ML14325A759
ML14325A759 | |
Person / Time | |
---|---|
Site: | Comanche Peak |
Issue date: | 11/19/2014 |
From: | Flores R, Madden F W Luminant Generation Co, Luminant Power |
To: | Document Control Desk, Office of Nuclear Reactor Regulation |
Shared Package | |
ML14325A782 | List: |
References | |
CP-201401379, TXX-14137 | |
Download: ML14325A759 (2) | |
Similar Documents at Comanche Peak | |
---|---|
Category:Inservice/Preservice Inspection and Test Report
MONTHYEARCP-202400319, (CPNPP) - Revision to CPNPP Letter to the NRC, Multiple Relief Requests for Unit 2 Third Ten-Year Inservice Inspection Interval from 10CFR50.55(a) Inspection Requirements Due to Impracticality2024-08-13013 August 2024
[Table view](CPNPP) - Revision to CPNPP Letter to the NRC, Multiple Relief Requests for Unit 2 Third Ten-Year Inservice Inspection Interval from 10CFR50.55(a) Inspection Requirements Due to Impracticality CP-202400253, (Cpnpp), Units 1 & 2 Inservice Testing Plan for Pumps & Valves Third Interval, Revision 52024-06-26026 June 2024 (Cpnpp), Units 1 & 2 Inservice Testing Plan for Pumps & Valves Third Interval, Revision 5 CP-202400235, (Cpnpp), Units 1 & 2, Inservice Testing Plan for Pumps & Valves Fourth Interval, Revision 02024-06-18018 June 2024 (Cpnpp), Units 1 & 2, Inservice Testing Plan for Pumps & Valves Fourth Interval, Revision 0 CP-202400063, (CPNPP) - Inservice Inspection (ISI) Owners Activity Reports (OAR-1 Forms) for Unit 1 Refueling Outage 23 (1RF23)2024-02-12012 February 2024 (CPNPP) - Inservice Inspection (ISI) Owners Activity Reports (OAR-1 Forms) for Unit 1 Refueling Outage 23 (1RF23) CP-202300442, (CPNPP) - Request to Use Later Code Edition for Inservice Inspection (ISI) Program2023-09-15015 September 2023 (CPNPP) - Request to Use Later Code Edition for Inservice Inspection (ISI) Program CP-202300411, (Cpnpp), Inservice Inspection (ISI) Owners Activity Reports (OAR-1 Forms) for Unit 2 Refueling Outage 20 (2RF20)2023-08-17017 August 2023 (Cpnpp), Inservice Inspection (ISI) Owners Activity Reports (OAR-1 Forms) for Unit 2 Refueling Outage 20 (2RF20) CP-202200419, (CPNPP) - Unit 1 Refueling Outage 22 (1RF22) Steam Generator 180 Day Report2022-11-0303 November 2022 (CPNPP) - Unit 1 Refueling Outage 22 (1RF22) Steam Generator 180 Day Report CP-202200306, (CPNPP) - Inservice Inspection (ISI) Owners Activity Reports (OAR-1 Forms) for Unit 1 Refueling Outage 22 (1RF22)2022-08-11011 August 2022 (CPNPP) - Inservice Inspection (ISI) Owners Activity Reports (OAR-1 Forms) for Unit 1 Refueling Outage 22 (1RF22) CP-202200200, (CPNPP) Unit 2 Refueling Outage 19 (2RF19) Steam Generator 180 Day Report2022-05-0505 May 2022 (CPNPP) Unit 2 Refueling Outage 19 (2RF19) Steam Generator 180 Day Report TXX-2201, (CPNPP) - Inservice Inspection (ISI) Owners Activity Report (OAR-1 Form) for Unit 2 Refueling Outage 19 (2RF19)2022-02-0101 February 2022 (CPNPP) - Inservice Inspection (ISI) Owners Activity Report (OAR-1 Form) for Unit 2 Refueling Outage 19 (2RF19) CP-202100751, (CPNPP) - ASME OM Inservice Test Program Relief Request SNB-3, Snubber Inservice Program Third Internal Extension2022-01-0404 January 2022 (CPNPP) - ASME OM Inservice Test Program Relief Request SNB-3, Snubber Inservice Program Third Internal Extension CP-202100150, (CPNPP) Units 1 & 2 - Inservice Testing Plan for Pumps & Valves Third Interval, Revision 42021-03-23023 March 2021 (CPNPP) Units 1 & 2 - Inservice Testing Plan for Pumps & Valves Third Interval, Revision 4 CP-202100061, (CPNPP) - Inservice Inspection (Isi) Owner'S Activity Report (OAR-1 Form) for Unit 1 Refueling Outage 21 (1RF21)2021-01-27027 January 2021 (CPNPP) - Inservice Inspection (Isi) Owner'S Activity Report (OAR-1 Form) for Unit 1 Refueling Outage 21 (1RF21) ML20282A7342020-10-22022 October 2020 Proposed Alternative to the Requirements of the ASME Code to Extend the Inservice Inspection Interval (EPID L-2020-LLR-0059 (COVID-19)) CP-202000463, (CPNPP) - Inservice Test (IST) Program Request to Use Later Code Edition2020-08-31031 August 2020 (CPNPP) - Inservice Test (IST) Program Request to Use Later Code Edition CP-202000262, Snubber Testing and Snubber Visual Examinations Relief Request2020-04-10010 April 2020 Snubber Testing and Snubber Visual Examinations Relief Request CP-202000261, Inservice Inspection (ISI) and Inservice Testing (IST) Program Relief Requests2020-04-0707 April 2020 Inservice Inspection (ISI) and Inservice Testing (IST) Program Relief Requests CP-201900496, Inservice Inspection (ISI) Owner'S Activity Reports (OAR-1 Forms) for Unit 1 Refueling Outage 20 (IRF20)2019-08-26026 August 2019 Inservice Inspection (ISI) Owner'S Activity Reports (OAR-1 Forms) for Unit 1 Refueling Outage 20 (IRF20) CP-201800215, Submittal of Nineteenth Refueling Outage (1RF19) Steam Generator 180 Day Report2018-04-19019 April 2018 Submittal of Nineteenth Refueling Outage (1RF19) Steam Generator 180 Day Report CP-201800086, Submittal of Unit 1 Nineteenth Refueling Outage (IRF19) Inservice Inspection (ISI) Summary Report (2007 Edition of ASME Code, Section XI, 2008 Addenda Unit 1 Third Interval Start Date: August 13, 2010 Unit 1 Third ..2018-02-0707 February 2018 Submittal of Unit 1 Nineteenth Refueling Outage (IRF19) Inservice Inspection (ISI) Summary Report (2007 Edition of ASME Code, Section XI, 2008 Addenda Unit 1 Third Interval Start Date: August 13, 2010 Unit 1 Third .. CP-201700623, Submittal of Sixteenth Refueling Outage (2RF16) Inservice Inspection (ISI) Summary Report (2007 Edition of ASME Code, Section XI, 2008 Addenda Third Interval, Start Date: Aug. 3, 2014 Third Interval End Date: Aug. 2, 2023)2017-08-0101 August 2017 Submittal of Sixteenth Refueling Outage (2RF16) Inservice Inspection (ISI) Summary Report (2007 Edition of ASME Code, Section XI, 2008 Addenda Third Interval, Start Date: Aug. 3, 2014 Third Interval End Date: Aug. 2, 2023) CP-201600869, Submittal of Eighteenth Refueling Outage (1RF18) Inservice Inspection Summary Report2016-08-31031 August 2016 Submittal of Eighteenth Refueling Outage (1RF18) Inservice Inspection Summary Report CP-201600148, Requesting Additional Information for Relief Request b-9 for Unit 2 Second Ten Year Inservice Inspection Interval2016-03-0202 March 2016 Requesting Additional Information for Relief Request b-9 for Unit 2 Second Ten Year Inservice Inspection Interval CP-201600117, Submittal of Fifteenth Refueling Outage (2RF15), Inservice Inspection (ISI) Summary Report (2007 Edition of ASME Code, Section XI, 2008 Addenda, Third Interval Start Date: August 3, 2014, Third Interval End Date: August 2, 2023)2016-02-0808 February 2016 Submittal of Fifteenth Refueling Outage (2RF15), Inservice Inspection (ISI) Summary Report (2007 Edition of ASME Code, Section XI, 2008 Addenda, Third Interval Start Date: August 3, 2014, Third Interval End Date: August 2, 2023) CP-201500777, Relief Request B-10, Second Ten Year Inservice Inspection Interval from 10CFR50.55a Inspection Requirements Due to Physical Interferences (1998 Edition of ASME Code, Section XI, 2000 Addenda Second Interval Start Date: August..2015-08-0303 August 2015 Relief Request B-10, Second Ten Year Inservice Inspection Interval from 10CFR50.55a Inspection Requirements Due to Physical Interferences (1998 Edition of ASME Code, Section XI, 2000 Addenda Second Interval Start Date: August.. CP-201500775, Relief Request B-3, Second Ten Year Inservice Inspection Interval from 10CFR50.55a Inspection Requirements Due to Physical Interferences (1998 Edition of ASME Code, Section XI, 2000 Addenda Second Interval Start Date: August..2015-08-0303 August 2015 Relief Request B-3, Second Ten Year Inservice Inspection Interval from 10CFR50.55a Inspection Requirements Due to Physical Interferences (1998 Edition of ASME Code, Section XI, 2000 Addenda Second Interval Start Date: August.. CP-201500776, Relief Request B-9, Second Ten Year Inservice Inspection Interval from 10CFR50.55a Inspection Requirements Due to Physical Interferences (1998 Edition of ASME Code, Section XI, 2000 Addenda Second Interval Start Date: August..2015-08-0303 August 2015 Relief Request B-9, Second Ten Year Inservice Inspection Interval from 10CFR50.55a Inspection Requirements Due to Physical Interferences (1998 Edition of ASME Code, Section XI, 2000 Addenda Second Interval Start Date: August.. CP-201500778, Relief Request B-11, Second Ten Year Inservice Inspection Interval from 10CFR50.55a Inspection Requirements Due to Physical Interferences (1998 Edition of ASME Code, Section XI, 2000 Addenda Second Interval Start Date: August..2015-08-0303 August 2015 Relief Request B-11, Second Ten Year Inservice Inspection Interval from 10CFR50.55a Inspection Requirements Due to Physical Interferences (1998 Edition of ASME Code, Section XI, 2000 Addenda Second Interval Start Date: August.. CP-201500779, Relief Request B-15, Second Ten Year Inservice Inspection Interval from 10CFR50.55a Inspection Requirements Due to Physical Interferences (1998 Edition of ASME Code, Section XI, 2000 Addenda Second Interval Start Date: August..2015-08-0303 August 2015 Relief Request B-15, Second Ten Year Inservice Inspection Interval from 10CFR50.55a Inspection Requirements Due to Physical Interferences (1998 Edition of ASME Code, Section XI, 2000 Addenda Second Interval Start Date: August.. CP-201500780, Relief Request C-2, Second Ten Year Inservice Inspection Interval from 10CFR50.55a Inspection Requirements Due to Physical Interferences (1998 Edition of ASME Code, Section XI, 2000 Addenda Second Interval Start Date: August..2015-08-0303 August 2015 Relief Request C-2, Second Ten Year Inservice Inspection Interval from 10CFR50.55a Inspection Requirements Due to Physical Interferences (1998 Edition of ASME Code, Section XI, 2000 Addenda Second Interval Start Date: August.. CP-201500781, Relief Request C-4, Second Ten Year Inservice Inspection Interval from 10CFR50.55a Inspection Requirements Due to Physical Interferences (1998 Edition of ASME Code, Section XI, 2000 Addenda Second Interval Start Date: August..2015-08-0303 August 2015 Relief Request C-4, Second Ten Year Inservice Inspection Interval from 10CFR50.55a Inspection Requirements Due to Physical Interferences (1998 Edition of ASME Code, Section XI, 2000 Addenda Second Interval Start Date: August.. CP-201500685, Response to Request for Additional Information for Relief Request 2A3-1, Unit 2, Inservice Inspection for Application of an Alternative to the ASME Boiler and Pressure Vessel Code Section XI Examination Requirements for Class 1 & 2.2015-07-22022 July 2015 Response to Request for Additional Information for Relief Request 2A3-1, Unit 2, Inservice Inspection for Application of an Alternative to the ASME Boiler and Pressure Vessel Code Section XI Examination Requirements for Class 1 & 2. CP-201500671, Relief Request T-1 for Inservice Testing Program for Application of an Alternative to the ASME OM Code Frequency Specifications, (2007 Edition of ASME Code, Section XI, 2008 Addenda Third Interval Start Date: August 3.2015-06-30030 June 2015 Relief Request T-1 for Inservice Testing Program for Application of an Alternative to the ASME OM Code Frequency Specifications, (2007 Edition of ASME Code, Section XI, 2008 Addenda Third Interval Start Date: August 3. CP-201500244, Relief Request 2A3-1 for Inservice Inspection for Application of an Alternative to the ASME Boiler and Pressure Vessel Code Section XI Examination Requirements for Class 1 and 2 Piping Welds (2007 Edition of ASME Code.2015-03-0404 March 2015 Relief Request 2A3-1 for Inservice Inspection for Application of an Alternative to the ASME Boiler and Pressure Vessel Code Section XI Examination Requirements for Class 1 and 2 Piping Welds (2007 Edition of ASME Code. CP-201500157, Relief Request No. 2C3-1 for the Reactor Pressure Vessel Leak-Off Flange (Third ISI Interval Start Date: August 3, 2014; Third ISI Interval End Date: August 2, 2023)2015-02-24024 February 2015 Relief Request No. 2C3-1 for the Reactor Pressure Vessel Leak-Off Flange (Third ISI Interval Start Date: August 3, 2014; Third ISI Interval End Date: August 2, 2023) CP-201500222, Submittal of Unit 1, Seventeenth Refueling Outage (1RF17) Inservice Inspection Summary Report (2007 Edition of ASME Code, Section XI, 2008 Addenda Third Interval Start Date August 13, 2010 Third Interval End Date: August 12, 2020)2015-02-18018 February 2015 Submittal of Unit 1, Seventeenth Refueling Outage (1RF17) Inservice Inspection Summary Report (2007 Edition of ASME Code, Section XI, 2008 Addenda Third Interval Start Date August 13, 2010 Third Interval End Date: August 12, 2020) ML14325A7592014-11-19019 November 2014 Transmittal of Inservice Testing Plan for Pumps and Valves Third Interval, Revision 1 CP-201401035, Relief Requests Nos. B-7, B-12 and B-13 for the Second 10-Year ISI Interval (Second ISI Interval Start Date: August 3, 2004; Second ISI Interval End Date: August 2, 2014)2014-08-27027 August 2014 Relief Requests Nos. B-7, B-12 and B-13 for the Second 10-Year ISI Interval (Second ISI Interval Start Date: August 3, 2004; Second ISI Interval End Date: August 2, 2014) CP-201400933, Submittal of Unit 2 Fourteenth Refueling Outage (2RF14) Inservice Inspection (ISI) Summary Report (1998 Edition of ASME Code, Section XI, 2000 Addenda Second Interval Start Date: August 3, 2004 Second Interval End Date: August 2, 20142014-07-23023 July 2014 Submittal of Unit 2 Fourteenth Refueling Outage (2RF14) Inservice Inspection (ISI) Summary Report (1998 Edition of ASME Code, Section XI, 2000 Addenda Second Interval Start Date: August 3, 2004 Second Interval End Date: August 2, 2014 CP-201401379, Transmittal of Inservice Testing Plan for Pumps and Valves Third Interval, Revision 12014-02-24024 February 2014 Transmittal of Inservice Testing Plan for Pumps and Valves Third Interval, Revision 1 CP-201300143, Response to RAI for Unit 1 Relief Request No. B-22013-02-0707 February 2013 Response to RAI for Unit 1 Relief Request No. B-2 CP-201300005, Submittal of Inservice Inspection Summary Report for the 13th Refueling Outage2013-01-31031 January 2013 Submittal of Inservice Inspection Summary Report for the 13th Refueling Outage CP-201300003, Submittal of Relief Request No. B-2, Third 10 Year ISI Interval from 10CFR50.55a Requirements for Reactor Vessel Hot Leg Nozzle Weld Examinations (Third ISI Interval Start Date August 13, 2010)2013-01-16016 January 2013 Submittal of Relief Request No. B-2, Third 10 Year ISI Interval from 10CFR50.55a Requirements for Reactor Vessel Hot Leg Nozzle Weld Examinations (Third ISI Interval Start Date August 13, 2010) CP-201200879, Relief Request No. V-1 for Unit 1 and Unit 2 Inservice Testing Plan for Pumps and Valves (ASME OM Code 2004 Edition, Through 2006 Addenda; Third Interval Start Date: August 3, 2013)2012-09-0606 September 2012 Relief Request No. V-1 for Unit 1 and Unit 2 Inservice Testing Plan for Pumps and Valves (ASME OM Code 2004 Edition, Through 2006 Addenda; Third Interval Start Date: August 3, 2013) CP-201200045, Submittal of Unit 1 Fifteenth Refueling Outage (1RF15) Inservice Inspection (ISI) Summary Report (Unit 1: 1998 Edition of ASME Code Section XI Through 2000 Addenda, Interval Start Date - August 13, 2010, Third Interval)2012-01-17017 January 2012 Submittal of Unit 1 Fifteenth Refueling Outage (1RF15) Inservice Inspection (ISI) Summary Report (Unit 1: 1998 Edition of ASME Code Section XI Through 2000 Addenda, Interval Start Date - August 13, 2010, Third Interval) CP-201101429, Twelfth Refueling Outage (2RF12) Steam Generator 180 Day Report2011-10-12012 October 2011 Twelfth Refueling Outage (2RF12) Steam Generator 180 Day Report CP-201101031, Transmittal of Unit 1 Inservice Inspection Program Plan, Revision 0 (Unit 1: ASME Code XI 1998 Edition, 1999 and 2000 Addenda, Interval Start - August 13, 2010, Third Interval)2011-08-0202 August 2011 Transmittal of Unit 1 Inservice Inspection Program Plan, Revision 0 (Unit 1: ASME Code XI 1998 Edition, 1999 and 2000 Addenda, Interval Start - August 13, 2010, Third Interval) CP-201100852, Submittal of 12th Refueling Outage (2RF12) Inservice Inspection (ISI) Summary Report (1998 Edition of ASME Code Section XI Through 2000 Addenda, Interval Start Date - August 4,2004, Second Interval)2011-07-21021 July 2011 Submittal of 12th Refueling Outage (2RF12) Inservice Inspection (ISI) Summary Report (1998 Edition of ASME Code Section XI Through 2000 Addenda, Interval Start Date - August 4,2004, Second Interval) CP-201001545, Relief Request No. B-10 for the Unit 1 Second 10 Years ISI Interval from 10 CFR 50.55a Inspection Requirements Due to Physical Interferences (Second Interval Start Date: August 13, 2000)2010-12-15015 December 2010 Relief Request No. B-10 for the Unit 1 Second 10 Years ISI Interval from 10 CFR 50.55a Inspection Requirements Due to Physical Interferences (Second Interval Start Date: August 13, 2000) CP-201000889, Relief Request No. C-6 for Unit 1 Second 10 Year ISI Interval from 10 CFR 50.55a Inspection Requirements Due to Physical Interferences (Second Interval Start Date: August 13, 2000)2010-12-15015 December 2010 Relief Request No. C-6 for Unit 1 Second 10 Year ISI Interval from 10 CFR 50.55a Inspection Requirements Due to Physical Interferences (Second Interval Start Date: August 13, 2000) 2024-08-13 Category:Letter MONTHYEARIR 05000445/20240032024-10-30030 October 2024
[Table view]Integrated Inspection Report 05000445/2024003 and 05000446/2024003 IR 05000445/20244042024-10-23023 October 2024 Security Baseline Inspection Report 05000445/2024404 and 05000446/2024404 (Public) IR 07200074/20244012024-10-10010 October 2024 Independent Spent Fuel Storage Installation Security Inspection Report 07200074/2024401 Public 05000445/LER-2024-002-01, Condition Prohibited by Technical Specifications Due to Inoperable Remote Shutdown System Functions2024-10-0303 October 2024 Condition Prohibited by Technical Specifications Due to Inoperable Remote Shutdown System Functions 05000446/LER-2024-001-01, Unit Two, Recurring Reactor Scrams Associated with Main Feedwater System Modifications2024-09-30030 September 2024 Unit Two, Recurring Reactor Scrams Associated with Main Feedwater System Modifications CP-202400335, License Amendment Request to Adopt TSTF-51, TSTF-471, and TSTF-571-T to Eliminate Use of the Term Core Alterations and Revise Requirements During Handling of Irradiated Fuel2024-09-12012 September 2024 License Amendment Request to Adopt TSTF-51, TSTF-471, and TSTF-571-T to Eliminate Use of the Term Core Alterations and Revise Requirements During Handling of Irradiated Fuel ML24031A6322024-09-11011 September 2024 Exemption from the Requirements of 10 CFR 50.71(e)(4), Final Safety Analysis Report Update Schedule (EPID L-2023-LLE-0023) - Letter ML24243A0152024-09-0303 September 2024 – Notification of Comprehensive Engineering Team Inspection (05000445/2025012 and 05000446/2025012) and Request for Information ML24194A1332024-08-28028 August 2024 Issuance of Amendment Nos. 190 and 190, Respectively, Revision to Technical Specifications to Adopt TSTF-589, Eliminate Automatic Diesel Generator Start During Shutdown ML24228A2252024-08-22022 August 2024 Relief to Use Later Code Edition for Inservice Inspection Program ML24179A0772024-08-20020 August 2024 Issuance of Amendment Nos. 189 and 189, Respectively, Extension of Allowed Outage Time for an Inoperable Emergency Diesel Generator ML24232A2262024-08-19019 August 2024 Information Request, Security IR 2024404 ML24232A2412024-08-19019 August 2024 Information Request, ISFSI Security IR 2024401 CP-202400294, (CPNPP) - Response to RAI for Exemption Request from 10 CPR 50.71(e)(4) Final Safety Analysis Update Schedule2024-08-15015 August 2024 (CPNPP) - Response to RAI for Exemption Request from 10 CPR 50.71(e)(4) Final Safety Analysis Update Schedule IR 05000445/20240052024-08-15015 August 2024 Updated Inspection Plan for Comanche Peak Nuclear Power Plant, Units 1 and 2 (Report 05000445/2024005 and 05000446/2024005) CP-202400319, (CPNPP) - Revision to CPNPP Letter to the NRC, Multiple Relief Requests for Unit 2 Third Ten-Year Inservice Inspection Interval from 10CFR50.55(a) Inspection Requirements Due to Impracticality2024-08-13013 August 2024 (CPNPP) - Revision to CPNPP Letter to the NRC, Multiple Relief Requests for Unit 2 Third Ten-Year Inservice Inspection Interval from 10CFR50.55(a) Inspection Requirements Due to Impracticality ML24177A2692024-08-0707 August 2024 Issuance of Amendment Nos. 188 and 188, Respectively, Revision to Technical Specifications to Adopt TSTF-591, Revise Risk Informed Completion Time (RICT) Program CP-202400315, (Cpnpp), Multiple Relief Requests for Unit 2 Third Ten-Year Inservice Inspection Interval from 10CFR50.55(a) Inspection Requirements Due to Impracticality2024-08-0505 August 2024 (Cpnpp), Multiple Relief Requests for Unit 2 Third Ten-Year Inservice Inspection Interval from 10CFR50.55(a) Inspection Requirements Due to Impracticality IR 05000445/20240022024-07-31031 July 2024 Units 1 and 2 - Integrated Inspection Report 05000445/2024002 and 05000446/2024002,and Independent Spent Fuel Storage Installation Inspection Report 07200074/2024001 IR 05000445/20244032024-07-16016 July 2024 Security Baseline Inspection Report 05000445/2024403 and 05000446/2024403 (Full Report) ML24187A0372024-07-15015 July 2024 Withdrawal of Requested Licensing Action Exemption from Select Requirements of 10 CFR Part 55, Operators Licenses ML24192A1862024-07-10010 July 2024 Notification of Inspection (NRC Inspection Report 05000445/2024003 and 05000446/2024003) and Request for Information ML24185A1382024-07-0202 July 2024 Inservice Inspection Request for Information CP-202400253, (Cpnpp), Units 1 & 2 Inservice Testing Plan for Pumps & Valves Third Interval, Revision 52024-06-26026 June 2024 (Cpnpp), Units 1 & 2 Inservice Testing Plan for Pumps & Valves Third Interval, Revision 5 IR 05000445/20244012024-06-26026 June 2024 MC&A Program Inspection Report 05000445-2024401 and 05000446-2024401 Public-Final CP-202400235, (Cpnpp), Units 1 & 2, Inservice Testing Plan for Pumps & Valves Fourth Interval, Revision 02024-06-18018 June 2024 (Cpnpp), Units 1 & 2, Inservice Testing Plan for Pumps & Valves Fourth Interval, Revision 0 IR 05000445/20240122024-06-17017 June 2024 Design Basis Assurance Inspection (Programs) Inspection Report 05000445/2024012 and 05000446/2024012 ML24120A3632024-06-10010 June 2024 Issuance of Amendment Nos. 187 and 187, Respectively Adoption of 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Plants 05000445/LER-1924-002, (Cpnpp), Unit 1, Condition Prohibited by Technical Specifications Due to Inoperable Remote Shutdown System Functions2024-06-0303 June 2024 (Cpnpp), Unit 1, Condition Prohibited by Technical Specifications Due to Inoperable Remote Shutdown System Functions CP-202400205, (Cpnpp), Units 1and 2, Submittal of the Snubber Inservice Program Plan for the Fourth Ten Year Interval2024-05-30030 May 2024 (Cpnpp), Units 1and 2, Submittal of the Snubber Inservice Program Plan for the Fourth Ten Year Interval CP-202400175, (CPNPP) - Supplement to License Amendment Request to Extend the Allowed Outage Time for an Inoperable Emergency Diesel Generator2024-05-16016 May 2024 (CPNPP) - Supplement to License Amendment Request to Extend the Allowed Outage Time for an Inoperable Emergency Diesel Generator 05000446/LER-2024-001, (Cpnpp), Unit 2, Two Recurring Reactor Scrams Associated with Main Feedwater System Modifications2024-05-13013 May 2024 (Cpnpp), Unit 2, Two Recurring Reactor Scrams Associated with Main Feedwater System Modifications 05000445/LER-2024-001, Re Potential Loss of Safety Function Due to Inoperability of Both Trains of Uninterruptible Power Supply Heating, Ventilation & Air Conditioning2024-05-0606 May 2024 Re Potential Loss of Safety Function Due to Inoperability of Both Trains of Uninterruptible Power Supply Heating, Ventilation & Air Conditioning ML24120A3042024-04-29029 April 2024 Lr Feis Section 106 Consultation Letters, Tribes-Sylestine, R, Alabama-Coushatta Tribe of Texas ML24120A2902024-04-29029 April 2024 Lr Feis Section 106 Consultation Letters, Tribes-Bunch, J, United Keetoowah Band of Cherokee Indians ML24120A2912024-04-29029 April 2024 Lr Feis Section 106 Consultation Letters, Tribes-Cooper, D, Apache Tribe of Oklahoma ML24120A3032024-04-29029 April 2024 Lr Feis Section 106 Consultation Letters, Tribes-SpottedBird, L, Kiowa Indian Tribe ML24107B1012024-04-29029 April 2024 Lr Feis Section 106 Consultation Letters, Tribes-Cernek, J, Coushatta Tribe of Louisiana ML24120A3022024-04-29029 April 2024 Lr Feis Section 106 Consultation Letters, Tribes-Pierite, M, Tunica-Biloxi Tribe of Louisiana ML24120A2922024-04-29029 April 2024 Lr Feis Section 106 Consultation Letters, Tribes-Dotson, Delaware Nation ML24120A2952024-04-29029 April 2024 Lr Feis Section 106 Consultation Letters, Tribes-Johnson, L.J., Seminole Nation of Oklahoma CP-202400153, (Cpnpp), Registration of Dry Spent Fuel Storage Canisters2024-04-29029 April 2024 (Cpnpp), Registration of Dry Spent Fuel Storage Canisters ML24120A3052024-04-29029 April 2024 Lr Feis Section 106 Consultation Letters, Tribes-Woommavovah, M, Comanche Nation ML24120A3072024-04-29029 April 2024 Lr Feis Section 106 Consultation Letters, Tribes-Yargee, W, Alabama-Quassarte Tribal Town ML24120A2932024-04-29029 April 2024 Lr Feis Section 106 Consultation Letters, Tribes-Garza, Jr, Juan, Kickapoo Traditional Tribe of Texas ML24120A3002024-04-29029 April 2024 Lr Feis Section 106 Consultation Letters, Tribes-Morrow, R K, Thlopthlocco Tribal Town ML24120A2942024-04-29029 April 2024 Lr Feis Section 106 Consultation Letters, Tribes-Gonzalez, B, Caddo Nation ML24120A3012024-04-29029 April 2024 Lr Feis Section 106 Consultation Letters, Tribes-Parton, T, Wichita and Affiliated Tribes ML24120A2972024-04-29029 April 2024 Lr Feis Section 106 Consultation Letters, Tribes-Martin, R, Tonkawa Tribe of Oklahoma ML24120A2962024-04-29029 April 2024 Lr Feis Section 106 Consultation Letters, Tribes-Kaskaske, D, Kickapoo Tribe of Oklahoma 2024-09-30 |
Text
Rafael Flores Senior Vice President& Chief Nuclear Officer Rafael.Flores@Luminant.com Luminant Power P 0 Box 1002 6322 North FM 56 Glen Rose, TX 76043 Luminant T 254 897 5590 C 817 559 0403 F 254 897 6652 CP-201401379 TXX-14137 November 19, 2014 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555
SUBJECT:
COMANCHE PEAK NUCLEAR POWER PLANT DOCKET NOS. 50-445 AND 50-446 TRANSMITTAL OF CPNPP UNITS 1 & 2 INSERVICE TESTING PLAN FOR PUMPS & VALVES THIRD INTERVAL, REVISION 1
Dear Sir or Madam:
As requested by the NRC, Luminant Generation Company LLC (Luminant Power), the owner of Comanche Peak Nuclear Power Plant Units 1 and 2 (herein referred to as CPNPP), herewith submits CPNPP Units I and 2 Inservice Testing Plan for Pumps and Valves, Third Interval, Revision 1.The current start date of the third interval of the Inservice Test Plan for Units 1 and 2 is August 3, 2013, and the end date for the third interval is August 2, 2023. Revision 1 was effective February 24, 2014. The enclosed CD-ROM contains the CPNPP Units 1 and 2 Inservice Testing Plan for Pumps and Valves, Third Interval, Revision 1.This communication contains no new licensing basis commitments regarding Comanche Peak Units 1 and 2.Should you have any questions, please contact Mr. Jack Hicks at (254) 897-6725.Sincerely, Luminant Generation Company LLC Rafael Flores By: AA/W 2 ,2 _,1-/Fred W. Madden Director, External Affairs A member of the STARS Alliance pA-D ul Callaway-Comanche Peak .Diablo Canyon- Palo Verde- Wolf Creek U. S. Nuclear Regulatory Commission TXX-14137 Page 2 of 2 11/19/2014 Enclosure
-CPNPP Units 1 & 2 Inservice Testing Plan for Pumps & Valves, Third Interval, Revision 1.c -Marc L. Dapas, Region IV clo Balwant K. Singal, NRR Resident Inspectors, Comanche Peak clo