Pages that link to "ML20249A630"
Jump to navigation
Jump to search
The following pages link to ML20249A630:
Displayed 50 items.
- PNO-I-85-072, advising That Current Util Contract W/Yoh Security Guards Expires on 851001.Contingency Security Guard Force Assembled.Strike Not Expected to Affect Plant Operations (← links)
- PNO-IV-85-059, on 851120,notification Received That Individual Suffered Head & Leg Injuries in Fall.Person Contaminated Transferred to Hosp.State of Ks Informed (← links)
- PNO-I-85-059, on 850815,unplanned 2% Power Excursion Occurred for 3-5 While Increasing Power to Permit Operational Testing of HPCI Sys.Power Ascension Program Testing Suspended Until Problem Resolved (← links)
- PNO-IV-97-030, on 970520,Wolf Creek Station Reactor Manually Tripped,When body-to-bonnet Steam Leak Developed on High Pressure Turbine Extraction Steam Line Isolation Valve.No Personnel Injured as Result of Steam Leak (← links)
- PNO-IV-97-011, on 970213,senior Mgt at Wolf Creek Generating Station Suspended Welding Activities.Welding Suspended Pending Completion of Internal Investigation & Required Welding Performed on exception-only Basis (← links)
- PNO-IV-85-040, on 850808,plant Power Increased to 100% for First Time & 250-h NSSS Acceptance Test Started.Power Ascension Testing for 100% Power Plateau Underway (← links)
- PNO-IV-85-041, on 850731,util Identified Terminal Blocks Unqualified for Temp Envelope of High Energy Line Break.On 850712,three Ventilation Dampers Did Not Close.Caused by Hardware Deficiencies.Terminal Blocks & Switches Replaced (← links)
- PNO-I-85-070, on 850925,RHR Loop B & HPCI Inoperable.Caused by Sheared Motor Mounting Bolts on Motor Operator.Piping Sys Integrity Unaffected (← links)
- PNO-IV-96-067, on 961215,two Fishermen Died & One Missing Following Capsizing of Boat on Wolf Creek Lake.Licensee & Coffey County Sheriff Ofc Issued Joint Press Release (← links)
- PNO-IV-85-031, updating Licensee Initiated Action to Correct Feedwater Control Problem.Inspectors Reviewed Revised Procedures,Operator Training & Hardware & Control Changes Implemented.Corrective Action Satisfactory (← links)
- PNO-IV-85-030, on 850711,reactor Tripped Due to Feedwater Control Problems While Attempting Transfer from Feedwater Bypass Valve to Main Feedwater Regulatory Valve.Util Will Not Restart Until Control Problems Resolved (← links)
- PNO-I-85-045, anti-Shoreham Demonstrations Planned at Site During Wk of 850705.Demonstrators Plan Civil Disobedience of Nonviolent Nature at Gate.Task Force Established to Plan for Event (← links)
- PNO-IV-85-023, on 850522,facility Achieved Initial Criticality.Low Power Testing in Progress.Nrc Does Not Plan to Issue Press Release,But Will Respond to Media Inquiries (← links)
- PNO-I-85-053, on 850726,scram Signal Generated Due to Low Reactor Water Level.Normal Suction Valve from Suppression Pool for Loop a Opened Before Alternate Suction for Shutdown Cooling Valve Closed.Approx 3,000 Gallons Drained (← links)
- ML20126L822 (← links)
- ML20126L510 (← links)
- PNO-III-80-050, on 800315,two Pipe Fitters Attempting to Find Gas Leak,Broke Hose Coupling Containing Gas Pressure of 40 Psi.Gas Denotated by Activation of two-way Radio.Three Men Received Second & Third Degree Burns Over 15% of Body (← links)
- PNO-IV-85-027, on 850609,facility Achieved Mode 1.Plant Presently at 10% Power.Nrc Does Not Plan to Issue Press Release (← links)
- ML20125E341 (← links)
- PNO-I-79-039, on 791218,two Former Employees of Const Contractors Made Statements That Welding & Concrete Work Improperly Performed.Region 1 Conducting Investigation of Allegations (← links)
- PNO-I-88-056, on 880526,util & State of Ny Reached Agreement in Principle for Settlement of Plant Controversy.Terms Will Call for Transferring Plant to Long Island Power Authority or Other State Agency & Providing Energy for Area People (← links)
- PNO-IV-88-076, on 880913,one Electrician Died & One Injured After Receiving Electrical Shock While Pulling 480 Volt Cables in Overhead on Second Level of Auxiliary Bldg.Caused by Electrician Slipping & Grabbing Conduit for Support (← links)
- ML20153B935 (← links)
- ML20151X694 (← links)
- PNO-IV-99-029, on 990625,female Licensee Employee Was Discovered Contaminated in Facial Area.Licensee Convened Incident Investigation Team to Assess Event.Worker Received Total Effective Dose Equivalent of Approx 7 Mrem (← links)
- PNO-IV-88-089, on 881121,seven People Externally Contaminated When Low Temp Reactor Coolant Inadvertently Sprayed from Top of Reactor Vessel.All Work Stopped Pending Decontamination of Reactor Bldg.Cause Under Investigation (← links)
- PNO-IV-86-019, on 860603,questionable Lug Crimping in Limitorque Valve Operators Identified During Evaluations Due to Previously Identified Problems.Five Day Outage Planned to Complete Corrective Actions & Evaluations (← links)
- PNO-I-88-063, on 880615,public Meeting W/Fema,Region I & Util Held in Patchogue,Ny to Discuss 880607-09 Emergency Preparedness Exercise.Discussion Included Status of Review of Emergency Plan & Preliminary Assessment of Exercise (← links)
- PNO-IV-98-051, on 981102,flooding in Vicinity of Wolf Creek Generating Station Occurred.Licensee Has Been in Close Contact with Army Corps of Engineers,Region VII Ofc of Federal Emergency Mgt Agency Emergency Organizations (← links)
- PNO-I-89-053, on 890628,about 95% of Lilco Shareholders Voted to Approve Settlement Agreement Which Will Transfer Shoreham to Long Island Power Authority for Decommissioning (← links)
- ML20198B384 (← links)
- ML20206A602 (← links)
- PNO-IV-86-011, on 860409,unit Shut Down More than 48 H When Leak of Approx 8 Gpm Identified in Packing of Pressurizer Bypass Spray Valve.Plant Shut Down for 15-day Outage in Order to Perform Tech Spec Surveillances & Maint (← links)
- PNO-III-86-034, on 860407,util Announced Plans to Convert Facility to Be Fueled by Natural Gas.Const on Facility Halted on 840716 Because of Financial & Rate Uncertainties. Conversion Phase to Be Completed in 1990 (← links)
- PNO-IV-87-001, Correcting PNO-IV-86-001:on 870108,reactor Tripped Automatically on Safety Injection Actuation.Caused When Technician Calibr Main Steam Pressure Transmitters & Isolated Wrong Transmitter (← links)
- ML20206H812 (← links)
- PNO-IV-86-001, on 870108,reactor Tripped Automatically on Safety Injection Actuation.Caused When Technician Calibr Main Steam Pressure Transmitters & Isolated Wrong Transmitter (← links)
- PNO-I-86-067, on 860826,plant Supplied Nuclear Generated Electricity to Util Electrical Sys as Part of Ongoing Test Program.Turbine Generator Output Breakers Closed Onto Sys Grid for Approx 24 H (← links)
- ML20244A866 (← links)
- ML20244A864 (← links)
- PNO-IV-87-063, on 871218,400 Uci Sr/Y-90 Instrument Check Source Declared Lost,Per Requirements of 10CFR20.402. Licensee Has Conducted Search of Power Block Areas & All Calibr Lab Areas Using Visual & Radiation Detectors (← links)
- ML20249B830 (← links)
- ML20249A850 (← links)
- ML20249A801 (← links)
- ML20249A684 (← links)
- PNO-I-89-058, on 890713,licensee Commenced Defueling of Facility.Defueling Scheduled to Be Completed in Approx 3 Wks.Following Completion of Core Offload,Reactor Vessel Will Be Reassembled & Normal Water Level Restored (← links)
- ML20236V371 (← links)
- ML20236P108 (← links)
- ML20236J762 (← links)
- ML20236F095 (← links)