ML093640136
ML093640136 | |
Person / Time | |
---|---|
Site: | Fermi |
Issue date: | 12/15/2009 |
From: | Plona J H DTE Energy |
To: | Document Control Desk, NRC/FSME |
References | |
NRC-09-0080 | |
Download: ML093640136 (2) | |
Similar Documents at Fermi | |
---|---|
Category:Environmental Report
MONTHYEARNRC-16-0031, Transmittal of 2015 Annual Non-Radiological Environmental Operating Report2016-04-26026 April 2016
[Table view]Transmittal of 2015 Annual Non-Radiological Environmental Operating Report NRC-14-0033, Annual Non-Radiological Environmental Operating Report for 20132014-04-28028 April 2014 Annual Non-Radiological Environmental Operating Report for 2013 ML14121A5392014-04-24024 April 2014 Fermi 2, License Renewal Application, Appendix E, Page 3-170 Through Page 9-23 ML14121A5382014-04-24024 April 2014 Fermi 2, License Renewal Application, Appendix D Through Appendix E, Page 3-169 NRC-14-0028, License Renewal Application, Appendix E, Page 10-1 Through End2014-04-24024 April 2014 License Renewal Application, Appendix E, Page 10-1 Through End NRC-14-0073, Response to LRA Environmental RAIs - Final Threatened and Endangered Species Survey and Assessment Report - Part 1 of 32013-10-16016 October 2013 Response to LRA Environmental RAIs - Final Threatened and Endangered Species Survey and Assessment Report - Part 1 of 3 ML14344B0032013-10-16016 October 2013 Response to LRA Environmental RAIs - Final Threatened and Endangered Species Survey and Assessment Report Part 3 of 3 NRC-14-0073, Response to LRA Environmental RAIs - Final Threatened and Endangered Species Survey and Assessment Report - Part 2 of 32013-10-16016 October 2013 Response to LRA Environmental RAIs - Final Threatened and Endangered Species Survey and Assessment Report - Part 2 of 3 NRC-14-0073, Response to LRA Environmental RAIs - Final Threatened and Endangered Species Survey and Assessment Report Part 3 of 32013-10-16016 October 2013 Response to LRA Environmental RAIs - Final Threatened and Endangered Species Survey and Assessment Report Part 3 of 3 ML14344B0012013-10-16016 October 2013 Response to LRA Environmental RAIs - Final Threatened and Endangered Species Survey and Assessment Report - Part 1 of 3 ML14344B0022013-10-16016 October 2013 Response to LRA Environmental RAIs - Final Threatened and Endangered Species Survey and Assessment Report - Part 2 of 3 NRC-13-0025, Annual Non-Radiological Environmental Operating Report2013-04-24024 April 2013 Annual Non-Radiological Environmental Operating Report NRC-14-0073, Response to LRA Environmental RAIs - Ducks Unlimited Wetland Investigation Report April 2011 - Part 2 of 52011-04-30030 April 2011 Response to LRA Environmental RAIs - Ducks Unlimited Wetland Investigation Report April 2011 - Part 2 of 5 NRC-14-0073, Response to LRA Environmental RAIs - Ducks Unlimited Wetland Investigation Report April 2011 - Part 1 of 52011-04-30030 April 2011 Response to LRA Environmental RAIs - Ducks Unlimited Wetland Investigation Report April 2011 - Part 1 of 5 NRC-14-0073, Response to LRA Environmental RAIs - Ducks Unlimited Wetland Investigation Report April 2011 - Part 3 of 52011-04-30030 April 2011 Response to LRA Environmental RAIs - Ducks Unlimited Wetland Investigation Report April 2011 - Part 3 of 5 NRC-14-0073, Response to LRA Environmental RAIs - Ducks Unlimited Wetland Investigation Report April 2011 - Part 4 of 52011-04-30030 April 2011 Response to LRA Environmental RAIs - Ducks Unlimited Wetland Investigation Report April 2011 - Part 4 of 5 ML14344B0062011-04-30030 April 2011 Response to LRA Environmental RAIs - Ducks Unlimited Wetland Investigation Report April 2011 - Part 2 of 5 ML14344B0052011-04-30030 April 2011 Response to LRA Environmental RAIs - Ducks Unlimited Wetland Investigation Report April 2011 - Part 1 of 5 ML14344B0072011-04-30030 April 2011 Response to LRA Environmental RAIs - Ducks Unlimited Wetland Investigation Report April 2011 - Part 3 of 5 ML14344B0082011-04-30030 April 2011 Response to LRA Environmental RAIs - Ducks Unlimited Wetland Investigation Report April 2011 - Part 5 of 5 NRC-14-0073, Response to LRA Environmental RAIs - Ducks Unlimited Wetland Investigation Report April 2011 - Part 5 of 52011-04-30030 April 2011 Response to LRA Environmental RAIs - Ducks Unlimited Wetland Investigation Report April 2011 - Part 5 of 5 NRC-10-0036, Annual Radiological Environmental Operating Report and Radioactive Effluent Release Report2010-04-28028 April 2010 Annual Radiological Environmental Operating Report and Radioactive Effluent Release Report ML0936401362009-12-15015 December 2009 Information Regarding License Termination Plan NRC-09-0080, Fermi, Unit 1 - Information Regarding License Termination Plan2009-12-15015 December 2009 Fermi, Unit 1 - Information Regarding License Termination Plan NRC-09-0070, Enrico Fermi Atomic Power Plant, Unit 1, Submittal of NRC Requested Information Regarding License Termination Plan2009-12-0303 December 2009 Enrico Fermi Atomic Power Plant, Unit 1, Submittal of NRC Requested Information Regarding License Termination Plan NRC-09-0053, Enrico Fermi Atomic Power Plant, Unit 1 - Information Regarding the License Termination Plan2009-10-23023 October 2009 Enrico Fermi Atomic Power Plant, Unit 1 - Information Regarding the License Termination Plan NRC-09-0046, Modeling Scenarios for License Termination Plan Criteria2009-08-27027 August 2009 Modeling Scenarios for License Termination Plan Criteria NRC-08-0031, Fermi 2- 2007 Annual Radioactive Effluent Release and Radiological Environmental Operating Report for the Period of January 1, 2007 Through December 31, 20072008-04-24024 April 2008 Fermi 2- 2007 Annual Radioactive Effluent Release and Radiological Environmental Operating Report for the Period of January 1, 2007 Through December 31, 2007 ML0812202332008-04-24024 April 2008 Fermi 2- 2007 Annual Radioactive Effluent Release and Radiological Environmental Operating Report for the Period of January 1, 2007 Through December 31, 2007 NRC-03-0043, Annual Radioactive Effluent Release and Radiological Environmental Operating Reports2003-04-29029 April 2003 Annual Radioactive Effluent Release and Radiological Environmental Operating Reports NRC-03-0041, Annual Non Radiological Environmental Operating Report2003-04-28028 April 2003 Annual Non Radiological Environmental Operating Report NRC-02-0031, 2001 Annual Non-Radiological Environmental Operating Report for Fermi 22002-04-24024 April 2002 2001 Annual Non-Radiological Environmental Operating Report for Fermi 2 2016-04-26 Category:Letter MONTHYEARIR 05000341/20230042024-02-0505 February 2024
[Table view]Integrated Inspection Report 05000341/2023004 ML23341A1852023-12-0808 December 2023 Acknowledgement of Response to NRC Inspection Report 05000341/2023402 and Disputed Non-Cited Violation ML23310A1492023-12-0808 December 2023 Issuance of Amendment No. 227 Regarding Revision of Technical Specification 3.8.1, AC Sources - Operating, Emergency Diesel Generator Voltage and Frequency Surveillance Requirements IR 05000341/20230102023-12-0808 December 2023 Nbsp;Biennial Problem Identification and Resolution Inspection Report 05000341/2023010 IR 05000016/20230012023-12-0101 December 2023 NRC Inspection Report No. 050-00016/2023-001 (Drss) - Enrico Fermi Atomic Power Plant, Unit 1 ML23334A1902023-12-0101 December 2023 Request for Information for an NRC Post-Approval Site Inspection for License Renewal Inspection Report 05000341/2024010 ML23335A0062023-12-0101 December 2023 Notification of NRC Baseline Inspection and Request for Information; Inspection Report 05000341/2024002 IR 05000341/20230032023-11-0707 November 2023 Integrated Inspection Report 05000341/2023003 and 07200071/2023001 ML23297A0512023-10-30030 October 2023 Issuance of Amendment No. 226 Regarding Revision of Technical Specifications 3.8.1, AC Sources - Operating (Exigent Circumstances) ML23311A3482023-10-20020 October 2023 DTE Electric Company (DTE) - Submittal of the Renewed Fermi 3 Michigan Department of Environmental, Great Lakes, and Energy (EGLE) National Pollutant Discharge Elimination System (NPDES) Permit No. MI0058892 ML23272A1552023-10-10010 October 2023 Letter to Licensee and Federal Register Notification of Amendment to Renewed Facility Operating License and Proposed No Significant Hazards Consideration Determination (Exigent Circumstances) (EPID L-2023-LLA-0134) (Letter) ML23283A0222023-10-0909 October 2023 Follow Up to Fermi Unit 2 Inservice Testing (IST) Program for the Fourth 10-Year Inspection Interval ML23276B4542023-10-0505 October 2023 Cyber Security Inspection Report 05000341/2023402 ML23243A8852023-09-18018 September 2023 Issuance of Amendment No. 225 Regarding Revision of Technical Specifications 3.7.2, Emergency Equipment Cooling Water, Emergency Equipment Service Water and System and Ultimate Heat Sink (Exigent Circumstances) ML23248A2242023-09-0707 September 2023 Regulatory Audit in Support of Review of License Amendment Request for a Risk-Informed Approach for Addressing the Effects of Debris on ECCS Strainer Performance ML23223A2242023-08-29029 August 2023 Individual Consideration of Issuance of Amendment to Renewed Facility Operating License, Proposed No Significant Hazards Consideration Determination, and Opportunity for Hearing (Exigent Circumstances) ML23237B4332023-08-25025 August 2023 Notification of an NRC Biennial Licensed Operator Requalification Program Inspection and RFI IR 05000341/20230052023-08-24024 August 2023 Updated Inspection Plan for Fermi Power Plant, Unit 2 (Report 05000341/2023005) ML23229A0122023-08-17017 August 2023 Issuance of Amendment No. 224 to Revise Technical Specifications to Adopt TSTF-568, Revise Applicability of BWR TS 3.6.2.5 and TS 3.6.3.2 (Emergency Circumstances) IR 05000341/20233012023-08-16016 August 2023 NRC Initial License Examination Report 05000341/2023301 ML23227A2212023-08-15015 August 2023 Emergency Application to Revise Technical Specifications to Adopt TSTF 568, Revise Applicability of BWR TS 3.6.2.5 and TS 3.6.3.2 ML23219A1792023-08-0707 August 2023 Information Request to Support Upcoming Problem Identification and Resolution Inspection at Fermi Power Plant, Unit 2 IR 05000341/20230022023-08-0404 August 2023 Integrated Inspection Report 05000341/2023002 ML23216A1872023-08-0404 August 2023 Submittal of Relief Request RR-A25 for Extended License Period ML23206A1272023-07-26026 July 2023 NOED for Fermi Power Plant, Unit Two Technical Specification 3.7.2, Emergency Equipment Cooling Water Emergency Equipment Service Water System and Ultimate Heat Sink ML23200A2552023-06-28028 June 2023 Post-Exam Letter with Comments and Exam Analysis IR 05000341/20230012023-06-28028 June 2023 Integrated Inspection Report 05000341/2023001 ML23178A2422023-06-28028 June 2023 Reassignment of the U.S. Nuclear Regulatory Commission Branch Chief in the Division of Operating Reactor Licensing for Plant Licensing Branch III ML23122A2332023-06-26026 June 2023 Issuance of Amendment No. 223 Regarding Revision of Technical Specifications to Adopt TSTF-582, Reactor Pressure Vessel Water Inventory Control (RPV WIC) Enhancements IR 05000341/20220102023-06-21021 June 2023 Reissue Fermi Power Plant, Unit 2, Design Basis Assurance Inspection (Teams) Inspection Report 05000341/2022010 ML23166A0892023-06-15015 June 2023 Operator Licensing Examination Approval Fermi Power Plant, June 2023 ML23158A1332023-06-0808 June 2023 Notice of Enforcement Discretion (NOED) for Fermi Power Plant, Unit Two (EPID L-2023-LLD-0000) Technical Specification 3.7.2, Emergency Equipment Cooling Water (Eecw)/ Emergency Equipment Service Water (Eesw) System and Ultimate Heat Sink ML23130A1032023-05-17017 May 2023 Regulatory Audit Summary Regarding License Amendment Request to Revise Technical Specification Surveillance Requirements Relating to Emergency Diesel Generator Voltage and Frequency IR 05000341/20234022023-05-0101 May 2023 Information Request for the Cyber-Security Baseline Inspection, Notification to Perform Inspection 05000341/2023402 ML23118A3612023-05-0101 May 2023 Information Request for the Cyber-Security Baseline Inspection, Notification to Perform Inspection 05000341/2023402 ML23114A1172023-05-0101 May 2023 Information Request to Support the NRC Annual Baseline Emergency Action Level and Emergency Plan Changes Inspection ML23115A4152023-04-25025 April 2023 Information Meeting with a Question and Answer Session to Discuss NRC 2022 End-of-Cycle Plant Performance Assessment of Fermi Power Plant, Unit 2 ML23124A2032023-04-10010 April 2023 DTE Electric Company Submittal of Fermi 3 Periodic Reports ML23200A1842023-04-0606 April 2023 Proposed Exam Submittal Letter IR 05000341/20230112023-04-0606 April 2023 Triennial Fire Protection Inspection Report 05000341/2023011 IR 05000341/20234012023-03-17017 March 2023 Security Baseline Inspection Report 05000341/2023401 ML23074A1972023-03-16016 March 2023 Confirmation of Initial License Examination February 2024 IR 05000341/20220062023-03-0101 March 2023 Annual Assessment Letter for Fermi Power Plant, Unit 2 (Report 05000341/2022006) ML22361A1022023-02-24024 February 2023 Reactor Decommissioning Branch Project Management Changes for Some Decommissioning Facilities and Establishment of Backup Project Manager for All Decommissioning Facilities ML22325A2992023-02-24024 February 2023 Audit Plan in Support of Review of License Amendment Request to Revise Technical Specification Surveillance Requirements Relating to Emergency Diesel Generator Voltage and Frequency ML23039A1552023-02-14014 February 2023 Integrated Inspection Report 05000341/2022004 IR 05000341/20224032023-02-13013 February 2023 Security Baseline Inspection Report 05000341/2022403 ML23200A2162023-01-20020 January 2023 Outline Submittal Letter 2024-02-05 |
Text
Joseph H. Plona Site Vice President 6400 N. Dixie Highway, Newport, MI 48166 Tel: 734.586.5910 Fax: 734.586.4172 DTE Energy-December 15, 2009 NRC-09-0080 U.S. Nuclear Regulatory Commission Attn.: Document Control Desk Washington, D.C. 20555
Reference:
- 1) Enrico Fermi Atomic Power Plant, Unit 1 NRC Docket No. 50-16 NRC License No. DPR-9 2) Detroit Edison Letter, NRC-09-0017, "Proposed License Amendment
-License Termination Plan", dated, March 25, 2009 Enrico Fermi Atomic Power Plant, Unit 1 Information Regarding the Fermi 1 License Termination Plan-
Subject:
The NRC requested that certain documents be submitted and docketed to aid in the technical review of the EF1 License Termination Plan (LTP). The answers and documents are to be docketed to aid in the technical review of the EFl LTP.
USNRC December 15, 2009 NRC-09-0080 Page 2 The following documents are being submitted for review: 1. ENG-00 1 through ENG-006 2. Impact of Revised Unsaturated Zone Thickness on Fermi 1 Soil DCGL Values.3. RESRAD reports to support "Impact of Revised Unsaturated Zone Thickness on Fermi 1 Soil DCGL Values" Should you have any questions, please contact Lynne Goodman, Manager, Fermi 1 at (734)586-1205 Sincerely, Joseph H. Plona JHP/ME/lj d Attachments (19)cc: NRC Regional Administrator, Region III T. Smith, NRC (Washington, D.C.)NRC Resident Inspector-Fermi 2 P. Lee, NRC Region III T. Strong, (Michigan Dept. of Environmental Quality)