ML14156A132
ML14156A132 | |
Person / Time | |
---|---|
Site: | Comanche Peak ![]() |
Issue date: | 06/05/2014 |
From: | Thomas Farnholtz Region 4 Engineering Branch 1 |
To: | Flores R Luminant Generation Co |
References | |
IR-14-004 | |
Download: ML14156A132 (7) | |
See also: IR 05000445/2014004
Text
R. Flores UNITED STATES
NUCLEAR REGULATORY COMMISSION
REGION IV
1600 E LAMAR BLVD
ARLINGTON, TX 76011-4511
June 5, 2014
Mr. Rafael Flores, Senior Vice President
and Chief Nuclear Officer
Luminant Generation Company, LLC
Comanche Peak Nuclear Power Plant
P.O. Box 1002
Glen Rose, TX 76043
SUBJECT: COMMANCHE PEAK NUCLEAR POWER PLANT - NOTIFICATION OF NRC
TRIENNIAL HEAT EXCHANGER INSPECTION REPORT 05000445/2014004
AND 05000446/2014004
Dear Mr. Flores:
The purpose of this letter is to notify you that U.S. Nuclear Regulatory Commission, Region IV,
staff will conduct a triennial heat sink performance inspection at the Comanche Peak Nuclear
Power Plant. The inspection will be comprised of one reactor inspector from the NRC Region IV
office. The inspection will be conducted in accordance with Inspection Procedure 71111.07,
"Heat Sink Performance."
The schedule for the inspection is as follows:
Onsite inspection - July 7-11, 2014
Experience has shown that this inspection is resource intensive, both for the NRC inspectors
and your staff. In order to minimize the impact to your onsite resources and to ensure a
productive inspection, we have enclosed a request for documents needed for this inspection.
Please note that the documents are requested to be provided by June 30, 2014. We request
that during the onsite inspection week, you ensure that copies of analyses, evaluations, or
documentation regarding the implementation and maintenance of your heat exchanger program
are available. Of specific interest are those documents that establish that your heat exchanger
program satisfies NRC regulatory requirements and conforms to applicable NRC guidance.
Also, appropriate personnel knowledgeable of safety-related heat exchangers should be
available to support the inspector at the site during the inspection.
We have discussed the schedule for this inspection activity with your staff and understand that
our regulatory contact for this inspection will be Gary Merka of your licensing organization. If
there are any questions about this inspection or the material requested, please contact the
inspector, Jim Melfi, at 817-200-1523 or by email, Jim.Melfi@nrc.gov.
R. Flores -2-
This letter does not contain new or amended information collection requirements subject
to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information
collection requirements were approved by the Office of Management and Budget, control
number 3150-0011. The NRC may not conduct or sponsor, and a person is not required
to respond to, a request for information or an information collection requirement unless the
requesting document displays a currently valid Office of Management and Budget control
number.
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter
and its enclosure will be available electronically for public inspection in the NRC Public
Document Room or from the Publicly Available Records (PARS) component of NRC's
document system (ADAMS). ADAMS is accessible from the NRC Web site at
http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Sincerely,
/RA/
Thomas R. Farnholtz, Branch Chief
Engineering Branch 1
Division of Reactor Safety
Dockets: 50-445; 50-446
Enclosure:
Heat Sink Performance Inspection
Document Request
Electronic Distribution for Comanche Peak
Power Plant
SUNSI Review ADAMS Publicly Available Non-Sensitive Keyword: SUNSI
By: JMelfi Yes No Non-Publicly Available Sensitive Review Complete
OFFICE PE:DRPE C:DRPA C:EB1
NAME J. Melfi W. Walker T. Farnholtz
SIGNATURE /RA/ /RA/ /RA/
DATE 6/2/14 6/4/14 6/5/14
Letter to Rafael Flores from Thomas R. Farnholtz, dated June 5, 2014
SUBJECT: COMMANCHE PEAK NUCLEAR POWER PLANT - NOTIFICATION OF NRC
TRIENNIAL HEAT EXCHANGER INSPECTION REPORT 05000445/2014004
AND 05000446/2014004
Electronic distribution by RIV:
Regional Administrator (Marc.Dapas@nrc.gov)
DRP Director (Kriss.Kennedy@nrc.gov)
DRP Deputy Director (Troy.Pruett@nrc.gov)
DRS Director (Anton.Vegel@nrc.gov)
DRS Deputy Director (Jeff.Clark@nrc.gov)
Senior Resident Inspector (John.Kramer@nrc.gov)
Resident Inspector (Rayomand.Kumana@nrc.gov)
Branch Chief, DRP/A (Wayne.Walker@nrc.gov)
Senior Project Engineer, DRP/A (Ryan.Alexander@nrc.gov)
Project Engineer, DRP/A (Brian.Cummings@nrc.gov)
Public Affairs Officer (Victor.Dricks@nrc.gov)
Public Affairs Officer (Lara.Uselding@nrc.gov)
Project Manager (Balwant.Singal@nrc.gov)
Branch Chief, DRS/TSB (Geoffrey.Miller@nrc.gov)
RITS Coordinator (Marisa.Herrera@nrc.gov)
ACES (R4ACES@nrc.gov)
Regional Counsel (Karla.Fuller@nrc.gov)
Technical Support Assistant (Loretta.Williams@nrc.gov)
Congressional Affairs Officer (Jenny.Weil@nrc.gov)
RIV/ETA: OEDO (Joseph.Nick@nrc.gov)
Heat Sink Performance Inspection Document Request
Inspection Dates: July 7-11, 2014
Inspection Procedures: IP 71111.07, Triennial Heat Sink Performance
Inspector: Jim Melfi, Project Engineer
Information Requested for the In-Office Preparation Week
The following information should be sent to the Region IV office in hard copy or electronic
format (ims.certrec.com database preferred), in care of Jim Melfi, by June 30, 2014. The
inspectors will select specific items from the information requested below and then request from
your staff additional documents needed during the on-site inspection week. We also request
that you categorize the documents in your response with the numbered list below. Please
provide requested documentation electronically if possible. If requested documents are large
and only hard copy formats are available, please inform the inspector and provide subject
documentation during the first day of the onsite inspection. If you have any questions regarding
this information request, please call the lead inspector as soon as possible.
The following heat exchangers/heat sinks have been selected for inspection:
- Residual Heat Removal Heat Exchanger 1-01
- Containment Spray Heat Exchanger 2-02
- Centrifugal Charging Pump Lube Oil Coolers (Unit 2)
- Unit 1 Spent Fuel Pool Heat Exchangers
For all Generic Letter 89-13 exchangers:
1. List of corrective action program documents (with a short description) associated with
Generic Letter 89-13 heat exchangers, heat sinks, silting, corrosion, fouling, heat
exchanger cavitation, or heat exchanger testing, in the previous three years
2. System health report(s) and maintenance rule system notebooks for all the GL 89-13
heat exchangers
3. Copy of any self-assessments done on any GL 89-13 heat exchangers in the previous
three years
4. Copies of procedures developed to implement the recommendations of Generic
Letter 89-13 (e.g., the Generic Letter 89-13 Heat Exchanger Program description)
Enclosure
For the specific heat exchangers selected:
Testing Documents
5. Copies of the two most recently completed tests confirming thermal performance for
those heat exchangers which are performance tested
6. Instrument uncertainties of the instruments used during testing
7. Copy of any operability determinations or other documentation of degradation
associated with the heat exchangers or the systems that support the operation for the
selected heat exchangers
8. Documents that show the as-found results are recorded, evaluated, and appropriately
dispositioned, such that the as-left condition is acceptable
Cleaning Documents
9. The cleaning and inspection maintenance schedule for each heat exchanger for the next
five years
10. Copy of the document describing the inspection results for the last two cleaning and
inspection activities completed on each heat exchanger
11. Cleaning procedures with acceptance criteria for the selected heat exchangers
12. Copies of the documents that verify the structural integrity of the heat exchanger,
(e.g., eddy current summary sheets, ultrasonic testing results, and visual inspection
results)
13. Copies of those documents that describe the methods taken to control water chemistry
in the heat exchangers
Design Documents
14. Copies of the design basis documents and updated final safety analysis report pages for
the selected heat exchangers
15. Provide a list of calculations with a description which currently apply to each heat
exchanger
16. Copies of vendor data sheets and design basis data for the selected heat exchangers
17. Copy of the calculation which establishes the limiting (maximum) design basis heat load
which is required to be removed by each of these heat exchangers
18. Copy of the calculation which correlates surveillance testing results from these heat
exchangers with design basis heat removal capability (e.g., basis for surveillance test
acceptance criteria)
-2-
19. Copy of the calculations or documents which evaluate the potential for water hammer or
excessive tube vibration in the heat exchanger or associated piping
20. Copy of the document which identifies the current number of tubes in service for each
heat exchanger and the supporting calculation which establishes the maximum number
of tubes that can be plugged in each heat exchanger
21. Copy of the document establishing the repair criteria (plugging limit) for degraded tubes
which are identified in each heat exchanger
For the ultimate heat sink or safety-related service water system:
22. Copies of calculations and surveillances that determine the ultimate heat sink reservoir
capacity and heat transfer capability (if applicable)
23. Copies of any design changes performed on the ultimate heat sink or safety-related
service water system
24. Copies of procedures for a loss of ultimate heat sink or safety-related service water
system
25. Copies of inspections and/or maintenance related to macrofouling (silt, mussel shells,
debris, etc.) and aquatic life
26. Copies of inspections and/or maintenance related to preventing biotic fouling
27. Copies of procedures and/or test results to survey or monitor interface valves between
the safety-related section of the service water system and the non-safety-related section
28. Copy of the most recent service water flow balance test results, both as-found and
as-left
29. History of any thru-wall pipe leaks on the safety-related service water system
Inspector Contact Information:
Project Engineer
817-200-1523
Jim.Melfi@nrc.gov
Mailing Address:
US NRC Region IV
Attn: Jim Melfi
1600 East Lamar Blvd.
Arlington, TX 76011-4511
-3-