NRC-09-0080, Fermi, Unit 1 - Information Regarding License Termination Plan
ML093640136 | |
Person / Time | |
---|---|
Site: | Fermi |
Issue date: | 12/15/2009 |
From: | Plona J H DTE Energy |
To: | Document Control Desk, NRC/FSME |
References | |
NRC-09-0080 | |
Download: ML093640136 (2) | |
Similar Documents at Fermi | |
---|---|
Category:Environmental Report
MONTHYEARNRC-16-0031, Transmittal of 2015 Annual Non-Radiological Environmental Operating Report2016-04-26026 April 2016
[Table view]Transmittal of 2015 Annual Non-Radiological Environmental Operating Report NRC-14-0033, Annual Non-Radiological Environmental Operating Report for 20132014-04-28028 April 2014 Annual Non-Radiological Environmental Operating Report for 2013 ML14121A5392014-04-24024 April 2014 Fermi 2, License Renewal Application, Appendix E, Page 3-170 Through Page 9-23 ML14121A5382014-04-24024 April 2014 Fermi 2, License Renewal Application, Appendix D Through Appendix E, Page 3-169 NRC-14-0028, License Renewal Application, Appendix E, Page 10-1 Through End2014-04-24024 April 2014 License Renewal Application, Appendix E, Page 10-1 Through End NRC-14-0073, Response to LRA Environmental RAIs - Final Threatened and Endangered Species Survey and Assessment Report - Part 1 of 32013-10-16016 October 2013 Response to LRA Environmental RAIs - Final Threatened and Endangered Species Survey and Assessment Report - Part 1 of 3 ML14344B0032013-10-16016 October 2013 Response to LRA Environmental RAIs - Final Threatened and Endangered Species Survey and Assessment Report Part 3 of 3 NRC-14-0073, Response to LRA Environmental RAIs - Final Threatened and Endangered Species Survey and Assessment Report - Part 2 of 32013-10-16016 October 2013 Response to LRA Environmental RAIs - Final Threatened and Endangered Species Survey and Assessment Report - Part 2 of 3 NRC-14-0073, Response to LRA Environmental RAIs - Final Threatened and Endangered Species Survey and Assessment Report Part 3 of 32013-10-16016 October 2013 Response to LRA Environmental RAIs - Final Threatened and Endangered Species Survey and Assessment Report Part 3 of 3 ML14344B0012013-10-16016 October 2013 Response to LRA Environmental RAIs - Final Threatened and Endangered Species Survey and Assessment Report - Part 1 of 3 ML14344B0022013-10-16016 October 2013 Response to LRA Environmental RAIs - Final Threatened and Endangered Species Survey and Assessment Report - Part 2 of 3 NRC-13-0025, Annual Non-Radiological Environmental Operating Report2013-04-24024 April 2013 Annual Non-Radiological Environmental Operating Report NRC-14-0073, Response to LRA Environmental RAIs - Ducks Unlimited Wetland Investigation Report April 2011 - Part 2 of 52011-04-30030 April 2011 Response to LRA Environmental RAIs - Ducks Unlimited Wetland Investigation Report April 2011 - Part 2 of 5 NRC-14-0073, Response to LRA Environmental RAIs - Ducks Unlimited Wetland Investigation Report April 2011 - Part 1 of 52011-04-30030 April 2011 Response to LRA Environmental RAIs - Ducks Unlimited Wetland Investigation Report April 2011 - Part 1 of 5 NRC-14-0073, Response to LRA Environmental RAIs - Ducks Unlimited Wetland Investigation Report April 2011 - Part 3 of 52011-04-30030 April 2011 Response to LRA Environmental RAIs - Ducks Unlimited Wetland Investigation Report April 2011 - Part 3 of 5 NRC-14-0073, Response to LRA Environmental RAIs - Ducks Unlimited Wetland Investigation Report April 2011 - Part 4 of 52011-04-30030 April 2011 Response to LRA Environmental RAIs - Ducks Unlimited Wetland Investigation Report April 2011 - Part 4 of 5 ML14344B0062011-04-30030 April 2011 Response to LRA Environmental RAIs - Ducks Unlimited Wetland Investigation Report April 2011 - Part 2 of 5 ML14344B0052011-04-30030 April 2011 Response to LRA Environmental RAIs - Ducks Unlimited Wetland Investigation Report April 2011 - Part 1 of 5 ML14344B0072011-04-30030 April 2011 Response to LRA Environmental RAIs - Ducks Unlimited Wetland Investigation Report April 2011 - Part 3 of 5 ML14344B0082011-04-30030 April 2011 Response to LRA Environmental RAIs - Ducks Unlimited Wetland Investigation Report April 2011 - Part 5 of 5 NRC-14-0073, Response to LRA Environmental RAIs - Ducks Unlimited Wetland Investigation Report April 2011 - Part 5 of 52011-04-30030 April 2011 Response to LRA Environmental RAIs - Ducks Unlimited Wetland Investigation Report April 2011 - Part 5 of 5 NRC-10-0036, Annual Radiological Environmental Operating Report and Radioactive Effluent Release Report2010-04-28028 April 2010 Annual Radiological Environmental Operating Report and Radioactive Effluent Release Report ML0936401362009-12-15015 December 2009 Information Regarding License Termination Plan NRC-09-0080, Fermi, Unit 1 - Information Regarding License Termination Plan2009-12-15015 December 2009 Fermi, Unit 1 - Information Regarding License Termination Plan NRC-09-0070, Enrico Fermi Atomic Power Plant, Unit 1, Submittal of NRC Requested Information Regarding License Termination Plan2009-12-0303 December 2009 Enrico Fermi Atomic Power Plant, Unit 1, Submittal of NRC Requested Information Regarding License Termination Plan NRC-09-0053, Enrico Fermi Atomic Power Plant, Unit 1 - Information Regarding the License Termination Plan2009-10-23023 October 2009 Enrico Fermi Atomic Power Plant, Unit 1 - Information Regarding the License Termination Plan NRC-09-0046, Modeling Scenarios for License Termination Plan Criteria2009-08-27027 August 2009 Modeling Scenarios for License Termination Plan Criteria NRC-08-0031, Fermi 2- 2007 Annual Radioactive Effluent Release and Radiological Environmental Operating Report for the Period of January 1, 2007 Through December 31, 20072008-04-24024 April 2008 Fermi 2- 2007 Annual Radioactive Effluent Release and Radiological Environmental Operating Report for the Period of January 1, 2007 Through December 31, 2007 ML0812202332008-04-24024 April 2008 Fermi 2- 2007 Annual Radioactive Effluent Release and Radiological Environmental Operating Report for the Period of January 1, 2007 Through December 31, 2007 NRC-03-0043, Annual Radioactive Effluent Release and Radiological Environmental Operating Reports2003-04-29029 April 2003 Annual Radioactive Effluent Release and Radiological Environmental Operating Reports NRC-03-0041, Annual Non Radiological Environmental Operating Report2003-04-28028 April 2003 Annual Non Radiological Environmental Operating Report NRC-02-0031, 2001 Annual Non-Radiological Environmental Operating Report for Fermi 22002-04-24024 April 2002 2001 Annual Non-Radiological Environmental Operating Report for Fermi 2 2016-04-26 Category:Letter type:NRC MONTHYEARNRC-24-0007, Report of Changes to Quality Assurance Program for Radioactive Material Packages2024-01-12012 January 2024
[Table view]Report of Changes to Quality Assurance Program for Radioactive Material Packages NRC-24-0002, Clarification for Request for Additional Information Responses for License Amendment Request to Revise Technical Specification 3.8.1, AC Sources - Operating, Surveillance Requirement SR 3.8.1.122024-01-12012 January 2024 Clarification for Request for Additional Information Responses for License Amendment Request to Revise Technical Specification 3.8.1, AC Sources - Operating, Surveillance Requirement SR 3.8.1.12 NRC-23-0079, Transmittal of Revision 1 of the Core Operating Limits Report for Cycle 222023-12-14014 December 2023 Transmittal of Revision 1 of the Core Operating Limits Report for Cycle 22 NRC-23-0077, Submittal of Revision 50 to the Fermi 2 Radiological Emergency Response Preparedness Plan2023-12-0404 December 2023 Submittal of Revision 50 to the Fermi 2 Radiological Emergency Response Preparedness Plan NRC-23-0073, Guarantee of Payment of Deferred Premiums2023-11-29029 November 2023 Guarantee of Payment of Deferred Premiums NRC-23-0071, Response to Request for Additional Information (RAI) for Exigent License Amendment Request for Revision of Technical Specification (TS) 3.8.1 AC Sources - Operating2023-10-13013 October 2023 Response to Request for Additional Information (RAI) for Exigent License Amendment Request for Revision of Technical Specification (TS) 3.8.1 AC Sources - Operating NRC-23-0062, Response to Request for Additional Information for License Amendment Request to Revise Technical Specification 3.8.1, AC Sources - Operating, Surveillance Requirement SR 3.8.1.122023-10-12012 October 2023 Response to Request for Additional Information for License Amendment Request to Revise Technical Specification 3.8.1, AC Sources - Operating, Surveillance Requirement SR 3.8.1.12 NRC-23-0068, Exigent License Amendment Request for Revision of Technical Specification (TS) 3.8.1 AC Sources - Operating2023-09-28028 September 2023 Exigent License Amendment Request for Revision of Technical Specification (TS) 3.8.1 AC Sources - Operating NRC-23-0064, Additional Supplemental Information to Exigent License Amendment Request for Technical Specification 3.7.2, Emergency Equipment Cooling Water (Eecw)/Emergency Equipment Service Water (Eesw) System and Ultimate Heat Sink (UHS)2023-09-11011 September 2023 Additional Supplemental Information to Exigent License Amendment Request for Technical Specification 3.7.2, Emergency Equipment Cooling Water (Eecw)/Emergency Equipment Service Water (Eesw) System and Ultimate Heat Sink (UHS) NRC-23-0057, Independent Spent Fuel Storage Installation Cask Registration2023-08-31031 August 2023 Independent Spent Fuel Storage Installation Cask Registration NRC-23-0054, Enrico Fermi Atomic Power Plant, Unit 1, Annual Report for Period Ending June 30 20232023-08-31031 August 2023 Enrico Fermi Atomic Power Plant, Unit 1, Annual Report for Period Ending June 30 2023 NRC-23-0056, Inservice Testing (IST) Program for the Fourth 10-Year Inspection Interval2023-08-31031 August 2023 Inservice Testing (IST) Program for the Fourth 10-Year Inspection Interval NRC-23-0061, Clarification for NRC-23-0059, Response to Request for Additional Information for Exigent License Amendment Request for Technical Specification 3.7.2, Emergency Equipment Cooling Water (Eecw)/Emergency Equipment Service Water..2023-08-30030 August 2023 Clarification for NRC-23-0059, Response to Request for Additional Information for Exigent License Amendment Request for Technical Specification 3.7.2, Emergency Equipment Cooling Water (Eecw)/Emergency Equipment Service Water.. NRC-23-0059, Response to Request for Additional Information Exigent License Amendment Request for Technical Specification 3.7.2,Emergency Equipment Cooling Water (Eecw)/Emergency Equipment Service Water (Eesw) System and Ultimate Heat Sink (UHS)2023-08-25025 August 2023 Response to Request for Additional Information Exigent License Amendment Request for Technical Specification 3.7.2,Emergency Equipment Cooling Water (Eecw)/Emergency Equipment Service Water (Eesw) System and Ultimate Heat Sink (UHS) NRC-23-0060, Supplemental Information to Exigent License Amendment Request for Technical Specification 3.7.2, Emergency Equipment Cooling Water (Eecw)/Emergency Equipment Service Water (Eesw) System and Ultimate Heat Sink (UHS)2023-08-25025 August 2023 Supplemental Information to Exigent License Amendment Request for Technical Specification 3.7.2, Emergency Equipment Cooling Water (Eecw)/Emergency Equipment Service Water (Eesw) System and Ultimate Heat Sink (UHS) NRC-23-0053, Independent Spent Fuel Storage Installation Cask Registration2023-08-23023 August 2023 Independent Spent Fuel Storage Installation Cask Registration NRC-23-0050, Exigent License Amendment Request for Technical Specification 3.7.2, Emergency Equipment Cooling Water (Eecw)/Emergency Equipment Service Water (Eesw) System and Ultimate Heat Sink (UHS)2023-08-10010 August 2023 Exigent License Amendment Request for Technical Specification 3.7.2, Emergency Equipment Cooling Water (Eecw)/Emergency Equipment Service Water (Eesw) System and Ultimate Heat Sink (UHS) NRC-23-0048, Independent Spent Fuel Storage Installation Cask Registration2023-08-0101 August 2023 Independent Spent Fuel Storage Installation Cask Registration NRC-23-0049, Request for Enforcement Discretion for Technical Specification 3.7.2, Emergency Equipment Cooling Water (Eecw)/Emergency Equipment Service Water (Eesw) System and Ultimate Heat Sink (UHS)2023-07-24024 July 2023 Request for Enforcement Discretion for Technical Specification 3.7.2, Emergency Equipment Cooling Water (Eecw)/Emergency Equipment Service Water (Eesw) System and Ultimate Heat Sink (UHS) NRC-23-0043, Independent Spent Fuel Storage Installation, Cask Registration2023-06-27027 June 2023 Independent Spent Fuel Storage Installation, Cask Registration NRC-23-0020, License Amendment Request for a Risk Informed Approach to ECCS Strainer Performance2023-06-13013 June 2023 License Amendment Request for a Risk Informed Approach to ECCS Strainer Performance NRC-23-0039, Request for Enforcement Discretion for Technical Specification 3.7.2, Emergency Equipment Cooling Water (Eecw)/Emergency Equipment Service Water (Eesw) System and Ultimate Heat Sink (UHS)2023-06-0606 June 2023 Request for Enforcement Discretion for Technical Specification 3.7.2, Emergency Equipment Cooling Water (Eecw)/Emergency Equipment Service Water (Eesw) System and Ultimate Heat Sink (UHS) NRC-23-0030, Inservice Inspection-Nondestructive Examination (ISI-NDE) Program for the Fourth 10-Year Inspection Interval2023-06-0505 June 2023 Inservice Inspection-Nondestructive Examination (ISI-NDE) Program for the Fourth 10-Year Inspection Interval NRC-23-0029, Snubber Program for the Fourth 10-Year Testing Interval2023-06-0505 June 2023 Snubber Program for the Fourth 10-Year Testing Interval NRC-23-0037, 56542-EN 56542 - Fermi2023-05-26026 May 2023 56542-EN 56542 - Fermi NRC-23-0031, Response to NRC Request from Audit of License Amendment Request to Revise Technical Specification 3.8.1, AC Sources -Operating,' Emergency Diesel Generator Voltage and Frequency Surveillance Requirements2023-05-16016 May 2023 Response to NRC Request from Audit of License Amendment Request to Revise Technical Specification 3.8.1, AC Sources -Operating,' Emergency Diesel Generator Voltage and Frequency Surveillance Requirements NRC-23-0002, License Amendment Request to Revise Technical Specification 3.8.1, AC Sources - Operating, Surveillance Requirement SR 3.8.1.122023-05-0505 May 2023 License Amendment Request to Revise Technical Specification 3.8.1, AC Sources - Operating, Surveillance Requirement SR 3.8.1.12 NRC-23-0010, License Amendment Request to Correct Non-Conservative Technical Specification 3.4.5, RCS Pressure Isolation Valve (PIV) Leakage2023-05-0505 May 2023 License Amendment Request to Correct Non-Conservative Technical Specification 3.4.5, RCS Pressure Isolation Valve (PIV) Leakage NRC-23-0017, Annual Radioactive Effluent Release Report and Radiological Environmental Operating Report2023-04-28028 April 2023 Annual Radioactive Effluent Release Report and Radiological Environmental Operating Report NRC-23-0025, Submittal of 2022 Safety Relief Valve Challenge Report, Main Steam Bypass Lines Report, and ECCS Cooling Performance Evaluation Model Changes or Errors Report2023-04-28028 April 2023 Submittal of 2022 Safety Relief Valve Challenge Report, Main Steam Bypass Lines Report, and ECCS Cooling Performance Evaluation Model Changes or Errors Report NRC-23-0018, Annual Non-Radiological Environmental Operating Report2023-04-26026 April 2023 Annual Non-Radiological Environmental Operating Report NRC-23-0024, Levels and Sources of Property Insurance Coverage2023-04-0303 April 2023 Levels and Sources of Property Insurance Coverage NRC-23-0021, ISFSI, Decommissioning Funding Plan Update2023-03-30030 March 2023 ISFSI, Decommissioning Funding Plan Update NRC-23-0016, Decommissioning Funding Status Report2023-03-30030 March 2023 Decommissioning Funding Status Report NRC-23-0015, Decommissioning Funding Status Report for Fermi 12023-03-30030 March 2023 Decommissioning Funding Status Report for Fermi 1 NRC-23-0011, License Renewal Commitment 7c: Transmittal of Core Plate Hold-Down Bolt Analysis2023-03-0707 March 2023 License Renewal Commitment 7c: Transmittal of Core Plate Hold-Down Bolt Analysis NRC-22-0026, License Amendment Request to Revise Technical Specification 3.8.1, AC Sources - Operating, Emergency Diesel Generator Voltage and Frequency Surveillance Requirements2022-12-16016 December 2022 License Amendment Request to Revise Technical Specification 3.8.1, AC Sources - Operating, Emergency Diesel Generator Voltage and Frequency Surveillance Requirements NRC-22-0051, DTE Electric Company - Guarantee of Payment of Deferred Premiums2022-11-29029 November 2022 DTE Electric Company - Guarantee of Payment of Deferred Premiums NRC-22-0052, Replacement Files for Submittal of Revision 24 to the Fermi 2 Updated Final Safety Analysis Report (UFSAR) Through EIE on November 9, 20222022-11-17017 November 2022 Replacement Files for Submittal of Revision 24 to the Fermi 2 Updated Final Safety Analysis Report (UFSAR) Through EIE on November 9, 2022 NRC-22-0046, Submittal of Biennial Review of the Fermi 1 Safety Analysis Report2022-11-14014 November 2022 Submittal of Biennial Review of the Fermi 1 Safety Analysis Report NRC-22-0041, Evacuation Time Estimate Report2022-10-0505 October 2022 Evacuation Time Estimate Report NRC-22-0033, Enrico Fermi Atomic Power Plant, Unit 1 - Annual Report for Period Ending June 30, 20222022-08-29029 August 2022 Enrico Fermi Atomic Power Plant, Unit 1 - Annual Report for Period Ending June 30, 2022 NRC-22-0030, Inservice Inspection Summary Report2022-08-10010 August 2022 Inservice Inspection Summary Report NRC-22-0023, Application to Revise Technical Specifications to Adopt TSTF-582, Reactor Pressure Vessel Water Inventory Control (RPV WIC) Enhancements2022-08-0404 August 2022 Application to Revise Technical Specifications to Adopt TSTF-582, Reactor Pressure Vessel Water Inventory Control (RPV WIC) Enhancements NRC-22-0022, Annual Non-Radiological Environmental Operating Report2022-04-29029 April 2022 Annual Non-Radiological Environmental Operating Report NRC-22-0021, Annual Radioactive Effluent Release Report and Radiological Environmental Operating Report2022-04-29029 April 2022 Annual Radioactive Effluent Release Report and Radiological Environmental Operating Report NRC-22-0020, Enrico Fermi Atomic Power Plant, Unit No. 1 & Fermi 2 Power Plant - 10 CFR 20.2206 Report of Individual Monitoring2022-04-28028 April 2022 Enrico Fermi Atomic Power Plant, Unit No. 1 & Fermi 2 Power Plant - 10 CFR 20.2206 Report of Individual Monitoring NRC-22-0003, Submittal of 2021 Safety Relief Valve Challenge Report, Main Steam Bypass Lines Report, and ECCS Cooling Performance Evaluation Model Changes or Errors Report2022-04-26026 April 2022 Submittal of 2021 Safety Relief Valve Challenge Report, Main Steam Bypass Lines Report, and ECCS Cooling Performance Evaluation Model Changes or Errors Report NRC-22-0019, Submittal of the National Pollutant Discharge Elimination System Permit Application for Reissuance2022-04-0404 April 2022 Submittal of the National Pollutant Discharge Elimination System Permit Application for Reissuance NRC-22-0011, Enrico Fermi Atomic Power Plant, Unit No. 1 - Decommissioning Funding Status Report2022-03-31031 March 2022 Enrico Fermi Atomic Power Plant, Unit No. 1 - Decommissioning Funding Status Report 2024-01-12 |
Text
Joseph H. Plona Site Vice President 6400 N. Dixie Highway, Newport, MI 48166 Tel: 734.586.5910 Fax: 734.586.4172 DTE Energy-December 15, 2009 NRC-09-0080 U.S. Nuclear Regulatory Commission Attn.: Document Control Desk Washington, D.C. 20555
Reference:
- 1) Enrico Fermi Atomic Power Plant, Unit 1 NRC Docket No. 50-16 NRC License No. DPR-9 2) Detroit Edison Letter, NRC-09-0017, "Proposed License Amendment
-License Termination Plan", dated, March 25, 2009 Enrico Fermi Atomic Power Plant, Unit 1 Information Regarding the Fermi 1 License Termination Plan-
Subject:
The NRC requested that certain documents be submitted and docketed to aid in the technical review of the EF1 License Termination Plan (LTP). The answers and documents are to be docketed to aid in the technical review of the EFl LTP.
USNRC December 15, 2009 NRC-09-0080 Page 2 The following documents are being submitted for review: 1. ENG-00 1 through ENG-006 2. Impact of Revised Unsaturated Zone Thickness on Fermi 1 Soil DCGL Values.3. RESRAD reports to support "Impact of Revised Unsaturated Zone Thickness on Fermi 1 Soil DCGL Values" Should you have any questions, please contact Lynne Goodman, Manager, Fermi 1 at (734)586-1205 Sincerely, Joseph H. Plona JHP/ME/lj d Attachments (19)cc: NRC Regional Administrator, Region III T. Smith, NRC (Washington, D.C.)NRC Resident Inspector-Fermi 2 P. Lee, NRC Region III T. Strong, (Michigan Dept. of Environmental Quality)