Other: 0CAN011601, Notification of Full Compliance with NRC Order EA-12-049 Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Bdbees), 0CAN021302, Units 1 and 2 - Overall Integrated Plan in Response to March 12, 2012, Commission Order to Modify Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049), 0CAN021405, Second Six-Month Status Report in Response to March 12, 2012, Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order EA-12-049), 0CAN021502, Fourth Six-Month Status Report in Response to March 12, 2012, Commission Order Modifying License with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Bdbees), 0CAN021503, Fourth Six-Month Status Report in Response to March 12, 2012, Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool (SFP) Instrumentation (Order Number EA-12-051), 0CAN081402, Third Six-Month Status Report in Response to March 12, 2012, Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Bdbees), ML13063A015, ML13241A414, ML13241A415, ML14045A156, ML14140A514, ML15016A433, ML15054A320, ML15236A340
|
MONTHYEAR0CAN021302, Units 1 and 2 - Overall Integrated Plan in Response to March 12, 2012, Commission Order to Modify Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049)2013-02-28028 February 2013 Units 1 and 2 - Overall Integrated Plan in Response to March 12, 2012, Commission Order to Modify Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049) Project stage: Other ML13063A0152013-02-28028 February 2013 Overall Integrated Plan in Response to March 12, 2012, Commission Order Modifying License with Regard to Reliable Spent Fuel Pool Instrumentation (Order No. EA-12-051) Project stage: Other ML13127A2352013-05-0707 May 2013 Request for Additional Information Email Overall Integrated Plan in Response to the Commission Order Modifying Licenses Project stage: RAI ML13156A3132013-06-26026 June 2013 Request for Additional Information, Overall Integrated Plan in Response to 3/12/12 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order EA-12-051) Project stage: RAI 0CAN071301, Response to Request for Additional Information for Overall Integrated Plan in Response to the Commission Order Modifying Licenses with Regard to Requirements for Reliable Spent Fuel Pool Instrumentation2013-07-25025 July 2013 Response to Request for Additional Information for Overall Integrated Plan in Response to the Commission Order Modifying Licenses with Regard to Requirements for Reliable Spent Fuel Pool Instrumentation Project stage: Response to RAI ML13241A4142013-08-28028 August 2013 First Six-Month Status Report in Response to March 12, 2012, Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049) Project stage: Other ML13241A4152013-08-28028 August 2013 First Six-Month Status Report in Response to March 12, 2012, Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051) Project stage: Other ML13281A5022013-10-29029 October 2013 Interim Staff Evaluation and Request for Additional Information Regarding the Overall Integrated Plan for Implementation of Order EA-12-051, Reliable Spent Fuel Pool Instrumentation Project stage: RAI ML14045A1562014-02-20020 February 2014 Mega-Tech Services, LLC Technical Evaluation Report Regarding the Overall Integrated Plan for Arkansas Nuclear One, Units 1 and 2, TAC Nos.: MF0942 and MF0943 Project stage: Other ML14007A4592014-02-25025 February 2014 Interim Staff Evaluation Relating to Overall Integrated Plan in Response to Order EA-12-049 (Mitigation Strategies) Project stage: Acceptance Review 0CAN021405, Second Six-Month Status Report in Response to March 12, 2012, Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order EA-12-049)2014-02-27027 February 2014 Second Six-Month Status Report in Response to March 12, 2012, Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order EA-12-049) Project stage: Other 1CAN041401, Request for Implementation Date Relief in Response to March 12, 2012,Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Bdbees)2014-04-0808 April 2014 Request for Implementation Date Relief in Response to March 12, 2012,Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Bdbees) Project stage: Request ML14114A6972014-05-20020 May 2014 Relaxation of the Schedule Requirements for Order EA-12-049 Issuance of Order to Modify Licenses with Regard to Requirements for Mitigation Strategies for Beyond Design Basis External Events Project stage: Approval ML14140A5142014-05-28028 May 2014 Update Regarding Audit Activities Associated with Order EA-12-049 (Mitigation Strategies) Project stage: Other 0CAN081402, Third Six-Month Status Report in Response to March 12, 2012, Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Bdbees)2014-08-28028 August 2014 Third Six-Month Status Report in Response to March 12, 2012, Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Bdbees) Project stage: Other ML15016A4332015-01-16016 January 2015 Commitment Change Notification for NRC Order EA-12-049 Project stage: Other 0CAN021503, Fourth Six-Month Status Report in Response to March 12, 2012, Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool (SFP) Instrumentation (Order Number EA-12-051)2015-02-24024 February 2015 Fourth Six-Month Status Report in Response to March 12, 2012, Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool (SFP) Instrumentation (Order Number EA-12-051) Project stage: Other 0CAN021502, Fourth Six-Month Status Report in Response to March 12, 2012, Commission Order Modifying License with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Bdbees)2015-02-24024 February 2015 Fourth Six-Month Status Report in Response to March 12, 2012, Commission Order Modifying License with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Bdbees) Project stage: Other ML15054A3202015-03-0909 March 2015 Plan for the Onsite Audit Regarding Implementation of Mitigating Strategies and Reliable Spent Fuel Pool Instrumentation Related to Orders EA-12-049 and EA-12-051 Project stage: Other ML15236A3402015-09-0101 September 2015 Report for the Audit Regarding Implementation of Mitigating Strategies and Reliable Spent Fuel Pool Instrumentation Related to Orders EA-12-049 and EA-12-051 Project stage: Other 0CAN011601, Notification of Full Compliance with NRC Order EA-12-049 Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Bdbees)2016-01-12012 January 2016 Notification of Full Compliance with NRC Order EA-12-049 Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Bdbees) Project stage: Other 2014-02-27
[Table View] |
|
---|
Category:Letter
MONTHYEARML24295A1202024-10-21021 October 2024 Relief Request ANO2-RR-24-001, Half-Nozzle Repair of Reactor Vessel Closure Head Penetration 71 ML24185A2602024-10-0404 October 2024 Issuance of Amendment No. 335 to Revise Typographical Errors in Technical Specifications IR 05000368/20253012024-09-0909 September 2024 Notification of NRC Initial Operator Licensing Examination 05000368/2025301 ML24255A8642024-09-0606 September 2024 Rscc Wire & Cable LLC Dba Marmon Industrial Energy & Infrastructure - Part 21 Retraction of Final Notification IR 05000313/20240112024-09-0505 September 2024 Comprehensive Engineering Team Inspection Report 05000313/2024011 and 05000368/2024011 ML24239A3972024-08-23023 August 2024 Rssc Wire & Cable LLC Dba Marmon - Part 21 Final Notification - 57243-EN 57243 IR 05000313/20240052024-08-21021 August 2024 Updated Inspection Plan for Arkansas Nuclear One – Units 1 and 2 (Report 05000313/2024005, 05000368/2024005) ML24198A0722024-08-21021 August 2024 Correction to Issuance of Amendment No. 333 Revision to Technical Specifications to Adopt TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b ML24220A2642024-08-20020 August 2024 Entergy Operations, Inc. - Entergy Fleet Project Manager Assignment ML24185A1522024-08-13013 August 2024 Issuance of Amendment Nos. 334, 235, and 215, Respectively, to Revise TSs to Adopt TSTF-205 IR 05000313/20240022024-08-0606 August 2024 Integrated Inspection Report 05000313/2024002 and 05000368/2024002 ML24208A0962024-07-25025 July 2024 57243-EN 57243 - Rssc Wire & Cable LLC, Dba Marmon - Part 21 Notification 05000313/LER-2024-001, Source Range Nuclear Instrument Failure Resulting in Condition Prohibited by Technical Specifications2024-07-0101 July 2024 Source Range Nuclear Instrument Failure Resulting in Condition Prohibited by Technical Specifications ML24101A1792024-06-25025 June 2024 Issuance of Amendment No. 333 Revision to Technical Specifications to Adopt TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b ML24143A0632024-05-22022 May 2024 Notification of Inspection (NRC Inspection Report 05000368/2024003) and Request for Information IR 05000313/20240012024-05-0808 May 2024 Integrated Inspection Report 05000313/2024001 and 05000368/2024001 ML24128A2472024-05-0808 May 2024 Project Manager Assignment ML24017A2982024-04-18018 April 2024 Summary of Regulatory Audit Regarding the License Amendment Request to Revise Technical Specifications to Adopt TSTF 505, Revision 2, Provide Risk-Informed Extended Completion Times RITSTF Initiative 4b ML24107A0282024-04-17017 April 2024 Notification of Comprehensive Engineering Team Inspection (05000313/2024011 and 05000368/2024011) and Request for Information ML24086A5412024-04-10010 April 2024 Authorization of Request for Alternative ANO1-ISI-037 Regarding Extension of Reactor Vessel Inservice Inspection Interval IR 05000313/20244022024-04-0808 April 2024 Security Baseline Inspection Report 05000313/2024402 and 05000368/2024402 (Full Report) IR 05000313/20244042024-04-0808 April 2024 Information Request for the Cybersecurity Baseline Inspection, Notification to Perform Inspection (05000313/2024404 and 05000368/2024404) ML24089A2262024-03-29029 March 2024 Entergy Response to Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Exams ML24075A1712024-03-15015 March 2024 Nuclear Onsite Property Damage Insurance (10 CFR 50.54(w)(3)) ML24031A6442024-03-14014 March 2024 Issuance of Amendment No. 282 to Modify Technical Specification 3.3.1, Reactor Pressure System (RPS) Instrumentation, Turbine Trip Function on Low Control Oil Pressure ML24074A2892024-03-14014 March 2024 Proof of Financial Protection (10 CFR 140.15) ML24102A1342024-03-12012 March 2024 AN1-2024-03 Post Exam Submittal IR 05000313/20230062024-02-28028 February 2024 Annual Assessment Letter for Arkansas Nuclear One- Units 1 and 2 Report 05000313/2023006 and 05000368/2023006 IR 05000313/20230042024-02-0808 February 2024 Integrated Inspection Report 05000313/2023004 and 05000368/2023004 and Independent Spent Fuel Storage Installation Inspection Report 07200013/2023002 ML24012A0502024-02-0202 February 2024 Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0054 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) ML23326A0392024-01-24024 January 2024 Issuance of Amendment No. 281 Revision to Technical Specifications to Adopt TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b ML24017A1582024-01-17017 January 2024 Submittal of Emergency Plan Revision 50 IR 05000313/20234202024-01-10010 January 2024 Security Baseline Inspection Report 05000313/2023420 and 05000368/2023420 IR 05000313/20234022024-01-0202 January 2024 Security Baseline Inspection Report 05000313/2023402 and 05000368/2023402 ML23354A0022023-12-21021 December 2023 Request for Withholding Information from Public Disclosure ML23349A1672023-12-21021 December 2023 Request for Withholding Information from Public Disclosure ML23348A3572023-12-14014 December 2023 Application to Revise Technical Specifications to Use Online Monitoring Methodology – Slides and Affidavit for Pre-Submittal Meeting ML23352A0292023-12-13013 December 2023 Entergy - 2024 Nuclear Energy Liability Evidence of Financial Protection ML23340A1592023-12-13013 December 2023 Entergy Operations, Inc. - Entergy Fleet Project Manager Assignment IR 05000313/20234052023-12-12012 December 2023 – Security Baseline Inspection Report 05000313/2023405 and 05000368/2023405 ML23341A0832023-12-11011 December 2023 – Material Control and Accounting Program Inspection Report 05000313/368/2023404- Cover Letter ML23305A0922023-12-0707 December 2023 – Summary of Regulatory Audit Regarding License Amendment Request to Revise Technical Specifications to Adopt TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times RITSTF Initiative 4b ML23333A1362023-11-29029 November 2023 Supplement to Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML23275A2072023-11-28028 November 2023 Issuance of Amendment No. 280 Removal of Technical Specification Condition Allowing Two Reactor Coolant Pump Operation ML23325A1412023-11-21021 November 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation IR 05000313/20230032023-11-21021 November 2023 Revised - ANO Revised Integrated Inspection Report 05000313/2023003 and 05000368/2023003 and Independent Spent Fuel Storage Installation Inspection Report 07200013/ 2023001 ML23324A0172023-11-16016 November 2023 Submittal of Amendment 31 to Safety Analysis Report ML23313A0962023-11-13013 November 2023 Integrated Inspection Report 05000313/2023003 and 05000368/2023003 and Independent Spent Fuel Storage Installation Inspection Report 07200013/2023001 ML23243B0452023-11-13013 November 2023 Request for Withholding Information from Public Disclosure ML23311A2082023-11-0909 November 2023 Reassignment of U.S. Nuclear Regulatory Commission Branch Chief in the Division of Operating Reactor Licensing for Plant Licensing Branch IV 2024-09-09
[Table view] |
Text
1CAN011504
January 16, 2015
U.S. Nuclear Regulatory Commission
Attn: Document Control Desk
Washington, DC 20555-0001
SUBJECT:
Commitment Change Notification for NRC Order EA-12-049 Arkansas Nuclear One - Unit 1
Docket No. 50-313
License No. DPR-51
REFERENCES:
- 1. NRC Letter to Entergy, Arkansas Nuclear One, Unit 1 - Relaxation of the Schedule Requirements for Order EA-12-049 "Issuance of Order to Modify Licenses with Regard to Requirements for Mitigation Strategies for
Beyond-Design-Basis External Events (BDBEEs)" (TAC No. MF0942), dated May 20, 2014 (1CNA051402) (ML14114A697)
- 2. Entergy letter to NRC, Request for Implementation Date Relief in Response to March 12, 2012, Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for BDBEEs (NRC
Order EA-12-049), dated April 7, 2014 (1CAN041401) (ML14098A114)
Dear Sir or Madam:
On March 12, 2012, the NRC issued order EA-12-049 to Entergy Operations, Inc. (Entergy).
The order was immediately effective and directed Entergy to develop, implement, and maintain
guidance and strategies to maintain or restore core cooling, containment, and spent fuel pool
cooling capabilities in the event of a BDBEE.
In response to order EA-12-049 Entergy requested a relaxation of the order due date for
Arkansas Nuclear One, Unit 1 (ANO-1) as documented in Reference 2, and it was subsequently
granted by the NRC as documented in Reference 1. As part of the request, (Reference 2)
Entergy made two specific commitments and is withdrawing these commitments as discussed
with the NRC Staff on January 14, 2015, and justified in the attachment to this letter.
There are no new regulatory commitments in this letter. If you have any questions regarding
this request, please contact Stephenie Pyle at 479.858.4704.
I declare under penalty of perjury that the foregoing is true and correct; executed on
January 16 2015.
Entergy Operations, Inc.
1448 S.R. 333 Russellville, AR 72802
Tel 479-858-3110 Jeremy G. Browning Site Vice President A rkansas Nuclear One
1CAN011504 Page 2 of 2
Sincerely, ORIGINAL SIGNED BY JEREMY G. BROWNING
JGB/nbm
Attachment:
ANO-1 Commitment Change Justification
cc: Mr. Marc L. Dapas Regional Administrator
U. S. Nuclear Regulatory Commission, Region IV
1600 East Lamar Boulevard Arlington, TX 76011-4511
NRC Senior Resident Inspector
Arkansas Nuclear One
P.O. Box 310
London, AR 72847
U. S. Nuclear Regulatory Commission
Attn: Mr. Peter Bamford
MS O-8B3 One White Flint North
11555 Rockville Pike
Rockville, MD 20852
Attachment to 1CAN011504 Arkansas Nuclear One, Unit 1 (ANO-1) Commitment Change Justification Attachment to 1CAN011504
Page 1 of 2
ANO-1 Commitment Change Justification
Background:
In a letter to the NRC (Reference 2) Entergy Operations, Inc. (Entergy) made two specific
commitments as part of the request for NRC order EA-12-049 "Issuance of Order to Modify
Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis
External Event (BDBEEs)," schedule relaxation. The two commitments were:
- 1. As an interim measure, instructions will be in place by startup from the ANO-1 refueling outage 1R25 for connecting a portable diesel generator to the 2B5 load center should
the ANO-2 2B6 load center not be capable of being powered for some unforeseen
reason during an extended loss of alternating current power.
- 2. The 2B5 load center modification will be the only aspect of the ANO-1 Diverse and Flexible Coping Strategies (FLEX) that will not be in full compliance with NRC Order
EA-12-049 by the ordered schedule date of February 2015. Additionally, the other aspects of compliance with NRC Order EA-12-049 will be complete by 1R25 (e.g., FLEX
Support Guidelines, training, equipment staged, and modifications installed).
Both these commitments were scheduled "Prior to ANO-1 Startup from 1R25 (February 2015)."
Commitment Change:
Entergy has determined that ANO-1 implementation of the NRC order EA-12-049 prior to
implementation at ANO-2 is a less optimal action than a coordinated ANO-1 and ANO-2
implementation. As a result, the two commitments discussed above are withdrawn. The basis
for this change is discussed below.
Basis: NRC Order EA-12-049 requires the development, implementation, and maintenance of
guidance and strategies to maintain or restore core cooling, containment, and spent fuel pool
cooling capabilities in the event of a BDBEE.Section II of this order dictates the need to have
guidance and strategies available to prevent fuel damage in the reactor and spent fuel pit
should the loss of power, motive force, and normal access to the ultimate heat sink affect all
units at a site simultaneously.
ANO is a two-unit site with significant physical and procedural interdependencies. The two units
share certain common structures, systems, com ponents (such as water tanks, electrical cross connections, and station blackout diesel generator), and common operational staff resources for
BDBEEs.
Compliance with the ANO-1 commitments to the NRC requires full implementation for ANO-1
with the exception of the 2B5 load center modifi cation. This results in an approximate six-month interim period that the two units would not be consistently configured for responding to a
BDBEE at the site. A specific example is the ANO qualified condensate storage tank (QCST).
The QCST is a seismically qualified tank common to both units which contains a protected Attachment to 1CAN011504
Page 2 of 2
water volume sufficient for both units to utilize until time is available to transfer to alternate water sources under current licensing basis conditions. Entergy is working to qualify the QCST in order to credit a larger volume of water for both units to meet FLEX needs. Currently, with ANO-1 in a FLEX condition and ANO-2 complying with the current license basis procedures, the
sharing of the volume of water available in the QCST would challenge operators to make
alternate line-ups in the time required. A similar issue also exists for the ANO-1 borated water
storage tank and the ANO-2 refueling water tank qualification for crediting the availability of the
volume of water.
While most of the physical modifications are unit-specific, due to the interdependency of needed
systems and structures, the interim period would require special procedures and training that
would create operational challenges on both units with respect to BDBEE mitigation philosophy.
Additionally the creation of a six-month interi m mixed implementation would create training, procedural, and regulatory issues while attempting to establish different requirements on the
same piece of equipment. An example of this is the commitment for an interim action to
connect a portable diesel generator to the 2B5 load center.
The elimination of the two ANO-1 stated commitments would allow both ANO-1 and ANO-2 to
be in compliance with the NRC Order EA-12-049 requirements at the same time. The
justification for this commitment withdrawal is based on implementation of a more consistent
and overall site response to a BDBEE. The ANO-1 full order compliance date is startup from
the 2R24 (October 2015).
Conclusion:
As described above, compliance with the previous commitments results in undue burden to the
operators by creating two separate operating environments, ANO-1 implementing FLEX while ANO-2 is using normal emergency operating procedures. Entergy has determined that
withdrawal of the commitments is a better approach by allowing implementation of a more
consistent and overall site response to a BDBEE. Accordingly, Entergy is withdrawing the
commitments to the NRC identified above.
References:
- 1. NRC Letter to Entergy, Arkansas Nuclear One, Unit 1 - Relaxation of the Schedule Requirements for Order EA-12-049 "Issuance of Order to Modify Licenses with Regard to Requirements for Mitigation Strategies for BDBEEs" (TAC No. MF0942), dated May 20, 2014 (1CNA051402) (ML14114A697)
- 2. Entergy letter to NRC, Request for Implementation Date Relief in Response to March 12, 2012, Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for BDBEEs (NRC Order EA-12-049), dated April 7, 2014 (1CAN041401) (ML14098A114)