MONTHYEARNOC-AE-19003684, Proposed Alternative to ASME Boiler & Pressure Vessel Code Section XI Requirements for Repair/Replacement of Essential Cooling Water (Ecw) System Class 3 Buried Piping in Accordance with 10 CFR 50.55a(z)(1)2019-09-26026 September 2019 Proposed Alternative to ASME Boiler & Pressure Vessel Code Section XI Requirements for Repair/Replacement of Essential Cooling Water (Ecw) System Class 3 Buried Piping in Accordance with 10 CFR 50.55a(z)(1) Project stage: Request NOC-AE-19003677, License Amendment Request to Revise Technical Specifications to Adopt TSTF-490, Revision 0, Deletion of E Bar Definition and Revision to RCS Specific Activity Tech Spec.2019-09-26026 September 2019 License Amendment Request to Revise Technical Specifications to Adopt TSTF-490, Revision 0, Deletion of E Bar Definition and Revision to RCS Specific Activity Tech Spec. Project stage: Request ML19309F1412019-11-0404 November 2019 Supplemental Information Request - Proposed Alternative to ASME Code Requirements for the Repair of Essential Cooling Water System Class 3 Buried Piping (EPID L 2019-LLR-0096) (Draft) Project stage: Draft Other ML19312A0962019-11-13013 November 2019 Supplemental Information Needed for Acceptance of Requested Licensing Action Proposed Alternative to ASME Requirements for Repair of Essential Cooling Water Class 3 Buried Piping Project stage: Acceptance Review NOC-AE-19003696, Supplemental Information for Proposed Alternative to ASME Code Requirements for the Repair/Replacement of Essential Cooling Water System Class 3 Buried Piping (Relief Request RR-ENG-3-24) EPID: L 2019-LLR-0096)2019-11-26026 November 2019 Supplemental Information for Proposed Alternative to ASME Code Requirements for the Repair/Replacement of Essential Cooling Water System Class 3 Buried Piping (Relief Request RR-ENG-3-24) EPID: L 2019-LLR-0096) Project stage: Supplement ML19344A0092019-12-0909 December 2019 NRR E-mail Capture - South Texas Project - Acceptance of Requested Licensing Action - Proposed Alternative to ASME Code Requirements for the Repair of Essential Cooling Water System Class 3 Buried Piping Project stage: Acceptance Review ML20036F5862020-02-0404 February 2020 Request for Additional Information - Proposed Alternative to ASME Code Requirements for the Repair of Essential Cooling Water System Class 3 Buried Piping (EPID L-2019-LLR-0096)Redacted Project stage: RAI NOC-AE-20003716, Request for Additional Information for Proposed Alternative to ASME Section XI Requirements for the Repair/Replacement of Essential Cooling Water System Class 3 Buried Piping2020-03-0909 March 2020 Request for Additional Information for Proposed Alternative to ASME Section XI Requirements for the Repair/Replacement of Essential Cooling Water System Class 3 Buried Piping Project stage: Request ML20069L4992020-03-0909 March 2020 Request for Additional Information for Proposed Alternative to ASME Section XI Requirements for the Repair/Replacement of Essential Cooling Water System Class 3 Buried Piping Project stage: Request NL-20-039, (04/29/2020) E-mail from R. Gaston to R. Guzman, Exemption Request from Requirements of 10 CFR Part 73, Appendix B, Section VI, Subsection C.3.(l)(1)2020-04-29029 April 2020 (04/29/2020) E-mail from R. Gaston to R. Guzman, Exemption Request from Requirements of 10 CFR Part 73, Appendix B, Section VI, Subsection C.3.(l)(1) Project stage: Other ML20128J8432020-05-15015 May 2020 Request for Withholding Information from Public Disclosure Project stage: Withholding Request Acceptance ML20142A5202020-05-21021 May 2020 Exemption Request Due to COVID-19 Pandemic Project stage: Other NL-20-0620, SNC Requests a Temporary Exemption from the Quarterly Fire Brigade Drills and Annual Live Fire Fighting Training Requirements of the Regulation2020-05-22022 May 2020 SNC Requests a Temporary Exemption from the Quarterly Fire Brigade Drills and Annual Live Fire Fighting Training Requirements of the Regulation Project stage: Other NL-20-0640, Response to Request for Additional Information for Exemption Request2020-05-27027 May 2020 Response to Request for Additional Information for Exemption Request Project stage: Response to RAI ULNRC-06587, Supplement to Security Training Exemption Request Due to COVID-192020-06-17017 June 2020 Supplement to Security Training Exemption Request Due to COVID-19 Project stage: Supplement NOC-AE-20003749, Response to Request for Additional Information for Proposed Alternative to ASME Section XI Requirements for the Repair/Replacement of Essential Cooling Water System Class 3 Buried Piping (Relief Request RR-ENG-3-24)2020-07-15015 July 2020 Response to Request for Additional Information for Proposed Alternative to ASME Section XI Requirements for the Repair/Replacement of Essential Cooling Water System Class 3 Buried Piping (Relief Request RR-ENG-3-24) Project stage: Response to RAI ML20197A2612020-07-15015 July 2020 Response to Request for Additional Information for Proposed Alternative to ASME Section XI Requirements for the Repair/Replacement of Essential Cooling Water System Class 3 Buried Piping (Relief Request RR-ENG-3-24) Project stage: Response to RAI ML20177A6452020-07-15015 July 2020 FRN - Notice of Issuance of Multiple Exemptions Regarding Various Parts of 10 CFR Due to COVID-19 Impacts for June 2020 Project stage: Approval ML20212L5682020-07-30030 July 2020 Supplement to Proposed Alternative to ASME Section XI Requirements for the Repair/Replacement of Essential Cooling Water System Class 3 Buried Piping (Relief Request RR-ENG-3-24) Project stage: Supplement NOC-AE-20003755, Supplement to Proposed Alternative to ASME Section XI Requirements for the Repair/Replacement of Essential Cooling Water System Class 3 Buried Piping (Relief Request RR-ENG-3-24)2020-07-30030 July 2020 Supplement to Proposed Alternative to ASME Section XI Requirements for the Repair/Replacement of Essential Cooling Water System Class 3 Buried Piping (Relief Request RR-ENG-3-24) Project stage: Supplement ML20232D1442020-08-26026 August 2020 Request for Withholding Information from Public Disclosure Project stage: Withholding Request Acceptance ML20227A3852020-09-0303 September 2020 Nonproprietary - Proposed Alternative RR-ENG-3-24 to ASME Code Requirements for the Repair of Essential Cooling Water System Class 3 Buried Piping Project stage: Other 2020-05-15
[Table View] |
|
---|
Category:Letter
MONTHYEARML24029A2752024-01-29029 January 2024 Request to Reschedule Evaluated Force-on-Force Drill IR 05000498/20230042024-01-29029 January 2024 Integrated Inspection Report 05000498/2023004 and 05000499/2023004 ML24024A1162024-01-24024 January 2024 STP Unit 2 Request for Information IR 05000498/20244042024-01-18018 January 2024 Information Request for the Cyber-Security Baseline Inspection, Notification to Perform Inspection 05000498/2024404; 05000499/2024404 IR 05000498/20230032023-12-28028 December 2023 Acknowledgment of Reply to a Notice of Violation (NRC Inspection Report 05000498/2023003 and 05000499/2023003) ML23360A1692023-12-26026 December 2023 FEMA, Submittal of Radiological Emergency Preparedness Final Report for the South Texas Project Medical Services Drill Evaluated on August 31, 2023 NOC-AE-230040, Supplement to Proposed Alternate Frequency to Containment Unbonded Post-Tensioning System Inservice Inspection (Relief Request RR-ENG-4-06)2023-12-14014 December 2023 Supplement to Proposed Alternate Frequency to Containment Unbonded Post-Tensioning System Inservice Inspection (Relief Request RR-ENG-4-06) NOC-AE-230039, Docket Nos. Stn 50-498, Stn 50-499 - Reply to a Notice of Violation, NRC Inspection Report 05000498/2023003 and 05000499/20230032023-12-12012 December 2023 Docket Nos. Stn 50-498, Stn 50-499 - Reply to a Notice of Violation, NRC Inspection Report 05000498/2023003 and 05000499/2023003 ML23326A2592023-12-0505 December 2023 Review of the Fall 2022 Steam Generator Tube Inspection Report ML23339A1902023-12-0505 December 2023 Update Foreign Ownership, Control, or Influence (FOCI) IR 05000498/20234012023-12-0404 December 2023 Security Baseline Inspection Report 05000498/2023401 and 05000499/2023401 ML23324A0102023-11-16016 November 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML23310A2282023-11-13013 November 2023 Integrated Inspection Report 05000498/2023003 and 05000499/2023003, and Notice of Violation ML23311A2082023-11-0909 November 2023 Reassignment of U.S. Nuclear Regulatory Commission Branch Chief in the Division of Operating Reactor Licensing for Plant Licensing Branch IV ML23298A0002023-11-0101 November 2023 the Associated Independent Spent Fuel Storage Installation - Issuance of Amendment Nos. 226 and 211 Related to Order Approving Indirect Transfer of Licenses and Conforming License Amendments ML23303A0782023-10-30030 October 2023 Submittal of Supplemental Information in Response to Order Consenting to License Transfers and Approval of Draft Conforming License Amendments ML23279A0342023-10-30030 October 2023 Associated Independent Spent Fuel Storage Installation - Order Approving Indirect Transfer of Licenses and Draft Conforming License Amendments (EPID L-2023-LLM-0004) (Letter) IR 05000498/20234032023-10-26026 October 2023 Material Control and Accounting Program Inspection Report 05000498/2023403 and 05000499/2023403 (Cover Letter) ML23317A1262023-10-12012 October 2023 South. Texas Project Physical Security Plan, Training and Qualification Plan, Safeguards Contingency Plan, and Independent Spent Fuel Storage Installation Security Program Revision 26 ML23279A1382023-10-0505 October 2023 Responses to Requests for Additional Information Related to Application for Order Approving Indirect Transfer of Control of Licenses ML23271A1942023-10-0303 October 2023 Notification of Commercial Grade Dedication Inspection (05000498/2024013 and 05000499/2024013) and Request for Information ML23270B2592023-09-27027 September 2023 Update Foreign Ownership, Control, or Influence ML23263B1132023-09-20020 September 2023 Operator Licensing Examination Schedule Revision 1 IR 05000498/20243012023-09-0707 September 2023 Notification of NRC Initial Operator Licensing Examination 05000498/2024301; 05000499/2024301 IR 05000498/20233012023-09-0101 September 2023 NRC Examination Report 05000498/2023301 and 05000499/2023301 ML23243B0562023-08-31031 August 2023 Supplemental Information to Application for Order Approving Indirect Transfer of Control of Licenses ML23236A6042023-08-24024 August 2023 Annual Dose Report for 2022 IR 05000498/20230052023-08-22022 August 2023 Updated Inspection Plan for South Texas Project Electric Generating Station, Units 1 and 2 (Report 05000498/2023005 and 05000499/2023005) - Mid Cycle Letter ML23229A5262023-08-17017 August 2023 Inservice Inspection Summary Report - 1 RE24, ML23229A5892023-08-17017 August 2023 Voluntary Response to Regulatory Issue Summary (RIS) 2023-02, Scheduling Information for the Licensing of Accident Tolerant, Increased Enrichment, and Higher Burnup Fuels ML23229A4992023-08-17017 August 2023 Supplement to Proposed Alternate Frequency to Containment Unbonded Post-Tensioning System Inservice Inspection (Relief Request RR-ENG-4-06) ML23228A2102023-08-15015 August 2023 Closure of Investigation (OI 4-22-19) ML23222A0322023-08-10010 August 2023 Report of Changes Made to Quality Assurance Program for Radioactive Material Packages ML23221A3002023-08-0909 August 2023 RE22 Inspection Summary Report for Steam Generator Tubinq, Rev. 1 (Epld L-2023-LRO-0029) ML23222A2792023-08-0909 August 2023 Submittal of Update Foreign Ownership, Control, or Influence (FOCI) IR 05000498/20230022023-07-28028 July 2023 Integrated Inspection Report 05000498/2023002 and 05000499/2023002 ML23198A0532023-07-24024 July 2023 Request for Withholding Information from Public Disclosure ML23188A1612023-07-14014 July 2023 the Associated ISFSI - Notice of Consideration of Approval of Indirect Transfer of Licenses and Conforming Amendments and Opportunity to Request a Hearing (EPID L-2023-LLM-0004) - Letter ML23193A9932023-07-11011 July 2023 Submittal of Update Foreign Ownership, Control or Influence (FOCI) ML23192A0482023-07-11011 July 2023 NRC Initial Operator Licensing Examination Approval 05000498/2023301; 05000499/2023301 NOC-AE-230039, Submittal of Update Foreign Ownership, Control or Influence (FOCI)2023-07-11011 July 2023 Submittal of Update Foreign Ownership, Control or Influence (FOCI) ML23180A2822023-06-29029 June 2023 Operator Licensing Examination Schedule ML23177A2522023-06-26026 June 2023 Units 1, 2 & Independent Spent Fuel Storage Installation - Biennial Submittal of Technical Specification Bases Changes, Commitment Changes, 10 CFR 50.59 Evaluation Summary, and 10 CFR 72.48 Evaluation Summary ML23166B0802023-06-14014 June 2023 Update Foreign Ownership, Control, or Influence (FOCI) ML23163A1762023-06-12012 June 2023 Application for Order Approving Indirect Transfer of Control of Licenses 2024-01-29
[Table view] |
Text
May 21, 2020 NOC-AE-20003736 File No.: G25 10 CFR 73.5 STI: 35020952 ATTN: Document Control Desk Director, Office of Nuclear Reactor Regulation Director, Office of Nuclear Material Safety and Safeguards U.S. Nuclear Regulatory Commission Washington, D.C. 20555-0001 South Texas Project Units 1 and 2 Docket Nos. STN 50-498, STN 50-499 Exemption Request due to COVID-19 Pandemic
Reference:
NRC Letter from H. Nieh and J. Lubinski to NEI, U.S. Nuclear Regulatory Commission Planned Actions Related to the Requirements for Part 73, Appendix B,Section VI During the Coronavirus Disease 2019 Public Health Emergency, April 20, 2020.
(ML20105A483)
As a result of the Coronavirus Disease 2019 (COVID-19) Public Health Emergency (PHE) STP Nuclear Operating Company (STPNOC) expects that it will no longer be able to comply with the requirements of the specific subsection(s) of 10 CFR Part 73, Appendix B, Section VI listed in the enclosures below and will implement site specific COVID-19 PHE training requalification controls consistent with those outlined in the Reference letter and its enclosures. These controls are documented in the enclosures.
STPNOC requests a temporary exemption from the identified security training requalification requirements listed in the enclosures. Granting of the requested exemption will allow deviation from the associated items in the South Texas Project Training and Qualification Plan. This temporary exemption supports the isolation restrictions (e.g., social distancing, group size limitations, self-quarantining, etc.) necessary to protect required site personnel in response to the 2020 COVID-19 PHE. These restrictions are needed to ensure personnel are isolated from the COVID-19 PHE and remain capable of maintaining plant security. STPNOC implemented isolation restrictions for site personnel on March 17, 2020.
This exemption is specific to security personnel who have previously demonstrated proficiency and are currently qualified in accordance with 10 CFR Part 73, Appendix B, Section VI, Nuclear Power Reactor Training and Qualification Plan for Personnel Performing Security Program Duties.
Additionally, because of the rigorous nature of STPNOC nuclear security personnel training programs, which consist of regularly scheduled training activities to include weapons training,
NOC-AE-20003736 Page 2 of 2 contingency response drills and exercises, and demonstrated acceptable performance of day-to-day job activities (e.g., detection and assessment, patrols, searches, and defensive operations), it is reasonable to conclude that security personnel will continue to maintain their proficiency even though the requalification periodicity is temporarily exceeded.
The date and time STPNOC will begin implementing its site-specific COVID-19 PHE controls for managing personnel performing Security Program duties, is indicated in the enclosures.
The time period during which the exemptions are required is not currently known but will be in effect until 90 days after the PHE is ended or until December 31, 2020, whichever occurs first. Near the end of the exemption period, if more time is needed, an additional email supplement request may be submitted to extend the exemption period.
STPNOC is only requesting exemptions from the requirements in 10 CFR Part 73 Appendix B.
STPNOC requests a written confirmation of this request.
There are no commitments in this letter.
If you have any questions, please contact Walter Fulton at 361-972-4349 or me at 361-972-7697.
Aldo Capristo Executive VP and Chief Administrative Officer -10 CFR 73 Appendix B Section VI Subsection B.4.(a) Medical examinations and Subsection B.5.(a) Physical requirements -10 CFR 73 Appendix B Section VI Subsection C.2.(a) and (b) 40 hours4.62963e-4 days <br />0.0111 hours <br />6.613757e-5 weeks <br />1.522e-5 months <br /> on-the-job training Enclosure 3-10 CFR 73 Appendix B Section VI Subsection C.3.(l)(1) Quarterly tactical response drills and annual force-on-force (FOF) exercises -10 CFR 73 Appendix B Section VI Subsection D.2.(a) Annual requalification, Subsection E.1.(c) Annual firearms familiarization and Subsection F.5.(a) Annual weapons requalification Enclosure 5-10 CFR 73 Appendix B Section VI Subsection E.1 .(f) Weapons range activities on a nominal 4-month periodicity wf ec:
Regional Administrator, Region IV U.S. Nuclear Regulatory Commission 1600 E. Lamar Boulevard Arlington, TX 76011-4511
NOC-AE-20003736 Enclosure 1 - 10 CFR 73 Appendix B Section VI Subsection B.4.(a) Medical examinations and Subsection B.5.(a) Physical requirements.
NOC-AE-20003736 Enclosure 1 10 CFR 73 Appendix Controls Begin Implementation B Section VI Subsection B.4.(a) STP will maintain a list of the STP will begin implementing Medical examinations names of the individuals who will COVID-19 PHE controls for not meet the requalification managing personnel and requirements and will include the performing Security Program dates of the last qualification, duties upon NRC approval.
Subsection B.5.(a)
Physical requirements and has established measures to ensure security personnel self-report any condition that could impact their ability to perform duties as a member of the security organization.
NOC-AE-20003736 Enclosure 2 - 10 CFR 73 Appendix B Section VI Subsection C.2.(a) and (b) 40 hours4.62963e-4 days <br />0.0111 hours <br />6.613757e-5 weeks <br />1.522e-5 months <br /> on-the-job training
NOC-AE-20003736 Enclosure 2 10 CFR 73 Appendix Controls Begin Implementation B Section VI Subsection C.2.(a) and STP will maintain a list of the STP will begin implementing (b) names of the individuals who will COVID-19 PHE controls for 40 hours4.62963e-4 days <br />0.0111 hours <br />6.613757e-5 weeks <br />1.522e-5 months <br /> on-the-job not meet the requalification managing personnel training requirements and will include the performing Security Program dates of initial qualification. duties upon NRC approval.
A needs analysis was conducted and determined that the individuals covered by the exemption have the requisite knowledge, skills and abilities to perform the duties assigned.
This exemption only applies to individuals who have completed the qualification requirements in 10 CFR Part 73, Appendix B, Section VI, subsection C.1.,
Duty training and qualification requirements, and have been previously qualified within STP security organization.
Security management will continue to evaluate security personnel performance in the plant to identify and correct performance issues in a timely manner.
NOC-AE-20003736 Enclosure 3 - 10 CFR 73 Appendix B Section VI Subsection C.3.(l)(1) Quarterly tactical response drills and annual force-on-force (FOF) exercises.
NOC-AE-20003736 Enclosure 3 10 CFR 73 Appendix Controls Begin Implementation B Section VI Subsection C.3.(l)(1) STP will maintain a list of the STP will begin implementing Quarterly tactical names of the individuals who will COVID-19 PHE controls for response drills and not meet the requalification managing personnel annual force-on-force requirements and will include the performing Security Program (FOF) exercises dates of the last qualification. duties at 00:00 on 06/12/2020.
and will ensure contingency response readiness of security personnel not participating in a quarterly drill or annual FOF exercise, or both, by conducting the following scenario-based evolution[s]:
a table-top exercise a lessons-learned review of past exercise and will complete the FOF exercise, within the time period in this request, when isolation restrictions are ended.
NOC-AE-20003736 Enclosure 4 - 10 CFR 73 Appendix B Section VI Subsection D.2.(a) Annual requalification, Subsection E.1.(c) Annual firearms familiarization and Subsection F.5.(a) Annual weapons requalification.
NOC-AE-20003736 Enclosure 4 10 CFR 73 Appendix Controls Begin Implementation B Section VI Subsection D.2.(a) STP will maintain a list of the STP will begin implementing Annual requalification names of the individuals who will COVID-19 PHE controls for not meet requalification managing personnel Subsection E.1.(c) requirements and will include the performing Security Program Annual firearms dates of the last qualification for duties at 00:00 on 09/02/2020.
familiarization each of the requirements not completed.
Subsection F.5.(a)
Annual weapons STP will conduct:
requalification discussions regarding critical tasks necessary for performance of security duties as assigned individual discussions regarding the fundamentals of marksmanship.
NOC-AE-20003736 Enclosure 5 - 10 CFR 73 Appendix B Section VI Subsection E.1.(f) Weapons range activities on a nominal 4-month periodicity.
NOC-AE-20003736 Enclosure 5 10 CFR 73 Appendix Controls Begin Implementation B Section VI Subsection E.1.(f) STP will maintain a list of the STP will begin implementing Weapons range names of the individuals who will COVID-19 PHE controls for activities on a nominal not meet the requalification managing personnel 4-month periodicity requirements and will include the performing Security Program dates of the last qualification. duties at 00:00 on 07/20/2020.
Since STP cannot complete the weapons range activities due to STP Pandemic response and CDC requirements that prohibit the ability to work within close range of the instructors and security force members on the range, discussions will be held with security personnel that will outline the objectives of the weapons range activity that will not be conducted due to COVID-19 PHE.