EPID:L-2018-LLA-0281, Request for License Amendment - Technical Specification 3.3.8.1, Loss of Power (LOP) Instrumentation (Approved, Closed) | |
Initiation
Administration | |
MONTHYEARML18291A6282018-10-18018 October 2018
[Table View]Request for License Amendment - Technical Specification 3.3.8.1, Loss of Power (LOP) Instrumentation Project stage: Request ML19058A0742019-02-26026 February 2019 NRR E-mail Capture - Draft Brunswick RAIs - LAR to Revise Allowable Value for TS 3.3.8.1 Time Delay on Loss of Voltage Project stage: Draft RAI ML19065A0962019-03-0606 March 2019 NRR E-mail Capture - Brunswick RAIs - LAR to Revise Allowable Value for TS 3.3.8.1 Time Delay on Loss of Voltage Project stage: RAI ML19268A0542019-10-31031 October 2019 Units 1 and 2 - Issuance of Amendment Nos. 295 and 323 to Revise Technical Specification 3.3.8.1, Loss of Power (LOP) Instrumentation Project stage: Approval 2019-10-31 |
ML18291A628 | |
Person / Time | |
---|---|
Site: | Brunswick ![]() |
Issue date: | 10/18/2018 |
From: | Gideon W R Duke Energy Progress |
To: | Document Control Desk, Office of Nuclear Reactor Regulation |
References | |
RA-18-0148 | |
Download: ML18291A628 (55) | |
Similar Documents at Brunswick | |
---|---|
Category:Letter
MONTHYEARIR 05000324/20230112023-12-26026 December 2023
[Table view]NRC Fire Protection Team Inspection - FPTI Report 05000324/2023011 and 05000325/2023011 IR 05000324/20234022023-12-14014 December 2023 Security Baseline Inspection Report 05000324-2023402 and 05000325-2023402 ML23297A0262023-11-27027 November 2023 Proposed Alternatives to ASME Code Section XI Subsection IWE Requirements for Torus Metallic Liner Inspections ML23317A3462023-11-14014 November 2023 Duke Fleet - Correction Letter to License Amendment Nos. 312 & 340 Issuance of Amendments Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-554, Revision 1 IR 05000324/20230032023-11-0101 November 2023 Integrated Inspection Report 05000324/2023003 and 05000325/2023003 IR 05000324/20230102023-10-17017 October 2023 Biennial Problem Identification and Resolution Inspection Report 05000324/2023010 and 05000325/2023010 IR 05000325/20234012023-10-16016 October 2023 Security Baseline Inspection Report 05000324 and 05000325 2023401 ML23346A1322023-10-0606 October 2023 Communication from C-10 Research & Education Foundation Regarding NextEra Common Emergency Fleet Plan License Amendment Request and Related Documents Subsequently Published ML23256A0882023-09-25025 September 2023 Issuance of Alternative to Steam Generator Welds ML23195A0782023-08-29029 August 2023 Issuance of Amendments Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-554, Revision 1 IR 05000324/20230052023-08-23023 August 2023 Updated Inspection Plan for Brunswick Steam Electric Plant, Units 1 and 2 (Report 05000324/2023005 and 05000325/2023005) IR 05000324/20230022023-08-0404 August 2023 Integrated Inspection Report 05000324/2023002 and 05000325/2023002 ML23201A2042023-07-28028 July 2023 Summary of Regulatory Audit in Support of Alternative Request RA-22-0308 for Inservice Inspection of the Torus Metallic Liner IR 05000324/20243012023-07-25025 July 2023 Notification of Licensed Operator Initial Examination 05000325/2024301 and 05000324/2024301 ML23212B2682023-07-25025 July 2023 Notification of Licensed Operator Initial Examination 05000325/2024301 and 05000324/2024301 ML23146A0012023-05-24024 May 2023 EN 56538 - Engine Systems Inc and Brunswick ML23212A9502023-05-24024 May 2023 Engine Systems, Inc., Part 21 Report Re Woodward EGB-35P Governor/Actuator with Foreign Material ML23130A3902023-05-12012 May 2023 Regulatory Audit Plan in Support of Alternative Request RA 22-0308 for Inservice Inspection of the Torus Metallic Liner IR 05000324/20230012023-05-10010 May 2023 Integrated Inspection Report 05000324 2023001 and 05000325 2023001 ML23118A0762023-05-0101 May 2023 Approval for Use of Specific Provision of a Later Edition of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section XI IR 05000324/20220042023-04-0404 April 2023 Reissue - Brunswick Steam Electric Plant - Integrated Inspection Report 05000324/2022004 and 05000325/022004 ML22332A4932023-03-10010 March 2023 William States Lee III 1 and 2 - Issuance of Amendments Regarding the Relocation of the Emergency Operations Facility IR 05000324/20220062023-03-0101 March 2023 Annual Assessment Letter for Brunswick Steam Electric Plant, Units 1 and 2 NRC Inspection Reports 05000324/2022006 and 05000325/2022006 ML23033A5252023-02-0808 February 2023 Integrated Inspection Report 05000324/2022004 and 05000325/2022004 IR 05000324/20223012023-02-0303 February 2023 NRC Operator License Examination Report 05000325/2022301 and 05000324/2022301 IR 05000324/20224022022-11-23023 November 2022 Security Baseline Inspection Report 05000324 2022402 and 05000325 2022402 ML22332A0132022-11-23023 November 2022 Operator Licensing Written Examination Approval 05000325/2022301 and 05000324/2022301 ML22096A0032022-11-18018 November 2022 McGuire Nuclear Station and Shearon Harris Nuclear Power Plant Authorization of RA-19-0352 Regarding Use of Alternative for RPV Head Closure Stud Examinations ML22256A2532022-11-14014 November 2022 Issuance of Amendments Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-541, Rev. 2 IR 05000324/20224032022-11-10010 November 2022 Cyber Security Inspection Report 05000324/2022403 and 05000325/2022403 ML22307A1762022-11-0707 November 2022 Notification of an NRC Fire Protection Team Inspection (FPTI) IR 05000324/20220032022-11-0707 November 2022 Integrated Inspection Report 05000324/2022003 and 05000325/2022003 ML22258A0302022-09-15015 September 2022 Evacuation Time Estimate Reports IR 05000324/20220052022-08-24024 August 2022 Updated Inspection Plan for Brunswick Steam Electric Plant (Report 05000324/2022005 and 05000325/2022005) ML22230D0692022-08-22022 August 2022 Documentation of the Completion of Required Actions Taken in Response to the Lessons Learned from the Fukushima Dai-ichi Accident IR 05000324/20220022022-08-0505 August 2022 Integrated Inspection Report 05000324/2022002 and 05000325/2022002 IR 05000324/20220102022-06-27027 June 2022 Design Basis Assurance Inspection (Teams) Inspection Report 05000324 2022010 and 05000325 2022010 ML22028A1742022-05-12012 May 2022 Issuance of Amendment Nos. 309 and 337 Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-580, Revision 1 IR 05000324/20220012022-05-10010 May 2022 Integrated Inspection Report 05000324/2022001 and 05000325/2022001 ML22119A1352022-05-0909 May 2022 Information Request for the Cyber-Security Baseline Security Inspection, Notification to Perform Inspection 05000325/2022403; 05000324/2022403 ML22082A2682022-05-0202 May 2022 Issuance of Amendment Nos. 308 and 336 Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-505, Revision 2 ML22102A0502022-04-11011 April 2022 301 Corporate Notification Letter IR 05000324/20224012022-03-16016 March 2022 Security Baseline Inspection Report 05000324/2022401 and 05000325/2022401 ML22054A2152022-03-0808 March 2022 Correction to Amendments to Revise Standby Liquid Control System Boron Solution Storage Tank Volume Technical Specifications IR 05000324/20210062022-03-0202 March 2022 Annual Assessment Letter for Brunswick Steam Electric Plant, Units 1 and 2 (Reports No. 05000324/2021006 and 05000325/2021006) IR 05000324/20210042022-02-14014 February 2022 Integrated Inspection Report 05000324/2021004 and 05000325/2021004 ML22035A1262022-02-0909 February 2022 Withdrawal of Exemption Request from the Requirements of 10 CFR Part 50, Appendix E, Section IV.F.2.d (EPID L-2021-LLE-0055 (COVID-19)) ML21354A5032022-01-24024 January 2022 Requested Exemption from 10 CFR 50, Appendix E, Section IV.F.2.D Not Required (EPID L-2021-LLE-0055 (COVID-19)) ML22018A1842022-01-18018 January 2022 Notification of Brunswick Steam Electric Plant, Units 1 & 2 - Design Bases Assurance Inspection - U.S. Nuclear Regulatory Inspection Report 05000324/2022010 and 05000325/2022010 ML21348A7192021-12-21021 December 2021 Regulatory Audit Summary Regarding License Amendment Request to Revise Technical Specifications to Adopt Risk-Informed Completion Times 2023-09-25 Category:License-Application for Facility Operating License (Amend/Renewal) DKT 50 MONTHYEARRA-23-0122, License Amendment Request to Revise the 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors, Categorization Process to .2023-08-17017 August 2023
[Table view]License Amendment Request to Revise the 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors, Categorization Process to . RA-22-0091, Application to Revise Technical Specifications to Adopt TSTF-554, Revision 1, Revise Reactor Coolant Leakage Requirements2023-02-16016 February 2023 Application to Revise Technical Specifications to Adopt TSTF-554, Revision 1, Revise Reactor Coolant Leakage Requirements RA-20-0107, Duke Energy Progress, LLC, and Duke Energy Carolinas, LLC, Application to Revise Technical Specifications to Adopt TSTF-541, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position2022-01-18018 January 2022 Duke Energy Progress, LLC, and Duke Energy Carolinas, LLC, Application to Revise Technical Specifications to Adopt TSTF-541, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position RA-21-0197, William, Units 1 and 2, License Amendment Request to Relocate the Duke Energy Emergency Operations Facility2021-12-14014 December 2021 William, Units 1 and 2, License Amendment Request to Relocate the Duke Energy Emergency Operations Facility RA-21-0239, Application to Revise Technical Specifications to Adopt TSTF-580, Revision 1, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling2021-12-0202 December 2021 Application to Revise Technical Specifications to Adopt TSTF-580, Revision 1, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling RA-21-0272, Supplement to License Amendment Request to Revise Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b2021-11-0101 November 2021 Supplement to License Amendment Request to Revise Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b RA-21-0141, Units 1 & 2 - Supplement to License Amendment Request to Revise Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative2021-04-26026 April 2021 Units 1 & 2 - Supplement to License Amendment Request to Revise Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative RA-18-0183, License Amendment Request to Revise Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b2021-04-0101 April 2021 License Amendment Request to Revise Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b RA-21-0009, Request for License Amendment - Standby Liquid Control (SLC) System Boron Solution Storage Tank Volume2021-02-23023 February 2021 Request for License Amendment - Standby Liquid Control (SLC) System Boron Solution Storage Tank Volume RA-20-0361, Application to Revise Technical Specifications to Adopt TSTF-582, Reactor Pressure Vessel Water Inventory Control (RPV WIC) Enhancements, Dated September 24, 2020, ADAMS Accession Number ML20272A0912020-11-17017 November 2020 Application to Revise Technical Specifications to Adopt TSTF-582, Reactor Pressure Vessel Water Inventory Control (RPV WIC) Enhancements, Dated September 24, 2020, ADAMS Accession Number ML20272A091 RA-20-0165, Application to Revise Technical Specifications to Adopt TSTF-582, Reactor Pressure Vessel Water Inventory Control (RPV WIC) Enhancements2020-09-24024 September 2020 Application to Revise Technical Specifications to Adopt TSTF-582, Reactor Pressure Vessel Water Inventory Control (RPV WIC) Enhancements RA-20-0127, Application to Revise Technical Specifications to Adopt TSTF-568, Revise Applicability of BWR TS 3.6.2.5 and TS 3.6.3.22020-07-27027 July 2020 Application to Revise Technical Specifications to Adopt TSTF-568, Revise Applicability of BWR TS 3.6.2.5 and TS 3.6.3.2 RA-20-0142, Application to Revise Technical Specifications to Adopt TSTF-566, Revise Actions for Inoperable RHR Shutdown Cooling Subsystems2020-07-21021 July 2020 Application to Revise Technical Specifications to Adopt TSTF-566, Revise Actions for Inoperable RHR Shutdown Cooling Subsystems RA-19-0437, Nos. 1 & 2 - License Amendment Request to Modify Approved 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors Categorization Process2020-07-0909 July 2020 Nos. 1 & 2 - License Amendment Request to Modify Approved 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors Categorization Process RA-19-0431, Application to Revise Technical Specifications to Adopt TSTF 564, Safety Limit MCPR2020-03-0909 March 2020 Application to Revise Technical Specifications to Adopt TSTF 564, Safety Limit MCPR ML20073F1862020-03-0606 March 2020 Issuance of Amendment Nos. 299 and 327 to Revise Technical Specification 5.6.5b to Allow Application of Advanced Framatome Atrium 11 Fuel Methodologies (EPID L-2018-LLA-0273) (Redacted) RA-19-0006, License Amendment Application to Relocate Technical Specification Unit/Facility Staff Qualification ANSI N18.1-1971, ANSI/ANS-3.1-1978 and ANSI/ANS-3.1-1981 Requirements to the Duke Energy Corporation Quality Assurance Program Description2019-07-0808 July 2019 License Amendment Application to Relocate Technical Specification Unit/Facility Staff Qualification ANSI N18.1-1971, ANSI/ANS-3.1-1978 and ANSI/ANS-3.1-1981 Requirements to the Duke Energy Corporation Quality Assurance Program Description RA-19-0139, Supplement to Request for License Amendment Regarding Application of Advanced Framatome Methodologies2019-03-18018 March 2019 Supplement to Request for License Amendment Regarding Application of Advanced Framatome Methodologies RA-19-0015, Request for License Amendment: Surveillance Requirements for Safety Relief Valves2019-03-0404 March 2019 Request for License Amendment: Surveillance Requirements for Safety Relief Valves RA-18-0148, License Amendment Request to Revise Units 1 and 2 Technical Specification 5.5.12 for Permanent Extension of Type a and Type C Leak Rate Test Frequencies2019-02-27027 February 2019 License Amendment Request to Revise Units 1 and 2 Technical Specification 5.5.12 for Permanent Extension of Type a and Type C Leak Rate Test Frequencies RA-18-0234, (Bsep), Unit Nos. 1 and 2, Application to Revise Technical Specifications to Adopt TSTF-269, Allow Administrative Means of Position Verification for Locked or Sealed Valves.2018-12-14014 December 2018 (Bsep), Unit Nos. 1 and 2, Application to Revise Technical Specifications to Adopt TSTF-269, Allow Administrative Means of Position Verification for Locked or Sealed Valves. ML18291A6282018-10-18018 October 2018 Request for License Amendment - Technical Specification 3.3.8.1, Loss of Power (LOP) Instrumentation RA-18-0135, Request for License Amendment - Technical Specification 3.7.4, Control Room Air Conditioning (AC) System2018-08-30030 August 2018 Request for License Amendment - Technical Specification 3.7.4, Control Room Air Conditioning (AC) System RA-18-0073, Application of Dissimilar Metal Weld Full Structural Overlay - Reactor Pressure Vessel Nozzles N4A and N4D2018-06-28028 June 2018 Application of Dissimilar Metal Weld Full Structural Overlay - Reactor Pressure Vessel Nozzles N4A and N4D BSEP 18-0041, Request for License Amendment to Revise the Technical Specifications to Relocate the Pressure-Temperature Limit Curves to a Pressure and Temperature Limits Report2018-04-0404 April 2018 Request for License Amendment to Revise the Technical Specifications to Relocate the Pressure-Temperature Limit Curves to a Pressure and Temperature Limits Report BSEP 17-0098, Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems, and Components (Sscs) for Nuclear Power Reactors2018-01-10010 January 2018 Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems, and Components (Sscs) for Nuclear Power Reactors BSEP 17-0111, Request for Risk-Informed Exigent License Amendment - Technical Specification 3.8.1, AC Sources Operating, One-Time Extension of Emergency Diesel Generator Completion Times and Suspension of Surveillance Requirements2017-11-28028 November 2017 Request for Risk-Informed Exigent License Amendment - Technical Specification 3.8.1, AC Sources Operating, One-Time Extension of Emergency Diesel Generator Completion Times and Suspension of Surveillance Requirements BSEP 17-0108, Request for Emergency License Amendment - Technical Specification 3.8.1, AC Sources - Operating, One-Time Extension of Emergency Diesel Generator Completion Times and Suspension of Surveillance Requirements2017-11-22022 November 2017 Request for Emergency License Amendment - Technical Specification 3.8.1, AC Sources - Operating, One-Time Extension of Emergency Diesel Generator Completion Times and Suspension of Surveillance Requirements BSEP 17-0017, Submittal of Request for License Amendment for Performance-Based Fire Protection Alternative for Thermal Insulation Material2017-11-15015 November 2017 Submittal of Request for License Amendment for Performance-Based Fire Protection Alternative for Thermal Insulation Material BSEP 17-0078, Request for License Amendment - DC Sources - Operating Surveillance Requirement (SR) 3.8.4.52017-10-0303 October 2017 Request for License Amendment - DC Sources - Operating Surveillance Requirement (SR) 3.8.4.5 BSEP 17-0060, Application to Revise Technical Specifications to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control.2017-06-29029 June 2017 Application to Revise Technical Specifications to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control. ML17088A3962017-06-0707 June 2017 Issuance of Amendments Regarding Revisions of Technical Specifications to Adopt TSTF-535, Revise Shutdown Margin Definition to Address Advanced Fuel Designs BSEP 17-0020, Supplement - License Amendment Request Regarding Relocation of Specific Surveillance Frequency Requirements to a Licensee-Controlled Program2017-02-27027 February 2017 Supplement - License Amendment Request Regarding Relocation of Specific Surveillance Frequency Requirements to a Licensee-Controlled Program BSEP 16-0083, Steam Electric Plant, Units 1 And. 2 - Application to Revise Technical Specifications to Adopt TSTF-535, Revision O, Revise Shutdown Margin Definition to Address Advance Fuel Designs.2016-11-18018 November 2016 Steam Electric Plant, Units 1 And. 2 - Application to Revise Technical Specifications to Adopt TSTF-535, Revision O, Revise Shutdown Margin Definition to Address Advance Fuel Designs. BSEP 16-0082, Transmittal of Application to Revise Technical Specifications to Adopt TSTF-529, Clarify Use and Application Rules.2016-10-27027 October 2016 Transmittal of Application to Revise Technical Specifications to Adopt TSTF-529, Clarify Use and Application Rules. BSEP 16-0087, License Amendment Request for Adoption of Technical Specifications Task Force (TSTF) Traveler TSTF-423, Revision 1, Technical Specifications End States, NEDC-32988-A.2016-09-28028 September 2016 License Amendment Request for Adoption of Technical Specifications Task Force (TSTF) Traveler TSTF-423, Revision 1, Technical Specifications End States, NEDC-32988-A. RA-16-0019, Duke Energy Progress - Application to Revise Technical Specifications to Adopt TSTF-522, Revision 0, Revise Ventilation System Surveillance Requirements to Operate for 10 Hours Per Month Using the Consolidated Line Item Improvement Proces2016-09-27027 September 2016 Duke Energy Progress - Application to Revise Technical Specifications to Adopt TSTF-522, Revision 0, Revise Ventilation System Surveillance Requirements to Operate for 10 Hours Per Month Using the Consolidated Line Item Improvement Process ML16287A4222016-09-26026 September 2016 FS1-0028339 Revision 1.0, Brunswick, Unit 1, Cycle 21 and Unit 2 Cycle 23 MELLLA SLMCPR Analyses with SAFLIM30 Methodology. BSEP 16-0078, Request for License Amendment - Revision to Technical Specification 2.1.1.2 Minimum Critical Power Ratio Safety Limit2016-09-26026 September 2016 Request for License Amendment - Revision to Technical Specification 2.1.1.2 Minimum Critical Power Ratio Safety Limit BSEP 16-0014, Request for License Amendment-Reactor Protection System(Rps) Electrical Protection Assembly (EPA) Electric Power Monitoring Surveillance Requirements (Srs) 3.3.8.2.2 and 3.3.8.2.32016-04-13013 April 2016 Request for License Amendment-Reactor Protection System(Rps) Electrical Protection Assembly (EPA) Electric Power Monitoring Surveillance Requirements (Srs) 3.3.8.2.2 and 3.3.8.2.3 RA-15-0040, License Amendment Request, Change in Corporate Form of Duke Energy Progress2016-02-0101 February 2016 License Amendment Request, Change in Corporate Form of Duke Energy Progress BSEP 15-0101, Application for Technical Specification Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee-Controlled Program2015-12-21021 December 2015 Application for Technical Specification Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee-Controlled Program ML15175A4472015-06-24024 June 2015 Application to Revise Technical Specifications to Adopt TSTF-523, Revision 2, Generic Letter 2008-01, Managing Gas Accumulation, Using the Consolidated Line Item Improvement Process. Part 5 of 6 ML15175A4482015-06-24024 June 2015 Application to Revise Technical Specifications to Adopt TSTF-523, Revision 2, Generic Letter 2008-01, Managing Gas Accumulation, Using the Consolidated Line Item Improvement Process. Part 6 of 6 ML15175A4452015-06-24024 June 2015 Application to Revise Technical Specifications to Adopt TSTF-523, Revision 2, Generic Letter 2008-01, Managing Gas Accumulation, Using the Consolidated Line Item Improvement Process. Part 4 of 6 ML15175A4422015-06-24024 June 2015 Application to Revise Technical Specifications to Adopt TSTF-523, Revision 2, Generic Letter 2008-01, Managing Gas Accumulation, Using the Consolidated Line Item Improvement Process. Part 3 of 6 RA-15-0006, Application to Revise Technical Specifications to Adopt TSTF-523, Revision 2, Generic Letter 2008-01, Managing Gas Accumulation, Using the Consolidated Line Item Improvement Process. Part 2 of 62015-06-24024 June 2015 Application to Revise Technical Specifications to Adopt TSTF-523, Revision 2, Generic Letter 2008-01, Managing Gas Accumulation, Using the Consolidated Line Item Improvement Process. Part 2 of 6 ML15175A4392015-06-24024 June 2015 Duke Energy Carolinas, LLC, Application to Revise Technical Specifications to Adopt TSTF-523, Rev. 2, Generic Letter 2008-01, Managing Gas Accumulation, Using the Consolidated Line Item Improvement Process. Part 1 of 6 RA-15-0009, Supplement to Application for Order Approving Transfer of Control of License and for Conforming License Amendment Pursuant to 10 CFR 50.80 and 10 CFR 50.902015-03-0404 March 2015 Supplement to Application for Order Approving Transfer of Control of License and for Conforming License Amendment Pursuant to 10 CFR 50.80 and 10 CFR 50.90 BSEP 15-0007, Request for License Amendments - Adoption of Topical Report ANP-10298P-A, Revision 12015-02-19019 February 2015 Request for License Amendments - Adoption of Topical Report ANP-10298P-A, Revision 1 2023-08-17 |
Text
Loss of Power (LOP) Instrumentation Loss of Power (LOP) Instrumentation, Loss of Power Instrumentation4.16 kV Emergency Bus (Loss of Voltage) Undervoltage and Time Delay Uncertainty and Setpoint Calculation (For 4kV 1-E1(E2)-AE7(AG5)-27/59E and 2-E3(E4)-AI3(AK0)-27/59E)
U.S. Nuclear Regulatory Commission Page 2 of 3 I declare, under penalty of perjury, that the foregoing is true and correct. Executed on October 18, 2018. Sincerely, William R. Gideon MAT/mat
Enclosure:
Description and Assessment of the Proposed Change Attachment 1: Proposed Technical Specification Changes (Mark-Up)
-Unit 1 Attachment 2: Proposed Technical Specification Changes (Mark-Up)
-Unit 2 Attachment 3: Revised (Typed) Technical Specification Pages -Unit 1 Attachment 4: Revised (Typed) Technical Specification Pages -Unit 2 Attachment 5: Calculation 04KV-0001, 4.16 kV Emergency Bus (Loss of Voltage) Undervoltage and Time Delay Uncertainty and Setpoint Calculation (For 4kV 1-E1 (E2)-AE7(AG5)-27/59E and 2-E3(E4)-Al3(AK0)-27/59E)
Loss of Power (LOP) Instrumentation
4.16 kV Emergency Bus (Loss of Voltage) Undervoltage and Time Delay Uncertainty and Setpoint Calculation (For 4kV 1-E1(E2)-
AE7(AG5)-27/59E and 2-E3(E4)-AI3(AK0)-27/59E)
Loss of Power (LOP) Instrumentation, Loss of Power Instrumentation Loss of Power InstrumentationLoss of Power Instrumentation 4.16 kV Emergency Bus (Loss of Voltage) Undervoltage and Time Delay Uncertainty and Setpoint Calculation (For 4kV 1-E1(E2)-AE7(AG5)-27/59E and 2-E3(E4)-AI3(AK0)-27/59E)
Technical specifications Loss of Power InstrumentationGeneral Design Criteria for Nuclear Power Plant Construction Electric power systemsInspection and testing of electric power systemsLoss of Power (LOP) Instrumentation,Loss of Power InstrumentationIssuance of amendment
LOP Instrumentation 3.3.8.1 Brunswick Unit 1 3.3-71 Amendment No. 239 Table 3.3.8.1-1 (page 1 of 1) Loss of Power Instrumentation FUNCTION REQUIRED CHANNELS PER BUS SURVEILLANCE REQUIREMENTS ALLOWABLE VALUE
- 1. 4.16 kV Emergency Bus Undervoltage (Loss of Voltage)
- a. Bus Undervoltage
1
SR 3.3.8.1.2 SR 3.3.8.1.4
3115 V and 3400 V b. Time Delay 1 SR 3.3.8.1.2 SR 3.3.8.1.4
0.5 seconds
and 2.0 seconds 2. 4.16 kV Emergency Bus Undervoltage (Degraded Voltage)
- a. Bus Undervoltage
3 SR 3.3.8.1.1 SR 3.3.8.1.3 SR 3.3.8.1.4
3706 V and 3748 V b. Time Delay 3 SR 3.3.8.1.1 SR 3.3.8.1.3 SR 3.3.8.1.4
9.0 seconds
and 11.0 seconds
LOP Instrumentation 3.3.8.1 Brunswick Unit 2 3.3-71 Amendment No. 267 Table 3.3.8.1-1 (page 1 of 1) Loss of Power Instrumentation FUNCTION REQUIRED CHANNELS PER BUS SURVEILLANCE REQUIREMENTS ALLOWABLE VALUE
- 1. 4.16 kV Emergency Bus Undervoltage (Loss of Voltage)
- a. Bus Undervoltage
1
SR 3.3.8.1.2 SR 3.3.8.1.4
3115 V and 3400 V b. Time Delay 1 SR 3.3.8.1.2 SR 3.3.8.1.4
0.5 seconds
and 2.0 seconds 2. 4.16 kV Emergency Bus Undervoltage (Degraded Voltage)
- a. Bus Undervoltage
3 SR 3.3.8.1.1 SR 3.3.8.1.3 SR 3.3.8.1.4
3706 V and 3748 V b. Time Delay 3 SR 3.3.8.1.1 SR 3.3.8.1.3 SR 3.3.8.1.4
9.0 seconds
and 11.0 seconds
Rev. # Pages Revised Pages Deleted Pages Added Rev. # Type Pages Revised Pages Deleted Pages Added