Letter Sequence Other |
---|
|
|
MONTHYEARNOC-AE-19003684, Proposed Alternative to ASME Boiler & Pressure Vessel Code Section XI Requirements for Repair/Replacement of Essential Cooling Water (Ecw) System Class 3 Buried Piping in Accordance with 10 CFR 50.55a(z)(1)2019-09-26026 September 2019 Proposed Alternative to ASME Boiler & Pressure Vessel Code Section XI Requirements for Repair/Replacement of Essential Cooling Water (Ecw) System Class 3 Buried Piping in Accordance with 10 CFR 50.55a(z)(1) Project stage: Request NOC-AE-19003677, License Amendment Request to Revise Technical Specifications to Adopt TSTF-490, Revision 0, Deletion of E Bar Definition and Revision to RCS Specific Activity Tech Spec.2019-09-26026 September 2019 License Amendment Request to Revise Technical Specifications to Adopt TSTF-490, Revision 0, Deletion of E Bar Definition and Revision to RCS Specific Activity Tech Spec. Project stage: Request ML19309F1412019-11-0404 November 2019 Supplemental Information Request - Proposed Alternative to ASME Code Requirements for the Repair of Essential Cooling Water System Class 3 Buried Piping (EPID L 2019-LLR-0096) (Draft) Project stage: Draft Other ML19312A0962019-11-13013 November 2019 Supplemental Information Needed for Acceptance of Requested Licensing Action Proposed Alternative to ASME Requirements for Repair of Essential Cooling Water Class 3 Buried Piping Project stage: Acceptance Review NOC-AE-19003696, Supplemental Information for Proposed Alternative to ASME Code Requirements for the Repair/Replacement of Essential Cooling Water System Class 3 Buried Piping (Relief Request RR-ENG-3-24) EPID: L 2019-LLR-0096)2019-11-26026 November 2019 Supplemental Information for Proposed Alternative to ASME Code Requirements for the Repair/Replacement of Essential Cooling Water System Class 3 Buried Piping (Relief Request RR-ENG-3-24) EPID: L 2019-LLR-0096) Project stage: Supplement ML19344A0092019-12-0909 December 2019 NRR E-mail Capture - South Texas Project - Acceptance of Requested Licensing Action - Proposed Alternative to ASME Code Requirements for the Repair of Essential Cooling Water System Class 3 Buried Piping Project stage: Acceptance Review ML20036F5862020-02-0404 February 2020 Request for Additional Information - Proposed Alternative to ASME Code Requirements for the Repair of Essential Cooling Water System Class 3 Buried Piping (EPID L-2019-LLR-0096)Redacted Project stage: RAI NOC-AE-20003716, Request for Additional Information for Proposed Alternative to ASME Section XI Requirements for the Repair/Replacement of Essential Cooling Water System Class 3 Buried Piping2020-03-0909 March 2020 Request for Additional Information for Proposed Alternative to ASME Section XI Requirements for the Repair/Replacement of Essential Cooling Water System Class 3 Buried Piping Project stage: Request ML20069L4992020-03-0909 March 2020 Request for Additional Information for Proposed Alternative to ASME Section XI Requirements for the Repair/Replacement of Essential Cooling Water System Class 3 Buried Piping Project stage: Request NL-20-039, (04/29/2020) E-mail from R. Gaston to R. Guzman, Exemption Request from Requirements of 10 CFR Part 73, Appendix B, Section VI, Subsection C.3.(l)(1)2020-04-29029 April 2020 (04/29/2020) E-mail from R. Gaston to R. Guzman, Exemption Request from Requirements of 10 CFR Part 73, Appendix B, Section VI, Subsection C.3.(l)(1) Project stage: Other ML20128J8432020-05-15015 May 2020 Request for Withholding Information from Public Disclosure Project stage: Withholding Request Acceptance ML20142A5202020-05-21021 May 2020 Exemption Request Due to COVID-19 Pandemic Project stage: Other NL-20-0620, SNC Requests a Temporary Exemption from the Quarterly Fire Brigade Drills and Annual Live Fire Fighting Training Requirements of the Regulation2020-05-22022 May 2020 SNC Requests a Temporary Exemption from the Quarterly Fire Brigade Drills and Annual Live Fire Fighting Training Requirements of the Regulation Project stage: Other NL-20-0640, Response to Request for Additional Information for Exemption Request2020-05-27027 May 2020 Response to Request for Additional Information for Exemption Request Project stage: Response to RAI ULNRC-06587, Supplement to Security Training Exemption Request Due to COVID-192020-06-17017 June 2020 Supplement to Security Training Exemption Request Due to COVID-19 Project stage: Supplement NOC-AE-20003749, Response to Request for Additional Information for Proposed Alternative to ASME Section XI Requirements for the Repair/Replacement of Essential Cooling Water System Class 3 Buried Piping (Relief Request RR-ENG-3-24)2020-07-15015 July 2020 Response to Request for Additional Information for Proposed Alternative to ASME Section XI Requirements for the Repair/Replacement of Essential Cooling Water System Class 3 Buried Piping (Relief Request RR-ENG-3-24) Project stage: Response to RAI ML20197A2612020-07-15015 July 2020 Response to Request for Additional Information for Proposed Alternative to ASME Section XI Requirements for the Repair/Replacement of Essential Cooling Water System Class 3 Buried Piping (Relief Request RR-ENG-3-24) Project stage: Response to RAI ML20177A6452020-07-15015 July 2020 FRN - Notice of Issuance of Multiple Exemptions Regarding Various Parts of 10 CFR Due to COVID-19 Impacts for June 2020 Project stage: Approval ML20212L5682020-07-30030 July 2020 Supplement to Proposed Alternative to ASME Section XI Requirements for the Repair/Replacement of Essential Cooling Water System Class 3 Buried Piping (Relief Request RR-ENG-3-24) Project stage: Supplement NOC-AE-20003755, Supplement to Proposed Alternative to ASME Section XI Requirements for the Repair/Replacement of Essential Cooling Water System Class 3 Buried Piping (Relief Request RR-ENG-3-24)2020-07-30030 July 2020 Supplement to Proposed Alternative to ASME Section XI Requirements for the Repair/Replacement of Essential Cooling Water System Class 3 Buried Piping (Relief Request RR-ENG-3-24) Project stage: Supplement ML20232D1442020-08-26026 August 2020 Request for Withholding Information from Public Disclosure Project stage: Withholding Request Acceptance ML20227A3852020-09-0303 September 2020 Nonproprietary - Proposed Alternative RR-ENG-3-24 to ASME Code Requirements for the Repair of Essential Cooling Water System Class 3 Buried Piping Project stage: Other 2020-05-15
[Table View] |
|
---|
Category:Letter
MONTHYEARML24304B0512024-10-30030 October 2024 Cycle 26 Core Operating Limits Report IR 05000498/20244022024-10-23023 October 2024 Security Baseline Inspection Report 05000498/2024402 and 05000499/2024402 05000499/LER-2024-003, Containment Isolation Valve Inoperable Resulting in Condition Prohibited by Technical Specification and Prevention of Fulfillment of Safety Function2024-10-22022 October 2024 Containment Isolation Valve Inoperable Resulting in Condition Prohibited by Technical Specification and Prevention of Fulfillment of Safety Function ML24295A0772024-10-21021 October 2024 Licensed Operator Positive Fitness-for-Duty Test 05000499/LER-2024-002, Two Control Room Envelope HVAC Trains Inoperable Resulting in a Condition That Could Have Prevented Fulfillment of a Safety Function2024-10-17017 October 2024 Two Control Room Envelope HVAC Trains Inoperable Resulting in a Condition That Could Have Prevented Fulfillment of a Safety Function ML24290A1162024-10-16016 October 2024 Change to South Texas Project Electric Generating Station (STPEGS) Emergency Plan ML24255A0322024-09-30030 September 2024 The Associated Independent Spent Fuel Storage Installation - Notice of Consideration of Approval of Direct Transfer of Licenses and Opportunity to Request a Hearing (EPID L-2024-LLM-0002) - Letter ML24269A1762024-09-25025 September 2024 Tpdes Permit Renewal Application WQ0001 908000 05000498/LER-2024-004, Loss of Offsite Power Resulting in Unit 1 Automatic Reactor Trip and Actuation of Emergency Diesel Generators and Auxiliary Feedwater Pumps2024-09-19019 September 2024 Loss of Offsite Power Resulting in Unit 1 Automatic Reactor Trip and Actuation of Emergency Diesel Generators and Auxiliary Feedwater Pumps ML24271A3022024-09-18018 September 2024 STP-2024-09 Post-Exam Comments - Redacted ML24274A0902024-09-16016 September 2024 Written Response - EA-24-026 STP Operator - Redacted ML24250A1882024-09-11011 September 2024 Request for Information for an NRC Post-Approval Site Inspection for License Renewal 05000499/LER-2024-001-01, Supplement to Automatic Reactor Trip and Actuation of Two of Three Emergency Diesel Generators2024-08-29029 August 2024 Supplement to Automatic Reactor Trip and Actuation of Two of Three Emergency Diesel Generators IR 05000498/20240052024-08-22022 August 2024 Updated Inspection Plan for South Texas Project Electric Generating Station, Units 1 and 2 (Report 05000498/2024005 and 05000499/2024005) IR 05000498/20240022024-08-0909 August 2024 Integrated Inspection Report 05000498/2024002 and 05000499/2024002 IR 05000498/20240102024-08-0808 August 2024 Biennial Problem Identification and Resolution Inspection Report 05000498/2024010 and 05000499/2024010 ML24218A1462024-07-26026 July 2024 2. EPA Comments on South Texas Project Exemption Ea/Fonsi ML24207A1782024-07-25025 July 2024 Licensed Operator Positive Fitness-For-Duty Test 05000499/LER-2024-001, Automatic Reactor Trip and Actuation of Two of Three Emergency Diesel Generators2024-07-0202 July 2024 Automatic Reactor Trip and Actuation of Two of Three Emergency Diesel Generators 05000498/LER-2024-003, Condition Prohibited by Technical Specifications and Potential Loss of Safety Function Due to Inoperable Low Head Safety Injection Pump2024-07-0101 July 2024 Condition Prohibited by Technical Specifications and Potential Loss of Safety Function Due to Inoperable Low Head Safety Injection Pump 05000498/LER-2024-002-01, Two Essential Chilled Water Trains Inoperable Resulting in a Condition That Could Have Prevented Fulfillment of a Safety Function2024-06-27027 June 2024 Two Essential Chilled Water Trains Inoperable Resulting in a Condition That Could Have Prevented Fulfillment of a Safety Function 05000498/LER-2023-003-01, Two Essential Chilled Water Trains Inoperable Resulting in a Condition That Could Have Prevented Fulfillment of a Safety Function2024-06-19019 June 2024 Two Essential Chilled Water Trains Inoperable Resulting in a Condition That Could Have Prevented Fulfillment of a Safety Function ML24141A0482024-05-17017 May 2024 EN 56958_1 Ametek Solidstate Controls, Inc ML24137A0882024-05-15015 May 2024 Operator Licensinq Examination Schedule Revision 3 ML24136A2872024-05-15015 May 2024 Submittal of 2024 Nrc/Fema Evaluated Exercise Scenario Manual ML24136A2842024-05-15015 May 2024 Independent Spent Fuel Storage Installation Supplement to Request for Exemption from Various Part 72 Regulations Resulting from Fuel Basket Design Control Compliance ML24130A2712024-05-0909 May 2024 Re Two Essential Chilled Water Trains Inoperable Resulting in a Condition That Could Have Prevented Fulfillment of a Safety Function ML24128A1572024-05-0707 May 2024 Independent Spent Fuel Storage Installation Request for Exemption from Various Part 72 Regulations Resulting from Fuel Basket Design Control Compliance IR 05000498/20240012024-05-0606 May 2024 Integrated Inspection Report 05000498/2024001 & 05000499/2024001 ML24120A3762024-04-29029 April 2024 Annual Dose Report for 2023 ML24116A3032024-04-25025 April 2024 Operations Quality Assurance Plan Condition Adverse to Quality Definition Change Resulting in a Reduction in Commitment ML24116A2282024-04-25025 April 2024 Annual Environmental Operating Report 05000498/LER-2023-004-01, Condition Prohibited by Technical Specifications Due to Inoperable Train of Essential Chilled Water2024-04-25025 April 2024 Condition Prohibited by Technical Specifications Due to Inoperable Train of Essential Chilled Water ML24117A1602024-04-24024 April 2024 2023 Radioactive Effluent Release Report ML24102A2452024-04-23023 April 2024 Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0046 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) ML24113A3122024-04-22022 April 2024 Cycle 24 Core Operating Limits Report ML24097A0072024-04-0606 April 2024 Relief Request Number RR-ENG-4-07 – Request for an Alternative to ASME Code Case N-729-6 for Reactor Vessel Head Penetration 75 05000498/LER-2024-001, Re Two Steam Generator Power Operated Relief Valves (Porvs) Inoperable Resulting in a Condition That Could Have Prevented Fulfillment of a Safety Function2024-04-0101 April 2024 Re Two Steam Generator Power Operated Relief Valves (Porvs) Inoperable Resulting in a Condition That Could Have Prevented Fulfillment of a Safety Function ML24088A3022024-03-28028 March 2024 Financial Assurance for Decommissioning - 2024 Update ML24081A3972024-03-21021 March 2024 Response to Request for Additional Information for Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML24080A2902024-03-19019 March 2024 Nuclear Liability Certificates of Insurance NOC-AE-240040, Nuclear Liability Certificates of Insurance2024-03-19019 March 2024 Nuclear Liability Certificates of Insurance ML24066A2002024-03-0606 March 2024 10 CFR 50.46 Thirty-Day Report of Significant ECCS Model Changes ML24079A1312024-03-0505 March 2024 Nuclear Insurance Protection ML24060A1742024-02-28028 February 2024 Submittal of Annual Fitness for Duty Performance Report for 2023 IR 05000498/20230062024-02-28028 February 2024 Annual Assessment Letter for South Texas Project Electric Generating Station, Units 1 and 2 (Report 05000498/2023006 and 05000499/2023006) IR 05000498/20240132024-02-27027 February 2024 Design Basis Assurance Inspection (Programs) Commercial Grade Dedication IR 05000498/2024013 and 05000499/2024013 ML24022A2252024-02-20020 February 2024 Issuance of Amendment Nos. 227 and 212 to Authorize the Revision of the Alternative Source Term Dose Calculation ML24050A0082024-02-19019 February 2024 Evidence of Financial Protection ML24045A0922024-02-16016 February 2024 Response to STP FOF Move Letter (2024) 2024-09-30
[Table view] |
Text
May 21, 2020 NOC-AE-20003736 File No.: G25 10 CFR 73.5 STI: 35020952 ATTN: Document Control Desk Director, Office of Nuclear Reactor Regulation Director, Office of Nuclear Material Safety and Safeguards U.S. Nuclear Regulatory Commission Washington, D.C. 20555-0001 South Texas Project Units 1 and 2 Docket Nos. STN 50-498, STN 50-499 Exemption Request due to COVID-19 Pandemic
Reference:
NRC Letter from H. Nieh and J. Lubinski to NEI, U.S. Nuclear Regulatory Commission Planned Actions Related to the Requirements for Part 73, Appendix B,Section VI During the Coronavirus Disease 2019 Public Health Emergency, April 20, 2020.
(ML20105A483)
As a result of the Coronavirus Disease 2019 (COVID-19) Public Health Emergency (PHE) STP Nuclear Operating Company (STPNOC) expects that it will no longer be able to comply with the requirements of the specific subsection(s) of 10 CFR Part 73, Appendix B, Section VI listed in the enclosures below and will implement site specific COVID-19 PHE training requalification controls consistent with those outlined in the Reference letter and its enclosures. These controls are documented in the enclosures.
STPNOC requests a temporary exemption from the identified security training requalification requirements listed in the enclosures. Granting of the requested exemption will allow deviation from the associated items in the South Texas Project Training and Qualification Plan. This temporary exemption supports the isolation restrictions (e.g., social distancing, group size limitations, self-quarantining, etc.) necessary to protect required site personnel in response to the 2020 COVID-19 PHE. These restrictions are needed to ensure personnel are isolated from the COVID-19 PHE and remain capable of maintaining plant security. STPNOC implemented isolation restrictions for site personnel on March 17, 2020.
This exemption is specific to security personnel who have previously demonstrated proficiency and are currently qualified in accordance with 10 CFR Part 73, Appendix B, Section VI, Nuclear Power Reactor Training and Qualification Plan for Personnel Performing Security Program Duties.
Additionally, because of the rigorous nature of STPNOC nuclear security personnel training programs, which consist of regularly scheduled training activities to include weapons training,
NOC-AE-20003736 Page 2 of 2 contingency response drills and exercises, and demonstrated acceptable performance of day-to-day job activities (e.g., detection and assessment, patrols, searches, and defensive operations), it is reasonable to conclude that security personnel will continue to maintain their proficiency even though the requalification periodicity is temporarily exceeded.
The date and time STPNOC will begin implementing its site-specific COVID-19 PHE controls for managing personnel performing Security Program duties, is indicated in the enclosures.
The time period during which the exemptions are required is not currently known but will be in effect until 90 days after the PHE is ended or until December 31, 2020, whichever occurs first. Near the end of the exemption period, if more time is needed, an additional email supplement request may be submitted to extend the exemption period.
STPNOC is only requesting exemptions from the requirements in 10 CFR Part 73 Appendix B.
STPNOC requests a written confirmation of this request.
There are no commitments in this letter.
If you have any questions, please contact Walter Fulton at 361-972-4349 or me at 361-972-7697.
Aldo Capristo Executive VP and Chief Administrative Officer -10 CFR 73 Appendix B Section VI Subsection B.4.(a) Medical examinations and Subsection B.5.(a) Physical requirements -10 CFR 73 Appendix B Section VI Subsection C.2.(a) and (b) 40 hours4.62963e-4 days <br />0.0111 hours <br />6.613757e-5 weeks <br />1.522e-5 months <br /> on-the-job training Enclosure 3-10 CFR 73 Appendix B Section VI Subsection C.3.(l)(1) Quarterly tactical response drills and annual force-on-force (FOF) exercises -10 CFR 73 Appendix B Section VI Subsection D.2.(a) Annual requalification, Subsection E.1.(c) Annual firearms familiarization and Subsection F.5.(a) Annual weapons requalification Enclosure 5-10 CFR 73 Appendix B Section VI Subsection E.1 .(f) Weapons range activities on a nominal 4-month periodicity wf ec:
Regional Administrator, Region IV U.S. Nuclear Regulatory Commission 1600 E. Lamar Boulevard Arlington, TX 76011-4511
NOC-AE-20003736 Enclosure 1 - 10 CFR 73 Appendix B Section VI Subsection B.4.(a) Medical examinations and Subsection B.5.(a) Physical requirements.
NOC-AE-20003736 Enclosure 1 10 CFR 73 Appendix Controls Begin Implementation B Section VI Subsection B.4.(a) STP will maintain a list of the STP will begin implementing Medical examinations names of the individuals who will COVID-19 PHE controls for not meet the requalification managing personnel and requirements and will include the performing Security Program dates of the last qualification, duties upon NRC approval.
Subsection B.5.(a)
Physical requirements and has established measures to ensure security personnel self-report any condition that could impact their ability to perform duties as a member of the security organization.
NOC-AE-20003736 Enclosure 2 - 10 CFR 73 Appendix B Section VI Subsection C.2.(a) and (b) 40 hours4.62963e-4 days <br />0.0111 hours <br />6.613757e-5 weeks <br />1.522e-5 months <br /> on-the-job training
NOC-AE-20003736 Enclosure 2 10 CFR 73 Appendix Controls Begin Implementation B Section VI Subsection C.2.(a) and STP will maintain a list of the STP will begin implementing (b) names of the individuals who will COVID-19 PHE controls for 40 hours4.62963e-4 days <br />0.0111 hours <br />6.613757e-5 weeks <br />1.522e-5 months <br /> on-the-job not meet the requalification managing personnel training requirements and will include the performing Security Program dates of initial qualification. duties upon NRC approval.
A needs analysis was conducted and determined that the individuals covered by the exemption have the requisite knowledge, skills and abilities to perform the duties assigned.
This exemption only applies to individuals who have completed the qualification requirements in 10 CFR Part 73, Appendix B, Section VI, subsection C.1.,
Duty training and qualification requirements, and have been previously qualified within STP security organization.
Security management will continue to evaluate security personnel performance in the plant to identify and correct performance issues in a timely manner.
NOC-AE-20003736 Enclosure 3 - 10 CFR 73 Appendix B Section VI Subsection C.3.(l)(1) Quarterly tactical response drills and annual force-on-force (FOF) exercises.
NOC-AE-20003736 Enclosure 3 10 CFR 73 Appendix Controls Begin Implementation B Section VI Subsection C.3.(l)(1) STP will maintain a list of the STP will begin implementing Quarterly tactical names of the individuals who will COVID-19 PHE controls for response drills and not meet the requalification managing personnel annual force-on-force requirements and will include the performing Security Program (FOF) exercises dates of the last qualification. duties at 00:00 on 06/12/2020.
and will ensure contingency response readiness of security personnel not participating in a quarterly drill or annual FOF exercise, or both, by conducting the following scenario-based evolution[s]:
a table-top exercise a lessons-learned review of past exercise and will complete the FOF exercise, within the time period in this request, when isolation restrictions are ended.
NOC-AE-20003736 Enclosure 4 - 10 CFR 73 Appendix B Section VI Subsection D.2.(a) Annual requalification, Subsection E.1.(c) Annual firearms familiarization and Subsection F.5.(a) Annual weapons requalification.
NOC-AE-20003736 Enclosure 4 10 CFR 73 Appendix Controls Begin Implementation B Section VI Subsection D.2.(a) STP will maintain a list of the STP will begin implementing Annual requalification names of the individuals who will COVID-19 PHE controls for not meet requalification managing personnel Subsection E.1.(c) requirements and will include the performing Security Program Annual firearms dates of the last qualification for duties at 00:00 on 09/02/2020.
familiarization each of the requirements not completed.
Subsection F.5.(a)
Annual weapons STP will conduct:
requalification discussions regarding critical tasks necessary for performance of security duties as assigned individual discussions regarding the fundamentals of marksmanship.
NOC-AE-20003736 Enclosure 5 - 10 CFR 73 Appendix B Section VI Subsection E.1.(f) Weapons range activities on a nominal 4-month periodicity.
NOC-AE-20003736 Enclosure 5 10 CFR 73 Appendix Controls Begin Implementation B Section VI Subsection E.1.(f) STP will maintain a list of the STP will begin implementing Weapons range names of the individuals who will COVID-19 PHE controls for activities on a nominal not meet the requalification managing personnel 4-month periodicity requirements and will include the performing Security Program dates of the last qualification. duties at 00:00 on 07/20/2020.
Since STP cannot complete the weapons range activities due to STP Pandemic response and CDC requirements that prohibit the ability to work within close range of the instructors and security force members on the range, discussions will be held with security personnel that will outline the objectives of the weapons range activity that will not be conducted due to COVID-19 PHE.