Letter Sequence Request |
---|
|
Initiation
- Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request
- Acceptance...
|
MONTHYEARML0917402832009-07-10010 July 2009 University of Missouri at Columbia - Request for Additional Information License Renewal Project stage: RAI ML13079A2162013-02-28028 February 2013 Letter from Kelly Mescher the Court in Sherman V. the Curators of the University of Missouri Project stage: Other ML13079A2152013-03-0505 March 2013 Statement of Intent Project stage: Other ML13079A2172013-03-12012 March 2013 Letter from Ralph A. Butler Enclosed with University of Missouri-Columbia Research Reactor'S Responses to the U.S. Nuclear Regulatory Commission'S (NRC) Request for Additional Information, Dated February 11, 2013, Regarding Our Renewal Requ Project stage: Request ML13079A2142013-03-12012 March 2013 Written Communication as Specified by 10 CFR 50.4(b)(1) Regarding the Response to the University of Missouri at Columbia - Request for Additional Information Updated Financial Information for License Renewal (TAC No. ME1580), Dated 02/11/20 Project stage: Request ML13079A2182013-03-12012 March 2013 University of Missouri System 2012 Financial Report Project stage: Other ML14324A7072014-12-0303 December 2014 Request for Additional Information Regarding the MURR License Renewal Review (Updated Info 11/19/2014) Project stage: RAI ML15034A4732015-01-28028 January 2015 University of Missouri-Columbia Research Reactor Response to NRC Request for Additional Information Re License Renewal Application Project stage: Response to RAI ML15034A4742015-01-28028 January 2015 Written Communication as Specified by 10 CFR 50.4(b)(1) Regarding the Response to the University of Missouri at Columbia - Request for Additional Information Regarding the Renewal of Facility Operating License No. R-103 for the University o Project stage: Request ML15049A0392015-02-12012 February 2015 University of Missouri-Columbia - Response to Request for Additional Information Regarding the Renewal of Facility Operating License No. R- 103 Dated December.3, 2014 Project stage: Response to RAI ML15051A0042015-02-20020 February 2015 University of Missouri at Columbia, Request for Withholding Information from Public Disclosure Project stage: Withholding Request Acceptance ML15098A6482015-04-17017 April 2015 University of Missouri at Columbia - Request for Additional Information Regarding the Renewal of Facility Operating License No. R-103 for the University of Missouri at Columbia Research Reactor Project stage: RAI ML15154B8122015-07-21021 July 2015 University of Missouri at Columbia Acknowledgement of the Imposition of an Administrative Limit for the Quantity of Iodine Processed in the Iodine Processing Laboratory Hot Cells for Facility Operating License No. R 103 Project stage: Other ML15224B3092015-09-14014 September 2015 University of Missouri at Columbia - Request for Additional Information Regarding, Physical Security Plan Review for Renewal of Facility Operating License No. R-103 for the University of Missouri at Columbia Research Reactor Project stage: RAI ML15260A4392015-09-15015 September 2015 University of Missouri-Columbia - Request for a Copy of the Emergency Plan in Support of the Renewal of Amended Facility License No. R-103 Project stage: Request ML15275A3142015-10-0101 October 2015 University of Missouri, Columbia - Responses to NRC Request for Additional Information, Dated April 17, 2015, Regarding Renewal Request for Amended Facility Operating License Project stage: Response to RAI ML15350A0882015-10-0606 October 2015 State of Missouri, Federal Assistance Clearinghouse Letter NRC Request for Additional Info Regarding the Physical Security Plan Review for Renewal of Facility Operating License No.R-103 for the Univ. of Missouri at Columbia Research Reactor Project stage: Request ML15280A3142015-10-28028 October 2015 University of Missouri at Columbia Research Reactor Request for Additional Information Regarding the Proposed Technical Specifications for the Murr License Renewal Review Project stage: RAI ML15344A0232015-12-0202 December 2015 University of Missouri(Um) at Columbia - Response to Request for Additional Information Regarding Physical Security Plan Review for Renewal of Facility Operating License No. R-103 for the Um at Columbia Research Reactor Project stage: Response to RAI ML15331A0492015-12-0909 December 2015 University of Missouri at Columbia Review of the Emergency Plan in Support of the License Renewal Project stage: Approval ML15337A1752015-12-17017 December 2015 University of Missouri at Columbia Clarifications Needed to NRC Staff Request for Additional Information Regarding the Renewal of Facility Operating License No. R-103 for the University of Missouri at Columbia Research Reactor Project stage: RAI ML16028A2552016-02-0808 February 2016 University of Missouri at Columbia; Request for Additional Information Updated Financial Information for Renewal of Facility Operating License No. R-103 for the University of Missouri at Columbia Research Reactor (Tac No. Me1580) Project stage: RAI ML16103A5302016-04-0808 April 2016 Univ. of Missouri, Columbia - Transmittal of Responses to NRC Request for Additional Information Dated February 8, 2016 Regarding Renewal Request for Amendment Project stage: Response to RAI ML16110A1642016-04-15015 April 2016 University of Missouri - Columbia Research Reactor, Response to Request for Additional Information on License Renewal Amendment Request Project stage: Response to RAI ML16155A1322016-05-31031 May 2016 University of Missouri-Columbia Research Reactor'S Responses to the NRC Request for Additional Information, Dated October 28, 2015, Regarding Our Renewal Request for Amended Facility Operating License No. R-103 Project stage: Request ML16209A2362016-07-25025 July 2016 University of Missouri, Response to Request for Additional Information Regarding the Proposed Technical Specifications for the License Renewal Project stage: Response to RAI ML16215A4152016-08-0202 August 2016 MURR Hazards Summary Report - Addendums 1-5 Redacted, in Support of an Application for a Research Reactor Project stage: Request ML16216A1222016-08-24024 August 2016 University of Missouri at Columbia - Request for Additional Information Financial Information for Renewal of Facility Operating License No. R-103 for the University of Missouri at Columbia Research Reactor Project stage: RAI ML16239A4252016-09-0707 September 2016 University of Missouri at Columbia - Request for Additional Information Regarding the Proposed Technical Specifications for the Renewal of Facility Operating License No. R-103 for the University of Missouri at Columbia Research Reactor Project stage: RAI ML16313A5172016-11-0707 November 2016 University If Missouri, Response to NRC Request for RAI, Dated September 7, 2016 Regarding License Renewal Amendment Project stage: Request ML16321A4552016-11-15015 November 2016 Written Communication as Specified by 10 CPR 73.4 Regarding Changes to the University of Missouri-Columbia Research Reactor Physical Security Plan That Was Previously Submitted in Response to University of Missouri at Columbia - Request for Project stage: Request ML16321A4852016-11-15015 November 2016 University of Missouri-Columbia Research Reactor - Response to Request for Additional Information Regarding License Renewal Request Project stage: Response to RAI ML15289A0142016-11-18018 November 2016 FRN: General Notice: Environmental Assessment and Finding of No Significant Impact RE: Renewal of Facility Operating License No. R-103, University of Missouri at Columbia Project stage: Request ML15289A0122016-11-18018 November 2016 University of Missouri at Columbia - Environmental Assessment and Finding of No Significant Impact Regarding Renewal of Facility Operating License No. R-103 for the University of Missouri at Columbia Research Reactor Project stage: Other ML16350A4242016-12-14014 December 2016 Written Communication as Specified by 10 CFR 50.4(b)(1) Regarding Responses to the University of Missouri at Columbia - Request for Additional Information Regarding the Proposed Technical Specifications for the Renewal of Facility Operating Project stage: Request ML16124A8872017-01-0404 January 2017 the University of Missouri Columbia Safety Evaluation Report for the Renewal of the Facility Operating License for the Nuclear Research Reactor Project stage: Approval 2015-07-21
[Table View] |
|
---|
Category:Letter
MONTHYEARML24142A1422024-08-27027 August 2024 Examination Report Letter No. 50-186/OL-24-02, University of Missouri - Columbia ML24142A1432024-08-27027 August 2024 Examination Result Letter No. 50-186/OL-24-02, University of Missouri - Columbia ML24184A1132024-07-0202 July 2024 Written Communication as Required by University of Missouri Research Reactor Technical Specification 6.6.c(3) Regarding a Deviation from Technical Specification 3.10.d IR 05000186/20242012024-05-29029 May 2024 the Curators of the University of Missouri - U.S. Nuclear Regulatory Commission Safety Inspection Report No. 05000186/2024201 05000186/LER-2024-001, Written Communication as Required by by LER 2024-001-00 for University of Missouri Research Reactor Technical Specification 6.6.c(3) Re Deviation from Technical Specification 3.1 0.d2024-05-23023 May 2024 Written Communication as Required by by LER 2024-001-00 for University of Missouri Research Reactor Technical Specification 6.6.c(3) Re Deviation from Technical Specification 3.1 0.d ML24081A1332024-04-0202 April 2024 University of Missouri-Columbia (MURR) – Change of Facility Project Manager ML24044A1162024-03-0101 March 2024 Examination Confirmation Letter No. 50-186/OL-24-02, University of Missouri-Columbia ML24064A1922024-03-0101 March 2024 Federal Funding for the Conversion of the University of Missouri-Columbia Research Reactor from Highly-Enriched Uranium Fuel to Low-Enriched Uranium Fuel ML24059A4412024-02-28028 February 2024 Univ. of Missouri - Columbia - Submittal of Annual Operating Report Technical Specification 6.6.e IR 05000186/20232022023-12-12012 December 2023 the Curators of the University of Missouri - U.S. Nuclear Regulatory Commission Safety Inspection Report No. 05000186/2023202 ML23198A0232023-08-29029 August 2023 Examination Result Letter No. 50-186/OL-23-02, University of Missouri-Columbia ML23198A0222023-08-29029 August 2023 Examination Report Letter No. 50-186/OL-23-02, University of Missouri - Columbia ML23221A1172023-08-0303 August 2023 Written Communication as Specified by 10 CFR 50.4(b)(4) Regarding the Submittal of the Physical Security Plan for the University of Missouri Research Reactor as a Part of the Process to Renew Amended Facility Operating License R-103 ML23213A0592023-08-0101 August 2023 Written Communication as Specified by University of Missouri Research Reactor Technical Specification 6.6.2(d) Regarding a Permanent Change in the Facility Organization Involving the Executive Director ML23186A2132023-07-31031 July 2023 Examination Confirmation Letter No. 50-186/OL-23-03, University of Missouri - Columbia IR 05000186/20232012023-07-31031 July 2023 the Curators of the University of Missouri U.S. Nuclear Regulatory Commission Safety Inspection Report No. 05000186/2023201 ML23124A0422023-05-0808 May 2023 Examination Confirmation Letter 50-186/OL-23-02, University of Missouri - Columbia ML23103A0742023-04-10010 April 2023 University of Missouri, Columbia Research Reactor, Shipment of Radioactive Material Shipment Identifier MURR 23-01 Highway Route Controlled Quantity ML23024A2772023-04-0707 April 2023 Cover Letter for the Security Inspection Report for the University of Missouri (Public) - October 2022 ML23087A1132023-03-29029 March 2023 Examination Report No. 50-186/OL-23-01, University of Missouri-Columbia ML23087A1142023-03-29029 March 2023 Examination Results Letter No. 50-186/OL-23-01, University of Missouri - Columbia ML23089A3162023-03-29029 March 2023 Letter Notifying Univ. of Missouri That Us Dept. of Energy Funding Will Not Be Available in Fiscal Year 2023 to Complete the Conversion of MURR to LEU Fuel ML23055B1372023-02-24024 February 2023 Submittal of Annual Operating Report for the University of Missouri-Columbia Research Reactor as Required by MURR Technical Specification 6.6.e IR 05000186/20222022023-02-23023 February 2023 the Curators of the University of Missouri - U.S. Nuclear Regulatory Commission Routine Inspection Report No. 05000186/2022202 - Cover Letter and Enclosure ML23031A0132023-02-14014 February 2023 Examination Confirmation Letter No. 50-186/OL-23-01, University of Missouri-Columbia ML23017A2072023-01-13013 January 2023 Written Communication as Required by University of Missouri Research Reactor Technical Specification 6.6.c(3) Regarding a Deviation from Technical Specification 6.1.f ML22349A0422022-12-0808 December 2022 Written Communication as Specified in 10 CFR 50.54(b)(5) Regarding Changes to the University of Missouri-Columbia Research Reactor Facility Emergency Plan Without Prior Commission Approval Pursuant to 10 CFR 50.54(q)(3) ML22314A2102022-11-0909 November 2022 Written Communication as Required by Technical Specification 6.6.d(2), Other Reports, Regarding a Change in University of Missouri-Columbia Research Reactor Organization Involving the Reactor Facility Director ML22304A0042022-10-27027 October 2022 University of Missouri - Columbia, Shipment of Radioactive Material, Highway Route Controlled Quantity ML22291A0322022-10-14014 October 2022 University of Missouri Written Communication as Required by 10 CFR 73, Appendix G Regarding a Deviation from the MURR Physical Security Plan ML22290A0042022-10-12012 October 2022 University of Missouri-Columbia Research Reactor, Reportable Event Report Pursuant to 20.2201(a)(ii) Regarding Loss of Licensed Material During Shipment IR 05000186/20222012022-06-14014 June 2022 the Curators of the University of Missouri - U.S. NRC Routine Inspection Report No. 05000186/2022201 ML22158A0792022-06-0606 June 2022 Submittal of Revised Annual Operating Report for the University of Missouri-Columbia Research Reactor as Required by MURR Technical Specification 6.6.e ML22097A0592022-04-0707 April 2022 Approval for Spent Nuclear Fuel Highway Route Application - NRC Route No. 182D - Docket Number 050-0186 ML22088A0782022-03-25025 March 2022 Univ. of Missouri, Federal Funding for the Conversion of the Columbia Research Reactor from Highly-Enriched Uranium Fuel to Low-Enriched Uranium Fuel IR 05000186/20212032022-03-0202 March 2022 the Curators of the University of Missouri U.S. Nuclear Regulatory Commission Routine Inspection Report No. 05000186/2021203 ML22056A5162022-02-25025 February 2022 Submittal of Annual Operating Report for the University of Missouri-Columbia Research Reactor as Required by MURR Technical Specification 6.6.e ML22038A6012022-02-0808 February 2022 Acceptance for Spent Nuclear Fuel Highway Route Application NRC No. 182D-Docket No. 050-0186 ML22013B1412022-01-21021 January 2022 Examination Confirmation Letter No. 50-186-OL-22-02, University of Missouri-Columbia ML21327A3042021-11-23023 November 2021 Written Communication as Required by University of Missouri Research Reactor Technical Specification 6.6.c(3) Regarding a Deviation from Technical Specification 3.2.f.6 ML21298A1972021-10-25025 October 2021 University of Missouri-Columbia Research Reactor - Written Communication as Required by University of Missouri Research Reactor Technical Specification 6.6.c(3) Regarding a Deviation from Technical Specification 3.2.g.6 ML21253A2482021-09-23023 September 2021 Examination Confirmation Letter No. 50-186/OL-22-01, University of Missouri Columbia ML21221A3252021-08-0909 August 2021 University of Missouri-Columbia Research Reactor, Written Communication as Required by Technical Specification 6.6.c(3) Regarding a Deviation from Technical Specifications 3.2.a ML21217A2982021-08-0505 August 2021 University of Missouri-Columbia Research Reactor - Reportable Event Report Pursuant to 20.2203(a)(2)(iv) ML21215A4982021-07-0707 July 2021 Univ of Missouri, Submittal of Revised Road Transportation Security Plan for the Shipment of Irradiated Reactor Fuel ML21098A1992021-06-10010 June 2021 the Curators of the University of Missouri Issuance of Amendment No. 40 to Renewed Facility Operating License No. R 103 to Amend Technical Specifications 6.2 and 6.4 for the University of Missouri Columbia Research Reactor IR 05000186/20212022021-05-28028 May 2021 the Curators of the University of Missouri - U.S. Nuclear Commission Routine Inspection Report No. 05000186/2021202 IR 05000186/20212012021-05-27027 May 2021 University of Missouri-Columbia U. S. Nuclear Regulatory Commission Security Inspection Report No. 05000186/2021201 - Non-OUO-Sri Cover Letter ML21118A9682021-04-28028 April 2021 Examination Confirmation Letter No. 50-186/OL-21-01, University of Missouri-Columbia ML21092A1712021-04-0202 April 2021 University of Missouri-Columbia Research Reactor - Federal Funding for the Conversion of the University of Missouri-Columbia Research Reactor from Highly-Enriched Uranium Fuel to Low-Enriched Uranium Fuel 2024-08-27
[Table view] Category:Response to Request for Additional Information (RAI)
MONTHYEARML18022A2592018-01-16016 January 2018 University of Missouri at Columbia - Response to Request for Additional Information Re License Amendment Request to Implement Selective Gas Extraction Target Experimental Facility at the University of Missouri Research Reactor ML16350A4242016-12-14014 December 2016 Written Communication as Specified by 10 CFR 50.4(b)(1) Regarding Responses to the University of Missouri at Columbia - Request for Additional Information Regarding the Proposed Technical Specifications for the Renewal of Facility Operating ML16321A4852016-11-15015 November 2016 University of Missouri-Columbia Research Reactor - Response to Request for Additional Information Regarding License Renewal Request ML16313A5172016-11-0707 November 2016 University If Missouri, Response to NRC Request for RAI, Dated September 7, 2016 Regarding License Renewal Amendment ML16246A0102016-08-31031 August 2016 University of Missouri - Columbia, Response to NRC Request for Additional Information Regarding Renewal for Amended Facility Operating License ML16209A2362016-07-25025 July 2016 University of Missouri, Response to Request for Additional Information Regarding the Proposed Technical Specifications for the License Renewal ML16209A2352016-07-25025 July 2016 University of Missouri - Columbia Research Reactor, Response to Request for Additional Information Regarding License Renewal Request ML16155A1322016-05-31031 May 2016 University of Missouri-Columbia Research Reactor'S Responses to the NRC Request for Additional Information, Dated October 28, 2015, Regarding Our Renewal Request for Amended Facility Operating License No. R-103 ML16110A1642016-04-15015 April 2016 University of Missouri - Columbia Research Reactor, Response to Request for Additional Information on License Renewal Amendment Request ML16110A1632016-04-15015 April 2016 University of Missouri - Columbia Research Reactor, Response to Request for Additional Information on License Renewal Amendment Request ML16055A0232016-02-19019 February 2016 Univ. of Missouri-Columbia - Response to Request for Additional Information Regarding the License Amendment Request to Modify, the Technical Specifications to Produce Radiochemical Sodium Iodine ML16041A2212016-02-0808 February 2016 Univ. of Missouri-Columbia - Response to NRC Request for Additional Information Dated December17, 2015, Regarding Renewal Request for License No. R-103 ML16011A3882016-01-0808 January 2016 Request for Additional Information Regarding the License Amendment Request to Modify the Technical Specifications to Produce Radiochemical Sodium Iodine at the University of Missouri at Columbia Research Reactor ML16004A1502015-12-30030 December 2015 Written Communication as Specified by 10 CFR 50.4(b)(1) Regarding Responses to the University of Missouri at Columbia - Request for Additional Information Regarding the License Amendment Request to Modify the Technical Specifications to Pro ML16004A1532015-12-30030 December 2015 Univ. of Missouri- Columbia - Transmittal of Responses to Request for Additional Information in Support of a Request to Amend the Technical Specifications Appended to License No. R-103 ML15344A0232015-12-0202 December 2015 University of Missouri(Um) at Columbia - Response to Request for Additional Information Regarding Physical Security Plan Review for Renewal of Facility Operating License No. R-103 for the Um at Columbia Research Reactor ML15275A3142015-10-0101 October 2015 University of Missouri, Columbia - Responses to NRC Request for Additional Information, Dated April 17, 2015, Regarding Renewal Request for Amended Facility Operating License ML15216A1222015-07-31031 July 2015 University of Missouri-Columbia - Response to Request for Additional Information Regarding Renewal Request for Amended Facility Operating License 2018-01-16
[Table view] |
Text
UNIVERSITY of MISSOURI RESEARCH REACTOR CENTER December 14, 2016 U.S. Nuclear Regulatory Attention:
Document Col}trol Desk Mail Station Pl-37 ,-Washington, DC 20555-0pOl
REFERENCE:
Docket No.
SUBJECT:
Research Rea,ctor Facility Ogerating License No. R-103 Writte11 commlmicati,on as specified by 10 CFJl 50.4Jb )(1) regarding responses to the "University of at Columbia -Request for Additiol).al Information Regarding the Proposed Specifications for the Renewal of Facility Operating License No. R-103 for the Vniversity of Missouri Reactor (TAC No.
dated September 7, 2016 On August 31, 2006, the University of Missouri-Columbia Reaqtor (MURR) submitted a request to the U.S. Nuclear Regulat9ry Commission (NRC) )o ren¢w Facility Operating License No. R-103. By letter dated May 6, 2Pl 0, the NRC{ requested additional infgrmathzn and clarification regarding the renewal request in the fqrm of (19) Complex Questiol)s.
By letter dated September 3, 2010, MURR responded to sevep (7)
Complex Questions.
By letter dated June 1, 2,blO, the NRG requested additional and clarification regarding the renewal request in the foryn of one and sixfy-seven (167) 45:Day Response Questions.
By letter , -dated July 16, 2010, MURR responded to forty-seven (47) of those 45-D.ay Response Questions.
,( ' . On July 14, 2010, via <eflectronic ,maJl (email), MURR requested
_aqditional time to respond to the --remaining one hundred apd twenty (120) 45-Day Response Questions.
By letter dated August 4, 2010, . the NRC granted the requfst. By letter-dated August 31, 2010, MURR responded to fifty-three (53) of the 45-Day Response Questi<;ins.
On September 1, 2010, via email, M\J.RR requested additional 7_fime to respond to the remaining twelve (12) Complex Questions.
By letter dated September 27, 2010, the NRC granted the request. 1513 Research Park Drive Columbia, MO 65211 Phone: 573-882-4211 Fax: 573-882-6360 Web: http://web.missouri.edu/-murrwww Fighting Cancer with Tomorrow's Technology On September 29, 2010, via email, MURR requested additional time to respond to the remaining seven (67) 45-Day Response Questions.
On September 30, 2010, MURR responded to sixteen (16) of the remaining 45-Day Questions.
By letter dated October 13, 2010, the NRC granted the extension request. By letter dated October 29, 2010, MURR responded to sixteen (16) of the remaining 45-Day Response Questions and two (2) of the remaining Complex Questions.
By letter dated November 30, 2010, MURR responded to twelve (12) of the remaining 45-Day Response Questions.
On December 1, 2010, via email, MURR requested additional time to respond to the remaining 45-Day Response and Complex Questions.
By letter dated December 13, 2010, the NRC granted the extension request. On January 14, 2011, via email, MURR requested additional time to respond to the remaining 45-Day Response and Complex Questions.
By letter dated February 1, 2011, the NRC granted the extension request. By letter dated March 11, 2011, MURR responded to twenty-one (21) of the remaining 45-Day Response Questions.
On May 27, 2011, via email, MURR requested additional time to respond to the remaining 45-Day Response and Complex Questions.
By letter dated July 5, 2011, the NRC granted the request. By letter dated September 8, 2011, MURR responded to six (6) of the remaining 45-Day Response and Complex Questions.
On September 30, 2011, via email, MURR requested additional time to respond to the remaining the remaining 45-Day Response and Complex Questions.
By letter dated November 10, 2011, the NRC granted the request. By letter dated January 6, 2012, MURR responded to four (4) of the remaining 45-Day Response and Complex Questions. Also submitted was an updated version of the MURR Technical Specifications.
On January 23, 2012, via email, MURR requested additional time to respond to the remaining the remaining 45-Day Response and Complex Questions.
By letter dated January 26, 2012, the NRC granted the request. On April 12, 2012, via email, MURR requested additional time to respond to the remaining the remaining 45-Day Response and Complex Questions.
By letter dated June 28, 2012, MURR responded to the remaining six (6) 45-Day Response and Complex Questions.
With that set of responses, all 45-Day Response and Complex Questions had been addressed.
2 of6 On December 20, 2012, the NRC requested a copy of the current Physical Security Plan (PSP) and Operator Requalification Program. By letter dated January 4, 2013, MURR provided the NRC a copy of the current PSP and Operator Requalification Program. By letter dated February 11, 2013, the NRC requested updated financial information in the form of four (4) questions because the information provided by the September 14, 2009 response had become outdated.
By letter dated March 12, 2013, MURR responded to the four (4) questions.
By letter dated December 3, 2014, the NRC requested additional information in the form of two (2) questions regarding significant changes to the MURR facility since submittal of the licensing renewal application in August 2006. By letter dated January 28, 2015, MURR responded to the two (2) questions.
By letter dated April 17, 2015, the NRC requested additional information in the form of ten (10) questions.
On May 29, 2015, via email, MURR requested additional time to respond to the ten (10) questions.
By letter dated June 18, 2015, the NRC requested additional information in the form of two (2) questions.
By letter dated July 31, 2015, MURR responded to the two (2) questions from the June 18, 2015 request. On September 14, 2015, via telephone, the NRC requested a copy of the Emergency Plan (BP). By letter dated September 14, 2015, the NRC requested additional information in the form of sixteen (16) questions regarding the PSP. By letter dated September 15, 2015, MURR provided the NRC a copy of the current BP. By letter dated October 1, 2015, MURR responded to the ten (10) questions from the April 17, 2015 request. By letter dated October 28, 2005, the NRC requested additional information regarding the proposed Technical Specifications.
By letter dated December 2, 2015, MURR responded to the fifteen (15) questions from the September 14, 2015 request regarding the PSP. 3 of6 By letter dated December 17, 2015, the NRC requested additional information in the form of thirteen (13) questions regarding follow-up information from MURR's October 1, 2015 responses to the NRC's April 17, 2015 request for additional information.
By letter dated February 8, 2016, MURR responded to the thirteen (13) questions from the December 17, 2015 request. By letter dated February 8, 2016, the NRC requested updated financial information in the form of four (4) questions because the information provided by the March 12, 2013 response had become outdated.
By letter dated March 23, 2016, the NRC requested additional information in the form of twenty-one (21) questions regarding follow-up information from MURR's February 8, 2016 responses to the NRC's April 17, 2015 request for additional information.
By letter dated April 8, 2016, MURR responded to the four (4) questions from the February 8, 2016 request. By letter dated April 15, 2016, MURR responded to the twenty-one (21) questions from the March 23, 2016 request. By letter dated May 31, 2016, MURR responded to questions from the October 28, 2015 request. Additionally, Technical Specification changes, as issued by Amendment No. 37 to the current facility operating license (NRC letter dated March 11, 2016), were incorporated into the revised proposed Technical Specifications.
On June 28, 2016, via a conference call between MURR and NRC staff, the NRC requested additional information/clarification regarding MURR's May 31, 2016 responses to the October 28, 2015 NRC request. By letter dated July 1, 2016, MURR responded to the request for additional information/clarification from the June 28, 2016 conference call as well as submitted the revised proposed Technical Specifications.
By letter dated August 24, 2016, the NRC requested financial information in the form of one (1) question.
By letter dated August 31, 2016, MURR responded to the one (1) question from the August 24, 2016 request. By letter dated September 7, 2016, the NRC requested additional information regarding the proposed Technical Specifications in the form of thirty (30) questions.
Additionally, via multiple conference calls between MURR and NRC staff, additional information/clarification was requested.
By letter dated November 7, 2016, MURR responded to the questions from the NRC letter dated September 7, 2016 and the numerous conference calls. Additionally, the revised proposed Technical Specifications were attached.
4 of6 On November 14, 2016, via a conference call between MURR and NRC staff, additional information/clarification was requested.
By letter dated November 15, 2016, MURR responded to the questions from the November 14, 2016 conference call. Additionally, the revised proposed Technical Specifications were attached.
On December 14, 2016, via a conference call between MURR and NRC staff, a proposed change to the Technical Specifications and License Conditions 2.B.2.c through 2.B.2.fwere discussed.
Below is the proposed change to the revised proposed Technical Specifications based on the December 14, 2016 conference call and a statement that MURR is in agreement with the proposed license conditions.
If there are any questions regarding this response, please contact me at (573) 882-5118 or MeffertB@missou.ri.edu.
I declare under penalty of perjury that the foregoing is true and correct. Sincerely, Reactor Manager xc: Reactor Advisory Committee Reactor Safety Subcommittee Dr. Garnett S. Stokes, Provost ENDORSEMENT:
Reviewed and Approved, Ralph A. Butler, P.E. Director Dr. Mark Mcintosh, Vice Chancellor for Research, Graduate Studies and Economic Development Mr. Alexander Adaµis Jr., U.S. Nuclear Regulatory Commission Mr. Geoffrey Wertz, U.S. Nuclear Regulatory Commission Mr. Johnny Eads, U.S. Nuclear Regulatory Commission Diane Puroell, Notary Publlc My Commission Expires: January 31. 2018 5 of6
- 1. MURR requests that the second paragraph of Technical Specification 6.2.b be changed from: "The RAC and its subcommittees shall maintain minutes of meetings in which the items considered and the committees' recommendations are recorded.
Dissemination of the minutes to the Office of the Chancellor, the RAC and its subcommittees shall be done within three (3) months after the meetings.
Independent actions of the subcommittees shall be reviewed by the parent committee at the next regular meeting. A quorum of the committee or the subcommittees consisting of at least fifty percent of the appointed members shall be present at any meeting to conduct the business of the committee or subcommittee.
Additionally, reactor facility staff shall not constitute greater than fifty percent of the quorum. Reactor facility staff shall not constitute a majority of the RAC. The RAC shall meet at least quarterly." To: "The RAC and its subcommittees shall maintain minutes of meetings in which the items considered and the committees' recommendations are recorded.
Dissemination of the minutes to the Office of the Chancellor, the RAC and its subcommittees shall be done within three (3) months after the meetings.
Independent actions of the subcommittees shall be reviewed by the parent committee at the next regular meeting. A quorum of the committee or the subcommittees consisting of at least fifty percent of the appointed members shall be present at any meeting to conduct the business of the committee or subcommittee.
Additionally, reactor facility staff shall not constitute greater than fifty percent of the quorum for a meeting of the RAC. Reactor facility staff shall not constitute a majority of the RAC. The RAC shall meet at least quarterly." Justification:
The words "for a meeting of the RAC" have been added to ensure that this requirement is specific to the Reactor Advisory Committee (RAC) and not to be misinterpreted that it applies to any of the subcommittees.
Although MURR aggressively solicits non-MURR staff members to serve on the RAC subcommittees, it is still very difficult to obtain members that are not MURR staff; therefore, it would be impossible to meet this requirement other than for RAC membership.
Additionally, all work performed by the subcommittees must be voted on and approved by the RAC, which is consistent with the intent of ANSI/ANS-15.1-2007, "The Development of Technical Specifications for Research Reactors." 2. MURR reviewed the draft license that was provided by the NRC by email, dated November 22, 2016, and we are in agreement with the proposed license conditions.
6 of6