ML14325A759

From kanterella
Revision as of 10:00, 9 July 2018 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
Jump to navigation Jump to search
Comanche Peak, Units 1 & 2 - Transmittal of Inservice Testing Plan for Pumps and Valves Third Interval, Revision 1
ML14325A759
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 11/19/2014
From: Flores R, Madden F W
Luminant Generation Co, Luminant Power
To:
Document Control Desk, Office of Nuclear Reactor Regulation
Shared Package
ML14325A782 List:
References
CP-201401379, TXX-14137
Download: ML14325A759 (2)


Text

Rafael Flores Senior Vice President& Chief Nuclear Officer Rafael.Flores@Luminant.com Luminant Power P 0 Box 1002 6322 North FM 56 Glen Rose, TX 76043 Luminant T 254 897 5590 C 817 559 0403 F 254 897 6652 CP-201401379 TXX-14137 November 19, 2014 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555

SUBJECT:

COMANCHE PEAK NUCLEAR POWER PLANT DOCKET NOS. 50-445 AND 50-446 TRANSMITTAL OF CPNPP UNITS 1 & 2 INSERVICE TESTING PLAN FOR PUMPS & VALVES THIRD INTERVAL, REVISION 1

Dear Sir or Madam:

As requested by the NRC, Luminant Generation Company LLC (Luminant Power), the owner of Comanche Peak Nuclear Power Plant Units 1 and 2 (herein referred to as CPNPP), herewith submits CPNPP Units I and 2 Inservice Testing Plan for Pumps and Valves, Third Interval, Revision 1.The current start date of the third interval of the Inservice Test Plan for Units 1 and 2 is August 3, 2013, and the end date for the third interval is August 2, 2023. Revision 1 was effective February 24, 2014. The enclosed CD-ROM contains the CPNPP Units 1 and 2 Inservice Testing Plan for Pumps and Valves, Third Interval, Revision 1.This communication contains no new licensing basis commitments regarding Comanche Peak Units 1 and 2.Should you have any questions, please contact Mr. Jack Hicks at (254) 897-6725.Sincerely, Luminant Generation Company LLC Rafael Flores By: AA/W 2 ,2 _,1-/Fred W. Madden Director, External Affairs A member of the STARS Alliance pA-D ul Callaway-Comanche Peak .Diablo Canyon- Palo Verde- Wolf Creek U. S. Nuclear Regulatory Commission TXX-14137 Page 2 of 2 11/19/2014 Enclosure

-CPNPP Units 1 & 2 Inservice Testing Plan for Pumps & Valves, Third Interval, Revision 1.c -Marc L. Dapas, Region IV clo Balwant K. Singal, NRR Resident Inspectors, Comanche Peak clo