Invitation to Participate in Industry Workshop on TSTF-493, Clarify Application of Setpoint Methodology for LSSS FunctionsML102920450 |
Person / Time |
---|
Site: |
Technical Specifications Task Force |
---|
Issue date: |
10/18/2010 |
---|
From: |
Browning R A, Croft W E, Raidy T W, Schrader K J Babcock & Wilcox, BWR Owners Group, Combustion Engineering, PWR Owners Group, Technical Specifications Task Force, Westinghouse |
---|
To: |
Document Control Desk, Office of Nuclear Reactor Regulation |
---|
References |
---|
TSTF-10-21, TSTF-493 |
Download: ML102920450 (5) |
|
|
---|
Category:Letter
MONTHYEARML23325A2132023-12-18018 December 2023 Cover Letter for Final Model SE of TSTF-591, Revise Risk Informed Completion Time (RICT) Program ML23262B2292023-09-21021 September 2023 Cover Letter Transmitting Final SE of TSTF-591, Revision 0, Revise Risk-Informed Completion Time (RICT) Program ML23124A2212023-09-11011 September 2023 Cover Letter for Final SEs of TSTF-589, Eliminate Automatic Diesel Generator (DG) Start During Shutdown ML23206A1242023-07-31031 July 2023 TSTF-584 Cover Letter for Final SE ML23205A2342023-07-0606 July 2023 Draft TSTF-601, 'Extend Shield Building Completion Time After Refueling' ML23012A2812023-03-13013 March 2023 Draft SEs of TSTF-584, Eliminate Automatic RWCU System Isolation on SLC Initiation ML23059A3342023-02-28028 February 2023 TSTF-576 Open Issues Letter ML23010A2592023-01-11011 January 2023 Request for Additional Information Traveler TSTF-592, Revision 0, Revise Automatic Depressurization System (ADS) Instrumentation Requirements ML22272A5542022-10-0707 October 2022 Request for Additional Information Traveler TSTF-591, Revise Risk Informed Completion Time (RICT) Program TSTF-22-07, Transmittal of TSTF-592, Revision 0, Revise Automatic Depressurization System (ADS) Instrumentation Requirements2022-07-19019 July 2022 Transmittal of TSTF-592, Revision 0, Revise Automatic Depressurization System (ADS) Instrumentation Requirements ML22193A2372022-07-12012 July 2022 Request for Additional Information TSTF-589, Eliminate Automatic Diesel Generator Start During Shutdown TSTF-22-06, Technical Specifications Task Force - Request for a Workshop to Discuss the Interaction of Natural Phenomena Protection Design Features and Operability2022-07-0808 July 2022 Technical Specifications Task Force - Request for a Workshop to Discuss the Interaction of Natural Phenomena Protection Design Features and Operability ML22110A1712022-04-26026 April 2022 Acceptance for Review Regarding Traveler Tstf-584, Rev 0, Eliminate Automatic RWCU System Isolation on SLC Initiation TSTF-22-04, Technical Specifications Task Force - Transmittal of TSTF-591, Revision 0, Revise Risk Informed Completion Time (RICT) Program2022-03-22022 March 2022 Technical Specifications Task Force - Transmittal of TSTF-591, Revision 0, Revise Risk Informed Completion Time (RICT) Program ML21188A2782021-07-11011 July 2021 Cover Letter Transmitting Final SEs of CLIIP TSTF-580, Revision 1, Provide Exception from Entering Mode 4 with No Operable RHR (Residual Heat Removal) Shutdown Cooling TSTF-21-03, TSTF Response to NRC Questions on TSTF-576, Revision 0, Revise Safety/Relief Valve Requirements and Submittal of Revision 12021-06-23023 June 2021 TSTF Response to NRC Questions on TSTF-576, Revision 0, Revise Safety/Relief Valve Requirements and Submittal of Revision 1 ML21054A2512021-05-26026 May 2021 Cover Letter Transmitting Draft SEs of CLIIP TSTF-580, RHR Shutdown Cooling System - Hot Shutdown ML21106A2452021-04-20020 April 2021 Cover Letter Transmitting Final Model SE of TSTF 554, Revision 1, Revise Reactor Coolant Leakage Requirements ML21098A2422021-04-14014 April 2021 Cover Letter for Final SEs of TSTF-577, Revision 1, Revised Frequencies for Steam Generator Tube Inspections ML21068A4012021-03-24024 March 2021 Cover Letter for Draft SEs TSTF 577, Revision 1, Revised Frequencies for Steam Generator Tube Inspections TSTF-21-01, Transmittal of TSTF-580, Revision 1, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling2021-01-26026 January 2021 Transmittal of TSTF-580, Revision 1, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling ML20322A3612020-12-18018 December 2020 TSTF-554 Cover Letter for Final SE ML20308A6562020-11-0606 November 2020 Request for Additional Information Traveler TSTF-577, Revision 0, Revised Frequencies for Steam Generator Tube Inspections ML20168A3962020-10-30030 October 2020 Cover Letter Transmitting Draft SE of TSTF-554, Revision 1, Revise Reactor Coolant Leakage Requirements ML20265A1152020-10-0909 October 2020 Cover Letter Transmitting Model SE of TSTF-582 and TSTF-583-T ML20133J8832020-07-29029 July 2020 Letter Transmitting Draft SE of Traveler TSTF-582, Revision 0, RPV WIC Enhancements TSTF-20-04, Technical Specifications Task Force - Transmittal of TSTF-577, Revision 0, Revised Frequencies for Steam Generator Tube Inspections2020-06-0808 June 2020 Technical Specifications Task Force - Transmittal of TSTF-577, Revision 0, Revised Frequencies for Steam Generator Tube Inspections ML20133J8152020-05-13013 May 2020 Letter Transmitting Revised Final SE of Traveler TSTF-564, Revision 2, Safety Limit MCPR, Using the Consolidated Line Item Improvement Process ML20132A1832020-05-11011 May 2020 Request for Additional Information TSTF-576, Revision 0, Revised Safety/Relief Valve Requirement TSTF-20-01, Transmittal of TSTF-IG-20-02, Guidance on Evaluating One-Time Surveillance Frequency Changes Under the Surveillance Frequency Control Program (TSTF-425M SFCP)2020-04-0909 April 2020 Transmittal of TSTF-IG-20-02, Guidance on Evaluating One-Time Surveillance Frequency Changes Under the Surveillance Frequency Control Program (TSTF-425M SFCP) TSTF-19-14, Technical Specifications Task Force - TSTF Response to NRC Questions on TSTF-582, RPV WIC Enhancements2020-02-12012 February 2020 Technical Specifications Task Force - TSTF Response to NRC Questions on TSTF-582, RPV WIC Enhancements TSTF-19-11, TSTF Response to NRC Questions on TSTF-554, Revise Reactor Coolant Leakage Requirements2020-01-16016 January 2020 TSTF Response to NRC Questions on TSTF-554, Revise Reactor Coolant Leakage Requirements ML19325C4362019-12-17017 December 2019 Cover Letter Transmitting Final SEs of Traveler TSTF-568, Revision 2, Revise Applicability of BWR/4 TS 3.6.2.5 and TS 3.6.3.2 TSTF-19-09, Technical Specifications Task Force - Transmittal of TSTF-576, Revision 0, Revise Safety/Relief Valve Requirements2019-12-13013 December 2019 Technical Specifications Task Force - Transmittal of TSTF-576, Revision 0, Revise Safety/Relief Valve Requirements ML19323E9282019-12-10010 December 2019 Cover Letter Transmitting Final SEs of Traveler TSTF-541, Revision 2, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position TSTF-19-13, Technical Specifications Task Force - Updated TSTF Membership and Distribution2019-12-0303 December 2019 Technical Specifications Task Force - Updated TSTF Membership and Distribution TSTF-19-12, TSTF Comments on Draft Safety Evaluations for Traveler TSTF-541, Revision 2, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position.2019-11-0505 November 2019 TSTF Comments on Draft Safety Evaluations for Traveler TSTF-541, Revision 2, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position. TSTF-19-10, Transmittal of Errata Changes to TSTF-541, Revision 2, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position2019-08-28028 August 2019 Transmittal of Errata Changes to TSTF-541, Revision 2, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position ML19176A1892019-08-14014 August 2019 Cover Letter Transmitting Final Safety Evaluations of Traveler TSTF-569, Revision 2, Revise Response Time Testing Definition TSTF-19-03, Request for Fee Exemption for TSTF-554, Revision 0, Revise Reactor Coolant Leakage Requirements - Letter2019-07-0808 July 2019 Request for Fee Exemption for TSTF-554, Revision 0, Revise Reactor Coolant Leakage Requirements - Letter TSTF-19-08, Draft of Traveler TSTF-582, Revision 0, RPV WIC Enhancements.2019-07-0303 July 2019 Draft of Traveler TSTF-582, Revision 0, RPV WIC Enhancements. TSTF-19-06, TSTF Comments on Draft Safety Evaluations for Traveler TSTF-569, Revision 1, Revise Response Time Testing Definition2019-06-25025 June 2019 TSTF Comments on Draft Safety Evaluations for Traveler TSTF-569, Revision 1, Revise Response Time Testing Definition TSTF-19-07, TSTF Handout for October 16, 2019, Meeting: Elimination of Commitment to Adopt TSTF-4932019-06-18018 June 2019 TSTF Handout for October 16, 2019, Meeting: Elimination of Commitment to Adopt TSTF-493 TSTF-19-05, Transmittal of TSTF-541, Revision 2, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position2019-06-18018 June 2019 Transmittal of TSTF-541, Revision 2, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position ML19017A2222019-05-29029 May 2019 Letter Transmitting Draft Safety Evaluations of Technical Specifications Task Force Traveler TSTF-569, Revision 1, Revise Response Time Testing Definition ML19028A2852019-02-21021 February 2019 Final SEs of TSTF-566, Revision 0, Revise Actions for Inoperable RHR Shutdown Cooling Subsystems (Transmittal Letter) TSTF-19-01, TSTF Comments on Draft Safety Evaluations for Traveler TSTF-566, Revision 0, Revise Actions for Inoperable RHR Shutdown Cooling Subsystems2019-01-17017 January 2019 TSTF Comments on Draft Safety Evaluations for Traveler TSTF-566, Revision 0, Revise Actions for Inoperable RHR Shutdown Cooling Subsystems ML19007A2252019-01-15015 January 2019 Letter Transmitting Final SEs of Traveler TSTF-557, Revision 1, Spent Fuel Storage Rack Neutron Absorber Monitoring Program. ML18284A3772018-12-31031 December 2018 Incorporation of Technical Specifications Task Force (TSTF) Traveler TSTF-565, Revision 1, Revise the LCO 3.0.2 and LCO 3.0.3 Bases, Into the Next Revision of the Standard Technical Specifications TSTF-18-13, TSTF Comments on Draft Safety Evaluation for Traveler TSTF-557, Revision 1, Spent Fuel Storage Rack Neutron Absorber Monitoring Program.2018-12-20020 December 2018 TSTF Comments on Draft Safety Evaluation for Traveler TSTF-557, Revision 1, Spent Fuel Storage Rack Neutron Absorber Monitoring Program. 2023-09-21
[Table view] |
Text
11921 Rockville Pike, Suite 100, Rockville, MD 20852 Phone: 301
-984-4400, Fax: 301
-984-7600 Administration by EXCEL Services Corporation TECHNICAL SPECIFICATIONS TASK FORCE A JOINT OWNERS GROUP ACTIVITY TSTF October 18, 2010 TSTF-10-2 1 PROJ0753 Attn: Document Control Desk U. S. Nuclear Regulatory Commission Washington, DC 20555
-0001
SUBJECT:
Invitation to Participat e in an Industry Workshop on TSTF
-493, "Clarify Application of Setpoint Methodology for LSSS Functions
"
Dear Sir or Madam:
The PWROG Licensing Subcommittee and BWROG Licensing Committee are sponsoring a joint Owners Group workshop to discuss adoption and implementation of TSTF
-493, "Clarify Application of Setpoint Methodology for LSSS Functions." The workshop will be held December 6 and the morning of December 7, 2010 at the Marco Island Marriott, Marco Island, Florida. We invite the NRC to present and participate in the meeting with the goal of promoting a common understanding between the NRC and the industry of the requirements in TSTF
-493 and the information needed by the NRC staff when reviewing licensee applications to adopt TSTF-493. Our goal is to improve regulatory stability by promoting consistency in the interpretation of these requirements, both in the development of the license amendment requests, as well as the implementation by the licensees upon NRC approval.
A draft agenda is attached. Based on earlier discussions with the NRC, the TSTF would like an NRC representative or representatives to consider making presentations on the following subjects: NRC Regulatory Issue Summary 2006
-17 NRC Perspective on TSTF
-493 Option A Adoption NRC Perspective on TSTF
-493 Option B Adoption NRC Feedback on Case Studies and NRC Lessons Learned In addition to these presentations, the NRC staff participation in discussion of the other presentations will be invaluable in promoting common understanding
. Please let us know if you will be able to participate and, if so, who will attend. Please contact Brian Mann at (301)984
-4400.
TSTF 10-21 October 18, 2010 Page 2 Should you have any questions, please do not hesitate to contact us.
Kenneth J. Schrader (PWROG/W) Roy A. Browning (BWROG)
Thomas W. Raidy (PWROG/CE)
Wend y E. Croft (PWROG/B&W)
Attachment
cc: Robert Elliott, Technical Specifications Branch, NRC William Kemper, Instrumentation and Controls Branch, NRC Michelle Honcharik, Licensing Processes Branch, NRC
Draft Agenda December 6
-7, 2010 Marco Island Marriott, Marco Island Florida Page 1 Monday, December 6 7:30 BREAKFAST & Registration 8:00 I. Introduction and Purpose Industry Speaker 8:10 II. History of TSTF-493 Industry Speaker A. Definitions & Terminology B. Initial Problem Definition
- 1. ISA RP67.04.02 Method 3 C. Problem Expansion
- 1. 10 CFR 50.36 terminology 8:25 D. NRC Regulatory Issue Summary 2006
-17 NRC Speaker 8:40 E. 2009 Industry/NRC Agreement Industry Speaker 1. TSTF-493 Option A / Option B Overview 9:00 III. TSTF-493, Option A A. Technical Description Industry Speaker
- 1. Footnote Requirements
- 2. Bases Additions
- 3. Function Scope & Exceptions 9:45 B. Q&A 10:00 BREAK C. NSSS Methodology & Plant Implementation Considerations 10:15 1. GE Methodology General Electric Speaker 10: 3 5 2. Westinghouse Methodology Westinghouse Speaker 11: 5 5 3. Other Methodologies Industry Speaker D. Plant Implementation Issues 11:15 1. PWR Practices, Trending, &
Training Industry Speakers 11:45 2. B WR Practices, Trending, & Training Industry Speakers
Draft Agenda December 6
-7, 2010 Marco Island Marriott, Marco Island Florida Page 2 12:15 LUNCH 1:15 IV. NRC Perspective on TSTF
-493 Option A Adoption NRC Speaker 2:45 BREAK 3:00 V. TSTF-493, Option B Industry Speaker A. Technical Description
- 1. Function Scope
- 2. Tech Spec and Bases changes 3. Program Requirements & Implementation Issues 3:45 B. Q&A 4:00 VI. NRC Perspective on TSTF
-493 Option B Adoption NRC Speaker 5:00 End of First Day Tuesday, December 7 8:00 VII. Owners Group Implementation Guidance Document Industry Speaker VIII. Case Studies & Lessons Learned 8:30 A. Kewaunee Adoption of TSTF
-493, Option B during ISTS Conversion Dominion Speaker 8:50 B. Cooper Adoption of TSTF
-493, Option B NPPD Speaker 9:20 C. NRC Feedback on Case Studies and NRC Lessons Learned NRC Speaker 10:00 BREAK 10:15 IX. Questions and Answers / Panel Discussion 12:00 ADJOURN Draft Agenda December 6
-7, 2010 Marco Island Marriott, Marco Island Florida Page 3 Based on discussions with the NRC, we anticipate the NRC staff would be interested in discussing the following topics in their presentations on TSTF
-493, Option s A and B: NRC Perspective on TST F-493 Option A Adoption NRC expectations with regard to meeting agreement strategies.
Where are the NRC expectations documented?
What are the expectations for custom TS plants?
Discussion of Scope exclusions or Scope additions Specification markups License Amendment Request Content Challenges with license amendment requests for setpoint changes affecting only one or two setpoint changes vs. Option A adoption strategies What are the NRC staff expectations and needs for reviewing "Summary Calculations" submitted with TSTF
-493 Option A in support of proposed setpoint value revisions?
What other evaluation criteria will be applied by the NRC staff when reviewing licensee determinations of Limiting Trip Setpoints and/or Nominal Trip Setpoints, As
-Found and As
-Left Tolerances, and Allowable Values?
Current concerns about preparing license amendment package NRC Perspective on TSTF
-493 Option B Adoption Discussion of Scope exclusions or Scope additions Specification markups Methodology references What are the expectations for custom TS plants?
Contents of Methodology Identify sources of uncertainty and classification What are the NRC staff's expectations for the implementation of the licensee's Setpoint Control Program?
License Amendment Request Content What criteria will be used by the NRC staff when evaluating licensee
-submitted setpoint methodology documentation submitted with TSTF
-493 Option B?
Current concerns about preparing license amendment package