Revising TSs to Adopt TSTF-205, Revision of Channel Calibration, Channel Functional Test, and Related Definitions ML23237B3972023-08-24024 August 2023 NRR E-mail Capture - Constellation Energy Generation, LLC - Fleet Request - Acceptance of Alternative Request to Use Updated BWRVIP Guidelines ML23194A1822023-08-0303 August 2023 Acceptance Review for LAR Re SRM 3.3.1.2 ML23194A1752023-07-13013 July 2023 NRR E-mail Capture - ANO-1 - Acceptance Review of Alternative Request ANO1-ISI-037 ML23191A8662023-07-10010 July 2023 NRR E-mail Capture - Grand Gulf - Acceptance Review of LAR Adopting 10 CFR 50.69, Risk-Informed Categorization and Treatment of SSCs for Nuclear Power Reactors ML23191A2802023-07-10010 July 2023 NRR E-mail Capture - Grand Gulf - Acceptance Review for LAR Adopting TSTF-505, Rev. 2, Provide Risk-Informed Completion Times - RITSTF Initiative 4b ML23187A0432023-07-0303 July 2023 NRR E-mail Capture - Arkansas Nuclear One, Unit 1 - TSTF-505 Audit Agenda ML23166A0132023-06-14014 June 2023 NRR E-mail Capture - Arkansas Nuclear One, Unit 1 - TSTF-505 Audit Questions ML23163A2292023-06-12012 June 2023 NRR E-mail Capture - Constellation Energy Generation, LLC - Fleet Request - Acceptance of License Amendment Request to Adopt TSTF-580, Revision 1 ML23130A2752023-05-10010 May 2023 NRR E-mail Capture - ANO Unit 2- Acceptance of Requested Licensing Action LAR to Adopt TSTF-505 Revision 2 ML23118A0692023-04-28028 April 2023 NRR E-mail Capture - ANO Unit 1 - Acceptance of Requested Licensing Action LAR to Modify ANO-1 TS 3.3.1, Reactor Protection System Instrumentation (L-2023-LLA-0048) ML23116A1462023-04-26026 April 2023 NRR E-mail Capture - Entergy Fleet (Grand Gulf and River Bend) - Final RAI for Request to Update ASME Code Relief Request Safety Evaluations with NRC-Approved Revision of BWRVIP Guidelines (GG-ISI-020, and RBS-ISI-019) ML23097A0412023-04-0606 April 2023 June 2023 Emergency Preparedness Exercise Inspection - Request for Information ML23076A0552023-03-13013 March 2023 EP Program Inspection RFI Hjs 10132022 ML23104A1052023-03-10010 March 2023 NRR E-mail Capture - ANO-2 Final RAI Alternative Request for Life-of-Repair of RVCH Pen. 46 ML23072A3672023-03-0909 March 2023 NRR E-mail Capture - Entergy Fleet - Acceptance Review of Quality Assurance Program Manual Reduction in Commitment ML23052A0882023-02-17017 February 2023 Inspection Request for Information ML23039A0872023-02-0808 February 2023 NRR E-mail Capture - Arkansas Nuclear One, Unit 2 - Acceptance Review of Relief Request ANO2-RR-23-001, Half-Nozzle Repair of RVCH Penetration 46 (L-2023-LLR-0000) ML23026A1322023-01-26026 January 2023 NRR E-mail Capture - ANO Unit 1 - Acceptance of Requested Licensing Action LAR to Adopt TSTF-505 Revision 2 ML23009B6912023-01-0909 January 2023 NRR E-mail Capture - Grand Gulf, Unit 1 and River, Unit 1 - Acceptance of Requested Licensing Action Request to Update ASME Code RR SE with NRC-Approved Revision of BWRVIP Guidelines ML22354A2622022-12-20020 December 2022 NRR E-mail Capture - Constellation Energy Generation, LLC - Fleet Request - Acceptance of Request to Use Certain Provisions of the 2019 Edition of the ASME BPV Code, Section XI ML22354A0122022-12-19019 December 2022 NRR E-mail Capture - ANO-1 and ANO-2 - Acceptance Review of Request for Alternative ANO-CISI-002 Alternative Frequency to Containment Unbonded Post-Tensioning System Inservice Inspection (L-2022-LLR-0080) ML22353A6122022-12-19019 December 2022 March 2023 Emergency Preparedness Exercise Inspection - Request for Information ML22349A0112022-12-14014 December 2022 NRR E-mail Capture - Final RAI Relief Request ANO1-ISI-035 ML22341A1202022-12-0707 December 2022 NRR E-mail Capture - ANO Unit 1 - Acceptance of Requested Licensing Action LAR to to Remove Technical Specification Condition Allowing Two Reactor Coolant Pump Operation (L-2022-LLA-0161) ML22336A0202022-12-0101 December 2022 NRR E-mail Capture - Acceptance Review for Waterford Unit 3 - License Amendment Request to Revise Technical Specification 3/4.3.2 ML22335A4802022-12-0101 December 2022 NRR E-mail Capture - NRC Update Completion Date for Waterford 3 LAR to Adopt TSTF-505 ML22329A0152022-11-0202 November 2022 NRR E-mail Capture - NRC Update Completion Date for Waterford 3 LAR to Adopt TSTF-505 ML22290A0442022-10-13013 October 2022 December 2022 Emergency Preparedness Program Inspection - Request for Information ML22273A0982022-09-30030 September 2022 NRR E-mail Capture - ANO Units 1 and 2 - Acceptance of Requested Licensing Action Emergency Plan Staffing Requirements ML22265A2012022-09-22022 September 2022 NRR E-mail Capture - ANO-1 - Acceptance Review of Relief Request ANO1-ISI-036 NRC-2100-2022, EN 55999 Valcor Coil Shell Assemblies Final Notification (004)2022-09-12012 September 2022 EN 55999 Valcor Coil Shell Assemblies Final Notification (004) ML22215A2062022-08-0303 August 2022 NRR E-mail Capture - Waterford 3 - LAR to Adopt Title 10 of the Code of Federal Regulations, Section 50.69: Loe and Completion Date Update ML22215A1492022-08-0303 August 2022 NRR E-mail Capture - Waterford 3 - LAR to Permit the Use of Risk-Informed Completion Times in Accordance with Technical Specifications Task Force (TSTF) Traveler TSTF-505, Revision 2 ML22206A0172022-07-22022 July 2022 NRR E-mail Capture - Request for Additional Information: Waterford 3 - License Amendment Requests to Adopt 10 CFR 50.69 and TSTF-505 ML22206A0152022-07-21021 July 2022 NRR E-mail Capture - Entergy (Grand Gulf, River Bend, and Waterford-3) - Acceptance Review of the RR EN-RR-22-001, Case N-752, Risk-informed Cat & Treatment for Repair/Replacement Activities in Class 2 & 3 Systems NRC 2110-2022, EN 55999 - Valcor Engineering Corporation (009)2022-07-18018 July 2022 EN 55999 - Valcor Engineering Corporation (009) ML22209A1082022-07-15015 July 2022 NRR E-mail Capture - Draft RAIs to License Amendment Request for Application to Adopt 10 CFR 50.69 and Revise Technical Specifications to Adopt TSTF-505, Revision 2 ML22188A1782022-07-0707 July 2022 NRR E-mail Capture - ANO-1 - Acceptance Review of Relief Request ANO1-ISI-035 ML22174A1362022-06-23023 June 2022 NRR E-mail Capture - ANO-2 Final RAI Relief Requests ANO2-ISI-023 Through -028 (EPIDs L-2022-LLR-0022 Through -0027) 2024-01-24
[Table view] Category:Request for Additional Information (RAI)
MONTHYEARML24024A1372024-01-24024 January 2024 NRR E-mail Capture - Final Snsb RAI Regarding FitzPatrick Amendment to Modify Safety Relief Valves Setpoint Lower Tolerance ML24018A0012024-01-18018 January 2024 Notification of Commercial Grade Dedication Inspection (05000333/2024010) and Request for Information ML23348A1222023-12-14014 December 2023 NRR E-mail Capture - Grand Gulf, River Bend, and Waterford, Unit 3 - 2nd Round of Official RAIs for RR EN-RR-22-001, Use ASME Code Case N-752, Risk Informed Categorization for Class 2 and 3 Systems ML23264A7992023-09-21021 September 2023 NRR E-mail Capture - Final RAI - Constellation Energy Generation, LLC Fleet Request License Amendment Request to Adopt TSTF-580, Revision 1 ML23191A4562023-07-10010 July 2023 Notification of Comprehensive Engineering Team Inspection (050003822023010) and Request for Information ML23164A0322023-06-13013 June 2023 Request for Information for a Biennial Problem Identification and Resolution Inspection; Inspection Report 05000333/2023010 ML23130A2972023-05-17017 May 2023 Notification of Inspection (NRC Inspection Report 05000313/2023003) and Request for Information ML23116A1462023-04-26026 April 2023 NRR E-mail Capture - Entergy Fleet (Grand Gulf and River Bend) - Final RAI for Request to Update ASME Code Relief Request Safety Evaluations with NRC-Approved Revision of BWRVIP Guidelines (GG-ISI-020, and RBS-ISI-019) ML23097A0412023-04-0606 April 2023 June 2023 Emergency Preparedness Exercise Inspection - Request for Information ML23076A0552023-03-13013 March 2023 EP Program Inspection RFI Hjs 10132022 ML23104A1052023-03-10010 March 2023 NRR E-mail Capture - ANO-2 Final RAI Alternative Request for Life-of-Repair of RVCH Pen. 46 ML23059A0742023-02-27027 February 2023 Information Request, Security IR 2023402 ML23052A0882023-02-17017 February 2023 Inspection Request for Information ML23019A0672023-01-19019 January 2023 Inservice Inspection Request for Information ML22353A6122022-12-19019 December 2022 March 2023 Emergency Preparedness Exercise Inspection - Request for Information ML22349A0112022-12-14014 December 2022 NRR E-mail Capture - Final RAI Relief Request ANO1-ISI-035 ML22321A0102022-11-17017 November 2022 Notification of Conduct of a Fire Protection Team Inspection ML22290A0442022-10-13013 October 2022 December 2022 Emergency Preparedness Program Inspection - Request for Information ML22271A8572022-10-0303 October 2022 Notification of Commercial Grade Dedication Inspection (05000416/2023011) and Request for Information ML22213A1662022-08-0101 August 2022 Information Request, Security IR 2022401 ML22208A0542022-07-26026 July 2022 Request for Information ML22206A0172022-07-22022 July 2022 NRR E-mail Capture - Request for Additional Information: Waterford 3 - License Amendment Requests to Adopt 10 CFR 50.69 and TSTF-505 ML22209A1082022-07-15015 July 2022 NRR E-mail Capture - Draft RAIs to License Amendment Request for Application to Adopt 10 CFR 50.69 and Revise Technical Specifications to Adopt TSTF-505, Revision 2 ML22174A1362022-06-23023 June 2022 NRR E-mail Capture - ANO-2 Final RAI Relief Requests ANO2-ISI-023 Through -028 (EPIDs L-2022-LLR-0022 Through -0027) ML22159A3242022-06-0909 June 2022 Notification of NRC Triennial Heat Exchanger/Sink Performance Inspection (05000313/2022003 and 05000368/2022003) and Request for Information ML22151A3262022-05-31031 May 2022 August 2022 Emergency Preparedness Exercise Inspection - Request for Information ML22124A2452022-05-0404 May 2022 NRR E-mail Capture - ANO-1 and ANO-2 - Final RAI 2 License Amendment Requests to Implement Provisions of 10 CFR 50.69 (L-2021-LLA-0105/-0106) ML22122A2952022-05-0404 May 2022 Notification of Inspection NRC Inspection Report 05000368/2022003 and Request for Information ML22124A2672022-05-0404 May 2022 Request for Additional Information for James A. FitzPatrick Nuclear Power Plant TSTF-505 ML22110A1172022-04-19019 April 2022 (GG) 2022 Emergency Preparedness (EP) Program Inspection RFI Sdh 041922 ML22108A1642022-04-18018 April 2022 NRR E-mail Capture - ANO-1: Final RAI License Amendment Request Concerning TS Changes Due to Revised Dose Calculations (L-2021-LLA-0181) ML22103A1712022-04-13013 April 2022 LAR to Revise TS to Adopt TSTF-505_NRC Request for Additional Information ML22041B5362022-02-10010 February 2022 NRR E-mail Capture - Constellation Energy Generation, LLC - Request for Additional Information Regarding Fleet License Amendment Request to Adopt TSTF-541 ML22034A5482022-02-0303 February 2022 NRR E-mail Capture - Final RAI License Amendment Requests to Implement Provisions of 10 CFR 50.69 (L-2021-LLA-0105/-0106) ML22020A0822022-01-19019 January 2022 NRR E-mail Capture - ANO-1 and 2 - Final RAI 2 License Amendment Requests to Allow the ECP to Remain Operable on a One-Time Basis for Up to 65 Days to Perform Piping Upgrade (L-2021-LLA-0015) ML22020A0642022-01-13013 January 2022 NRR E-mail Capture - Exelon Generation Company, LLC - Request for Additional Information Regarding Proposed Fleet Alternative for Repair of Water Level Instrumentation Partial Penetration Nozzles ML22012A1592022-01-0505 January 2022 WF3 2022 EP Exercise Inspection RFI Sdh 010522 ML21312A0382021-11-0505 November 2021 NRR E-mail Capture - ANO-2 RAI Relief Request ANO2-RR-21-002 ML21286A7132021-10-15015 October 2021 ANO2022010 Tfp RFI Stg, Arkansas Nuclear One, Units 1 and 2 - Notification of an NRC Fire Protection Baseline Inspection (NRC Inspection Report 05000313/2022010 and 05000368/2022010) and Request for Information ML21285A0242021-10-0505 October 2021 Digital Instrumentation and Control Modification Inspection Request for Information ML21280A0812021-10-0505 October 2021 Email 10-5-21 - Request for Information_ Waterford EP Inspection (71114.04 & 71151) - Nov-Dec 2021 ML21273A0672021-09-29029 September 2021 NRR E-mail Capture - ANO-2 Final RAI 2 License Amendment Request to Adopt a Safety Function Determination Program ML21236A3222021-09-19019 September 2021 Request for Information ML21256A1902021-09-10010 September 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Request for Additional Information Regarding License Transfer Application ML21252A0052021-08-20020 August 2021 NRR E-mail Capture - ANO-1 and 2 Final RAI License Amendment Request to Allow the ECP to Remain Operable on a One-Time Basis for Up to 65 Days to Perform Piping Upgrade (L-2021-LLA-0015) ML22112A1512021-08-0606 August 2021 NRR E-mail Capture - for Review: Draft RAIs to LAR to Relocate Chemical Detection Systems Technical Specifications (TS) to Technical Requirements Manual (TRM) ML21217A3302021-08-0505 August 2021 (ANO) Problem Identification and Resolution (PIR) Request for Information Combined ML21216A4562021-08-0404 August 2021 WF3 2021 EP Exercise Inspection Request for Information (RFI) ML21204A0842021-07-28028 July 2021 ANO Phase 4 2021013 RFI Gap ML21218A0402021-07-26026 July 2021 NRR E-mail Capture - Final RAIs to Entergy Operations, Waterford Steam Electric Station, Unit 3 LAR to Adopt 10 CFR 50.69 2024-01-24
[Table view] |
Text
Guzman, Richard From: Guzman, Richard Sent: Tuesday, April 26, 2016 9:53 AM To: DAVANT, GUY H Cc: Eng, Anders Yuk (AEng@entergy.com); WEICKS, JOSEPH G (JWEICKS@entergy.com)
Subject:
Request for Additional Information - Entergy Fleet EN-ISI-15 Proposed Alternative to Maintain ISI-Related Activities to the 2001E/2003A of ASME Section XI Code (CAC Nos. MF7133 - MF7136)
- Guy, The NRC staff has reviewed the information provided in the subject fleet relief request dated November 20, 2015 (ADAMS Accession No. ML15329A305) and has determined that additional information is needed to complete its review. Shown below are the NRC staffs request for additional information questions. Please provide your formal response by May 31, 2016. If you have any questions, please contact me.
- Thanks,
~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~
Rich Guzman Sr. PM, Division Operator Reactor Licensing Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Office: O8E-10 l Phone: (301) 415-1030 Richard.Guzman@nrc.gov REQUEST FOR ADDITIONAL INFORMATION REQUEST FOR RELIEF EN-ISI-15-1 INSPECTION AND COINTAINMENT INSERVICE INSPECTION RELATED ACTIVITIES ON THE 2001 EDITION THROUGH 2003 ADDENDA OF THE ASME SECTION XI FOR ENTERGY NUCLEAR OPERATIONS, INC.
ARKANSAS NUCLEAR ONE, UNIT 1, FIFTH 10-YEAR INSERVICE INSPECTION INTERVAL GRAND GULF NUCLEAR STATION, FOURTH 10-YEAR INSERVICE ISI INTERVAL JAMES A. FITZPATRICK NUCLEAR POWER PLANT, FIFTH 10-YEAT ISI INTERVAL WATERFORD STEAM ELECTRIC STATION, UNIT 3, FOURTH 10-YEAR ISI INTERVAL ENTERGY NUCLEAR OPERATIONS, INC.
DOCKET NOS. 50-313, 50-416, 50-333, AND 50-382 By letter dated November 20, 2015 (Agencywide Documents Access and Management System (ADAMS)
Accession Number ML15329A305), Entergy Nuclear Operations, Inc. (Entergy, the licensee) requested relief from the requirements of the American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code (B&PV Code). Relief request EN-ISI-15-1 pertains to maintaining inservice inspection (ISI) and containment inservice inspection (CII) Repair & Replacement (R&R), pressure testing (PT), and nondestructive testing (NDE) programs related activities on the 2001 Edition through 2003 Addenda of the ASME Code, Section XI, during fifth 10-year ISI interval for the Arkansas Nuclear One, Unit 1 (ANO-1), Fourth 10-year ISI interval for Grand Gulf Nuclear Station (GGNS), Fifth 10-year ISI interval for James A. Fitzpatrick Nuclear Plant (JAF), and Fourth 10-year ISI interval for Waterford 3 Steam Electric (WF3).
To complete its review, the NRC staff requests the following additional information.
1
- 1. The licensee states that the proposed duration of this alternative request is from January 1, 2017 through November 30, 2017. On December 1, 2017, Entergy intends to update the Code of Record (ASME Section XI, 2007 Edition/2008 Addenda) for NDE, PT, and R&R programs to the latest Edition/Addenda of the ASME Section XI approved by the NRC in 10 CFR 50.55a(a)(1)(ii) for the entire fleet. Please discuss which portions of the Section XI ASME Code will be updated. Will only the sections that have currently been requested to be retained at the 2001E/2003A be updated to the latest edition, or will all sections be updated after November 30, 2017?
- 2. Please confirm that from December 1, 2017, all the subject plants will be using NDE, PT and R&R programs based on ASME Section XI, 2007 Edition with 2008 Addenda.
- 3. In Footnote (5) on page 2 of the Enclosure 1 to the relief request, the licensee stated, Entergy will not apply the IWB-3514 acceptance standards of the 2001 Edition/2004 Addenda to planar surface flaws in UNS N06600, N06682, or W86182 materials or austenitic stainless steels
- a. Please clarify whether there is a typographical error in quoting UNS N06682 and provide the correct material type;
- b. Otherwise, provide a description of UNS N06682 material and state where it is used at ANO-1, GGNS, JAF, and WF3.
- 4. Discuss which edition and addenda of the ASME Code, Section Xl, will be used for the non-mandatory appendices during January 1, 2017 through November 30, 2017 and provide justification.
- 5. Footnote (6) on page 2 of the Enclosure 1 to the relief request EN-ISI-15-1 states that, snubber preservice and inservice examination and testing will be performed with Subsection ISTD of the ASME Operation and Maintenance (OM) Code, 2004 Edition/2006 Addenda For snubber inservice examination and testing, 10 CFR 50.55a(b)(v) allows the use of ASME OM Code in lieu of the ASME Section XI. Whereas, the snubbers repair and replacements are still under ASME Section XI. Please provide (1) the Edition and Addenda of the ASME Section XI, which will be used for repair and replacement of snubber at various plants (ANO-1, GGNS, JAF, and WF3), and (2) the ASME OM Code or ASME Section XI with edition and addenda which are being currently used for snubber examination and testing at various plants (ANO-1, GGNS, JAF, and WF3).
- 6. Footnote (9) on page 2 of the Enclosure 1 states that IWF-5000 was deleted from Subsection IWF in the 2006 Addenda of ASME Section. See RAI 5 above and provide a response accordingly.
- 7. For the first bullet of Footnote (8) on page 2 of Enclosure 1, please clarify whether there is a typographical error in quoting the regulation 10 CFR 50.55a(xxiv) instead of 10 CFR 50.55a(b)(2)(xxiv).
- 8. In the Attachment to the relief request on page 1, the table specifies various sections of Article IWL for plants ANO-1, GGNS, JAF, and WF3. These plants are either PWRs or BWRs. Please specify which plants will be using IWL for concrete examination.
- 9. Section 5 of the submitted relief request provides the proposed duration of this alternative for ANO-1, GGNS, JAF, and WF3 is from the start date of the new 10-year ISI interval for each plant through November 30, 2017 as shown below:
Duration of Relief Request ISI Interval Plant ISI ISI Interval ISI Interval End Date Interval Start Date End Date ANO-1 5th 5/31/2017 11/30/2017 5/30/27 GGNS 4th 6/2/2017 11/30/2017 6/1/27 JAF 5th 1/1/2017 11/30/2017 12/31/26 WF3 4th 7/1/2017 11/30/2017 6/30/27 2
As shown in the above table, Entergy requested to extend the use of the 2001 edition through 2003 addenda beyond the current 10-year ISI intervals at various Entergy plants (ANO-1, GGNS, JAF, and WF3) up to November 30, 2017. Please explain how previously NRC approved relief requests for the previous 10-year ISI intervals at these Entergy plants will be addressed for the extended period up to November 30, 2017.
- 10. In a letter dated November 26, 2014 (ADAMS No. ML14342B001), Entergy submitted a similar relief request in PRR-26 for Pilgrim Nuclear Power Station. In this request (PRR-26), Section 5, Duration of Proposed Alternative, it states, in part, that Entergy proposes to maintain standardization of the corporate administered R&R, PT, NDE programs across its entire nuclear fleet at 2001 Edition through 2003 Addenda through December 2017. However, in the November 20, 2015, relief request EN-ISI-15-1, Section 6, Duration of Proposed Alternative, it states, in part, that Entergy proposes to maintain standardization of the of its corporately administered NDE, PT and R&R programs across its entire nuclear fleet at 2001 Edition through 2003 Addenda through November 2017.
Please explain the inconsistency between the stated November 2017 and December 2017 dates. If needed, please make appropriate changes.