ML14156A132

From kanterella
Jump to navigation Jump to search
Notification of NRC Triennial Heat Exchanger Inspection Report 05000445-14-004 and 05000446-14-004
ML14156A132
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 06/05/2014
From: Thomas Farnholtz
Region 4 Engineering Branch 1
To: Flores R
Luminant Generation Co
References
IR-14-004
Download: ML14156A132 (7)


See also: IR 05000445/2014004

Text

R. Flores UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION IV

1600 E LAMAR BLVD

ARLINGTON, TX 76011-4511

June 5, 2014

Mr. Rafael Flores, Senior Vice President

and Chief Nuclear Officer

Luminant Generation Company, LLC

Comanche Peak Nuclear Power Plant

P.O. Box 1002

Glen Rose, TX 76043

SUBJECT: COMMANCHE PEAK NUCLEAR POWER PLANT - NOTIFICATION OF NRC

TRIENNIAL HEAT EXCHANGER INSPECTION REPORT 05000445/2014004

AND 05000446/2014004

Dear Mr. Flores:

The purpose of this letter is to notify you that U.S. Nuclear Regulatory Commission, Region IV,

staff will conduct a triennial heat sink performance inspection at the Comanche Peak Nuclear

Power Plant. The inspection will be comprised of one reactor inspector from the NRC Region IV

office. The inspection will be conducted in accordance with Inspection Procedure 71111.07,

"Heat Sink Performance."

The schedule for the inspection is as follows:

Onsite inspection - July 7-11, 2014

Experience has shown that this inspection is resource intensive, both for the NRC inspectors

and your staff. In order to minimize the impact to your onsite resources and to ensure a

productive inspection, we have enclosed a request for documents needed for this inspection.

Please note that the documents are requested to be provided by June 30, 2014. We request

that during the onsite inspection week, you ensure that copies of analyses, evaluations, or

documentation regarding the implementation and maintenance of your heat exchanger program

are available. Of specific interest are those documents that establish that your heat exchanger

program satisfies NRC regulatory requirements and conforms to applicable NRC guidance.

Also, appropriate personnel knowledgeable of safety-related heat exchangers should be

available to support the inspector at the site during the inspection.

We have discussed the schedule for this inspection activity with your staff and understand that

our regulatory contact for this inspection will be Gary Merka of your licensing organization. If

there are any questions about this inspection or the material requested, please contact the

inspector, Jim Melfi, at 817-200-1523 or by email, Jim.Melfi@nrc.gov.

R. Flores -2-

This letter does not contain new or amended information collection requirements subject

to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information

collection requirements were approved by the Office of Management and Budget, control

number 3150-0011. The NRC may not conduct or sponsor, and a person is not required

to respond to, a request for information or an information collection requirement unless the

requesting document displays a currently valid Office of Management and Budget control

number.

In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter

and its enclosure will be available electronically for public inspection in the NRC Public

Document Room or from the Publicly Available Records (PARS) component of NRC's

document system (ADAMS). ADAMS is accessible from the NRC Web site at

http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely,

/RA/

Thomas R. Farnholtz, Branch Chief

Engineering Branch 1

Division of Reactor Safety

Dockets: 50-445; 50-446

Licenses: NPF-87; NPF-89

Enclosure:

Heat Sink Performance Inspection

Document Request

Electronic Distribution for Comanche Peak

Power Plant

ML14156A132

SUNSI Review ADAMS Publicly Available Non-Sensitive Keyword: SUNSI

By: JMelfi Yes No Non-Publicly Available Sensitive Review Complete

OFFICE PE:DRPE C:DRPA C:EB1

NAME J. Melfi W. Walker T. Farnholtz

SIGNATURE /RA/ /RA/ /RA/

DATE 6/2/14 6/4/14 6/5/14

Letter to Rafael Flores from Thomas R. Farnholtz, dated June 5, 2014

SUBJECT: COMMANCHE PEAK NUCLEAR POWER PLANT - NOTIFICATION OF NRC

TRIENNIAL HEAT EXCHANGER INSPECTION REPORT 05000445/2014004

AND 05000446/2014004

Electronic distribution by RIV:

Regional Administrator (Marc.Dapas@nrc.gov)

DRP Director (Kriss.Kennedy@nrc.gov)

DRP Deputy Director (Troy.Pruett@nrc.gov)

DRS Director (Anton.Vegel@nrc.gov)

DRS Deputy Director (Jeff.Clark@nrc.gov)

Senior Resident Inspector (John.Kramer@nrc.gov)

Resident Inspector (Rayomand.Kumana@nrc.gov)

Branch Chief, DRP/A (Wayne.Walker@nrc.gov)

Senior Project Engineer, DRP/A (Ryan.Alexander@nrc.gov)

Project Engineer, DRP/A (Brian.Cummings@nrc.gov)

Public Affairs Officer (Victor.Dricks@nrc.gov)

Public Affairs Officer (Lara.Uselding@nrc.gov)

Project Manager (Balwant.Singal@nrc.gov)

Branch Chief, DRS/TSB (Geoffrey.Miller@nrc.gov)

RITS Coordinator (Marisa.Herrera@nrc.gov)

ACES (R4ACES@nrc.gov)

Regional Counsel (Karla.Fuller@nrc.gov)

Technical Support Assistant (Loretta.Williams@nrc.gov)

Congressional Affairs Officer (Jenny.Weil@nrc.gov)

RIV/ETA: OEDO (Joseph.Nick@nrc.gov)

Heat Sink Performance Inspection Document Request

Inspection Dates: July 7-11, 2014

Inspection Procedures: IP 71111.07, Triennial Heat Sink Performance

Inspector: Jim Melfi, Project Engineer

Information Requested for the In-Office Preparation Week

The following information should be sent to the Region IV office in hard copy or electronic

format (ims.certrec.com database preferred), in care of Jim Melfi, by June 30, 2014. The

inspectors will select specific items from the information requested below and then request from

your staff additional documents needed during the on-site inspection week. We also request

that you categorize the documents in your response with the numbered list below. Please

provide requested documentation electronically if possible. If requested documents are large

and only hard copy formats are available, please inform the inspector and provide subject

documentation during the first day of the onsite inspection. If you have any questions regarding

this information request, please call the lead inspector as soon as possible.

The following heat exchangers/heat sinks have been selected for inspection:

  • Centrifugal Charging Pump Lube Oil Coolers (Unit 2)
  • Unit 1 Spent Fuel Pool Heat Exchangers

For all Generic Letter 89-13 exchangers:

1. List of corrective action program documents (with a short description) associated with

Generic Letter 89-13 heat exchangers, heat sinks, silting, corrosion, fouling, heat

exchanger cavitation, or heat exchanger testing, in the previous three years

2. System health report(s) and maintenance rule system notebooks for all the GL 89-13

heat exchangers

3. Copy of any self-assessments done on any GL 89-13 heat exchangers in the previous

three years

4. Copies of procedures developed to implement the recommendations of Generic

Letter 89-13 (e.g., the Generic Letter 89-13 Heat Exchanger Program description)

Enclosure

For the specific heat exchangers selected:

Testing Documents

5. Copies of the two most recently completed tests confirming thermal performance for

those heat exchangers which are performance tested

6. Instrument uncertainties of the instruments used during testing

7. Copy of any operability determinations or other documentation of degradation

associated with the heat exchangers or the systems that support the operation for the

selected heat exchangers

8. Documents that show the as-found results are recorded, evaluated, and appropriately

dispositioned, such that the as-left condition is acceptable

Cleaning Documents

9. The cleaning and inspection maintenance schedule for each heat exchanger for the next

five years

10. Copy of the document describing the inspection results for the last two cleaning and

inspection activities completed on each heat exchanger

11. Cleaning procedures with acceptance criteria for the selected heat exchangers

12. Copies of the documents that verify the structural integrity of the heat exchanger,

(e.g., eddy current summary sheets, ultrasonic testing results, and visual inspection

results)

13. Copies of those documents that describe the methods taken to control water chemistry

in the heat exchangers

Design Documents

14. Copies of the design basis documents and updated final safety analysis report pages for

the selected heat exchangers

15. Provide a list of calculations with a description which currently apply to each heat

exchanger

16. Copies of vendor data sheets and design basis data for the selected heat exchangers

17. Copy of the calculation which establishes the limiting (maximum) design basis heat load

which is required to be removed by each of these heat exchangers

18. Copy of the calculation which correlates surveillance testing results from these heat

exchangers with design basis heat removal capability (e.g., basis for surveillance test

acceptance criteria)

-2-

19. Copy of the calculations or documents which evaluate the potential for water hammer or

excessive tube vibration in the heat exchanger or associated piping

20. Copy of the document which identifies the current number of tubes in service for each

heat exchanger and the supporting calculation which establishes the maximum number

of tubes that can be plugged in each heat exchanger

21. Copy of the document establishing the repair criteria (plugging limit) for degraded tubes

which are identified in each heat exchanger

For the ultimate heat sink or safety-related service water system:

22. Copies of calculations and surveillances that determine the ultimate heat sink reservoir

capacity and heat transfer capability (if applicable)

23. Copies of any design changes performed on the ultimate heat sink or safety-related

service water system

24. Copies of procedures for a loss of ultimate heat sink or safety-related service water

system

25. Copies of inspections and/or maintenance related to macrofouling (silt, mussel shells,

debris, etc.) and aquatic life

26. Copies of inspections and/or maintenance related to preventing biotic fouling

27. Copies of procedures and/or test results to survey or monitor interface valves between

the safety-related section of the service water system and the non-safety-related section

28. Copy of the most recent service water flow balance test results, both as-found and

as-left

29. History of any thru-wall pipe leaks on the safety-related service water system

Inspector Contact Information:

Jim Melfi

Project Engineer

817-200-1523

Jim.Melfi@nrc.gov

Mailing Address:

US NRC Region IV

Attn: Jim Melfi

1600 East Lamar Blvd.

Arlington, TX 76011-4511

-3-