Pacific Gas and Electric Company" March 4, 2020 PG&E Letter DCL-20-011 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Docket No. 50-323, OL-DPR-82 Diablo Canyon Unit 2 Paula Gerten Site Vice President Owner's Activity Report for Unit 2 Twenty-First Refueling Outage Diablo Canyon Power Plant Mail code 104/6/605 P.O. Box 56 Avila Beach, CA 93424 805.545.4596 Internal: 691.4596 Fax: 805.545.4234 10 CFR 50.4 In accordance with American Society of Mechanical Engineers (ASME) Code Case N-532-5, enclosed is the Owner's Activity Report for inservice inspection (ISi) activities performed at Diablo Canyon Power Plant Unit 2 through the completion of the Unit 2 Twenty-First Refueling Outage.
Code Case N-532-5 was used as an alternative to the requirements of ASME Section XI, Article IWA-6000, as listed in Regulatory Guide 1.147, "lnservice Inspection Code Case Acceptability, ASME Section XI, Division 1," Revision 18, and approved in accordance with 10 CFR 50.55a(b)(5).
There are no new or revised regulatory commitments (as defined by NEI 99-04) in this submittal.
If you have any questions regarding the information enclosed, or other ISi program activities, please contact Mr. Ken Bych, Manager, Technical Support Engineering, at (805) 545-4241.
- ~~
Paula Gerfen 0 dqmg/6192/50942981-3 Enclosure cc/enc:
Scott A. Morris, NRC Region IV Administrator Lindsay N. Merker, Acting Senior Resident Inspector John P. Reynoso, NRC Resident Inspector Balwant K. Singal, NRR Senior Project Manager State of California, Pressure Vessel Unit A
member of the STARS Alliance Callaway
- Diablo Canyon
- Palo Verde
- Wolf Creek
Diablo Canyon Power Plant Unit 2 Refueling Outage: 2R21 Operating License No. DPR-82 USNRC Docket No. 50-323 Owner's Activity Report, Rev. 0 Enclosure PG&E Letter DCL-20-011
==
Introduction:==
DIABLO CANYON POWER PLANT UNIT 2 REFUELING OUTAGE: 2R21 Operating License No. DPR-82 USNRC Docket No. 50-323 OWNER'S ACTIVITY REPORT Rev. 0 Contents:
OAR-1 Report Number: DCPP-2R21:
Table 1:
Items with Flaws or Relevant Conditions That Required Evaluation for Continued Service.
Table 2:
Abstract of Repair/Replacement Activities Required for Continued Service.
Prepared By:
Thomas L. Alcott, ISi Specialist Date Reviewed By: ___
_,._ f::'"+-Ja
_m_e_~* -E.-~-;;1-, I-S-1 S-p-~ -ia-lis-t ------ Date Approved By: --~-/ _,_* ----~--"'~-=*===--~::,...,=..-e==--
Ken Bych, Manager Technical Su1crin?rf Engineering Document Date: Feb 18, 2020 Pacific Gas and Electric Company 77 Beale Street, San Francisco, CA 94106 Diablo Canyon Power Plant P.O. Box 56, Avila Beach, CA 93424 Page 1 of 5 2lrer /2tJ.20 1
2./i:,/2.vU>
INTRODUCTION lnservice inspection (ISi) of scheduled ASME Section XI components and their supports at Pacific Gas and Electric Company's Diablo Canyon Power Plant (DCPP) Unit 2 were inspected during the twenty-first refueling outage (2R21) and through Feb 3, 2020 thus ending Interval 4, Period 1.
2R21 was the second outage in the first period within the fourth 10-year ISi interval.
This Owner's Activity Report, OAR-1, complies with the provisions of Code Case N-532-5 as approved by Regulatory Guide 1.147, Revision 18.
The OAR-1 Report covers any mid cycle Section XI Repair/Replacement work completed after April 23, 2018 and any applicable 2R21 Section XI Repair/Replacement work completed prior to and including Jan 18, 2020.
Page 2 of 5
FORM OAR-1 OWNERS ACTIVITY REPORT -- DCPP-2R21 Report Number ---=D-=C_,_P.,_P....,-2=R-"'2"--'1'-------------------------
Plant Diablo Canyon Nuclear Power Plant, P.O. Box 56, Avila Beach, California 93424 Unit No. _ __,2=-----C=-=-om'"'"""'m"'e=r-=-c=ia~l-=-se=rv'--'-'-'ic=e---'d=a=t-=-e _ ___,_M=a=r-=c~h_1~3'-'-'1-=-9-=-8-=-6 __ Refueling outage no.
2R21 Current inspection interval _
__,l_,_W~B~/ ~IW_,_C~/~IW~D---'/__,l_,_W-'-'-F_-_4"'""'t-'-'-h ____
l'--'-W_,_E=-.c..-/_,_IWc...c..:L_--=3~rd,__ _______
(1st, 2nd, 3rd, 4th, other)
Current inspection period __
__,_IW-'--'-=B=-/'-'l'--'-W_,_C"'-'--/"'""'IW'--'-=D_,_/__,_IW-'--'-'-F_-___,_1.,,_st,__ ___
"'"'IW'--'--=E'--'-/__,_IW-'--'--"L=--___,1-=s-'-t ________ _
(1st, 2nd, 3rd)
Edition and Addenda of Section X I applicable to the inspection plans -~l~W~B=-/~C~/D~/~F~2~0~0~7_E~d~/~2~00~8~A~d~d __
IWE/IWL, 2007 Ed / 2008 Add Date and revision of inspection plans IWB / IWC / IWD / IWF -- 4/18/2017 Rev. 0 IWE / IWL-4/4/2019 Rev. 0 Edition and addenda of Section XI applicable to repair/replacement activities, if different than the inspection plans No Difference Code Cases used: ------~N~-~5_,_32=-~5~N~-~7=2=2-~1~N~-~73~1~N~-~7=2_,_9-_4~N_,_-_,_7 4~0=--=2 _______
(if applicable)
CERTIFICATE OF CONFORMANCE I certify that (a) the statements made in this report are correct; (b) the examinations and tests meet the Inspection Plan as required by the ASME Code,Section XI; and (c) the repair/replacement activities and evaluations supporting the completion of 2R21 (refueling outage no) conform to the requirements of Section XI.
Signed ~~
~
/ Manager, Technical Support Engineering Owner of'"owner's designee, Title CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and employed by The Hartford Stearn Boiler Inspection and Insurance Company of Connecticut have inspected the items described in this Owner's Activity Report, and state that, to the best of my knowledge and belief, the Owner has performed all activities represented by this report in accordance with the requirements of Section XI.
By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the repair/replacement activities and evaluation described in this report. Furthermore, neither the Inspector nor his employer shall be liable in any manner f r a7~ ersonal injury or property damage or a loss of any kind arising from or connected with this inspection.
_ __,:....c..,~~=-=,:.q,:,=-'--------Commission NB-15083 CA2184 Al/ IS/ I-N-R National Board, State, Province, and Endorsements Date _ 'L_/_z~y_,__/-'-'2._0_*z__o __
Page 3 of 5
FORM OAR-1 OWNERS ACTI\\LJTY REPORT -- DCPP-2R21 TABLE 1 ITEMS WITH FLAWS OR REVELANT CONDITIONS THAT REQUIRED EVALUATION FOR CONTINUED SERVICE Examination Category and Item Number Item Description Evaluation Description Accepted for continued use with:
Follow-up UT of Weld Overlay applied in Augmented RHR Line 2-109-14 2R20.
Weld: WIB-245 (OL)
Request for Alternative:
Result: No recordable indications.
(2R20 Weld Overlay)
REP-RHR-SWOL Used Code Case N-740-2 per alternative request, REP-RHR-SWOL approved January 2, 2018 (ML17338A131)
Page 4 of 5
FORM OAR-1 OWNERS ACTIVITY REPORT_ -- DCPP-2R21 TABLE 2 ABSTRACT OF REPAIR/REPLACEMENT ACTIVITIES REQUIRED FOR CONTINUED SERVICE Code Item Description Description of Work Date Repair/Replacement Class Completed Plan Number 2
MS-2-2019 Replaced Bonnet Capscrews 10/22/2019 60109027-0025 damaged during removal 2
MS-2-2019 Replaced Bonnet/ Spacer Ring to 10/23/2019 60109027-0027 assure continued operability.
Machine valve body bolt holes to 2
MS-2-PCV-21 receive Step Studs following 11/12/2019 60109545-0004 damage during removal ASP2 3
Aux Salt Water Pump Replaced degraded stuffing box.
10/2/2019 60115547-0010 2-2 LOHEl Replaced degraded Reversing 3
DEG2-1 Lube Oil Heat Chamber Bonnet 11/6/2019 60115896-0060 Exchanger
( Gasket joint leakage)
Page 5 of 5