MONTHYEARCY-23-014, Biennial Update of the CYAPCO Quality Assurance Program for the Haddam Neck ISFSI2023-12-0404 December 2023 Biennial Update of the CYAPCO Quality Assurance Program for the Haddam Neck ISFSI CY-23-006, Independent Spent Fuel Storage Installation - Decommissioning Funding Assurance Status Report2023-03-0606 March 2023 Independent Spent Fuel Storage Installation - Decommissioning Funding Assurance Status Report CY-23-007, Independent Spent Fuel Storage Installation - Funding Status Report for Managing Irradiated Fuel and GTCC Waste2023-03-0606 March 2023 Independent Spent Fuel Storage Installation - Funding Status Report for Managing Irradiated Fuel and GTCC Waste CY-23-003, Independent Spent Fuel Storage Installation, Nuclear Liability Insurance Coverage2023-01-17017 January 2023 Independent Spent Fuel Storage Installation, Nuclear Liability Insurance Coverage CY-23-004, Independent Spent Fuel Storage Installation, Property Insurance Coverage2023-01-17017 January 2023 Independent Spent Fuel Storage Installation, Property Insurance Coverage CY-23-001, Independent Spent Fuel Storage Installation, Report of 10 CFR 50.59 Changes, Tests, and Experiments2023-01-0505 January 2023 Independent Spent Fuel Storage Installation, Report of 10 CFR 50.59 Changes, Tests, and Experiments CY-23-002, Independent Spent Fuel Storage Installation, Report of 10 CFR 72.48 Changes, Tests, and Experiments2023-01-0505 January 2023 Independent Spent Fuel Storage Installation, Report of 10 CFR 72.48 Changes, Tests, and Experiments CY-22-012, Independent Spent Fuel Storage Installation, Supplemental Information for the Three-Year Update to the Independent Spent Fuel Storage Installation Decommissioning Funding Plan2022-08-0303 August 2022 Independent Spent Fuel Storage Installation, Supplemental Information for the Three-Year Update to the Independent Spent Fuel Storage Installation Decommissioning Funding Plan CY-22-010, Connecticut Yankee Atomic Power Company Haddam Neck Plant Independent Spent Fuel Storage Installation, Formal Announcement of New ISFSI Manager2022-05-25025 May 2022 Connecticut Yankee Atomic Power Company Haddam Neck Plant Independent Spent Fuel Storage Installation, Formal Announcement of New ISFSI Manager CY-22-006, Independent Spent Fuel Storage Installation Annual Radioactive Effluent Release Report, Annual Radiological Environmental Operating Report, and Changes to the Offsite Dose Calculation Manual for 20212022-04-25025 April 2022 Independent Spent Fuel Storage Installation Annual Radioactive Effluent Release Report, Annual Radiological Environmental Operating Report, and Changes to the Offsite Dose Calculation Manual for 2021 CY-22-003, and Independent Spent Fuel Storage Installation, Decommissioning Funding Assurance Status Report2022-03-14014 March 2022 and Independent Spent Fuel Storage Installation, Decommissioning Funding Assurance Status Report CY-22-004, Independent Spent Fuel Storage Installation - Funding Status Report for Managing Irradiated Fuel and GTCC Waste2022-03-14014 March 2022 Independent Spent Fuel Storage Installation - Funding Status Report for Managing Irradiated Fuel and GTCC Waste CY-22-002, Independent Spent Fuel Storage Installation - Property Insurance Coverage2022-01-20020 January 2022 Independent Spent Fuel Storage Installation - Property Insurance Coverage CY-22-001, Independent Spent Fuel Storage Installation - Nuclear Liability Insurance Coverage2022-01-20020 January 2022 Independent Spent Fuel Storage Installation - Nuclear Liability Insurance Coverage CY-21-015, Independent Spent Fuel Storage Installation, Three-Year Update to the Independent Spent Fuel Storage Installation Decommissioning Funding Plan2021-12-10010 December 2021 Independent Spent Fuel Storage Installation, Three-Year Update to the Independent Spent Fuel Storage Installation Decommissioning Funding Plan CY-21-013, Biennial Update to the Haddam Neck Plant License Termination Plan2021-12-0101 December 2021 Biennial Update to the Haddam Neck Plant License Termination Plan CY-21-011, Biennial Update of the CYAPCO Quality Assurance Program for the Haddam Neck ISFSI2021-12-0101 December 2021 Biennial Update of the CYAPCO Quality Assurance Program for the Haddam Neck ISFSI CY-21-014, Independent Spent Fuel Storage Installation - Adoption of Amendment 8 of NAC-MPC Certificate of Compliance No. 72-1025 and Canister Registration2021-11-18018 November 2021 Independent Spent Fuel Storage Installation - Adoption of Amendment 8 of NAC-MPC Certificate of Compliance No. 72-1025 and Canister Registration CY-21-005, Independent Spent Fuel Storage Installation - Decommissioning Funding Assurance Status Report2021-03-0202 March 2021 Independent Spent Fuel Storage Installation - Decommissioning Funding Assurance Status Report CY-21-006, Independent Spent Fuel Storage Installation - Funding Status Report for Managing Irradiated Fuel and GTCC Waste2021-03-0202 March 2021 Independent Spent Fuel Storage Installation - Funding Status Report for Managing Irradiated Fuel and GTCC Waste CY-21-004, Independent Spent Fuel Storage Installation - Property Insurance Coverage2021-01-27027 January 2021 Independent Spent Fuel Storage Installation - Property Insurance Coverage CY-21-003, Independent Spent Fuel Storage Installation Nuclear Liability Insurance Coverage2021-01-27027 January 2021 Independent Spent Fuel Storage Installation Nuclear Liability Insurance Coverage CY-20-011, Independent Spent Fuel Storage Installation - Request for a Temporary Exemption from 10 CFR 73, Appendix B, Section Le and 10 CFR 73.55(r) Annual Physical Requalification Requirement2020-05-14014 May 2020 Independent Spent Fuel Storage Installation - Request for a Temporary Exemption from 10 CFR 73, Appendix B, Section Le and 10 CFR 73.55(r) Annual Physical Requalification Requirement CY-20-007, Independent Spent Fuel Storage Installation - Formal Announcement of New Tsfst Manager2020-03-31031 March 2020 Independent Spent Fuel Storage Installation - Formal Announcement of New Tsfst Manager CY-20-004, Independent Spent Fuel Storage Installation - Funding Report for Managing Irradiated Fuel and GTCC Waste2020-03-17017 March 2020 Independent Spent Fuel Storage Installation - Funding Report for Managing Irradiated Fuel and GTCC Waste CY-20-003, Independent Spent Fuel Storage Installation - Decommissioning Funding Assurance Status Report2020-03-12012 March 2020 Independent Spent Fuel Storage Installation - Decommissioning Funding Assurance Status Report CY-20-002, Independent Spent Fuel Storage Installation, Letter Notifying NRC the Amount of Property Insurance Coverage in Force for 20202020-01-22022 January 2020 Independent Spent Fuel Storage Installation, Letter Notifying NRC the Amount of Property Insurance Coverage in Force for 2020 CY-19-014, Independent Spent Fuel Storage Installation - Formal Announcement of ISFSI Manager'S Return2019-06-0505 June 2019 Independent Spent Fuel Storage Installation - Formal Announcement of ISFSI Manager'S Return CY-19-012, Independent Spent Fuel Storage Installation - 2018 Individual Monitoring NRC Form 5 Report2019-04-23023 April 2019 Independent Spent Fuel Storage Installation - 2018 Individual Monitoring NRC Form 5 Report CY-18-021, Connecticut Yankee Atomic Power Company Haddam Neck Plant Three-Year Update to the Independent Spent Fuel Storage Installation Decommissioning Funding Plan2018-12-10010 December 2018 Connecticut Yankee Atomic Power Company Haddam Neck Plant Three-Year Update to the Independent Spent Fuel Storage Installation Decommissioning Funding Plan CY-18-005, Independent Spent Fuel Storage Installation - Funding Status Report for Managing Irradiated Fuel and GTCC Waste2018-03-0505 March 2018 Independent Spent Fuel Storage Installation - Funding Status Report for Managing Irradiated Fuel and GTCC Waste CY-18-004, Independent Spent Fuel Storage Installation - Decommissioning Funding Assurance Status Report2018-03-0505 March 2018 Independent Spent Fuel Storage Installation - Decommissioning Funding Assurance Status Report CY-17-021, Independent Spent Fuel Storage Installation Formal Announcement of Change in HNP ISFSI Manager2017-09-0505 September 2017 Independent Spent Fuel Storage Installation Formal Announcement of Change in HNP ISFSI Manager CY-17-010, Independent Spent Fuel Storage Installation - Funding Status Report for Managing Irradiated Fuel and GTCC Waste2017-03-0909 March 2017 Independent Spent Fuel Storage Installation - Funding Status Report for Managing Irradiated Fuel and GTCC Waste CY-17-005, Independent Spent Fuel Storage Installation - Property Insurance Coverage2017-02-28028 February 2017 Independent Spent Fuel Storage Installation - Property Insurance Coverage CY-17-004, ISFSI - Nuclear Liability Insurance Coverage2017-02-28028 February 2017 ISFSI - Nuclear Liability Insurance Coverage CY-17-007, Independent Spent Fuel Storage Installation - Revision 6 to Haddam Neck Plant Post-Shutdown Decommissioning Activities Report2017-02-22022 February 2017 Independent Spent Fuel Storage Installation - Revision 6 to Haddam Neck Plant Post-Shutdown Decommissioning Activities Report CY-17-001, ISFSI - Notification of Changes to the Decommissioning Schedule, Per 10 CFR 50.82(a)(7)2017-01-0505 January 2017 ISFSI - Notification of Changes to the Decommissioning Schedule, Per 10 CFR 50.82(a)(7) CY-17-002, Independent Spent Fuel Storage Installation2017-01-0505 January 2017 Independent Spent Fuel Storage Installation CY-17-003, ISFSI - Report of 10 CFR 50.59 Changes, Tests, and Experiments for 01/01/1995 - 12/31/20162017-01-0505 January 2017 ISFSI - Report of 10 CFR 50.59 Changes, Tests, and Experiments for 01/01/1995 - 12/31/2016 CY-16-035, Independent Spent Fuel Storage Installation - Formal Announcement of Change in HNP ISFSI Manager2016-12-15015 December 2016 Independent Spent Fuel Storage Installation - Formal Announcement of Change in HNP ISFSI Manager CY-16-012, ISFSI - Funding Status Report for Managing Irradiated Fuel and GTCC Waste2016-03-23023 March 2016 ISFSI - Funding Status Report for Managing Irradiated Fuel and GTCC Waste CY-16-011, ISFSI - Decommissioning Funding Assurance Status Report2016-03-0909 March 2016 ISFSI - Decommissioning Funding Assurance Status Report CY-16-004, Independent Spent Fuel Storage Installation, Submittal of Property Insurance Coverage2016-02-29029 February 2016 Independent Spent Fuel Storage Installation, Submittal of Property Insurance Coverage CY-16-006, ISFSI - Annual Notification of Foreign Ownership, Control, or Influence (FOCI) Status2016-02-0202 February 2016 ISFSI - Annual Notification of Foreign Ownership, Control, or Influence (FOCI) Status CY-16-002, ISFSI - Revision 5 of the Post-Shutdown Decommissioning Activities Report2016-01-14014 January 2016 ISFSI - Revision 5 of the Post-Shutdown Decommissioning Activities Report CY-15-042, ISFSI - Three-Year Update to the Decommissioning Funding Plan2015-12-14014 December 2015 ISFSI - Three-Year Update to the Decommissioning Funding Plan CY-15-035, Redacted Haddam Neck ISFSI - Biennial Update to the Updated Final Safety Analysis Report2015-12-0101 December 2015 Redacted Haddam Neck ISFSI - Biennial Update to the Updated Final Safety Analysis Report CY-15-043, ISFSI - Revision 13 to the Emergency Plan2015-12-0101 December 2015 ISFSI - Revision 13 to the Emergency Plan CY-15-037, ISFSI - Biennial Update of the Quality Assurance Program2015-12-0101 December 2015 ISFSI - Biennial Update of the Quality Assurance Program 2023-03-06
[Table view] Category:Status Report
MONTHYEARCY-23-006, Independent Spent Fuel Storage Installation - Decommissioning Funding Assurance Status Report2023-03-0606 March 2023 Independent Spent Fuel Storage Installation - Decommissioning Funding Assurance Status Report CY-23-007, Independent Spent Fuel Storage Installation - Funding Status Report for Managing Irradiated Fuel and GTCC Waste2023-03-0606 March 2023 Independent Spent Fuel Storage Installation - Funding Status Report for Managing Irradiated Fuel and GTCC Waste CY-22-004, Independent Spent Fuel Storage Installation - Funding Status Report for Managing Irradiated Fuel and GTCC Waste2022-03-14014 March 2022 Independent Spent Fuel Storage Installation - Funding Status Report for Managing Irradiated Fuel and GTCC Waste CY-21-006, Independent Spent Fuel Storage Installation - Funding Status Report for Managing Irradiated Fuel and GTCC Waste2021-03-0202 March 2021 Independent Spent Fuel Storage Installation - Funding Status Report for Managing Irradiated Fuel and GTCC Waste CY-20-004, Independent Spent Fuel Storage Installation - Funding Report for Managing Irradiated Fuel and GTCC Waste2020-03-17017 March 2020 Independent Spent Fuel Storage Installation - Funding Report for Managing Irradiated Fuel and GTCC Waste CY-20-003, Independent Spent Fuel Storage Installation - Decommissioning Funding Assurance Status Report2020-03-12012 March 2020 Independent Spent Fuel Storage Installation - Decommissioning Funding Assurance Status Report CY-18-004, Independent Spent Fuel Storage Installation - Decommissioning Funding Assurance Status Report2018-03-0505 March 2018 Independent Spent Fuel Storage Installation - Decommissioning Funding Assurance Status Report CY-18-005, Independent Spent Fuel Storage Installation - Funding Status Report for Managing Irradiated Fuel and GTCC Waste2018-03-0505 March 2018 Independent Spent Fuel Storage Installation - Funding Status Report for Managing Irradiated Fuel and GTCC Waste CY-17-010, Independent Spent Fuel Storage Installation - Funding Status Report for Managing Irradiated Fuel and GTCC Waste2017-03-0909 March 2017 Independent Spent Fuel Storage Installation - Funding Status Report for Managing Irradiated Fuel and GTCC Waste CY-16-012, ISFSI - Funding Status Report for Managing Irradiated Fuel and GTCC Waste2016-03-23023 March 2016 ISFSI - Funding Status Report for Managing Irradiated Fuel and GTCC Waste CY-15-008, ISFSI - Funding Status Report for Managing Irradiated Fuel and GTCC Waste2015-02-10010 February 2015 ISFSI - Funding Status Report for Managing Irradiated Fuel and GTCC Waste CY-14-012, Connecticut Yankee Atomic Power Company - Haddam Neck Plant Independent Spent Fuel Storage Installation2014-03-11011 March 2014 Connecticut Yankee Atomic Power Company - Haddam Neck Plant Independent Spent Fuel Storage Installation CY-13-047, of the Haddam Neck Plant Post-Shutdown Decommissioning Activities Report2013-12-0202 December 2013 of the Haddam Neck Plant Post-Shutdown Decommissioning Activities Report CY-13-018, Independent Spent Fuel Storage Installation, Decommissioning Funding Assurance Status Report2013-03-25025 March 2013 Independent Spent Fuel Storage Installation, Decommissioning Funding Assurance Status Report CY-13-017, Connecticut Yankee, Haddam Neck Independent Spent Fuel Storage Installation, Funding Status Report for Managing Irradiated Fuel and GTCC Waste2013-03-20020 March 2013 Connecticut Yankee, Haddam Neck Independent Spent Fuel Storage Installation, Funding Status Report for Managing Irradiated Fuel and GTCC Waste CY-09-005, Submittal of Decommissioning Funding Assurance Status Report - 10CFR 50.752009-03-16016 March 2009 Submittal of Decommissioning Funding Assurance Status Report - 10CFR 50.75 ML0720803912007-07-12012 July 2007 Revision 2 to Final Status Survey Final Report Phase V, Book 1 of 13 CY-07-106, Revision 0 to Final Status Survey, Final Report Phase V, Appendix A12, Survey Unit Release Record, Book 13 of 13; Including Covers for Books 3 - 12 of 132007-07-12012 July 2007 Revision 0 to Final Status Survey, Final Report Phase V, Appendix A12, Survey Unit Release Record, Book 13 of 13; Including Covers for Books 3 - 12 of 13 ML0720803962007-07-0202 July 2007 Revision 0 to Final Status Survey, Final Report Phase V, Appendix A1 Survey Unit Release Record, 9520-0001, Southwest Site Storage Area, Book 2 of 13 ML0731303912007-06-30030 June 2007 Phase VI and VII Final Status Survey Instruction for Removal/Insertion of Pages CY-07-104, Revision 1 to the Final Status Survey Reports for Phase VI and VII2007-06-28028 June 2007 Revision 1 to the Final Status Survey Reports for Phase VI and VII ML0717304472007-05-31031 May 2007 Final Status Survey (FSS) Final Report - Phase VII - Chapter 9 of 19 - Appendix A8, Survey Unit Release Record 9312-0006, Primary Auxiliary Building (Pab) (Former Radiologically Controlled Area) CY-07-089, Final Status Survey Final Report - Phase VII - Chapter 102007-05-29029 May 2007 Final Status Survey Final Report - Phase VII - Chapter 10 CY-07-077, Final Status Survey (FSS) Final Report - Phase VII2007-05-17017 May 2007 Final Status Survey (FSS) Final Report - Phase VII ML0717304312007-05-10010 May 2007 Final Status Survey (FSS) Final Report - Phase VII - Chapter 1 of 19 ML0717304642007-05-0202 May 2007 Final Status Survey (FSS) Final Report - Phase VII - Chapter 17 of 19 - Appendix A16, Survey Unit Release Record 9801-0000, Subsurface Soils in the Radiologically Controlled Area ML0717304712007-05-0202 May 2007 Final Status Survey (FSS) Final Report - Phase VII - Chapter 18 of 19 - Appendix A17, Survey Unit Release Record 9802-0000, Subsurface Area Associated with the West Industrial Site Grounds (Non-Protected Area) ML0717304782007-05-0101 May 2007 Final Status Survey (FSS) Final Report - Phase VII - Chapter 19 of 19 - Appendix A18, Survey Unit Release Record 9803-0000, Subsurface Area Associated with North Grounds (Non-Protected Area) ML0717304902007-04-27027 April 2007 Final Status Survey (FSS) Final Report - Phase VII - Chapter 15 of 19 - Appendix A14, Survey Unit Release Record 9514-0000, West Primary Parking Lot ML0717304812007-04-27027 April 2007 Final Status Survey (FSS) Final Report - Phase VII - Chapter 12 of 19 - Appendix A11, Survey Unit Release Record 9312-0009, Former Radiologically Controlled Area East Trench North ML0717304852007-04-27027 April 2007 Final Status Survey (FSS) Final Report - Phase VII - Chapter 13 of 19 - Appendix A12, Survey Unit Release Record 9312-0010, Radiologically Controlled Area East Trench South / Mwst A&B ML0717304492007-04-27027 April 2007 Final Status Survey (FSS) Final Report - Phase VII - Chapter 4 of 19 - Appendix A3, Survey Unit Release Record 9312-0001, Containment (Former Radiologically Controlled Area) ML0717304362007-04-27027 April 2007 Final Status Survey (FSS) Final Report - Phase VII - Chapter 2 of 19 - Appendix A1, Survey Unit Release Record 93 02-0000, Northwest Protected Area Grounds ML0717304402007-04-27027 April 2007 Final Status Survey (FSS) Final Report - Phase VII - Chapter 6 of 19 - Appendix A5, Survey Unit Release Record 9312-0003, Southwest 115Kv Switchyard (Former Radiologically Controlled Area) ML0717304412007-04-15015 April 2007 Final Status Survey (FSS) Final Report - Phase VII - Chapter 3 of 19 - Appendix A2, Survey Unit Release Record 9312-0005, Former Radiologically Controlled Area Tank Farm ML0717304522007-04-15015 April 2007 Final Status Survey (FSS) Final Report - Phase VII - Chapter 5 of 19 - Appendix A4, Survey Unit Release Record 9312-0003, Southwest 115k V Switchyard (Radiologically Controlled Area) ML0717304442007-03-30030 March 2007 Final Status Survey (FSS) Final Report - Phase VII - Chapter 8 of 19 - Appendix A7, Survey Unit Release Record 9312-0005, Former Radiologically Controlled Area Tank Farm ML0717304562007-03-23023 March 2007 Final Status Survey (FSS) Final Report - Phase VII - Chapter 16 of 19 - Appendix A15, Survey Unit Release Record 9514-0001, East Primary Parking Lot ML0717304882007-03-16016 March 2007 Final Status Survey (FSS) Final Report - Phase VII - Chapter 14 of 19 - Appendix A13, Survey Unit Release Record 9313-0000, Central Site Grounds ML0717304422007-03-0707 March 2007 Final Status Survey (FSS) Final Report - Phase VII - Chapter 7 of 19 - CYAPCO Final Status Survey Release Record Former Radiologically Controlled Area North of the Primary Auxillary Building and Tank Farm, Survey Unit 9312-0004 ML0717304802007-03-0303 March 2007 Final Status Survey (FSS) Final Report - Phase VII - Chapter 11 of 19 - Appendix A10, Survey Unit Release Record 9312-0008, 115 Kv West Side Gw Treatment Facility (Former Radiologically Controlled Area) ML0731304392007-02-28028 February 2007 Final Status Survey, Final Report Phase VI, Appendix A16, Survey Unit Release Record 9539-0002, ISFSI Haul Road ML0731304302007-02-28028 February 2007 Final Status Survey, Final Report Phase VI, Appendix A15, Survey Unit Release Record 9539-0001, ISFSI Haul Road ML0731304232007-02-28028 February 2007 Final Status Survey, Final Report Phase VI, Appendix A6, Survey Unit Release Record 9522-0001, Southeast Site Grounds (Non-Protected Area) ML0707405982007-02-13013 February 2007 Final Status Survey Final Report Phase VI - Appendix A4, Survey Unit Released Record 9506-0000, North Site Grounds, Book 5 of 18 ML0707405432007-02-12012 February 2007 Final Status Survey Final Report Phase VI - Book 1 of 18 ML0707405892007-02-0505 February 2007 Final Status Survey Final Report Phase VI - Appendix A3, Survey Unit Release Record 9504-0000, Bypass Road and Secondary Parking Lot, Book 4 of 18 ML0707406722007-02-0303 February 2007 Final Status Survey Final Report Phase VI - Appendix A13, Survey Unit Release Record 9527-0005, East Mountain Side, Book 14 of 18 ML0707406752007-02-0101 February 2007 Final Status Survey Final Report Phase VI - Appendix A14, Survey Unit Release Record 9527-0006, East Mountain Side, Book 15 of 18 ML0707406102007-02-0101 February 2007 Final Status Survey Final Report Phase VI - Appendix A5, Survey Unit Release Record 9512-0000, Northwest Site Grounds (Non-Protected Area), Book 6 of 18 2023-03-06
[Table view] |
Text
CONNECTICUT YANKEE ATOMIC POWER COMPANY HADDAM NECK PLANT 362 INJUN HOLLOW ROAD EAST HAMPTON, CT 06424-3099 March 12, 2020 CY-20-003 10 CFR 50.4 10 CFR 50.75(£)(1) and (2) 10 CFR 50.82(a)(8)(v) and (vi) 1--.---....-- .
ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555 - 0001 Connecticut Yankee Atomic Power Company Haddam N eek Plant Independent Spent Fuel Storage Installation NRC License No. DPR-61 (NRC Docket No. 50-213) 7 2._-0 3 {
Subject:
Decommissioning Funding Assurance Status Report On December 5, 1996, Connecticut Yankee Atomic Power Company (CYAPCO) informed the USNRC that the Board of Directors of CYAPCO had decided to permanently cease operations at the Haddam N eek Plant and that fuel had been permanently removed from the reactor (Reference 1). In accordance with 10 CFR 50.82(a)(2), the certifications in the letter modified the CYAPCO license to permanently withdraw CYAPCO's authority to operate the reactor.
In 1996, CYAPCO commenced decommissioning the power plant. On November 26, 2007, the NRC released most of the formerly licensed land for unrestricted use, shrinking the licensed land to the Independent Spent Fuel Storage Installation (ISFSI) only (Reference 2). The only decommissioning activities that remain are those associated with the decommissioning of the Haddam Neck Plant ISFSI, which will occur after the Department of Energy (DOE) removes the irradiated fuel and Greater than Class C (GTCC) waste.
In Attachment 1, CYAPCO provides the attached Decommissioning Funding Assurance Status Report for the Haddam Neck Plant ISFSI to comply with 10 CFR 50.75(£)(1) and (2) and 10 CFR 50.82(a)(8)(v) and (vi).
This letter contains no regulatory commitments.
1U f-/(551-lf fVrll~ s
Connecticut Yankee Atomic Power Company CY-20-003\March 12, 2020\Page 2 If you have any questions regarding this letter, please do not hesitate to contact me at (860) 267-6426 x304.
Respectfully,
~~~
Vice President, Chief Financial Officer, and Treasurer f------,--
Attachment:
- 1. Decommissioning Funding Status Report for the Haddam Neck Plant Independent Spent Fuel Storage Installation (Status as of 12/31/2019)
References:
- 1. CYAPCO letter to USNRC, "Haddam Neck Plant Certifications of Permanent Cessation of Power Operation and that Fuel Has Been Permanently Removed from the Reactor Vessel,"
dated December 5, 1996
- 2. USNRC letter to CYAPCO, "Haddam Neck Plant - Release of Land from Part 50 License,"
dated November 26, 2007 cc:
D. Lew, NRC Region I Administrator A. Dimitriadis, Chief, Decommissioning Branch, NRC, Region 1 D. Doyle, Acting Chief, Division of Fuel Management, Storage and Transportation Licensing Branch J. Semancik, Director, CT DEEP, Radiation Division
ATTACHMENT 1 TO CY-20-003 DECOMMISSIONING FUNDING STATUS REPORT FOR THE HADDAM NECK PLANT INDEPENDENT SPENT FUEL STORAGE INSTALLATION (STATUS AS OF 12/31/2019)
Attachment 1 to CY-20-003 Decommissioning Funding Status Report for the Haddam Neck Plant Independent Spent Fuel Storage Installation (Status as of 12/31/2019) 10 CFR Requirement Response Comment 10 CFR 50.75(f)(l) and (2) Requirements
- 1. The amount of decommissioning ~$16.63 10 CFR 50.75(c) provides the calculation basis for determining minimum amounts of funds estimated to be required million funding required to demonstrate reasonable assurance of funds for decommissioning.
pursuant to 10 CFR 50.75 (b) and (in 2019 However, the methodology does not take into consideration work that has already been (c) dollars) commenced decommissioning the power plant. On November 26, 2007, the NRC released most of the formerly licensed land for unrestricted use, shrinking the licensed land to only those associated with the Haddam Neck Plant fudependent Spent Fuel Storage Installation (ISFSI). Thus, the only decommissioning activities and decommissioning funding requirements that remain are those associated with the decommissioning of the Haddam Neck Plant ISFSI, which is currently scheduled to be occur after the Department of Energy (DOE) removes the irradiated fuel and Greater than Class C (GTCC) waste.
On December 10, 2018, Connecticut Yankee Atomic Power Company (CYAPCO) provided a three-year update to the decommissioning funding plan for the Haddam Neck Plant ISFSI in accordance with 10 CFR 72.30(c) that included a revised Decommissioning Cost Estimate (DCE) for the Haddam Neck Plant ISFSI.
- 2. The amount accumulated at the ~$36.60 CYAPCO has established an account within its Nuclear Decommissioning Trust (NDT) end of the calendar year preceding million (as of entitled "ISFSI Radiological Decom" that segregates the funds for radiological the date of the report for items 12/31/19) decommissioning of the ISFSI from the larger balance of funds for ongoing included in 10 CFR 50.75 management of irradiated fuel and GTCC waste held in the NDT. This market balance (e)(l )(i) only reflects the funds in the segregated account for radiological decommissioning of the ISFSI.
- 3. Schedule of the annual amounts $0 No additional comments.
remaining to be collected Including amounts beyond those required in 10 CFR 50.75(e)(l)(i)
- Years to collect NIA Page 1 of7
Attachment 1 to CY-20-003 Decommissioning Funding Status Report for the Haddam Neck Plant Independent Spent Fuel Storage Installation (Status as of 12/31/2019) 10 CFR Requirement Response Comment
- 4. The assumptions used regarding No additional comments.
escalation of the decommissioning cost estimate, rates of earnings on decommissioning funds, and rates of other factors used in funding projections are:
Annual escalation rate 2.5%
Annual after-tax earnings rate on 4.0%
decommissioning trust funds Other factors assumed None
- 5. Any contracts upon which the Yes CYAPCO may collect funds through its power contracts and amendatory agreements licensee is relying pursuant to under FERC regulation. The power contracts and the amendatory agreements specify 10 CPR 50.75(e)(l)(ii)(A) the obligations of the purchasers for the costs of CYAPCO, including decommissioning costs. Such contracts have been filed with FERC.
- 6. Any modifications to a licensee's None No additional comments.
current method of providing financial assurance occurring since the last submitted report.
- 7. Any material changes to trust None No additional comments.
agreements.
Page 2 of7
Attachment 1 to CY-20-003 Decommissioning Funding Status Report for the Haddam Neck Plant Independent Spent Fuel Storage Installation (Status as of 12/31/2019) 10 CFR Requirement Response Comment 10 CFR 50.82(a)(8)(v) (A) through (D) Requirements
- 1. The amount spent on In 1996, CYAPCO commenced decommissioning the power plant. On November 26, decommissioning, both: 2007, the NRC released most of the formerly licensed land for unrestricted use, shrinking the licensed land to ISFSI only. The only decommissioning activities that Cumulative $0 (Referto remain are those associated with the decommissioning of the Haddam Neck Plant Comment) ISFSI, which is currently scheduled to occur after the DOE removes the irradiated fuel and and GTCC waste.
Over the previous calendar year $0 10 CFR 50.82(a)(8)(v) became effective on December 17, 2012. At that time, the only areas that were within the control of the Operating License No. DPR-61 were those associated with the Haddam Neck Plant ISFSI. Thus, CYAPCO is only presenting the information associated with the decommissioning of the areas that remain within the control of Operating License No. DPR-61.
Presently, CYAPCO is storing irradiated fuel and GTCC waste on site until it is removed by the DOE. Decommissioning of the Haddam Neck Plant ISFSI is currently scheduled to be completed in calendar year 2038 after the DOE removes the irradiated fuel and GTCC waste. Thus, the cumulative cost spent on decommissioning the Haddam Neck Plant ISFSI is $0, and the amount spent in calendar year 2019 is $0.
- 2. The remaining balance of any -$36.60 CYAPCO has established an account within its NDT entitled "ISFSI Radiological decommissioning funds. million (as of Decom" that segregates the funds for radiological decommissioning of the ISFSI from 12/31/19) the larger balance of funds for ongoing management of irradiated fuel and GTCC waste held in the NDT. This market balance only reflects the funds in the segregated account for radiological decommissioning of the ISFSI.
Page 3 of7
Attachment 1 to CY-20-003 Decommissioning Funding Status Report for the Haddam Neck Plant Independent Spent Fuel Storage Installation (Status as of 12/31/2019)
- 3. The amount provided by other $0.0 million As of December 31, 2019, CYAPCO's NDT account entitled "ISFSI Radiological financial assurance methods being Decom" has a balance more than sufficient to cover the estimated cost of the remaining relied upon radiological decommissioning of the ISFSI. However, if in the future, the balance in the account is not fully funded to cover the estimated cost of the remaining radiological decommissioning of the ISFSI, the Company has several methods of obtaining additional funds, if required, to cover projected costs.
First, CYAPCO may collect funds through its power contracts and amendatory agreements under FERC regulation. The power contracts and the amendatory agreements specify the obligations of the purchasers for the costs of CYAPCO, including decommissioning. Pursuant to these power contracts, CYAPCO has the ongoing ability to seek collections from its purchasers for additional funds that may be required to cover these costs.
Second, CYAPCO has received proceeds from the successful litigation of the first four phases of its breach of contract damages claims against the DOE for failure to begin the removal of spent nuclear fuel (SNF) and GTCC waste from the site in 1998. CYAPCO will continue to file claims against the DOE as long as the DOE continues to breach its contract obligations related to SNF and GTCC waste.
A CYAPCO FERC filing approved in June 2013, implemented a fifteen-year funding mechanism. Until the 2013 FERC filing, the Company had employed a "full funding" assumption in developing funding requirements. The fifteen-year funding mechanism was put in place to incorporate the potential for the receipt of future DOE breach of contract damages as a source of funding as discussed below. If future damage recovery does not occur, the Company has the ability to apply to FERC for more funding, if necessary. The approved FERC filing also requires CYAPCO to provide an informational filing regarding the adequacy of funding if five years pass without receipt of damage awards from litigation with the DOE.
Page 4 of 7
Attachment 1 to CY-20-003 Decommissioning Funding Status Report for the Haddam Neck Plant Independent Spent Fuel Storage Installation (Status as of 12/31/2019) 10 CFR Requirement Response Comment Third, CYAPCO expects to utilize the investment return on Decommissioning Trust assets as a funding source. The current assumed rate of investment return, after fees and taxes, is 4.0%.
- 4. An estimate of the costs to -$16.63 On December 10, 2018, CYAPCO provided a three-year update to the decommissioning complete decommissioning, million funding plan in accordance with 10 CFR 72.30(c) that included a revised DCB for the reflecting any difference between (in 2019 Haddam Neck Plant ISFSI.
actual and estimated costs for dollars) work performed during the year.
- 5. The decommissioning criteria 10CFR The assumptions regarding the decommissioning cost estimate are provided in the DCB upon which the estimate is based 20.1402 for the Haddam Neck Plant ISFSI provided on December 10, 2018.
- 6. Any modifications occurring to a None No additional comment.
licensee's current method of providing financial assurance since the last submitted report.
- 7. Any material changes to trust None No additional comment.
agreements or financial assurance contracts.
Page 5 of 7
Attachment 1 to CY-20-003 Decommissioning Funding Status Report for the Haddam Neck Plant Independent Spent Fuel Storage I,nstallation (Status as of 12/31/2019) 10 CFR 50.82(a)(8)(vi) Requirement
- 1. Additional financial assurance None As of December 31, 2019, CYAPCO's NDT account entitled "ISFSI Radiological required to cover the estimate cost Decom" has a balance more than sufficient to cover the estimated cost of the remaining of completion. radiological decommissioning of the ISFSI. However, if in the future, the balance in the account is not fully funded to cover the estimated cost of the remaining radiological decommissioning of the ISFSI, the Company has several methods of obtaining additional funds, if required, to cover projected costs.
First, CYAPCO may collect funds through its power contracts and amendatory agreements under FERC regulation. The power contracts and the amendatory agreements specify the obligations of the purchasers for the costs of CYAPCO, including decommissioning. Pursuant to these power contracts, CYAPCO has the ongoing ability to seek collections from its purchasers for additional funds that may be required to cover these costs.
Second, CYAPCO has received proceeds from the successful litigation of the first four phases of its breach of contract damages claims against the DOE for failure to begin the removal of spent nuclear fuel (SNF) and GTCC waste from the site in 1998. CYAPCO will continue to file claims against the DOE as long as the DOE continues to breach its contract obligations related to SNF and GTCC waste.
A CYAPCO FERC filing approved in June 2013, implemented a fifteen-year funding mechanism. Until the 2013 FERC filing, the Company had employed a "full funding" assumption in developing funding requirements. The fifteen-year funding mechanism was put in place to incorporate the potential for the receipt of future DOE breach of contract damages as a source of funding as discussed below. If future damage recovery does not occur, the Company has the ability to apply to FERC for more funding, if necessary. The approved FERC filing also requires CYAPCO to provide an informational filing regarding the adequacy of funding if five years pass without receipt of damage awards from litigation with the DOE.
Page 6 of7
Attachment 1 to CY-20-003 l/
Decommissioning Funding Status Report for the /
Haddam Neck Plant Independent Spent Fuel Storage Installation
. (Status as of 12/31/2019) :, I Third, CYAPCO expects to utilize the investment return on Decommissioning Trust assets as a funding source. The current assumed rate of investment return, after fees and taxes, is 4.0%.
Page 7 of7