|
---|
Category:Inspection Plan
MONTHYEARIR 05000387/20240052024-08-29029 August 2024 Updated Inspection Plan for Susquehanna Steam Electric Station, Units 1 and 2 (Report 05000387/2024005 and 05000388/2024005) IR 05000387/20244042024-05-0707 May 2024 Information Request for the Cybersecurity Baseline Inspection, Notification to Perform Inspection 05000387/2024404 and 05000388/2024404 IR 05000387/20230062024-02-28028 February 2024 Annual Assessment Letter for Susquehanna Steam Electric Station, Units 1 and 2 (Reports 05000387/2023006 and 05000388/2023006) ML23277A0412023-10-0505 October 2023 Notification of Commercial Grade Dedication Inspection (05000387/2024011 and 05000388/2024011) and Request for Information IR 05000387/20230052023-08-31031 August 2023 Updated Inspection Plan for Susquehanna Steam Electric Station, Units 1 and 2 (Report 05000387/2023005 and 05000388/2023005) IR 05000387/20220062023-03-0101 March 2023 Annual Assessment Letter for Susquehanna Steam Electric Station, Units 1 and 2 (Reports 05000387/2022006 and 05000388/2022006) IR 05000387/20220052022-08-31031 August 2022 Updated Inspection Plan for Susquehanna Steam Electric Station, Units 1 and 2 (Report 05000387/2022005 and 05000388/2022005) IR 05000387/20210062022-03-0202 March 2022 Annual Assessment Letter for Susquehanna Steam Electric Station, Units 1 and 2 (Reports 05000387/2021006 and 05000388/2021006) ML22041A1562022-02-10010 February 2022 Information Request for a Triennial Baseline Design Bases Assurance Inspection (Team); Inspection Report 05000387/2022013 and 05000388/2022013 ML21312A1012021-11-0808 November 2021 Information Request to Support Post-Approval Site Inspection for License Renewal; Inspection Report 05000387/2022011 ML21236A2662021-11-0808 November 2021 Ti 2515/194 Inspection Documentation Request IR 05000387/20210052021-09-0101 September 2021 Updated Inspection Plan for the Susquehanna Steam Electric Station, Units 1 and 2 (Report 05000387/2021005 and 05000388/2021005) ML21210A2232021-07-29029 July 2021 Information Request to Support Triennial Baseline Design-Basis Capability of Power-Operated Valves Inspection; Inspection Report 05000387/2021010 and 05000388/2021010 IR 05000387/20200062021-03-0303 March 2021 Annual Assessment Letter for Susquehanna Steam Electric Station, Units 1 and 2 (Reports 05000387/2020006 and 05000388/2020006) IR 05000387/20200052020-08-31031 August 2020 Updated Inspection Plan (Inspection Reports 05000387/2020005 and 05000388/2020005) ML20149K4492020-05-28028 May 2020 Notification of Conduct of a Fire Protection Team Inspection IR 05000387/20190062020-03-0303 March 2020 Annual Assessment Letter for Susquehanna Steam Electric Station, Units 1 and 2 (Report 05000387/2019006 and 05000388/2019006) ML20056E4392020-02-21021 February 2020 Ti 2515/194 Inspection Documentation Request IR 05000387/20190052019-08-28028 August 2019 Updated Inspection Plan (Inspection Reports 05000387/2019005 and 05000388/2019005) ML19191A0652019-07-10010 July 2019 Information Request for Triennial Baseline Design Bases Assurance Inspection (Team); Notification to Perform Inspection 05000387/2019011 and 05000388/2019011 IR 05000387/20180062019-03-0404 March 2019 Annual Assessment Letter for Susquehanna Steam Electric Station, Units 1 and 2 (Reports 05000387/2018006 and 05000388/2018006) IR 05000387/20180052018-08-28028 August 2018 Updated Inspection Plan (Inspection Report 05000387/2018005 and 05000388/2018005) IR 05000387/20170062018-02-28028 February 2018 Annual Assessment Letter for Susquehanna Units 1 and 2 (Report 05000387-2017006 and 05000388-2017006 Report 05000387-2017402 and 05000388-2017402 Report 05000387-2017501 and 05000388-2017501) IR 05000387/20170052017-08-28028 August 2017 Updated Inspection Plan for Susquehanna Steam Electric Station, Units 1 and 2 Letter with Report 22 (Report 05000387/2017005 and 05000388/2017005) IR 05000387/20160062017-03-0101 March 2017 Annual Assessment Letter for Susquehanna Units 1 and 2 Report Nos. 05000387/2016006 and 05000388/2016006 IR 05000387/20160052016-08-31031 August 2016 Mid-Cycle Assessment Letter for Susquehanna Steam Electric Station, Units 1 and 2, (Report 05000387/2016005 and 05000388/2016005) IR 05000387/20150062016-03-0202 March 2016 ROP 16 Annual Assessment Letter for Susquehanna Steam Electric Station, Units 1 and 2 (Inspection Report 05000387/2015006 and 05000388/2015006) IR 05000387/20150052015-09-0101 September 2015 ROP-16 Mid-Cycle Assessment Letter for Susquehanna Steam Electric Station, Units 1 and 2 (Report 05000387/2015005 and 05000388/2015005) IR 05000387/20140012015-03-0404 March 2015 ROP 15 Annual Assessment Letter for Susquehanna Steam Electric Station, Units 1 and 2 (Report 05000387/2014001 and 05000388/2014001) IR 05000387/20140062014-09-0202 September 2014 ROP-15 Mid-Cycle Performance Review and Inspection Plan Report 05000387-14-006 and 0500388-14-006 IR 05000387/20130012014-03-0404 March 2014 ROP-14 2013 Susquehanna Steam Electric Station, Units 1 & 2, Annual Assessment Letter for Report 05000387/2013001 and 05000388/2013001 and Inspection Plan IR 05000387/20130062013-09-0303 September 2013 Mid-cycle Performance Review and Inspection Plan Report 05000387-13-006 and 05000388-13-006 IR 05000387/20120012013-03-0404 March 2013 Annual Assessment Letter for Susquehanna Steam Electric Station, Units 1 and 2 (Report 05000387/2012001 and 05000388-12-001) IR 05000387/20120062012-09-0404 September 2012 Mid-Cycle Performance Review and Inspection Plan 2012 - Susquehanna Steam Electric Station, Units 1 and 2 (Report 05000387/2012006 and 05000388/2012006) IR 05000387/20110012012-03-0101 March 2012 Annual Assessment Letter for Susquehanna Steam Electric Station, Units 1 and 2 (Report 05000387/2011001 and 05000388/2011001) ML1124304692011-09-0101 September 2011 Mid-Cycle Performance Review and Inspection Plan 2011 - Susquehanna Steam Electric Station, Units 1 and 2 IR 05000387/20100012011-03-0404 March 2011 Annual Assessment Letter for Susquehanna Steam Electric Station, Units 1 and 2, EOC-11 (Report 05000387/2010001 and 05000388/2010001) ML1024404622010-09-0101 September 2010 IR 05000387-10-001 and 05000388-10-001 on 08/11/2010 for Susquehanna Steam Electric Station, Units 1 & 2, Mid-Cycle Assessment Letter 2010 ML1006210392010-03-0303 March 2010 Annual Assessment Letter - Susquehanna Steam Electric Station, Units 1 and 2 (05000387-10-001 and 05000388-10-001) ML0924402702009-09-0101 September 2009 Mid-Cycle Performance Assessment Letter - Susquehanna Steam Electric Station IR 05000387/20090012009-03-0404 March 2009 Annual Assessment Letter - Susquehanna Steam Electric Station (05000387-09-001 and 05000388-09-001) ML0824704642008-09-0202 September 2008 2008 Mid-Cycle Performance Assessment Letter - Susquehanna ML0734707322007-12-13013 December 2007 ROP 8 - Susquehanna - Change to Inspection Plan, 12/13/07 ML0724306552007-08-31031 August 2007 Mid-Cycle Performance Review and Inspection Plan, for 07/01/2007 - 12/31/2008 IR 05000387/20070012007-03-0202 March 2007 Annual Assessment Letter - Susquehanna Steam Electric Station (Report 05000387/2007001 and 05000388/2007001) ML0624305252006-08-31031 August 2006 Mid-cycle Performance Review and Inspection Plan - Susquehanna Steam Electric Station ML0606204502006-03-0202 March 2006 2006-001 - Annual Assessment Letter - Susquehanna Steam Electric Station (Report 05-387/2006001 and 05-388/2006001) ML0524207002005-08-30030 August 2005 2005 Mid-Cycle Review and Inspection Plan - Susquehanna ML0718301432005-03-14014 March 2005 CH-ER-314, Rev 1, SSES Environmental Inspection Plan Procedure. IR 05000387/20050012005-03-0202 March 2005 Annual Assessment Letter for 05000387-05-001 and 05000388-05-001 2024-08-29
[Table view] Category:Letter
MONTHYEARML24289A1252024-10-22022 October 2024 – Authorized Alternative to Requirements of the ASME OM Code PLA-8145, Biennial 10 CFR 50.59 and 72.48 Summary Report and Changes to Regulatory Commitments - PLA-81452024-10-21021 October 2024 Biennial 10 CFR 50.59 and 72.48 Summary Report and Changes to Regulatory Commitments - PLA-8145 ML24291A1562024-10-16016 October 2024 Missed Annual Inventory Required by 40 CFR 266, Subpart in PLE 0026645 PLA-8148, Registration for the Use of Spent Fuel Storage Casks 311, 308, and 3102024-10-15015 October 2024 Registration for the Use of Spent Fuel Storage Casks 311, 308, and 310 PLA-8141, Response to Request for Additional Information Regarding Relief Request 1RR06, PLA-81412024-09-18018 September 2024 Response to Request for Additional Information Regarding Relief Request 1RR06, PLA-8141 PLA-8142, Registration for the Use of Spent Fuel Storage Casks 306, 309, and 307 - PLA-81422024-09-18018 September 2024 Registration for the Use of Spent Fuel Storage Casks 306, 309, and 307 - PLA-8142 ML24260A2312024-09-17017 September 2024 Senior Reactor and Reactor Operator Initial License Examinations 05000387/LER-2024-002, B Diesel Generator Inoperable Due to Failed Excitation System Linear Reactor2024-09-16016 September 2024 B Diesel Generator Inoperable Due to Failed Excitation System Linear Reactor ML24255A8642024-09-0606 September 2024 Rscc Wire & Cable LLC Dba Marmon Industrial Energy & Infrastructure - Part 21 Retraction of Final Notification ML24249A1362024-09-0404 September 2024 EN 57304 - Westinghouse Electric Company, LLC, Final Report - No Embedded Files. Notification of the Potential Existence of Defects Pursuant to 10 CFR Part 21 ML24233A2192024-09-0303 September 2024 – Authorized Alternative to Requirements of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code IR 05000387/20240052024-08-29029 August 2024 Updated Inspection Plan for Susquehanna Steam Electric Station, Units 1 and 2 (Report 05000387/2024005 and 05000388/2024005) 05000387/LER-2023-004-01, Manual Reactor Scram Due to Degraded Main Condenser Vacuum2024-08-26026 August 2024 Manual Reactor Scram Due to Degraded Main Condenser Vacuum IR 05000387/20240022024-08-12012 August 2024 Integrated Inspection Report 05000387/2024002 and 05000388/2024002 ML24208A0962024-07-25025 July 2024 57243-EN 57243 - Rssc Wire & Cable LLC, Dba Marmon - Part 21 Notification PLA-8117, 23rd Refueling Outage Owners Activity Report (PLA-8117)2024-07-23023 July 2024 23rd Refueling Outage Owners Activity Report (PLA-8117) ML24197A0982024-07-15015 July 2024 Request for Information for a Biennial Problem Identification and Resolution Inspection; Inspection Report 05000387/2024010 and 05000388/2024010 PLA-8126, Response to Request for Confirmation of Information Regarding Relief Request 1RR062024-05-29029 May 2024 Response to Request for Confirmation of Information Regarding Relief Request 1RR06 ML24127A2262024-05-29029 May 2024 Issuance of Amendment Nos. 288 and 272 Adoption of TSTF-563 PLA-8122, Annual Radiological Environmental Operating Report (PLA-8122)2024-05-28028 May 2024 Annual Radiological Environmental Operating Report (PLA-8122) PLA-8115, Relief Request IRR06 One Time Extension to the Fourth 10-Year Inservice Testing Program Interval (PLA-8115)2024-05-23023 May 2024 Relief Request IRR06 One Time Extension to the Fourth 10-Year Inservice Testing Program Interval (PLA-8115) 05000387/LER-2024-001, Main Steam Isolation Valve Leakage2024-05-23023 May 2024 Main Steam Isolation Valve Leakage IR 05000387/20240012024-05-13013 May 2024 Integrated Inspection Report 05000387/2024001 and 05000388/2024001 IR 05000387/20244042024-05-0707 May 2024 Information Request for the Cybersecurity Baseline Inspection, Notification to Perform Inspection 05000387/2024404 and 05000388/2024404 PLA-8095, 2023 Annual Radiological Environmental Operating Report (PLA-8095)2024-04-22022 April 2024 2023 Annual Radiological Environmental Operating Report (PLA-8095) ML24082A1372024-04-22022 April 2024 Issuance of Amendment Nos. 287 and 271 Adoption of TSTF-568, Revision 2 and Associated Technical Specification Changes PLA-8101, Re 2023 Annual Report of Radiation Exposure2024-04-22022 April 2024 Re 2023 Annual Report of Radiation Exposure PLA-8094, Radioactive Effluent Release Report and Offsite Dose Calculation Manual PLA-80942024-04-22022 April 2024 Radioactive Effluent Release Report and Offsite Dose Calculation Manual PLA-8094 PLA-8102, Annual Environmental Operating Report (Nonradiological) PLA-81022024-04-11011 April 2024 Annual Environmental Operating Report (Nonradiological) PLA-8102 PLA-8113, Response to Request for Additional Information Regarding Relief Request 4RR-11 (PLA-8113)2024-04-11011 April 2024 Response to Request for Additional Information Regarding Relief Request 4RR-11 (PLA-8113) PLA-8112, Relief Request 4RR-11 Relief from End of Interval Boundary Leakage Test PLA-81122024-04-0909 April 2024 Relief Request 4RR-11 Relief from End of Interval Boundary Leakage Test PLA-8112 PLA-8110, Submittal of Unit 1 Cycle 24 Core Operating License Report (Pla 8110)2024-04-0404 April 2024 Submittal of Unit 1 Cycle 24 Core Operating License Report (Pla 8110) PLA-8100, Property Insurance Program (PLA-8100)2024-04-0101 April 2024 Property Insurance Program (PLA-8100) ML24092A4022024-04-0101 April 2024 Annual Financial Report (PLA-8098) PLA-8109, Supplement to Request for Exemption from Certain Requirements of 10 CR 72.212 and 10 CFR 72.214 Resulting from Fuel Basket Design Control Compliance (PLA-8109)2024-03-21021 March 2024 Supplement to Request for Exemption from Certain Requirements of 10 CR 72.212 and 10 CFR 72.214 Resulting from Fuel Basket Design Control Compliance (PLA-8109) PLA-8107, Request for Exemption from Certain Requirements of 10 CFR 72.212 and 10 CFR 72.214 Resulting from Fuel Basket Design Control Compliance2024-03-19019 March 2024 Request for Exemption from Certain Requirements of 10 CFR 72.212 and 10 CFR 72.214 Resulting from Fuel Basket Design Control Compliance ML24067A2512024-03-19019 March 2024 Authorized Alternative to Requirements of the ASME Code ML24044A2532024-03-14014 March 2024 Associated Independent Spent Fuel Storage Installation – Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0077 (Security Notifications, Reports, and Recordkeeping & Suspicious Activity Reporting)) IR 05000387/20240112024-02-29029 February 2024 Commercial Grade Dedication Inspection Report 05000387/2024011 and 05000388/2024011 IR 05000387/20230062024-02-28028 February 2024 Annual Assessment Letter for Susquehanna Steam Electric Station, Units 1 and 2 (Reports 05000387/2023006 and 05000388/2023006) ML24039A1882024-02-27027 February 2024 Issuance of Amendment Nos. 286 and 270 Changes to Technical Specifications for Control Rods ML24037A3072024-02-22022 February 2024 Summary of Regulatory Audit in Support of Relief Request 5RR-02 PLA-8099, Proof of Financial Protection and Guarantee of Payment of Deferred Premiums (PLA-8099)2024-02-13013 February 2024 Proof of Financial Protection and Guarantee of Payment of Deferred Premiums (PLA-8099) IR 05000387/20230042024-02-0707 February 2024 Integrated Inspection Report 05000387/2023004 and 05000388/2023004 PLA-8096, Response to Request for Additional Information Regarding Proposed Relief Request for the Fifth 10-Year Inservice Test Program Interval2024-01-0404 January 2024 Response to Request for Additional Information Regarding Proposed Relief Request for the Fifth 10-Year Inservice Test Program Interval PLA-8077, Emergency Plan Revision 67 (PLA-8077)2023-12-27027 December 2023 Emergency Plan Revision 67 (PLA-8077) IR 05000387/20230102023-12-11011 December 2023 Fire Protection Team Inspection Report 05000387/2023010 and 05000388/2023010 PLA-8089, Submittal of Revision to Inservice Testing Program Plan2023-12-0505 December 2023 Submittal of Revision to Inservice Testing Program Plan PLA-8088, Request for Exemption from Enhanced Weapons, Firearms Background Checks and Security Event Notifications Implementation (PLA-8088)2023-12-0505 December 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks and Security Event Notifications Implementation (PLA-8088) PLA-8084, Application to Revise Technical Specifications to Adopt TSTF-568, Revise Applicability of BWR TS 3.6.2.5 and TS 3.6.3.22023-11-29029 November 2023 Application to Revise Technical Specifications to Adopt TSTF-568, Revise Applicability of BWR TS 3.6.2.5 and TS 3.6.3.2 2024-09-06
[Table view] |
Text
September 4, 2012
Mr. Timothy Senior Vice President and Chief Nuclear Officer PPL Susquehanna, LLC 769 Salem Boulevard
Berwick, PA 18603-0467
SUBJECT: MID-CYCLE PERFORMANCE REVIEW AND INSPECTION PLAN -
SUSQUEHANNA STEAM ELECTRIC STATION, UNlTS 1 AND 2 (REPORT 05000387/2012006 and 05000388/2012006)
Dear Mr. Rausch:
On August 15, 2012, the U. S. Nuclear Regulatory Commission (NRC) completed its mid-cycle performance review of Susquehanna Steam Electric Station (Susquehanna) Units 1 and 2. The NRC reviewed the most recent quarterly performance indicators (PIs) in addition to inspection results and enforcement actions from July 1, 2011 through June 30, 2012. This letter informs you of the NRC's assessment of your facility during this period and its plans for future inspections at your facility. This assessment reflects the integration of the Security Cornerstone into the ROP performance assessment progr am governed by IMC 0305, "Operating Reactor Assessment Program."
The NRC determined that the performance at Susquehanna Unit 1 during the most recent quarter was within the Regulatory Response Column of the NRC
=s Reactor Oversight Process (ROP) Action Matrix because of one finding having low to moderate safety significance (i.e., white) associated with the Initiating Events Cornerstone. The White finding was related to an internal flooding event on July 16, 2010, which required the operators to insert a manual scram and isolate the normal heat sink.
On May 7, 2012, the NRC issued an interim 95002 supplemental inspection report and follow-up assessment letter (ML1215A374) associated with a Unit 1 Unplanned Scrams per 7000 Critical Hours PI which crossed the threshold from green to white in the first quarter of 2011 and the
White internal flooding finding discussed abov e. While the NRC concluded that PPL had adequately addressed the Unplanned Scrams PI, the White internal flooding finding was held open based on significant weaknesses associated with PPL's assessment of the extent of condition and extent of cause. In addition, the NRC was unable to evaluate the effectiveness of the procedure quality upgrade project due to insufficient progress. Accordingly, the White finding associated with the internal flooding event and the 95002 supplemental inspection will remain open until all inspection objectives have been met. As discussed in the May 7 correspondence, a follow-up 95002 inspection will be conducted once the NRC has been informed of your readiness. The NRC determined the performance at Susquehanna Unit 2 during the most recent quarter was within the Licensee Response Column of the NRC
=s ROP Action Matrix because all inspection findings had very low safety significance (i.e., green), and all PIs indicated that your performance was within the nominal, expected range (i.e., green). Therefore, the NRC plans to conduct ROP baseline inspections at Unit 2.
The NRC evaluates cross-cutting themes to determine whether a substantive cross-cutting issue (SCCI) exists in a particular area and to encourage licensees to take appropriate actions
before more significant performance issues em erge. During this assessment period, the NRC continued to identify a SCCI in the Corrective Action Program (CAP) component of the Problem Identification and Resolution (Pl&R) cross-cutting area. Specifically, there were four findings with a PI&R cross-cutting aspect of P.1(c) - Evaluation of Identified Problems, one of which is the White internal flooding finding which was held open following the 95002 supplemental inspection. The P.1(c) SCCI was initially assigned in the 2011 Mid-Cycle assessment letter (ML112430469) and continued in the 2011 Annual Assessment letter (ML12061A021). For the current assessment period, the NRC has determined that the exit criteria defined in the 2011 Mid-Cycle Assessment letter have not been met since PPL has not demonstrated sustainable performance improvement. Specifically, there is not yet evidence of effective implementation of the corrective action plan in that there has not been a notable reduction in the number of findings with the same cross-cutting aspect. Furthermore, the NRC notes that while some progress has been made, the P.1(c) SCCI recovery plan is not yet complete. Therefore, the P.1(c) SCCI will remain open until PPL has demonstrated sustainable performance improvement as evidenced by effective implementation of an appropriate corrective action plan that results in no safety significant findings and a notable reduction in the overall number of inspection findings with the same cross-cutting aspect.
During this assessment period, the NRC also continued to identify a SCCI in the Resources component of the Human Performance cross-cutting area. Specifically, there were four findings with a Human Performance cross-cutting aspect of H.2(c) - Documentation, Procedures and Component Labeling. The H.2(c) SCCI was initially assigned in the 2011 Annual Assessment letter. For the current assessment period, the NRC has determined that the exit criteria defined in the 2011 Annual Assessment letter have not been met. Specifically, there is not yet evidence of effective implementation of the corrective action plan in that there has not been a notable reduction in the number of findings with the same cross-cutting aspect. Therefore, the H.2(c)
SCCI will remain open until PPL has demonstrated sustainable performance improvement as evidenced by effective implementation of an appropriate corrective action plan that results in no safety significant findings and a notable reduction in the overall number of inspection findings with the same cross-cutting aspect.
Because this is the third consecutive assessment letter documenting a P.1(c) SCCI and the second letter documenting a H.2(c) SCCI, the NRC requests that you address, in a public meeting, your assessment of the: 1) causal factors associated with the SCCIs; and 2) the implementation, effectiveness, and timeliness of corrective actions to address the SCCIs, including the status of the procedure quality upgrade project. Furthermore, we understand that you plan to conduct a safety culture assessment during 2013, which is part of your participation
in industry wide initiatives. The NRC requests th at you discuss your pl ans for this upcoming safety culture assessment and how insights associated with the SCCIs may be factored into the development of the plan. The NRC will continue to monitor your staff's efforts and progress in addressing these SCCIs through the baseline inspection program. The enclosed inspection plan lists the inspections scheduled through December 31, 2013. Routine inspections performed by resident inspectors are not included in the inspection plan. In addition to the baseline inspections, consistent with the Agency's actions related to Fukushima, the NRC will perform TI-187, "Inspection of Near-Term Task Force Recommendation 2.3 Flooding Walkdowns" and TI-188, "Inspection of Near-Term Task Force Recommendation 2.3 Seismic Walkdowns." We also plan to conduct Inspection Procedure (IP) 92702, "Follow-up on Traditional Enforcement Actions," and independent spent fuel storage installation inspections (lSFSl) using Inspection Procedure 60855.1,"Operation of an ISFSI at Operating Plants." The inspections listed during the last nine months of the inspection plan are tentative and may be
revised at the end-of-cycle performance review. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. This inspection plan does not include security-related inspections, which will be sent via separate, non-publicly available correspondence.
In accordance with 10 CFR 2.390 of the NRC
=s A Rules of Practice,@ a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Please contact Paul Krohn at 610-337-5120 with any questions you have regarding this letter.
Sincerely,/RA/
Darrell J. Roberts, Director Division of Reactor Projects Docket Nos. 50-387; 50-388 License Nos. NPF-14, NPF-22
Enclosure:
Susquehanna Steam Electric Station Inspection/Activity Plan
cc w/encl: Distribution via ListServ
ML12248A066 SUNSI Review Non-Sensitive Sensitive Publicly Available Non-Publicly Available OFFICE RI/DRP RI/DRP RI/DRP NAME SMcCarver/SM PKrohn/PGK DRoberts/DJR DATE 08/27/12 08/27/12 09/04 /12 Page 1 of 2 08/29/2012 14:44:43 Report 22 Unit Number Planned Dates Start End Inspection Activity Title No. of Staff on Site Susquehanna Inspection / Activity Plan 07/01/2012
-12/31/2013 71152B-PI&R 7 1, 2 IP Problem Identification and Resolution 71152B 07/09/2012 07/13/2012 1, 2 IP Problem Identification and Resolution 71152B 07/23/2012 07/27/2012 71124-RAD SAFETY 1 1, 2 IP Radiological Hazard Assessment and Exposure Controls 71124.01 08/20/2012 08/24/2012 1, 2 IP Occupational ALARA Planning and Controls 71124.02 08/20/2012 08/24/2012 1, 2 IP Occupational Dose Assessment 71124.04 08/20/2012 08/24/2012 TI-187-FLOODING WALKDOWNS 1 1, 2 IP Inspection of Near-Term Task Force Recommendation 2.3 Flooding Walkdowns 2515/187 08/15/2012 10/30/2012 TI-188-SEISMIC WALKDOWNS 1 1, 2 IP Inspection of Near-Term Task Force Recommendation 2.3 Seismic Walkdowns 2515/188 08/15/2012 10/30/2012 60855-ISFSI LOADING INSPECTION 2 1, 2 IP Operation Of An ISFSI 60855 09/17/2012 09/21/2012 1, 2 IP Operation of an Independent Spent Fuel Storage Installation at Operating Plants 60855.1 09/17/2012 09/21/2012 92702-FOLLOWUP ON TRADTIONAL ENFORCMENT ACTION 1 1, 2 IP Followup On Corrective Actions For Violations And Deviations 92702 10/01/2012 12/31/2012 71124.08-RADWASTE 1 1, 2 IP Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation 71124.08 10/15/2012 10/19/2012 EP EX-EP EXERCISE EVALUATION 6 1, 2 IP Exercise Evaluation 7111401 10/22/2012 10/26/2012 1, 2 IP Emergency Action Level and Emergency Plan Changes 7111404 10/22/2012 10/26/2012 71124.06-RETS INSPECTION 1 1, 2 IP Radioactive Gaseous and Liquid Effluent Treatment 71124.06 11/05/2012 11/09/2012 1, 2 IP RETS/ODCM Radiological Effluent 71151-PR01 11/05/2012 11/09/2012 MODS-PERMANENT PLANT MODIFICATIONS 3 1, 2 IP Evaluations of Changes, Tests, or Experiments and Permanent Plant Modifications 7111117T 11/26/2012 11/30/2012 1, 2 IP Evaluations of Changes, Tests, or Experiments and Permanent Plant Modifications 7111117T 12/10/2012 12/14/2012 4/22 EXM-SUSQ INITIAL EXAM 5 1 FY13-SUSQ INITIAL OPERATOR LICENSING EXAM U01868 03/25/2013 03/29/2013 1 FY13-SUSQ INITIAL OPERATOR LICENSING EXAM U01868 04/22/2013 05/03/2013 7111108G-U2 INSERVICE INSPECTION 1 2 IP Inservice Inspection Activities - BWR 7111108G 04/22/2013 04/26/2013 This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.
Page 2 of 2 08/29/2012 14:44:43 Report 22 Unit Number Planned Dates Start End Inspection Activity Title No. of Staff on Site Susquehanna Inspection / Activity Plan 07/01/2012
-12/31/2013 71124-RADIATION SAFETY INSPECTION 1 1, 2 IP Radiological Hazard Assessment and Exposure Controls 71124.01 04/22/2013 04/26/2013 1, 2 IP Occupational ALARA Planning and Controls 71124.02 04/22/2013 04/26/2013 1, 2 IP In-Plant Airborne Radioactivity Control and Mitigation 71124.03 04/22/2013 04/26/2013 1, 2 IP Occupational Dose Assessment 71124.04 04/22/2013 04/26/2013 71124-RADIATION SAFETY INSPECTION 1 1, 2 IP Radiological Environmental Monitoring Program 71124.07 06/17/2013 06/21/2013 1, 2 IP Performance Indicator Verification 71151 06/17/2013 06/21/2013 7111121-CDBI 7 1, 2 IP Component Design Bases Inspection 7111121 07/29/2013 08/02/2013 1, 2 IP Component Design Bases Inspection 7111121 08/12/2013 08/16/2013 1, 2 IP Component Design Bases Inspection 7111121 08/26/2013 08/30/2013 7111111B-SUSQUEHANNA REQUAL INSP WITH P/F RESULTS 2 1 IP Licensed Operator Requalification Program 7111111B 11/11/2013 11/15/2013 71124-RADIATION SAFETY INSPECTION 1 1, 2 IP In-Plant Airborne Radioactivity Control and Mitigation 71124.03 09/09/2013 09/13/2013 1, 2 IP Occupational Dose Assessment 71124.04 09/09/2013 09/13/2013 71124-RADIATION SAFETY INSPECTION 1 1, 2 IP Operation of an Independent Spent Fuel Storage Installation at Operating Plants 60855.1 11/04/2013 11/08/2013 1, 2 IP Radiological Hazard Assessment and Exposure Controls 71124.01 11/04/2013 11/08/2013 1, 2 IP Occupational ALARA Planning and Controls 71124.02 11/04/2013 11/08/2013 1, 2 IP In-Plant Airborne Radioactivity Control and Mitigation 71124.03 11/04/2013 11/08/2013 1, 2 IP Occupational Dose Assessment 71124.04 11/04/2013 11/08/2013 1, 2 IP Performance Indicator Verification 71151 11/04/2013 11/08/2013 EP PROGR-EP PROGRAM INSPECTION 1 1, 2 IP A lert and Notification System Testing 7111402 11/04/2013 11/08/2013 1, 2 IP Emergency Preparedness Organization Staffing and Augmentation System 7111403 11/04/2013 11/08/2013 1, 2 IP Emergency Action Level and Emergency Plan Changes 7111404 11/04/2013 11/08/2013 1, 2 IP Correction of Emergency Preparedness Weaknesses and Deficiencies 7111405 11/04/2013 11/08/2013 This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.