- ENCLOSURE 1 CHRONOLOGICAL LISTING OF SIGNIFICANT EVENTS 1-4-80; Civil Per,alty (CP) issued (B. Ferry) - For loss of containment on U3 1-4-80; ORDER issued (B. Ferry) - To review administrative control-and s maintenance activities to assure that safety features are not defeated s\
I 1-20-80; Mtg. for TVA to describe actions implemented in response to ORDER.
3-20-80; Mgt. Mtg. (Const. Sites) - RA meets with OEDC managers con-1 cerning QA/QC effectiveness ,
6-18-80; CP issued (B. Ferry) - For radwaste shipment 6-30-80; Immediate Action Letter (IAL) issued (B. Ferry) - To investigate
, failure of control rod to scram 7-2-80; Confirmation of Action (COA) (Sequoyah) - Completion of IEB 79-14 requirements 7-25-80; Mtg. (All Dockets) - Discussion of results of QA team inspection of OEDC l
7-25-80; Mtg. (All Dockets) - RA meets with senior TVA management related to employee concerns program ,
f 8-1-80; Mtg. (B. Ferry) - Review of as-built SDV and related scram systems 9-4-80; Mtg. ( All Dockets) - RA addresses all senior TV4 management on QA matters 9-11-80; IAL issued (B. Ferry) - For unsatisf actory response to IEB 80-1 10-2-80; Mtg. (B. Ferry) - Discussion of IEB 79-01B requirements 10-9-80; IAL issued (B. Ferry) For failure to monitor water in scram dis-charge volume as required 10-23-80; Mtg. to discuss SALP results 11-19-80; Mtg. ( All Dockets) - QA for construction testing at all plants 11-19-80; Mtg. (All Dockets) - QA fo- construction testing at all plants
~
r
.a >
. . .- r e . . I
. J r
I l
12-4-80; Mtg. (All Dockets) - RA meets with TVA GM and relates growing QA l concerns on plant testimony 12-30-80; Mtg. (All Dockets) - Discussion of nperations, management controls j and construction activities !
1 1-7-81; Mtg. (B. Ferry) - Discussion of security program \ l l
1-19-81; IAL concerning security program access controls 2-4-81; IAL concerning fire protection problems 2-11-81; Mtg. (B. Ferry) - Discussion of fire protection program deficiencies , l 2-23-81; COA (Sequoyah) - Spraydown of Unit I containment event 3-6-81; Mtg. (All Dockets) - Discussion of TVA reorganization 3-20-81; Cp issued (B. Ferry) - For fire protection problems ,
9-3-81; Enforcement Conference (Sequoyah) - Containment spray misalignment i
9-24-81; CP issued (Sequoyah) - Inoperability of both trains of contain- i ment spray 12-15-81; Mgt. Conf. (Watts Bar) - Results of NSRS review of OE design controls 12-23-81; COA (Sequoyah) - Violations of established rod withdrawal limits 1-6-82; Mgt. Conf. (Sequoyah) - Violations of established rod withdrawal limits 2-11-82; Enforcement Conference (B. Ferry) - Exceeding LCO involved with shutting a valve associated with pressure transmitter 2-18-82; Mgt. Ccnf. (Watts Bar) - Need to improve QA program at Watts Bar 3-9-82; Enforcement Conference (B. Ferry) - Security issue 5-7-82; CP issued (B. Ferry) - Unsecured vital area 5-27-82; Enf. Conf. (B. Ferry) - Unsecured radiation area 6/14 - Team inspection (all Dockets) - Identified Q list deficiencies 6-25/82 at Watts Bar s.
_ _ _ _ _ _ . . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . _ _ _ _ _ _ _ _ _ _ _ _ _ . _ _ _ . _ _ _ _ _ _ _ . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . .a
l
_ . r' - . . .
(
)
3 l
7-20-82; COA (Sequoyah) - Emergency exercise deficiencies 8-29-82; CP issued (Sequoyah) - Low power operation with control rods with-l drawn beyond limit ;
i ;
- 9-8-82 & Enforcement Conference (B. Ferry) - Radioactive waste shipment l 11-5-82 , l l 11-18-82; Mgt. Conf. (Bellefonte) - Flushing operation deficiencies \
12-2-82; Enf. Conf. (B. Ferry) - Waste oil disposal 12-15-82; Mgt. Mtg. (B. Ferry) - TVA program to reduce,MSIV leakage 12-17-82; CP issued (B. Ferry) - Defective packaging of radwaste shipment 12-29-82; Mgt. Conf. (Bellefonte) - Flushing operation deficiencies 1-5-83; Enf. Conf. (B. Ferry) - Security issue 1-6-83; Mgt. Mtg. (B. Ferry).- Recirculation pipe crack issue 1-13-83; CP issued (B. Ferry) - Failure to control access to protected area 3-4-83; Mtg. (Sequoyah) - Repetition of valve position verification errors 3-15-83; Mtg. (B. Ferry) - Security construction l l 3-25-83; ORDER (B. Ferry) - Incorporate TMI action items 4/17-19/83; Meeting (B. Ferry) - Regional management at site to rey:w !
licensee performance 6-1-83; Enf. Conf. (B. Ferry) - Refueling operation violations I I 6-24-83; ORDER (B. Ferry) - Permanent SDV modifications l 1 -
l 7-20-83; Enforcement Conference (B. Ferry) - Security issue l 8-10-83; Enforcement Conference (B. Ferry) - Standby Gas Treatment i System (SGTS) inoperability a 8-26-23; ORDER (B. Ferry) - Shutdown Unit 3 for Integration Stress
, Corrosion Cracking (ISCC) inspections 10-17-83; Enf. Conf. (B. Ferry) - Radiation exposure control 4
f l
l
- g. . ,
(L . z i
10/20- Meeting (B. Ferry) - Regional management at site for review 10/21/83 of Licensee performance i
12-16-83; Enforcement Conference (B. Ferry) - Security issue i
12-16-83; Mtg. (B. Ferry) - Operator training deficiencies
~
12-19-83; ORDER (B. Ferry) - Inspection Unit I recirculation and RCS piping \
\
12-21-83; COA (B. Ferry) - Corrective actions for security 1/8-10/84; Site review (B. Ferry) - Regional management review of plant performance 1-13-84; Mtg. (B. Ferry) - Emergency planning deficiencies 1-16-84; Enforcement Conference (Sequoyah) - Procedural noncompliance; :
personnel errors 1-19-84; Mtg. (B. Ferry) - Security issue 1-20-84; Mtg. (B. Ferry) - Need for management changes 2-24-84; Enforcement Conference (B. Ferry) - Improper rod movement
- 3-2-84; CP (B. Ferry) - Security issue 3-7-84; CP (B Ferry) - LCO violations and failure to report 3/27- Meeting (B. Ferry) - Regional management at site to review 3/28/84 licensee performance 3-30-84; Mtg.(Al sockets) - Nuclear Safety Review Staff (NSRS) review ,
of radiography reviews 4-12-84; Mtg. (B. Ferry) - Site organizational changes 1
- 4/23- Meeting (B. Ferry) - Regional management at site to review l 1 4/24/84 licensee performance 5-11-84; CP (B. Ferry) - Improper shutdown of Unit 1 l
)
l 5/14- Site review (B. Ferry) - Regional management review of plant per- j 5/15/84 formance 5-23-84; Mtg. (B. Ferry) - Integrated schedule 6-21-84; Enforcement Conference (B. Ferry) - Ele:trical design review l
l
. i . .
6- .
7-11-84; Mtg. (Sequoyah) - Compensatory measures for power block concept 7-13-84; ORDER (B. Ferry) - Impose regulatory performance program (RPIP) 8-3-84; Mtg, (Sequoyah & Watts Bar) - Fire protection p,ogram and compliance with Appendix R
\
8-10-84; Confirmatory Action Letter (CAL) (Sequoyah) - Fire protection program related to Appendix R s\
S-30-84; Enforcement Conference (B. Ferry) - Inoperable Residual Heat Removal (RHR) service water pumps 8-31-84; Mtg. (B. Ferry) - Regulatory Performance Impact Program (RPIP) status review ,
9-25-84; Enforcement Conference (Sequoyah) - NSRS Report on seal table event 9-26-84; Mtg. ( All Dockets) - QA reorganization 9-26-84; Enforcement Conference (B. Ferry) - CSS overpressurization 10 Mtg. (B. Ferry) - Integrated Schedule 10-4-84; 10-16-84; Mtg. (All Dockets) - NSRS activities 10 Mtg. (B. Ferry) - Integrated Schedule 10-18-84; 11-17-84; Enforcement Conference (B. Ferry) - Unit 3 reactor startup event 12-31-84; Mtg. with TVA Board to discuss matters requiring Board attention i 1-28-85; Insp. (B. Ferry) - Improper activities in installing seismic supports 2-4-85; New RA on board - briefing on TVA 2-6-85; Mtg. (B. Ferry) - Integrated Schedule 2-7-85; Enforcement Conference (B. Ferry) - Management control of
- maintenance activities 2-12-85; First visit to B. Ferry. Regional Administrator Told Site Director
. (James Coffey) "my preliminary impression is that there is a sign-ificant p-cbability - and I do not mean 10'8 - that there will be a serieus event at Browns Ferry this year that will embarrass TVA I
and the hRC and perphaps set the industry back another decade."
~'
y , ,
.' - 6- -
2-20-85; Enforcement Conference (Sequoych) - Compliance with Appendix R 2-27-85; CP (B. Ferry) - Improper reactor startup 2-28-85; Mtg. (All Dockets) - NSRS functior.s and performance 2
2-28-85; Enforcement Conference (All Dockets) - Corrective action for QA identified .\
\
2-29-85; Mtg. (B. Ferry) - RA's second visit for Browns Ferry (with Commissioner Asselstine)
First meeting with Chairman Dean and Hugs Parris (Mgr. Power and Engineering). RA repeated his conc < en to Dean and Parris previously expressed to Site Director Coffey.
3-8-85; Regional Administrator called Hugh Parris to ask TVA to come to RIl and justify continued operation of Browns Ferry in view of their handling of the water level discrepancy and other recent events. Parris agreed to come in on 3/11, but then decided to shut down 3/9.
3-14-85; Enforcement Conference (B. Ferry) - Unit 3 water level instrumentation 3-25-85; Mtg. (B. Ferry) - Discuss EQ of electrical equipment 4-8-85; Enforcement Conference (B. Ferry) - Discussion on high pressure core injection turbine problem 4-9-85; Mtg. (B. Ferry) - Brief Commissioner Zech on corrective actions 4-12-85; Senior NRC Executive Panel meets with TVA to discuss need to enhance TVA's handling of employee concerns.
4-29 NRL performs site visit to evaluate concerns 5-2-85 5-2-85; Mtg. (B. Ferry & W. Bar) - Discussion of inadequate surveil-lance instructions.
5-2-85; Senior Executive Board Mtg. with TVA (All Dockets) - Discuss employee concerns program 5-7-85; CP (Sequoyah) - Seal table event 5-15-85; Enforcement Conference (Sequoyah) - Security event 5-15-85; Enforcement Conferu.ce (W. Bar) - S e mittal of inaccurate control rod (CR) design review status
' ~~
l - -
. 1 I
i l
5-16-85; CP (B. Ferry) - Security issue 5-16-85; NRC request information on allegations l 5-20-85; NRC site visit to interview NSRS RE: allegations 1
1 5-28-85; Site review (B. Ferry) - Regional management review of Regulatory , :
Performance Improvement Program (RPIP) status I s\
5-30-85; Mtg. (W. Bar) - Discuss Technical Specifications (TS) and Black & ,
Veach (B&V) reports and employee concerns '
6-5-85 TVA responds to allegations l 1
6-13-85; Mtg. (W. Bar) - Discuss nonconforming conditions on Unistrut. l 6-14-85; ORDER (Sequoyah) - Related to nonconformance reports (NCR's);
containment pressure transmitters 6-26-85 ACRS Mtg. on Quality and Quality Assurance in Design and j Construction.
6-28-85; Staff concerns issued to Commission regarding TVA issues (SECY 85-231) 7-3-85; Ltr. (All Dockets) - EDO transmits staff concerns to TVA management 7-12-85; ACRS Mtg on TVA QA problems. '
7-15 NRC site visit to review enhanced employee concern program 7-18-85 7-16-85; Mtg. with TVA Board 7-22-85; CP (B. Ferry) - Water level instrumentation 7-29-85; Mtg. (B. Ferry) operational readiness program review 8-23-85; COA (W. Bar) - Welder recertification inaccuracies 9-4-85; Mtg. (B. Ferry) - Biscuss TVA plans to restart B. Ferry 9-5-85; Mtg. with TVA regarding status TVA actions k 9-10-85; NRC Executive Board meets to discuss SALP evaluation 9-12-85; Mtg. to discuss status TVA nuclear porgram with Commission
l 1
6
{
. . \
- - 1- -
)
, l
. g. -
i l
1 9-17-85; Ltr. (All Dockets) - EDO submittal of 50.54f letter 9-17-85; COA (W. Bar) - Welder recertification inaccuracies
' 1 1
9-18-85; 1
Mtg. (All Dockets) - NRC meet with Congressional staff members 9-19-85; Congressional caucus meeting with TVA .,,
9-19 Denton visit to W. Bar NN 9-20-85 1 9-25-85; Mtg. (W. Bar) - Discuss lifting of stop work order on welding l l
9-30 NRC inspection of ERT program .
10-4-85 l
. 1 10-10-85; ACRS Mtg. on TVA organizational changes '
10-21 NRC inspection of ERT program (continuation of 9/30-10/4/85 10-25-85 Inspection) 10-22-85; Mtg. (Sequoyah) - Meet to discuss TVA initial resporses !
to 50.54f letter as relates to Corporate and Sequoyah '
10-25-85; Mtg. to discuss EQ extension (Sequoyah denied) with Commission i
l j
l l
r d
1 l
,. c '
U S NUCLE AR Kt0ULATOAY COMMIS$10N o
t M.tos*%.w C. & g
. ,- n .,
x.' .
( I' RESPONSE TO FREEDOM OF
"'4 I l "'
INFORM ATION ACT (FOIA) REQUEST NO = 1 198p'
( . . . ./ .
S g .,,. ...., . .
"%)iusan\'~CowndL ~
..m, i atconos atte.sto om ~of toc.Tto is c .c.w a l
6.se.i
. - , . , _ , ~ , - . ,
I
~.. _ _ ._,. ,_,,.~ ,_ , .,
s
.. . . ~ w ~ < - .* c n . .: , m o . ,,i. , '
)( ..,.,x,
,, . .. .. ~ . . ..
.n r. . , u . . .-* . Auw . _-
x 4 ...
.-1. ... , . . . . . ~ . u ,, . ~ ,, . c ,, e. l
, . ,,n. e. . , u . . . ixw. . -, 1 ,
. .me ....,.x..._._...,.~,..-.....,..~,
1 _ . ,.._ ,..._ .~,.,,. ,.
-.-.,~s.:.~....-,,
.s...,,_x...,_.~.,0,.~. _.,...
- . . -- ,~......
[ Clc d . e,.r*i.W C. N>* v *.y CC 4^ .C C ,. 64 ,h. C h.', f etc,9 ..co... p.c.3 e t'. s. C ..w ooc.,at 8.om ,,,,M ... .N w ,. seg,ee oc
...,....,_,,.~. , . . . _ .. ..... . .,~.....~~ .,, .....~,.~ _.,._ .
. . . . . , . . _ . . . . , ~ . . . . . - . . . - . . . . - . . . , . . - , . _
..,s.c..-.~,..._..,1....,.,....
..m7 il A-IN.cm ht ATloN erTHMitD FRoh4 ,vstic o,5ctosunt
,. .~,..,,,.~,....
c.....~...
, ,,,,. . .,.~ . -, ~ . ,~,, ,-- x- ...,~, ~.-...0..~
. ~ . , . ..,<
X _~~.c . .. c.. ~ _ . ~,. . , . . . . . ,
. . . .,. , ,~. ..._ ,~ ~- .. -. _~ , ~~, ._ _ - . , .
1 l
Q L c r S SE a re. M c L < ,
O M fi2q u q a r t L
g' Obd Ln Ouf TO 5L. t L u .
r C & r ~;DIA7 ren a n ')
i l ,
A
.. &. .m..
. ~2 7 .. _M QoyGNM
+rF
= _
. . .- . -=._
4
- i FRIEDOM OF l FORMATION ACT RESPONSE FOu NUMet:($h k' Daft: = 1 1Q00
+
PART 11 S. APPLICABLE FQ(A Ext %tPT10NS / T Reords subiect ta M rNuest that are described in the enclosed Appendaces - are boog withhold in their entirety or in part ur.det FOIA Wmptions and for the reasons set forth below pursuant to 5 U.S.C. 552tbl EMS % CFR 9 5(e) of NRC Regulations.
- 1. The wthheid informaton is property cines #ed pursvant to taaevtwo Order 12N4 tutMPTON 11
- 2. TN methheW eformaton relates soiety to the intemal personnel rules and procedures of NRC. (DEMFTON 21
- 3. TN wthheW Wormacon is specshcesy enogted from public decloowre by statute irdcated. IDEMPTON 31 Sectson 14t 145 of the Atcmc trergy Act which prohbts the doctoewre of Restncted Data
- Formody Restrcted Data 142 U.$ C. 216121661.
s Secten 147 of the Atomic Energy Act whch prohbts the decios are of Unciassefed $4 ogwards f informaten 142 U.S C. 2t47).
- 4. The wthheld efortreton e a trede secret or commeecel or feancel inf ten that e toeg wthhed for the reasorWs) indicated. (D1MPTON 4)
The adormaton as corecered to be conf 4ential buseess (propretaryl informaren.
The rWormaten e cons 4ered to te propretary informaton pwesvant to 10 CFR 2.79NdH11.
The informaten was swtmeted and recernd e conf 4ence from a fore.gn source pursuant to 10 CFR 2.79Gd42) 6 The wthheld intorn sten conerses of eterogency or setrangency records that see not avaistee through decovery owrrig ht.gaten. Doctoswee of predecocaat adormaton no.as ter4 to mhbt the coen erus frar* enchange cf adeas essent.ai to the ce6eerative process. Where records are wthhed e the.r entrety, the facts s'e restricater snartwred eth the predecoorW cformeten There aw are re reasonetWv segregatdo faowel portens becewee the re' essa of the facts now6d pemwt en corect riowiry y to the prooeciser.ar process of the egency. ILAEMPIQN b
}
- 4. The wthhe6d anformabon a ese@ted from pubiac sectosvre because ns ceceswee wou6d reswet in a c6eady vnaerrented irnesen of personal penecy. ItxtMPTON $1
- 7. The mathheW '.nformation conersts of rivestigatcry records comp 4ed for law ordorcement purposes end 4 beeg wt? tie 44 for the r6asoNsl andcated (DEMPTON 71 Decbew ee wowtd rweriore meh an enforcement proceedee becavse a cowed rowel the scope, erecten, and focus of enforcervent e ons n and thws cow 6d posse amoe them to take scien to sNeid potentani wongdong or a volaton of NRC roownervents from evoorgetors. (UEMPTION 7t All Decesure wowld constewte an onmervanted rnes* e1 per onal penecy (D1MPTCN 7tCD TM rsformaton consets of names of edevdwa's sets other mformaten the hwe of Wh wouy reveal asentities of conf 4 ental sources. ItxtMPTON hDH PART If C.OINYING OFFfCIALS Pursuant so to CFR 9 9 erss/or 915 of tre U S. hecamer Regulatory Canmeson regulature. ei has been determrod thet the edarmaten wthrend o esempt from ortActon or c>nacm,re.
and that as graducten or dewe e contrary to ese putdic riterest. The persons remporeene for the een.al are thoes oMcanis asent#es beton as eenyeg oMcises eruf the Drector, Diveen of Rules *nd Recoros, Once et Aonwestratson, tor any eennem thei may be appeaed to the tascueve Oroctor for Operetsons stDoi.
j DENYtNG OHCAL TITL1/Of flit , RECORDS DENitD APPELLATE OFFictAL Wf -- -
f - .
l l
l J
- PART li D. APPEAL RIGHTS The derut by each denying offcial dentded in Part it.C reay be appealed to the Appenate Official identered in that section. Any such appeal must te n I wteg and rmrst be mese withan 30 days of receipt of then response. Appea's must be addressed as appropnate to N Esecutive 0. rector for operations ce to the Secretary of the Commssson, U S. Nuclear Regutatory Commas.on Washegton, DC 20656, and shov6d clear *y state on the envenope and in the letter that R is an " Appeal from an instel FotA Decessort snac poana esa treet m U.S. NUCLE AR REQULATORY COMMISSION osse FOlA RESPONSE CONTINUATION
Re: FOIA- h
!) '
APPENDIX _': _
RECORDS MAINTAINEO AMONG POR FILES _
NUMBER DATE DESCRIPTION !
\
- l. GnM 64erfrem W.7. Dicds a Cwg h. ;
, e i
i 4
5 4
I l
t
- 4
- i t
I I
l 1 l 1 1 1
1
)
1 i
. - , . , . - - - - , ~ , - -- -- . - . . ,
Re: FOIA- '
APPENDIX _
RECORDS TOTALLY WITHHELO I NUMBER DATE DESCRIPTION & EXEMPTION !
\. b9018 b b u m o p D.! h s b % ;
terev:nem pqcf. Curnmrynwc ,
b ds L Zs N mo em fuA M e ri3hs. 03pyd 94 en51en (
t I
e k
4 f
4 1
1 l
i l
- - - - . - . .