ML20244A866

From kanterella
Jump to navigation Jump to search
PNS-IV-79-011:on 791025,third Bomb Threat Via Telcon Was Received at 1:50 PM on 791025.Pipe Fabricaton Shop Received Call from Onsite Extension.Shop Evacuated.Search Completed. No Bomb Found
ML20244A866
Person / Time
Site: Wolf Creek Wolf Creek Nuclear Operating Corporation icon.png
Issue date: 10/25/1979
From: Crossman W, Oberg C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To:
References
PNS-IV-79-011, PNS-IV-79-11, NUDOCS 7912210037
Download: ML20244A866 (1)


Text

_ _ _ _ - _ - _ - _ - _ _ _ _ - _ _ _ - - _ _ _ _ _ _ - _ _ - . -

. PPILUiDIARY MODIFICATION '

October 25, 1979 PT2*.~XU;AEI NOTIFICATION OF SAFIGUARDS E7ENT --PNS-IV-79-11

'his *.):elinina v notification constiruten EARLY notice of events of POSSIBLE na:10:7.1 security or pub 31c interest _ significance. The infor: nation presented is as initially received without variRication or evaluaticu and is basically al'. that is kno.m by IE staff as of this date.

TAIILI"Y : Kansar, Gas & Electric Company +

~ " Wolf Creek, Unit 1 (Sh"JPPS)

Dock.at No. STN 50-482 SC2 JECT: 50M3 TE?2AT At 1:50 p.n. on October 25, 1979, a third bomb threat telephone call'was received at the Wolf Creek site. The pipe fabrication shop received a call from an on-site extension. A cale voice stated, "There's a bomb by your chair, you'd better get the hell out of there." He then hung up.

The pipe f abrication shop was evacuated. A search was completed and no bomb was found. No site evacuation was conducted. - .

The Sheriff of Coffey County, Kansas City FBI and ATF vere notified. The IAT and offices of Coc=1ssioner Hendrie hnd Kennedy were notified by telephone on October 25, 1979.

No press release was mada or planned by the licensee or NRC.

The site construction progress is currently reported at 37% complete. There is no S:01 on site.

This Preliminary Notification is issued for information only and no further action b/ !! is anticipated. Region IV, Arlington, Texas, received notification of :his o::urrence by telephone from the Project Inspector on site at 2:30 p.m. on C:tebe: 25, 1979.

COTACT: C. Oberg, RIV 334 2411; V. Crossman, RIV 334-2411

,- Distribution: Transmitted H St.

Cr.a:.rr.an Eendrie Co=aissioner Bradford S. J. Chilk, SECY l Cc=.issioner Kennedy Co=missioner Ahearne C. C. Kammerer, CA Co-d ssioney Cilinsky . .

g ACRS (For Distr 1bution)

Tra- edtted: MN33 _

P. Bldg. IE:XOOS (IE:EQ Dis L. V. Go ssick, EDO H. R. Denton E. L. Ornstein EDO R. C. DeYoung, h1R J. J. - Fouchard, PA R. J. Mattson, NRR Landow (6 min /page

5. - M. Zaller, KPA D. Vassallo, NRR J. J. Cumnings , OIA

?.. G . Ry an , OS ? D. Eisenhut, h1R

3. T., Shepar, ELD SS Bldg. (MAIL)

W. J. Dircks,10:SS R. Minogue, SD S. Levine, RES IE:XQQt

[ ..

PFIL~:!ISATX NOTIFICATION!; clM j 7912ppo Op i-

- _ - _ - _ - - _ - - _ _ _