ML12352A250

From kanterella
Jump to navigation Jump to search
Submittal of 10 CFR 50 Appendix E Evacuation Time Estimate Analysis
ML12352A250
Person / Time
Site: Peach Bottom  Constellation icon.png
Issue date: 12/12/2012
From: Gullott D M
Exelon Generation Co
To:
Document Control Desk, Office of Nuclear Material Safety and Safeguards, Office of Nuclear Reactor Regulation, NRC/FSME
Shared Package
ML123550276 List:
References
RS-12-218
Download: ML12352A250 (3)


Text

AOExelon Generation, RS-12-218 10 CFR 50.4 10 CFR 50 Appendix E December 12, 2012 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Peach Bottom Atomic Power Station, Units 1, 2, and 3 Facility Operating License Nos. DPR-12, (Renewed)

DPR-44 and DPR-56 NRC Docket Nos. 50-171, 50-277, 50-278 and 72-29

Subject:

10 CFR 50 Appendix E Evacuation Time Estimate Analysis for Peach Bottom Atomic Power Station In accordance with 10 CFR 50.4, "Written Communications," Exelon Generation Company, LLC (EGC) is submitting the evacuation time estimates (ETE) analysis for Peach Bottom Atomic Power Station. This analysis is being submitted in accordance with the requirements of 10 CFR 50 Appendix E, Section IV, "Content of Emergency Plans," paragraph 4.The attached Peach Bottom Atomic Power Station ETE analysis was developed using the decennial census data from the U.S. Census Bureau and in accordance with the federal guidance in NUREG/CR-7002 (SAND2010-0016P), "Criteria for Development of Evacuation Time Estimate Studies," published November 2011.There are no commitments in this letter. If you have any questions concerning this letter, please contact Dwi Murray at (630) 657-3695.Respectfully, David M. Gullott Manager -Licensing Exelon Generation Company, LLC

Attachment:

2012 Peach Bottom Atomic Power Station EPZ ETE Analysis cc: Regional Administrator

-NRC Region I NRC Senior Resident Inspector

-Peach Bottom Atomic Power Station mss;2G Attachment 2012 Peach Bottom Atomic Power Station EPZ ETE Analysis