Category:Inservice/Preservice Inspection and Test Report
MONTHYEARDCL-23-009, Owner'S Activity Report for Unit 2 Twenty-Third Refueling Outage2023-02-22022 February 2023 Owner'S Activity Report for Unit 2 Twenty-Third Refueling Outage DCL-22-091, Revised Steam Generator Tube Inspection Report for Twenty-First Refueling Outage2022-12-20020 December 2022 Revised Steam Generator Tube Inspection Report for Twenty-First Refueling Outage DCL-22-060, Owner'S Activity Report for Unit 1 Twenty-Third Refueling Outage2022-07-21021 July 2022 Owner'S Activity Report for Unit 1 Twenty-Third Refueling Outage ML22138A4362022-05-18018 May 2022 ASME Section XI Inservice Inspection Program Plan - Fourth 10-Year Inspection Interval, Revision 1 ML21307A0012021-11-15015 November 2021 Review of the Fall 2020 Steam Generator Tube Inservice Inspection Report DCL-21-055, Owner'S Activity Report for Unit 2 Twenty-Second Refueling Outage2021-07-19019 July 2021 Owner'S Activity Report for Unit 2 Twenty-Second Refueling Outage DCL-21-008, Owner'S Activity Report for Unit 1 Twenty-Second Refueling Outage2021-01-27027 January 2021 Owner'S Activity Report for Unit 1 Twenty-Second Refueling Outage DCL-20-039, One Hundred Eighty Day Steam Generator Report for Diablo Canyon Power Plant Unit 2 Twenty-First Refueling Outage2020-05-13013 May 2020 One Hundred Eighty Day Steam Generator Report for Diablo Canyon Power Plant Unit 2 Twenty-First Refueling Outage ML20064F5782020-03-0404 March 2020 Owner'S Activity Report for Unit 2 Twenty-First Refueling Outage DCL-19-084, ASME Section XI Lnservice Inspection Program Request for Alternative NDE-RCSSE-2R22 Use of Alternate Sizing Qualification Criteria Through a Protective Clad Layer2019-10-31031 October 2019 ASME Section XI Lnservice Inspection Program Request for Alternative NDE-RCSSE-2R22 Use of Alternate Sizing Qualification Criteria Through a Protective Clad Layer DCL-19-049, Owner'S Activity Report for Unit 1 Twenty-first Refueling Outage2019-06-13013 June 2019 Owner'S Activity Report for Unit 1 Twenty-first Refueling Outage DCL-18-105, Submittal of the Fourth Ten-Year Interval Inservice Testing (1ST) Program Plan, Revision 12018-12-0505 December 2018 Submittal of the Fourth Ten-Year Interval Inservice Testing (1ST) Program Plan, Revision 1 DCL-18-048, Owner'S Activity Report for Unit 2 Twentieth Refueling Outage2018-06-19019 June 2018 Owner'S Activity Report for Unit 2 Twentieth Refueling Outage DCL-17-028, ASME Section XI Inservice Inspection Program Plan - Fourth 10-Year Inspection Interval2017-04-18018 April 2017 ASME Section XI Inservice Inspection Program Plan - Fourth 10-Year Inspection Interval DCL-16-116, ASME Section XI Inservice Inspection Program Relief Request NDE-SIF-U2 Due to Impracticality of Full Examination Volume Coverage Requirements2016-11-10010 November 2016 ASME Section XI Inservice Inspection Program Relief Request NDE-SIF-U2 Due to Impracticality of Full Examination Volume Coverage Requirements DCL-16-115, ASME Section XI Inservice Inspection Program Relief Request NDE-RCS-SE-1R20 to Allow Use of Alternative Depth Sizing Criteria2016-11-10010 November 2016 ASME Section XI Inservice Inspection Program Relief Request NDE-RCS-SE-1R20 to Allow Use of Alternative Depth Sizing Criteria DCL-16-086, Owner'S Activity Report for Unit 2 Nineteenth Refueling Outage2016-08-31031 August 2016 Owner'S Activity Report for Unit 2 Nineteenth Refueling Outage DCL-16-056, One Hundred Eighty-Day Steam Generator Report for Nineteenth Refueling Outage2016-05-0202 May 2016 One Hundred Eighty-Day Steam Generator Report for Nineteenth Refueling Outage DCL-16-024, Submittal of the Fourth Ten-Year Interval Inservice Testing (IST) Program Plan2016-03-0202 March 2016 Submittal of the Fourth Ten-Year Interval Inservice Testing (IST) Program Plan DCL-16-018, Owner'S Activity Report for Nineteenth Refueling Outage2016-02-0303 February 2016 Owner'S Activity Report for Nineteenth Refueling Outage DCL-15-116, Submittal of 10 CFR 50.55a Request FLIG-U1, Request for Extension of Third Lnservice Inspection Interval for Performing Reactor Vessel Stud Hole Ligament Examinations2015-10-0707 October 2015 Submittal of 10 CFR 50.55a Request FLIG-U1, Request for Extension of Third Lnservice Inspection Interval for Performing Reactor Vessel Stud Hole Ligament Examinations DCL-15-106, ASME Section XI Inservice Inspection Program Request for Relief NDE-FWNS-U1/U2 to Allow Use of Alternate Examination Volume Coverage Requirements2015-09-0303 September 2015 ASME Section XI Inservice Inspection Program Request for Relief NDE-FWNS-U1/U2 to Allow Use of Alternate Examination Volume Coverage Requirements DCL-15-054, One Hundred Eighty-Day Steam Generator Report for Diablo Canyon Power Plant, Unit 2, Eighteenth Refueling Outage2015-04-29029 April 2015 One Hundred Eighty-Day Steam Generator Report for Diablo Canyon Power Plant, Unit 2, Eighteenth Refueling Outage DCL-15-048, ASME Section XI Inservice Inspection Program Request for Relief NDE-PNS-U2A to Allow Use of Alternate Examination Volume Coverage Requirements2015-04-0909 April 2015 ASME Section XI Inservice Inspection Program Request for Relief NDE-PNS-U2A to Allow Use of Alternate Examination Volume Coverage Requirements DCL-14-053, Owner'S Activity Report for Eighteenth Refueling Outage2014-06-11011 June 2014 Owner'S Activity Report for Eighteenth Refueling Outage DCL-14-027, Request for Relief from the Requirements of Appendix IX of ASME Section XI, 2001 Edition with 2003 Addendum2014-03-28028 March 2014 Request for Relief from the Requirements of Appendix IX of ASME Section XI, 2001 Edition with 2003 Addendum DCL-13-063, Inservice Inspection Report for Seventeenth Refueling Outage2013-06-13013 June 2013 Inservice Inspection Report for Seventeenth Refueling Outage DCL-12-089, Inservice Inspection Report for Unit 1 Seventeenth Refueling Outage2012-09-13013 September 2012 Inservice Inspection Report for Unit 1 Seventeenth Refueling Outage DCL-12-007, Request for Approval of an Alternative to the American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code Section XI Examination Requirement for Class 1 and 2 Piping Welds2012-01-20020 January 2012 Request for Approval of an Alternative to the American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code Section XI Examination Requirement for Class 1 and 2 Piping Welds ML12025A3042011-12-28028 December 2011 Inservice Inspection Program Plan, Third 10-Year Inspection Interval, Revision 1, Page 201 Through Drawing No. 102028, Sheet 38 ML12025A3052011-12-28028 December 2011 Inservice Inspection Program Plan, Third 10-Year Inspection Interval, Revision 1, Drawing No. 102028, Sheet 39, Through Drawing No. 104628, Sheet 46 ML12025A3032011-12-28028 December 2011 Inservice Inspection Program Plan, Third 10-Year Inspection Interval, Revision 1, Page 101 Through Page 200 ML12025A3022011-12-28028 December 2011 Inservice Inspection Program Plan, Third 10-Year Inspection Interval, Revision 1, Cover Page Through Page 100 DCL-12-006, Diablo Canyon - Inservice Inspection Program Plan, Third 10-Year Inspection Interval, Revision 1, Drawing No. 102028, Sheet 39, Through Drawing No. 104628, Sheet 462011-12-28028 December 2011 Diablo Canyon - Inservice Inspection Program Plan, Third 10-Year Inspection Interval, Revision 1, Drawing No. 102028, Sheet 39, Through Drawing No. 104628, Sheet 46 DCL-12-006, Diablo Canyon - Inservice Inspection Program Plan, Third 10-Year Inspection Interval, Revision 1, Page 201 Through Drawing No. 102028, Sheet 382011-12-28028 December 2011 Diablo Canyon - Inservice Inspection Program Plan, Third 10-Year Inspection Interval, Revision 1, Page 201 Through Drawing No. 102028, Sheet 38 DCL-12-006, Diablo Canyon - Inservice Inspection Program Plan, Third 10-Year Inspection Interval, Revision 1, Page 101 Through Page 2002011-12-28028 December 2011 Diablo Canyon - Inservice Inspection Program Plan, Third 10-Year Inspection Interval, Revision 1, Page 101 Through Page 200 DCL-12-006, Diablo Canyon - Inservice Inspection Program Plan, Third 10-Year Inspection Interval, Revision 1, Cover Page Through Page 1002011-12-28028 December 2011 Diablo Canyon - Inservice Inspection Program Plan, Third 10-Year Inspection Interval, Revision 1, Cover Page Through Page 100 DCL-11-093, Inservice Inspection Report for Sixteenth Refueling Outage2011-09-0101 September 2011 Inservice Inspection Report for Sixteenth Refueling Outage DCL-11-053, One Hundred Eighty-Day Steam Generator Report - Sixteenth Refueling Outage2011-04-21021 April 2011 One Hundred Eighty-Day Steam Generator Report - Sixteenth Refueling Outage DCL-10-157, Snubber Visual Examination and Functional Testing Related to the Inservice Inspection Program Third 10-Year Interval2010-12-21021 December 2010 Snubber Visual Examination and Functional Testing Related to the Inservice Inspection Program Third 10-Year Interval DCL-10-051, ASME Section XI Inservice Inspection Program Relief Request NDE-RCS-SE-1R16 to Allow Use of Alternate Sizing Qualification Criteria2010-05-17017 May 2010 ASME Section XI Inservice Inspection Program Relief Request NDE-RCS-SE-1R16 to Allow Use of Alternate Sizing Qualification Criteria ML1005005362010-02-0808 February 2010 Inservice Inspection Report for Fifteenth Refueling Outage DCL-09-046, Submittal of Fifteenth Refueling Outage Inservice Inspection Report2009-06-22022 June 2009 Submittal of Fifteenth Refueling Outage Inservice Inspection Report DCL-08-103, ASME Section XI Inservice Inspection Program Relief Request NDE-Leak Path for the Unit 1, Fifteenth Refueling Outage, Third Ten-Year Inspection Interval to Allow Use of the Rules of the NRC First Revised Order, EA-03-009.2008-12-0404 December 2008 ASME Section XI Inservice Inspection Program Relief Request NDE-Leak Path for the Unit 1, Fifteenth Refueling Outage, Third Ten-Year Inspection Interval to Allow Use of the Rules of the NRC First Revised Order, EA-03-009. DCL-08-058, Transmittal of Inservice Inspection Report, Fourteenth Refueling Outage2008-07-10010 July 2008 Transmittal of Inservice Inspection Report, Fourteenth Refueling Outage DCL-07-099, ASME Section XI Inservice Inspection Program Relief Request REP-1 U2, Revision 1, and Response to Request for Additional Information2007-10-22022 October 2007 ASME Section XI Inservice Inspection Program Relief Request REP-1 U2, Revision 1, and Response to Request for Additional Information DCL-07-084, Inservice Inspection Report for Fourteenth Refueling Outage2007-08-27027 August 2007 Inservice Inspection Report for Fourteenth Refueling Outage DCL-06-099, ASME Section XI Inservice Inspection Program Relief Requests NDE-SLH U2 and NDE-LSL U22006-08-24024 August 2006 ASME Section XI Inservice Inspection Program Relief Requests NDE-SLH U2 and NDE-LSL U2 DCL-06-101, Inservice Inspection Report for Plant Thirteenth Refueling Outage2006-08-23023 August 2006 Inservice Inspection Report for Plant Thirteenth Refueling Outage DCL-06-031, Inservice Inspection Report for Unit 1 Thirteenth Refueling Outage2006-03-0303 March 2006 Inservice Inspection Report for Unit 1 Thirteenth Refueling Outage 2023-02-22
[Table view] Category:Letter type:DCL
MONTHYEARDCL-24-010, Nuclear Material Transaction Report for New Fuel2024-01-29029 January 2024 Nuclear Material Transaction Report for New Fuel DCL-24-009, Nuclear Material Transaction Report for New Fuel2024-01-17017 January 2024 Nuclear Material Transaction Report for New Fuel DCL-24-008, Schedule Considerations for Review of the DCPP License Renewal Application2024-01-17017 January 2024 Schedule Considerations for Review of the DCPP License Renewal Application DCL-24-004, Supplement to License Amendment Request 23-01 Revision to Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b2024-01-15015 January 2024 Supplement to License Amendment Request 23-01 Revision to Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b DCL-23-129, Nuclear Material Transaction Report for New Fuel2023-12-27027 December 2023 Nuclear Material Transaction Report for New Fuel DCL-23-122, Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2023-12-14014 December 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation DCL-23-128, Emergency Plan Update2023-12-13013 December 2023 Emergency Plan Update DCL-23-125, Core Operating Limits Report for Unit 1 Cycle 252023-12-0606 December 2023 Core Operating Limits Report for Unit 1 Cycle 25 DCL-23-121, Supplement to License Amendment Request 23-03, Revision to Technical Specification3.7.8, Auxiliary Saltwater System2023-11-16016 November 2023 Supplement to License Amendment Request 23-03, Revision to Technical Specification3.7.8, Auxiliary Saltwater System DCL-23-120, License Amendment Request 23-03 Revision to Technical Specification 3.7.8, Auxiliary Saltwater (Asw) System2023-11-14014 November 2023 License Amendment Request 23-03 Revision to Technical Specification 3.7.8, Auxiliary Saltwater (Asw) System DCL-23-118, License Renewal Application2023-11-0707 November 2023 License Renewal Application DCL-2023-520, Discharge Self-Monitoring at Diablo Canyon Power Plant (DCPP)2023-10-19019 October 2023 Discharge Self-Monitoring at Diablo Canyon Power Plant (DCPP) DCL-23-103, Independent Spent Fuel Storage Installation - Withdrawal of License Amendment Request 22-01, Request for Approval of Alternative Security Measures for Early Warning System2023-10-13013 October 2023 Independent Spent Fuel Storage Installation - Withdrawal of License Amendment Request 22-01, Request for Approval of Alternative Security Measures for Early Warning System DCL-23-092, Material Status Report for the Period Ending August 31, 20232023-09-28028 September 2023 Material Status Report for the Period Ending August 31, 2023 DCL-23-077, License Amendment Request 23-02 Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors2023-09-27027 September 2023 License Amendment Request 23-02 Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors DCL-23-083, Upcoming Meeting with Nuclear Security and Incident Response Staff2023-09-13013 September 2023 Upcoming Meeting with Nuclear Security and Incident Response Staff DCL-23-078, Nuclear Material Transaction Report for New Fuel2023-09-0606 September 2023 Nuclear Material Transaction Report for New Fuel DCL-23-070, Withdrawal of Request Regarding Senior Reactor Operator License Application2023-08-16016 August 2023 Withdrawal of Request Regarding Senior Reactor Operator License Application DCL-23-068, Nuclear Material Transaction Report for New Fuel2023-08-0909 August 2023 Nuclear Material Transaction Report for New Fuel DCL-23-066, Nuclear Material Transaction Report for New Fuel2023-08-0303 August 2023 Nuclear Material Transaction Report for New Fuel DCL-23-065, Letter DCL-23-065 Request That Exam Material Be Withheld from Public Disclosure2023-07-27027 July 2023 Letter DCL-23-065 Request That Exam Material Be Withheld from Public Disclosure DCL-23-064, Nuclear Material Transaction Report for New Fuel2023-07-26026 July 2023 Nuclear Material Transaction Report for New Fuel DCL-23-054, License Amendment Request 23-01 Revision to Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b2023-07-13013 July 2023 License Amendment Request 23-01 Revision to Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b DCL-23-055, Nuclear Material Transaction Report for New Fuel2023-07-0606 July 2023 Nuclear Material Transaction Report for New Fuel DCL-23-042, Independent Spent Fuel Storage Installation, Submittal of Quality Assurance Program Description, Revision 02023-05-24024 May 2023 Independent Spent Fuel Storage Installation, Submittal of Quality Assurance Program Description, Revision 0 DCL-23-032, Independent Spent Fuel Storage Installation Docket No. 72-27, Materials License Number SNM-2514 Humboldt Bay Independent Spent Fuel Storage Installation - NRC Requested Notification of Withdrawal from Voluntary Program2023-05-22022 May 2023 Independent Spent Fuel Storage Installation Docket No. 72-27, Materials License Number SNM-2514 Humboldt Bay Independent Spent Fuel Storage Installation - NRC Requested Notification of Withdrawal from Voluntary Program DCL-23-041, 10 CFR 50.46 Annual Report of Emergency Core Cooling System Evaluation Model Changes for Peak Cladding Temperature for 20222023-05-22022 May 2023 10 CFR 50.46 Annual Report of Emergency Core Cooling System Evaluation Model Changes for Peak Cladding Temperature for 2022 DCL-23-038, Revision to the Unit 1 Reactor Vessel Material Surveillance Program Withdrawal Schedule2023-05-15015 May 2023 Revision to the Unit 1 Reactor Vessel Material Surveillance Program Withdrawal Schedule DCL-23-034, 2022 Annual Nonradiological Environmental Operating Report2023-05-0101 May 2023 2022 Annual Nonradiological Environmental Operating Report DCL-23-036, 2022 Annual Radiological Environmental Operating Report2023-05-0101 May 2023 2022 Annual Radiological Environmental Operating Report DCL-23-025, 2022 Annual Radioactive Effluent Release Report2023-05-0101 May 2023 2022 Annual Radioactive Effluent Release Report DCL-2023-512, Submittal of Receiving Water Monitoring Program 2022 Annual Report2023-04-27027 April 2023 Submittal of Receiving Water Monitoring Program 2022 Annual Report DCL-23-035, Response to Request for Additional Information on Request Regarding Senior Reactor Operator License Application2023-04-24024 April 2023 Response to Request for Additional Information on Request Regarding Senior Reactor Operator License Application DCL-23-028, Technical Specification Bases, Revision 142023-04-24024 April 2023 Technical Specification Bases, Revision 14 DCL-2023-511, Report on Discharge Monitoring for the First Quarter of 20232023-04-20020 April 2023 Report on Discharge Monitoring for the First Quarter of 2023 DCL-23-031, Submittal of Annual Report of Occupational Radiation Exposure for 20222023-04-19019 April 2023 Submittal of Annual Report of Occupational Radiation Exposure for 2022 DCL-23-024, Independent Spent Fuel Storage Installation, Response to Nrg Request for Additional Information for Revision to License Amendment Request 22-01 Request for Approval of Alternative Security Measures for Early Warning System2023-04-0404 April 2023 Independent Spent Fuel Storage Installation, Response to Nrg Request for Additional Information for Revision to License Amendment Request 22-01 Request for Approval of Alternative Security Measures for Early Warning System DCL-23-022, 2023 Annual Statement of Insurance for Pacific Gas and Electric Companys Diablo Canyon Power Plant2023-03-29029 March 2023 2023 Annual Statement of Insurance for Pacific Gas and Electric Companys Diablo Canyon Power Plant DCL-23-023, Decommissioning Funding Report for Diablo Canyon Power Plant, Units 1 and 22023-03-28028 March 2023 Decommissioning Funding Report for Diablo Canyon Power Plant, Units 1 and 2 DCL-23-021, Independent Spent Fuel Storage Installation, Emergency Plan Update2023-03-23023 March 2023 Independent Spent Fuel Storage Installation, Emergency Plan Update DCL-23-020, Responses to NRC Questions Regarding License Renewal Efforts2023-03-17017 March 2023 Responses to NRC Questions Regarding License Renewal Efforts DCL-23-009, Owner'S Activity Report for Unit 2 Twenty-Third Refueling Outage2023-02-22022 February 2023 Owner'S Activity Report for Unit 2 Twenty-Third Refueling Outage DCL-23-008, Request Regarding Senior Reactor Operator License Application2023-02-22022 February 2023 Request Regarding Senior Reactor Operator License Application DCL-2023-503, Annual Sea Turtle Report2023-01-26026 January 2023 Annual Sea Turtle Report DCL-2023-502, (DCPP) 4th Quarter 2022 Report on Discharge Self-Monitoring2023-01-18018 January 2023 (DCPP) 4th Quarter 2022 Report on Discharge Self-Monitoring DCL-22-091, Revised Steam Generator Tube Inspection Report for Twenty-First Refueling Outage2022-12-20020 December 2022 Revised Steam Generator Tube Inspection Report for Twenty-First Refueling Outage DCL-22-089, Core Operating Limits Report for Unit 2 Cycle 242022-12-20020 December 2022 Core Operating Limits Report for Unit 2 Cycle 24 DCL-22-085, Request to Resume Review of the License Renewal Application or, Alternatively, for an Exemption from 10 CFR 2.109(b), Concerning a Timely Renewal Application2022-10-31031 October 2022 Request to Resume Review of the License Renewal Application or, Alternatively, for an Exemption from 10 CFR 2.109(b), Concerning a Timely Renewal Application DCL-22-041, Site-Specific Decommissioning Cost Estimate, Revision 12022-10-12012 October 2022 Site-Specific Decommissioning Cost Estimate, Revision 1 DCL-22-042, Post-Shutdown Decommissioning Activities Report, Revision 12022-10-12012 October 2022 Post-Shutdown Decommissioning Activities Report, Revision 1 2024-01-29
[Table view] |
Text
Pacific Gas and Electric Company~
Paula Gerten Diablo Canyon Power Plant Site Vice President Mail code 104/5/502 P.O. Box 56 Avila Beach, CA 93424 805.545.4596 Internal: 691.4596 Fax: 805.545.4234 June 13, 2019 PG&E Letter DCL-19-049 U.S. Nuclear Regulatory Commission 10 CFR 50.4 ATTN: Document Control Desk Washington, DC 20555-0001 Docket No. 50-275, OL-DPR-80 Diablo Canyon Unit 1 Owner's Activity Report for Unit 1 Twenty-first Refueling Outage In accordance with American Society of Mechanical Engineers (ASME) Code Case N-532-5, enclosed is the Owner's Activity Report for inservice inspection (ISi) activities performed at Diablo Canyon Power Plant through the completion of the Unit 1 Twenty-first Refueling Outage (1 R21 ).
Code Case N-532-5 was used as an alternative to the requirements of ASME Section XI, Article IWA-6000, as listed in Regulatory Guide 1.147, "lnservice Inspection Code Case Acceptability, ASME Section XI, Division 1," Revision 18, and approved in accordance with 10 CFR 50.55a(b )(5).
There are no new or revised regulatory commitments (as defined by NEI 99-04) in this submittal.
If you have any questions regarding the information enclosed, or other ISi program activities, please contact Mr. Ken Bych, Manager, Technical Support Engineering, at (805) 545-4241.
AJ~ fe.c~ -f-1 Paula Gerten dqmg/6192/50942981-2 Enclosure cc/enc: Scott A. Morris, NRC Region IV Administrator Christopher W. Newport, NRC Senior Resident Inspector Balwant K. Singal, NRR Senior Project Manager State of California, Pressure Vessel Unit A member of the STARS Alliance Callaway
Enclosure PG&E Letter DCL-19-049 Pacific Gas and Electric Company Diablo Canyon Power Plant Owner's Activity Report for Unit 1 Twenty-first Refueling Outage
DIABLO CANYON POWER PLANT UNIT 1 REFUELING OUTAGE: 1 R21 Operating License No. DPR-80 USNRC Docket No. 50-275 OWNER'S ACTIVITY REPORT Rev. 0 Contents:
==
Introduction:==
OAR-1 Report Number: DCPP-1 R21:
Table 1: Items with Flaws or Relevant Conditions That Required Evaluation for Continued Service.
Table 2: Abstract of Repair/Replacement Activities Required for Continued Service.
Prepared By: Date 5/t~/lf Reviewed By: Date s hs /,.9 Approved By: Date ~- u- /45/
Document Date: May 15, 2019 Pacific Gas and Electric Company 77 Beale Street, San Francisco, CA 94106 Diablo Canyon Power Plant L P.O. Box 56, Avila Beach, CA 93424 Page 1 of 4
INTRODUCTION lnservice inspection (ISi) of scheduled ASME Section XI components and their supports at Pacific Gas and Electric Company's Diablo Canyon Power Plant (DCPP) was completed during the Unit 1 twenty-first refueling outage (1 R21) from February 2019 through March 2019.
1R21 was the second outage in the first period within the fourth 10-year ISi interval.
This Owner's Activity Report OAR-1, complies with the provisions of Code Case N-532-5 as 1
approved by Regulatory Guide 1.147, Revision 18.
The OAR-1 Report covers any mid cycle work completed after July 19, 2017, and any applicable 1R21 work completed prior to and including April 18, 2019.
Page 2 of 4
FORM OAR-1 OWNERS ACTIVITY REPORT -- DCPP-1 R21 Report Number DCPP-1 R21 Plant __ D_ia_b_lo_C_an_y,_o_n_N_uc_l_e_ar_P_o_w_er_P_la_n~t,_P_.O_._B_o_x_5_6~,_A_v_il_a_B_e_a_c_h,_,C_al_if_o_rn_ia__ 93_4_2_4_ _ _ _ _ _ __
Unit No. _ _ _ _ _ _ _ C_o_m_m_e_r_c_ia_l_s_e_rv_ic_e_da_t_e___ M_a~y_7~,_1_9_8_5_ _ _ Refueling outage no. 1R21 Current inspection interval --'I---'----W-'---=B"--'-/'----'-IW---'----C-=------'--/---'----IW'--'--=D-'-/-'-IW. :. . :. . :. F_-_4.:. . : t;. .:.h_ _ __cl---'----W-'---=E=---.c_/'----'-IW-'-'L=----3=r-=d_ _ _ _ _ _ __
(1st, 2nd , 3rd, 4th , other)
Current inspection period _ _ _IW_B_/_I_W_C_/_IW_D_/~IW'---F_-_1s~t_ _ _ _ _ lW_E_/_IW_L_-_1s ~ t ' - - - - - - - - - -
(1 st, 2nd, 3rd)
Edition and Addenda of Section XI applicable to the inspection plans __I_W_B_/_C_/D_/_F~,_2_0_0_7_E_d_/_20_0_8_A_dd_ __
IWE/IWL, 2007 Ed / 2008 Add Date and revision of inspection plans IWB / IWC / IWD / IWF -- 4/18/2017 Rev. 0 IWE / IWL -- 4/4/19 Rev . 0 Edition and addenda of Section XI applicable to repair/replacement activities, if different than the inspection plans No Difference Code Cases used: N-532-5 N-722-1 N-740-2 N-770-2 (if applicable)
CERTIFICATE OF CONFORMANCE I certify that (a) the statements made in this report are correct; (b) the examinations and tests meet the Inspection Plan as required by the ASME Code, Section XI; and (c) the repair/replacement activities and evaluations supporting the completion of 1 R21 (refueling outage no) conform to the requirements of Section XI.
Date _ "5
_ * --- ~__ .- _,_ / _ ~- - - -
CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and employed by The Hartford Steam Boiler Inspection and Insurance Company of Connecticut have inspected the items described in this Owner's Activity Report, and state that, to the best of my knowledge and belief, the Owner has performed all activities represented by this report in accordance with the requirements of Section XI.
By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied , concerning the repair/replacement activities and evaluation described in this report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for an personal injury or property damage or a loss of any kind arising from or connected with this inspection .
Page 3 of 4
FORM OAR-1 OWNERS ACTIVITY REPORT -- DCPP-1 R21 TABLE 1 ITEMS WITH FLAWS OR REVELANT CONDITIONS THAT REQUIRED EVALUATION FOR CONTINUED SERVICE Examination Category and Item Number Item Description Evaluation Description Accepted for continued use with:
- 1) 1st successive UT exam of flaw identified in 1R20.
Results: No flaw growth.
Line-1-109-14S PL CAT R-A Class-1 Weld, WIB-228. 2) Application of Structural Weld Overlay ITEM Rl.11 Rejectable UT indication. (SWOL) during 1R21 SAPN 50915871 (Order/Op 60109329-0010).
Used Code Case N-740-2 per alternative request, REP-RHR-SWOL approved January 2, 2018 (ML17338A131)
TABLE 2 ABSTRACT OF REPAIR/REPLACEMENT ACTIVITIES REQUIRED FOR CONTINUED SERVICE Code Date Repair/Replacement Item Description Description of Work Class Completed Plan Number Application of Struct~ral Line 1-109-14 1 * ; Weld Overlay {SWOL) 3/21/2019 60109329-10 Weld, WIB-228 50970594 Installed 6 plugs by welding 3 CCWHX 1-1 3/12/2019 64137645-600 (Eddy Current evaluations)
Installed 6 plugs by welding 3 CCWHX 1-2 2/26/2019 64220070-200 (Eddy Current evaluations)
Page 4 of 4