ML090700909
ML090700909 | |
Person / Time | |
---|---|
Site: | San Onofre |
Issue date: | 03/10/2009 |
From: | Lantz R E Operations Branch IV |
To: | Ridenoure R T Southern California Edison Co |
References | |
Download: ML090700909 (6) | |
See also: IR 05000361/2009302
Text
March 10, 2009
Mr. Ross T. Ridenoure
Senior Vice President and
Chief Nuclear Officer
Southern California Edison Company
San Onofre Nuclear Generating Station
P.O. Box 128
San Clemente, CA 92674-0128
SUBJECT: SAN ONOFRE NUCLEAR GENERATING STATION, UNITS 2, AND 3 - NOTIFICATION OF NRC INITIAL OPERATOR LICENSING EXAMINATION
05000361/2009302; 05000362/2009302
Dear Mr. Ridenoure:
In a telephone conversation on February 23, 2009, between Messrs. B
ill Arbour and Gabriel Apger, Chief Examiner, arrangements were made for the administration of licensing
examinations at San Onofre Nuclear Generating Station during the weeks of October 19 and
October 26, 2009.
As agreed during the telephone conversation, your staff will prepare the examinat
ions based on the guidelines in NUREG-1021, "Operator Licensing Examination Standards for Power
Reactors," Revision 9, S
upplement 1, and NUREG-1122, "Knowledge and Abilities Catalog for Nuclear Power Plant Operators," Revi
sion 2, Supplement 1. The NRC's regional office will discuss with your staff any changes that might be necessary before the examinations are
administered.
To meet the above sc
hedule, and as agreed to in the telephone conversation, it will be necessary for your staff to furnish the examination outlines by March 20, 2009. The written
examinations, operating tests, and supporting reference materials identified in Attachment 3 to
ES-201 will be due by August 17, 2009. Pursuant to Ti
tle 10, Section 55.40(b)(3), of the Code of
Federal Regulati
ons (10 CFR 55.40(b)(3)), an authorized representative of the facility licensee shall approve the outlines, examinations, and tests before they are submitted to the NRC for
review and approval. All materials shall be complete and ready-to-use. We request that any
personal, proprietary, sensitive unclassified, or safeguards information in your response be
contained in a separate enclosure and appropriately marked. Any delay in receiving the required
examinations and reference materials, or the submittal of inadequate or incomplete materials,
may cause the examinations to be rescheduled. In addition, your support for on-site validation
of the examinations is required during the week of September 14, 2009. UNITED STATESNUCLEAR REGULATORY COMMISSIONREGION IV612 EAST LAMAR BLVD, SUITE 400ARLINGTON, TEXAS 76011-4125
Southern California Edison Company - 2 -
In order to conduct the requested written examinations and
operating tests, it will be necessary for your staff to provide adequate space and accommodations in accordance with ES-402 and to
make the simulation facility av
ailable on the dates noted above. In accordance with ES-302, your staff should retain the original simulator performance data (e.g., system pressures,
temperatures, and levels) generated during the dynamic operating tests until the examination
results are final.
Appendix E to NUREG-1021 contains a number of NRC policies and guidelines that will be in effect while the written examinations and operating tests are being administered.
To permit timely NRC review and evaluation, your staff should submit preliminary operator and
senior operator license applications (Office of Management and Budget (OMB) approval number
3150-0090), medical certifications (OMB approval number 3150-0024), and waiver requests (if
any)(OMB approval number 3150-0090) at least 30 days before the first examination date. If the
applications are not received at least 30 days before the examination date, a postponement may
be necessary. Signed applications certifying that all training has been completed should be
submitted at least 14 days before the first examination date.
This letter contains information collections that are subject to the Paperwork Reduction Act of
1995 (44 U.S.C. 3501 et seq.). These information collections were approved by OMB, under approval number 3150-0018, which expires on June 30, 2009. The public reporting burden for
this collection of information is estimated to average 50 hours5.787037e-4 days <br />0.0139 hours <br />8.267196e-5 weeks <br />1.9025e-5 months <br /> per response, including the time
for reviewing instructions, gathering and maintaining the data needed, and completing and
reviewing the collection of information. Send comments regarding this burden estimate or any
other aspect of these information collections, including suggestions for reducing the burden, to
the Records and FOIA/Privacy Services Branch (T-5 F52), U.S. Nuclear Regulatory
Commission, Washington, DC 20555-0001, or by Internet electronic mail to
INFOCOLLECTS@NRC.GOV.
The NRC may neither conduct nor sponsor, and a person is not required to respond to, an
information collection, unless it displays a currently valid OMB control number.
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its
enclosures will be available electronically for public
inspection in the NRC'
s Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide
Documents Access and Management System (ADAMS). ADAMS is accessible from the
electronic Reading Room page of the NRC's public Web site at http://www.nrc.gov/reading-rm/adams.html.
Southern California Edison Company - 3 -
Thank you for your cooperation in this matter. Mr. Arbour has been advised of the policies and
guidelines referenced in this letter. If you have any questions regarding the NRC's examination
procedures and guidelines, please contact Mr. Apger at 817-276-6508, or myself at 817-860-
8159.
Sincerely,
/RA/
Ryan E. Lantz, Chief Operations Branch Division of Reactor Safety
Dockets: 50-361; 50-362
DISTRIBUTION:
Chairman, Board of Supervisors
County of San Diego
1600 Pacific Highway, Room 335
San Diego, CA 92101
Gary L. Nolff
Assistant Director-Resources
City of Riverside
3900 Main Street
Riverside, CA 92522
Mark L. Parsons
Deputy City Attorney
City of Riverside
3900 Main Street
Riverside, CA 92522
Gary H. Yamamoto, P.E., Chief
Division of Drinking Water and
Environmental Management
1616 Capitol Avenue, MS 7400
P.O. Box 997377
Sacramento, CA 95899-7377
Southern California Edison Company - 4 -
Michael J. DeMarco
San Onofre Liaison
San Diego Gas & Electric Company
8315 Century Park Ct. CP21G
San Diego, CA 92123-1548
Director, Radiological Health Branch
State Department of Health Services
P.O. Box 997414 (MS 7610)
Sacramento, CA 95899-7414
Mayor
City of San Clemente
100 Avenida Presidio
San Clemente, CA 92672
James D. Boyd, Commissioner
California Energy Commission
1516 Ninth Street (MS 34)
Sacramento, CA 95814
Douglas K. Porter, Esq.
Southern California Edison Company
2244 Walnut Grove Avenue
Rosemead, CA 91770
Albert R. Hochevar
Southern California Edison Company
San Onofre Nuclear Generating Station
P.O. Box 128
San Clemente, CA 92675
A. Edward Scherer
Southern California Edison Company
San Onofre Nuclear Generating Station
P.O. Box 128
San Clemente, CA 92674-0128
Mr. Steve Hsu
Department of Health Services
Radiologic Health Branch
MS 7610, P.O. Box 997414
Sacramento, CA 95899-7414
Southern California Edison Company - 5 -
Mr. Mike Short
Southern California Edison Company
San Onofre Nuclear Generating Station
P.O. Box 128
San Clemente, CA 92674-0128
Chief, Technological Hazards Branch
FEMA Region 9
1111 Broadway, Suite 1200
Oakland, CA 94607-4052
Southern California Edison Company - 6 -
Electronic distribution by RIV:
Regional Administrator (Elmo.Collins@nrc.gov) Deputy Regional Administrator (Chuck.Casto@nrc.gov)
DRP Director (Dwight.Chamberlain@nrc.gov)
DRP Deputy Director (Anton.Vegel@nrc.gov)
DRS Director (Roy.Caniano@nrc.gov)
DRS Deputy Director (Troy.Pruett@nrc.gov)
Senior Resident Inspector (Greg.Warnick@nrc.gov)
Resident Inspector (John.Reynoso@nrc.gov)
Branch Chief, DRP/D (Michael.Hay@nrc.gov)
Senior Project Engineer, DRP/D (Don.Allen@nrc.gov)
SO Site Secretary (Heather.Hutchinson@nrc.gov)
Public Affairs Officer (Victor.Dricks@nrc.gov)
Team Leader, DRP/TSS (Chuck.Paulk@nrc.gov)
RITS Coordinator (Marisa.Herrera@nrc.gov)
Only inspection reports to the following:
OEDO RIV Coordinator, Primary (Shawn.Williams@nrc.gov)
OEDO RIV Coordinator, Backup (Eugene.Guthrie@nrc.gov)
ROPreports
File located: S:\DRS\OB\OB-Only\EXAMS\SO\SO-2009-10-INIT EXAM\PUBLIC FORMS SUNSI Rev Compl. Yes No ADAMS Yes No Reviewer Initials GWA Publicly Avail Yes No Sensitive Yes No Sens. Type Initials GWA OE:OB SOE:OB C:OB GWApger CCOsterholtz BWStapleton for RELantz /RA/ /RA/ /RA/ 3/10/ 09 3/10/09 3/10/09 OFFICIAL RECORD COPY T=Telephone E=E-mail F=Fax