|
---|
Category:Letter
MONTHYEARIR 05000369/20240032024-11-0404 November 2024 Integrated Inspection Report 05000369/2024003 and 05000370/2024003 ML24303A4212024-10-30030 October 2024 Mcguire Nuclear Station, Units 1 & 2, Notification of an NRC Fire Protection Team Inspection FPTI NRC 05000369/2025010, 05000370/2025010 and Request for Information RFI IR 05000369/20244022024-10-0808 October 2024 Security Baseline Inspection Report 05000369/2024402 05000370/2024402 IR 05000369/20240052024-08-26026 August 2024 Updated Inspection Plan for McGuire Nuclear Station, Units 1 and 2, (Report 05000369-2024005 and 05000370-2024005) IR 05000369/20244042024-08-0101 August 2024 Cover Letter Security Baseline Inspection Report 05000369/2024404 and 05000370/2024404 IR 05000369/20253012024-07-29029 July 2024 Notification of Licensed Operator Initial Examination 05000369/2025301 and 05000370/2025301 IR 05000369/20244032024-07-25025 July 2024 – Cyber Security Inspection Report 05000369/2024403 and 05000370/2024403 Rev IR 05000369/20240022024-07-24024 July 2024 Integrated Inspection Report 05000369/2024002 and 05000370/2024002 ML24183A0972024-07-12012 July 2024 ISFSI; Catawba 1, 2 & ISFSI; McGuire 1, 2 & ISFSI; Oconee 1, 2, 3 & ISFSI; Shearon Harris 1; H. B. Robinson 2 & ISFSI; and Radioactive Package Shipping Under 10 CFR 71 (71-266 & 71-345) – Review of QA Program Changes EPID L-2024-LLQ-0002 IR 05000369/20244012024-07-0303 July 2024 – Security Baseline Inspection Report 05000369/2024401 and 05000370/2024401 ML24176A2802024-06-26026 June 2024 Notification of Target Set Inspection and Request for Information (NRC Inspection Report 05000369-2024404 and 05000370-2024404) IR 05000369/20240112024-06-0404 June 2024 Biennial Problem Identification and Resolution Inspection Report 05000369/2024011 and 05000370/2024011 ML24149A1772024-05-28028 May 2024 NRC Response to Duke Energy 2025 FOF Schedule Change Request (Catawba and McGuire) IR 05000369/20240012024-05-0808 May 2024 Integrated Inspection Report 05000369-2024001 and 05000370-2024001 and 07200038-2024001 ML24110A0382024-04-30030 April 2024 – Correction to Issuance of Amendment Nos. 330 and 309, Regarding Implementation of Technical Specifications Task Force (TSTF) Traveler TSTF 505, Revision 2, Provide Risk-Informed Extended Completion Times - Ritstf ML24100A8742024-04-10010 April 2024 Information Request for the Cybersecurity Baseline Inspection, Notification to Perform Inspection 05000369/2024403; and 05000370/2024403 ML24052A3062024-04-0808 April 2024 Issuance of Amendment Nos. 331 & 310, Regarding Adoption of Title 10 of Code of Federal Regulations Section 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Plants ML24031A5402024-03-26026 March 2024 Issuance of Amendment Nos. 330 and 309 Regarding Implementation of TSTF 505,Rev. 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4B ML24085A2402024-03-21021 March 2024 Requalification Program Inspection - McGuire Nuclear Station IR 05000369/20230062024-02-28028 February 2024 Annual Assessment Letter for McGuire Nuclear Station, Units 1 and 2 - NRC Inspection Report 05000369/2023006 and 05000370/2023006 ML24024A2182024-02-0505 February 2024 Exemption from Select Requirements of 10 CFR Part 73 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting) IR 05000369/20230042024-01-31031 January 2024 Integrated Inspection Report 05000369/2023004 and 05000370/2023004 ML24019A1392024-01-25025 January 2024 TSTF 505 and 50.69 Audit Summary ML24019A2002024-01-24024 January 2024 Notification of Inspection and Request for Information for NRC Problem Identification and Resolution Inspection IR 05000369/20234022023-12-14014 December 2023 – Material Control and Accounting Program Inspection Report 05000369/2023402 and 05000370/2023402 05000369/LER-1923-001, Automatic Actuation of the 1A Motor Driven Auxiliary Feedwater Pump Due to Human Error2023-12-13013 December 2023 Automatic Actuation of the 1A Motor Driven Auxiliary Feedwater Pump Due to Human Error ML23317A2272023-11-17017 November 2023 William B. McGuire Nuclear Station, Units 1 and 2 - Transmittal of Dam Inspection Report - Non-Proprietary ML23317A3462023-11-14014 November 2023 Duke Fleet - Correction Letter to License Amendment Nos. 312 & 340 Issuance of Amendments Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-554, Revision 1 IR 05000369/20230032023-10-24024 October 2023 Integrated Inspection Report 05000369/2023003 and 05000370/2023003; and Inspection Report 07200038/2023001 IR 05000369/20240102023-10-13013 October 2023 Notification of McGuire Nuclear Station Comprehensive Engineering Team Inspection – U.S. Nuclear Regulatory Commission Inspection Report 05000369, 370/2024010 IR 05000369/20230102023-10-13013 October 2023 Age Related Degradation Inspection Report 05000369/2023010 and 05000370/2023010 ML23256A0882023-09-25025 September 2023 Issuance of Alternative to Steam Generator Welds IR 05000369/20233012023-09-20020 September 2023 William B. McGuire Nuclear Station - NRC Examination Report 05000369/2023301 and 05000370/2023301 ML23230A0652023-08-31031 August 2023 William B. McGuire Nuclear Station, Units 1 and 2 - Relief Request Use of Later Edition of ASME Code ML23195A0782023-08-29029 August 2023 Issuance of Amendments Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-554, Revision 1 IR 05000369/20230052023-08-25025 August 2023 Updated Inspection Plan for McGuire Nuclear Station Units 1 and 2 (Report 05000369/2023005 and 05000370/2023005) IR 05000369/20234012023-08-0404 August 2023 – Security Baseline Inspection Report 05000369/2023401 and 05000370/2023401 (OUO-SRI) Cover IR 05000369/20230022023-07-28028 July 2023 Integrated Inspection Report 05000369/2023002 and 05000370/2023002 IR 05000369/20234202023-07-24024 July 2023 – Security Baseline Inspection Report 050003692023420 and 050003702023420 ML23206A0092023-07-24024 July 2023 William B. McGuire Nuclear Station – Operator Licensing Written Examination Approval 05000369/2023301 and 05000370/2023301 ML23207A0762023-07-14014 July 2023 EN 56557 - Update to Part 21 Report Re Potential Defect with Trane External Auto/Stop Emergency Stop Relay Card Pn: XI2650728-06 ML23159A2712023-06-20020 June 2023 William B. McGuire Nuclear Station, Unit 1 - Relief Request Impractical Reactor System Welds ML23237A2672023-06-13013 June 2023 June 13, 2002 - Meeting Announcement - McGuire and Catawba Nuclear Stations 50-369, 50-370 and 50-413, 50-414 ML23159A0052023-06-0505 June 2023 56557-EN 56557 - Paragon - Redlined ML23124A0862023-05-0303 May 2023 Cycle 29, Revision 1, Core Operating Limits Report (COLR) ML23118A0762023-05-0101 May 2023 Approval for Use of Specific Provision of a Later Edition of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section XI IR 05000369/20230012023-05-0101 May 2023 Integrated Inspection Report 05000369/2023001 and 05000370/2023001 ML23115A2122023-05-0101 May 2023 Review of the Spring 2022 Steam Generator Tube Inspection Report ML23094A1832023-04-18018 April 2023 Audit Plan TSTF-505, Rev. 2, RITSTF Initiative 4B & 10 CFR 50.69, Risk-Informed Categorization & Treatment of Structures, Systems & Components for Nuclear Power Reactors (EPIDs L-2023-LLA-0021 & L-2023-LLA-0022) ML22332A4932023-03-10010 March 2023 William States Lee III 1 and 2 - Issuance of Amendments Regarding the Relocation of the Emergency Operations Facility 2024-08-26
[Table view] Category:Request for Additional Information (RAI)
MONTHYEARML24197A1702024-07-15015 July 2024 Request for Additional Information Two Proposed Alternatives (RA-23-0242) for the Inspection of Reactor Vessel Closure Head Penetrations ML23151A3482023-05-30030 May 2023 Duke Fleet - Request for Additional Information Proposed Alternative for Pressurizer Welds in Accordance with 10 CFR 50.55a(z)(1) ML23142A2732023-05-22022 May 2023 Duke Fleet - Request for Additional Information Proposed Alternative for Steam Generator Welds in Accordance with 10 CFR 50.55a(z)(1) ML23030B9032023-01-30030 January 2023 Formal Release of RAIs for McGuire Unit 1, Relief Request Impractical RPV Rx Coolant System Welds, Due March 1, 2023 (Email) ML23017A2232023-01-13013 January 2023 Request for Additional Information (RAI) Issuance for McGuire Unit 1 Steam Generator Tube Inspection Report (Email) ML22175A0162022-06-24024 June 2022 Notification of Inspection and Request for Information for NRC Problem Identification and Resolution Inspection ML22115A1412022-04-25025 April 2022 NRR E-mail Capture - Duke Common EOF Relocation - Request for Addition Information ML22102A2962022-04-13013 April 2022 Request for Withholding Information from Public Disclosure Response to Request for Additional Information ML22063B1782022-03-0909 March 2022 Request for Additional Information Regarding LAR for Revision to the Conditional Exemption of the End of Cycle Moderator Temperature Coefficient Measurement Methodology (EPID L-2021-LLA-0198) NON-PROPRIETARY ML22010A0732022-01-0606 January 2022 50.59 Inspection Information Request ML21354A8612021-12-15015 December 2021 NRR E-mail Capture - Request for Additional Information - Duke Fleet Request RA-19-0352 - Alternative for RPV Closure Stud Exams (L-2020-LLR-0156) ML21267A2782021-09-23023 September 2021 50.59 Inspection Information Request ML21252A0532021-09-0808 September 2021 NRR E-mail Capture - Formal Release of Rais, 30 Day Response, Mcguire Relief Request, Ref: Later Edition Addenda ASME Code, Section XI, 50.55a(g)(4)(iv) ML21103A0542021-04-13013 April 2021 NRR E-mail Capture - Extension to Request for Additional Information AMS Topical Report AMS-TR-0720R1 ML21067A6742021-03-0505 March 2021 NRR E-mail Capture - Final Request for Additional Information AMS Topical Report AMS-TR-0720R1 ML21049A2632021-02-0404 February 2021 NRR E-mail Capture - Request for Additional Information - Duke Energy Fleet License Amendment Request to Revise Emergency Plan ML21020A0682021-01-20020 January 2021 Notification of an NRC Fire Protection Team Inspection (FPTI) (NRC Inspection Report 05000369/2021011 and 05000370/2021011) and Request for Information (RFI) ML20346A0212020-12-10010 December 2020 NRR E-mail Capture - Formal Release of RAIs - License Amendment to Change TS 3.8.1 Due Jan. 29, 2021 ML20323A4072020-11-18018 November 2020 NRR E-mail Capture - Request for Additional Information - Brunswick License Exemption Request from 10CFR73 Annual Force on Force Exercise Requirements (EPIC L-2020-LLE-0180) ML20216A3512020-08-0303 August 2020 Mcquire U-1 ISI RFI ML20101L3132020-04-10010 April 2020 Notification of Inspection and Request for Information ML20071D0962020-03-0505 March 2020 NRR E-mail Capture - Request for Additional Information - McGuire Nuclear Station Unit 1 Delay in Update of the Code of Record for in Service Inspections ML20050D3382020-02-21021 February 2020 Letter RAI 1 MAGNASTOR-Catawba and McGuire Exemptions with Enclosure ML19354B6372020-01-0707 January 2020 Exemption Request for NAC Magnastor Cask Loaded to Incorrect Helium Backfill Density Request for Additional Information ML19011A1372019-01-10010 January 2019 NRR E-mail Capture - Duke Energy Fleet RAIs - Relief Request 18-GO-001 - Proposed Alternative for Depth Sizing Qualification Examination of Welds (L-2018-LLR-0117) ML19007A3422018-12-21021 December 2018 NRR E-mail Capture - Duke Energy Fleet Draft RAIs - Relief Request 18-GO-001 - Proposed Alternative for Depth Sizing Qualification Examination of Welds (L-2018-LLR-0117) ML18352A8052018-12-18018 December 2018 NRR E-mail Capture - Request for Additional Information - McGuire Nuclear Station, Units 1 and 2 - MRP-227 Review ML18306A9372018-11-0202 November 2018 NRR E-mail Capture - Request for Additional Information - McGuire Nuclear Station, Units 1 and 2 - Esps LAR ML18285A0812018-10-11011 October 2018 NRR E-mail Capture - Request for Additional Information - McGuire Nuclear Station, Units 1 and 2 - TORMIS LAR RA-18-0011, Response to Request for Supplemental Information Regarding Duke Energy'S Response to GL 2016-01 Monitoring of Neutron-Absorbing Materials in Spent Fuel Pools2018-05-30030 May 2018 Response to Request for Supplemental Information Regarding Duke Energy'S Response to GL 2016-01 Monitoring of Neutron-Absorbing Materials in Spent Fuel Pools ML18138A4662018-05-18018 May 2018 NRR E-mail Capture - Request for Additional Information - McGuire Nuclear Station, Units 1 and 2 - TORMIS LAR ML18088B2822018-03-29029 March 2018 Requalification Program Inspection - McGuire Nuclear Station ML18057A2182018-02-23023 February 2018 Enclosurequest for Additional Information (Letter to A. Zaremba Request for Additional Information for Review of Duke Energy'S Decommissioning Funding Plan Update) ML17331B1492017-11-21021 November 2017 NRR E-mail Capture - Request for Additional Information - McGuire Nuclear Station, Units 1 and 2 - Nsws One-Time LAR (CACs MG0242 and MG0243, EPID L-2017-LLA-0299) ML17317B0932017-11-13013 November 2017 NRR E-mail Capture - Request for Additional Information - McGuire Nuclear Station, Units 1 and 2 - Irlt (CACs MF9020 and MF9021; EPID L-2016-LLA-0032) ML17230A1512017-08-15015 August 2017 Notification of Inspection of Inspection and Request for Information ML17192A4842017-07-11011 July 2017 NRR E-mail Capture - Duke Energy Fleet RAIs Alternative for Reactor Pressure Vessel Flange Threads Examination (MF9513 to MF9521) ML17135A0322017-05-12012 May 2017 NRR E-mail Capture - Request for Additional Information - McGuire TSTF-197 ML17114A4992017-04-17017 April 2017 Emergency Preparedness Inspection and Request for Information ML16302A1122016-11-0404 November 2016 Request for Additional Information Regarding License Amendment Request to Implement a Risk-Informed, Performance-Based Fire Protection Program (CAC Nos. MF2934 and MF2935) MNS-16-077, Responding to Request for Additional Information Related to License Amendment Request to Implement a Risk-informed Performance-Based Fire Protection Program2016-09-29029 September 2016 Responding to Request for Additional Information Related to License Amendment Request to Implement a Risk-informed Performance-Based Fire Protection Program ML16228A2612016-08-15015 August 2016 Email - McGuire Unit No. 1: Request for Additional Informati- Relief Request 16-MN-003 Alternative to Defect Removal Prior to Performing Temporary Repair Activities on Three-Inch-Diameter Nuclear Service Water System Piping. ML16194A2862016-07-12012 July 2016 E-Mail - Mcguirai Ice Condenser Door Position Alternate Verification, (ML16089A228) CAC Nos. MF7526 and MF7527 ML16175A0222016-07-12012 July 2016 Request for Additional Information Regarding License Amendment Request to Implement a Risk-Informed, Performance-Based Fire Protection Program ML16014A6882016-01-20020 January 2016 Request for Additional Information Regarding License Amendment Request to Revise Emergency Action Level Scheme ML15348A2602015-12-17017 December 2015 Request for Additional Information Regarding License Amendment Request to Use an Alternative Fission Gas Gap Release Fraction ML15320A3862015-11-19019 November 2015 RAI LAR to Adopt TSTF-523 ML15314A3592015-11-10010 November 2015 Duke Energy Draft RAIs Request to Adopt TSTF-523 (CAC Nos. MF6413-MF6422) ML15314A3562015-11-10010 November 2015 E-mail from J. Whited to A. Zaremba Duke Energy Draft RAIs License Amendment Request to Adopt TSTF-523 (CAC Nos. MF6413-MF6422) ML15289A5552015-10-26026 October 2015 Request for Additional Information Regarding License Amendment Request Nuclear Service Water System Allowed Outage Time Extension 2024-07-15
[Table view] |
See also: IR 05000370/2009006
Text
UNITED STATES
NUCLEAR REGULATORY COMMISSION
REGION II
SAM NUNN ATLANTA FEDERAL CENTER
61 FORSYTH STREET, SW, SUITE 23T85
ATLANTA, GEORGIA 30303-8931
March 9, 2009
Mr. Bruce H. Hamilton
Vice President
Duke Power Company, LLC
d/b/a Duke Energy Carolinas, LLC
McGuire Nuclear Station
12700 Hagers Ferry Road
Huntersville, NC 28078-8985
SUBJECT: WILLIAM B. MCGUIRE NUCLEAR STATION - COMPONENT DESIGN BASES
INSPECTION - NRC INSPECTION REPORT 05000369/2009-006 AND
05000370/2009-006
Dear Mr. Hamilton:
The purpose of this letter is to notify you that the U.S. Nuclear Regulatory Commission (NRC)
Region II staff will conduct a component design bases inspection at your William B. McGuire
Nuclear Station during the weeks of May 18-22, June 1-5, and June 15-19, 2009. The
inspection team will be led by R. Moore, a Senior Reactor Inspector from the NRC's Region II
Office. This inspection will be conducted in accordance with the baseline inspection procedure,
Procedure 71111.21, Component Design Bases Inspection, issued August 19, 2008.
The inspection will evaluate the capability of risk significant / low margin components to function
as designed and to support proper system operation. The inspection will also include a review
of selected operator actions, operating experience, and modifications.
During a telephone conversation on March 3, 2009, Mr. Moore confirmed with Ms. K. Crane of
your staff, arrangements for an information gathering site visit and the three-week onsite
inspection. The schedule is as follows:
- Information gathering visit: Week of May 4-8, 2009.
- Onsite weeks: May 18-22, June 1-5, and June 15-19, 2009.
The purpose of the information gathering visit is to meet with members of your staff to identify
risk-significant components and operator actions. Information and documentation needed to
support the inspection will also be identified. Mr. R. Bernhard, a Region II Senior Reactor
Analyst, may accompany Mr. Moore during the information gathering visit to review probabilistic
risk assessment data and identify risk significant components which will be examined during the
inspection.
The enclosure lists documents that will be needed prior to the information gathering visit.
Please contact Mr. Moore with any questions prior to preparing materials listed in the enclosure
and provide the referenced information to the Region II office by April 20, 2009. The inspectors
will try to minimize your administrative burden by specifically identifying only those documents
required for the inspection preparation.
DPC, LLC 2
During the information gathering visit, the team leader will also discuss the following inspection
support administrative details: office space; supplemental documents requested to be made
available to the team in the Region II office prior to the inspection preparation week of
May 11-15, 2009; arrangements for site access; and the availability of knowledgeable plant
engineering and licensing personnel to serve as points of contact during the inspection.
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its
enclosure will be available electronically for public inspection in the NRC Public Document
Room or from the Publicly Available Records (PARS) component of NRC's document system
(ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-
rm/adams.html (the Public Electronic Reading Room).
Thank you for your cooperation in this matter. If you have any questions regarding the
information requested or the inspection, please contact Mr. Moore at (404) 562-4628 or me at
(404) 562-4519.
Sincerely,
/RA/
Binoy B. Desai, Chief
Engineering Branch 1
Division of Reactor Safety
Docket Nos. 50-369, 50-370
License Nos. NPF-9, NPF-17
Enclosure: Information Request For William B. McGuire Nuclear Station Component Design
Bases Inspection
cc w/encl: (See page 3)
DPC, LLC 3
cc w/encl:
Steven D. Capps Kathryn B. Nolan,
Engineering Manager Senior Counsel
Duke Power Company, LLC d/b/a Duke Duke Energy Corporation
Energy Carolinas, LLC 526 South Church Street-EC07H
Electronic Mail Distribution Charlotte, NC 28202
Scotty L. Bradshaw David A. Repka
Training Manager Winston Strawn LLP
Duke Power Company, LLC d/b/a Duke Electronic Mail Distribution
Energy Carolinas, LLC
Electronic Mail Distribution County Manager of Mecklenburg County
720 East Fourth Street
Kenneth L. Ashe Charlotte, NC 28202
Regulatory Compliance Manager
Duke Power Company, LLC d/b/a Duke SBeverly O. Hall
Energy Carolinas, LLC Chief, Radiation Protection Section
Electronic Mail Distribution Department of Environmental Health
N.C. Department of Environmental
R. L. Gill, Jr. Commerce & Natural Resources
Manager Electronic Mail Distribution
Nuclear Regulatory Issues & Industry Affairs
Duke Power Company, LLC d/b/a Duke Dhiaa M. Jamil
Energy Carolinas, LLC Group Executive and Chief Nuclear Officer
Electronic Mail Distribution Duke Energy Carolinas, LLC
Electronic Mail Distribution
Lisa F. Vaughn
Associate General Counsel Senior Resident Inspector
Duke Energy Corporation Duke Energy Corporation
526 South Church Street-EC07H William B. McGuire Nuclear Station
Charlotte, NC 28202 U.S. NRC
12700 Hagers Ferry Rd
Huntersville, NC 28078
_________________________ G SUNSI REVIEW COMPLETE
OFFICE RII:DRS RII:DRS RII:DRP RII:DRS
SIGNATURE RA RA RA RA
NAME RMOORE WROGERS JBARTLEY BDESAI
DATE 3/5/2009 3/5/2009 3/5/2009 3/9/2009
E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO YES NO
INFORMATION REQUEST FOR WILLIAM B. McGUIRE NUCLEAR STATION
COMPONENT DESIGN BASES INSPECTION
Please provide the information electronically in .pdf files, Excel, or other searchable format on
CDROM. The CDROM should be indexed and hyperlinked to facilitate ease of use. Information
in lists should contain enough information to be easily understood to someone who has
knowledge of pressurized water reactor technology.
1. From your most recent probabilistic safety analysis (PSA) excluding external events and
fires, please provide:
a. Two risk rankings of components from your site-specific probabilistic safety
analysis (PSA) - one sorted by Risk Achievement Worth (RAW), and the other
sorted by Birnbaum Importance.
b. A list of the top 500 cutsets.
2. From your most recent probabilistic safety analysis (PSA) including external events and
fires, please provide:
a. Two risk rankings of components from your site-specific probabilistic safety
analysis (PSA) - one sorted by Risk Achievement Worth (RAW), and the other
sorted by Birnbaum Importance.
b. A list of the top 500 cutsets.
3. Risk ranking of operator actions from your site specific PSA sorted by RAW. Provide
copies of your human reliability worksheets for these items.
4. Any pre-existing evaluation or list of components and calculations with low design
margins (i.e., pumps closest to the design limit for flow or pressure, diesel generator
close to design required output, heat exchangers close to rated design heat removal,
MOV risk-margin rankings, etc.).
5. A list of station applicability evaluations/reviews performed and documented in the station
corrective action program in the past two years for industry events, critical equipment
failures, and safety related equipment vulnerabilities (as communicated by NRC generic
communications, industry communications, 10 CFR Part 21 notifications, etc.).
6. A list of operability evaluations completed within the last two years, sorted by associated
component or system.
7. A list of common-cause failures of components that have occurred at McGuire Nuclear
Station and have been identified within the last five years.
8. A list of equipment currently on the sites Key Equipment Priorities List, including a
description of the reason(s) why each component (i.e. not a programmatic or system
level concern) is on that list and summaries (if available) of your plans to address those
reasons.
9. A list of equipment currently in RIS 05-020 (formerly GL 91-18) status, or in MR (a)(1)
status.
10. Contact information for a person to discuss PRA information prior to the information
gathering trip: name, title, phone number, and e-mail address.
Enclosure