ML16259A389
ML16259A389 | |
Person / Time | |
---|---|
Site: | Susquehanna |
Issue date: | 09/09/2016 |
From: | Gerlach R M Susquehanna |
To: | Document Control Desk, Office of Nuclear Reactor Regulation |
References | |
Download: ML16259A389 (47) | |
Text
- *
- Sep. 09, 2016 MANUAL HARD COPY DISTRIBUTION DOCUMENT TRANSMITTAL 2016-31024 USER INFORMATION:
GERLACH*ROSEY M Address:
NUCSA2 Phone#: 542-3194 EMPL#: 028401 CA#: 0363 TRANSMITTAL INFORMATION:
TO: , GERLACH*ROSEY M LOCATION:
USNRC 09/09/2016 FROM: NUCLEAR RECORDS DOCUMENT CONTROL CENTER (NUCSA-2)
Page 1 THE FOLLOWING CHANGES HAVE OCCURRED TO THE HARDCOPY OR ELECTRONIC MANUAL ASSIGNED TO YOU. HARDCOPY USERS MUST ENSURE THE DOCUMENTS PROVIDED MATCH THE INFORMATION ON THIS TRANSMITTAL.
WHEN REPLACING THIS MATERIAL IN YOUR HARDCOPY MANUAL, ENSURE THE UPDATE DOCUMENT ID IS THE SAME DOCUMENT ID YOU'RE REMOVING FROM YOUR MANUAL. TOOLS FROM THE HUMAN PERFORMANCE TOOL BAG SHOULD BE UTILIZED TO ELIMINATE THE CHANCE OF ERRORS. ATTENTION:
"REPLACE" directions do not affect the Table of Contents, Therefore no TOC will be issued with the updated material.
TRM2 -TECHNICAL REQUIREMENTS MANUAL UNIT 2 REMOVE MANUAL TABLE OF CONTENTS DATE: 08/22/2016 ADD MANUAL TABLE OF CONTENTS DATE: 09/08/2016 CATEGORY:
DOCUMENTS TYPE: TRM2 of 3
- *
- Sep. 09, 2016 ID: TEXT 3.11.2.6 REMOVE: REV: 5 ADD: REV: 6 CATEGORY:
DOCUMENTS TYPE: TRM2 ID: TEXT 3.3.4 REMOVE: REV: 8 ADD: REV: 9 CATEGORY:
DOCUMENTS TYPE: TRM2 ID: TEXT 3.7.3.1 ADD: REV: 4 REMOVE: REV:3 CATEGORY:
DOCUMENTS ID: TEXT B3.11.2.6 ADD: REV: 2 REMOVE: REV:l TYPE: TRM2 CATEGORY:
DOCUMENTS TYPE: TRM2 ID: TEXT LOES ADD: REV: 90 REMOVE: REV: 89 Page ANY DISCREPANCIES WITH THE MATERIAL
UPDATES FOR HARDCOPY MANUALS WILL BE DISTRIBUTED WITHIN 3 DAYS IN ACCORDANCE WITH DEPARTMENT PROCEDURES.
PLEASE MAKE ALL CHANGES AND ACKNOWLEDGE COMPLETE IN YOUR NIMS INBOX UPON COMPLETION OF UPDATES.
FOR ELECTRONIC MANUAL 2 of 3
- *
- Sep. 09, 2016 Page 3 USERS, ELECTRONICALLY REVIEW THE APPROPRIATE DOCUMENTS AND ACKNOWLEDGE COMPLETE IN YOUR NIMS INBOX . of 3 r SSES MANUAL * *. ::::
- ICAL REQUIREMENTS MANUAL UNIT 2 Table Of Contents Issue Date: 09/08/2016 Procedure Name Rev :Cssue Date TEXT LOES 90 09/08/2016 Title: LIST OF EFFECTIVE SECTIONS TEXT TOC 25 05/10/2016 Title: TABLE OF CONTENTS TEXT 1.1 0 11/19/2002 Title: USE AND APPLICATION DEFINITIONS TEXT 2.1 1 Title: PLANT PROGRAMS AND TEXT 2.2 11 Title: PLANT PROGRAMS AND TEXT 3.0 ..1"' *'"""" '\_,'\ ,..:'! ,...<*,6
,, . ,,03/05/2015 Change :CD / ' ) /' Change Nultlber
.............
,, \.., '*:. Title: APPLICABILITY TECHNICAI>.REQUIREMENT FOR OPERATION (TRO) APPLICABILITY
<'.::*
'* ' TEXT 3 .1.1 /
11/09/2007
,' ( *, \ *,*,,.' Title: REACTIVITY
$YSTEMS ANTICIPATED TRANSIENT WITHOUT SCRAM ALTERNATE ROD INSTRUMENTATION
/ * ,,,.-'v * ., '--.. .. , / \ \ 1 \
). / 0 11/19/2002 TEXT 3 .1.2 Title:
SYSTEMS CONTROL ROD DRIVE (CRD) HOUSING SUPPORT TEXT 3 .1. 3 4 05/14/2009 Title: REACTIVITY CONTROL SYSTEMS CONTROL ROD BLOCK INSTRUMENTATION TEXT 3 .1. 4 0 11/19/2002 Title: REACTIVITY CONTROL SYSTEMS CONTROL ROD SCRAM ACCUMULATORS INSTRUMENTATION AND CHECK VALVE TEXT 3.2.1 12 11/10/2015 Title: CORE OPERATING LIMITS REPORT (COLR) Page .1 of 1..2. Report Date: 09/08/16 SSES MANUAL Manual Name: TRM2
- Manual Title: TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT 3.3.1 0 11/19/2002 Title: INSTRUMENTATION RADIATION MONITORING INSTRUMENTATION TEXT 3.3.2 3 03/31/2011 Title: INSTRUMENTATION SEISMIC MONITORING INSTRUMENTATION TEXT 3.3.3 2 11/09/2007 Title: INSTRUMENTATION METEOROLOGICAL MONITORING INSTRUMENTATION TEXT 3.3.4 9 09/08/2016 Title: INSTRUMENTATION TRM POST-ACCIDENT MONITORING INSTRUMENTATION TEXT 3.3.5 0 11/19/2002 Title: INSTRUMENTATION THIS PAGE INTENTIONALLY LEFT BLANK TEXT 3.3.6 4 04/29/2014
- Title: INSTRUMENTATION TRM ISOLATION ACTUATION INSTRUMENTATION TEXT 3.3.7 2 11/10/2015 Title: INSTRUMENTATION MAIN TURBINE OVERSPEED PROTECTION SYSTEM TEXT 3.3.8 1 10/22/2003 Title: INSTRUMENTATION TRM RPS INSTRUMENTATION TEXT 3.3.9 3 05/14/2009 Title: INSTRUMENTATION LPRM UPSCALE ALARM INSTRUMENTATION TEXT 3.3.10 1 12/14/2004 Title: INSTRUMENTATION REACTOR RECIRCULATION PUMP MG SET STOPS TEXT 3.3.11 1 10/22/2003 Title: INSTRUMENTATION MVP ISOLATION INSTRUMENTATION TEXT 3.3.12 1 03/05/2015
- Title: WATER MONITORING INSTRUMENTATION Page 2. of 15 Report Date: 09/08/16
,_/ ** .:'
- SSES MANUAL Manual Name: TRM2 Manual Titleg TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT 3.4.1 1 04/26/2006 Title: REACTOR COOLANT SYSTEM REACTOR COOLANT SYSTEM CHEMISTRY TEXT 3.4.2 1 04/16/2009 Title: REACTOR COOLANT SYSTEM STRUCTURAL INTEGRITY TEXT 3.4.3 1 11/09/2007 Titleg REACTOR COOLANT SYSTEM REACTOR COOLANT SYSTEM (RCS) TEXT 3.4.4 2 05/14/2009 Title: REACTOR COOLANT SYSTEM REACTOR RECIRCULATION FLOW AND ROD LINE LIMIT TEXT 3.4.5 1 04/26/2006 Title: REACTOR COOLANT SYSTEM REACTOR VESSEL MATERIALS TEXT 3. 4. 6. 1 04/25/2013 Title: REACTOR RECIRCULATION SINGLE LOOP OPERATION SLO FLOW RATE RESTRICTION TEXT 3.5.1 1 02/04/2005 Title: ECCS AND RCIC ADS MANUAL INHIBIT TEXT 3.5.2 1 ' 11/09/2007 Title: ECCS AND RCIC ECCS AND RCIC SYSTEM MONITORING INSTRUMENTATION TEXT 3.5.3 0 11/19/2002 Title: ECCS AND RCIC LONG TERM NITROGEN SUPPLY TO ADS TEXT 3.6.1 0 11/19/2002 Title: CONTAINMENT VENTING OR PURGING TEXT 3.6.2 2 04/29/2014 Title: SUPPRESSION CHAMBER TO DRYWELL VACUUM BREAKER POSITION INDICATION TEXT 3.6.3 0 11/19/2002 Title: CONTAINMENT SUPPRESSION POOL ALARM INSTRUMENTATION Page .l of 15 Report Date: 09/08/16 SSES MANUAL Manual Name: TRM2
- Manual Title: TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT 3.6.4 0 11/19/2002 Title: CONTAINMENT PRIMARY CONTAINMENT CLOSED SYSTEM BOUNDARIES TEXT 3.7.1 0 11/19/2002 Title: PLANT SYSTEMS EMERGENCY SERVICE WATER SYSTEM (ESW) SHUTDOWN TEXT 3.7.2 0 11/19/2002 Title: PLANT SYSTEMS ULTIMATE HEAT SINK (UHS) AND GROUND WATER LEVEL TEXT 3.7.3.l 4 09/08/2016 Title: PLANT SYSTEMS FIRE SUPPRESSION WATER SUPPLY SYSTEM LDCN TEXT 3.7.3.2 3 04/16/2009 Title: PLANT SYSTEMS SPRAY.AND SPRINKLER SYSTEMS TEXT 3.7.3.3 4 05/16/2016 Title: PLANT SYSTEMS C02 SYSTEMS TEXT 3.7.3.4 2 04/16/2009 Title: PLANT SYSTEMS HALON SYSTEMS TEXT 3.7.3.5 2 04/16/2009 Title: PLANT SYSTEMS FIRE HOSE STATIONS TEXT 3.7.3.6 2 04/16/2009 Title: PLANT SYSTEMS YARD FIRE HYDRANTS AND HYDRANT HOSE HOUSES TEXT 3 . 7 . 3 . 7
, 1 04/26/2006 Title: PLANT SYSTEMS FIRE RATED ASSEMBLIES TEXT 3.7.3.8 11 09/27/2012 Title: PLANT SYSTEMS FIRE DETECTION INSTRUMENTATION TEXT 3.7.4 1 04/26/2006 Title: PLANT SYSTEMS SOLID RADWASTE SYSTEM Page .4. of 15 5283 *
- Report Date: 09/08/16
- SSES MANUAL Manual Name: TRM2 Manual Title: TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT 3.7.5.1 1 03/05/2015 Title: PLANT SYSTEMS MAIN CONDENSER OFFGAS HYDROGEN MONITOR TEXT 3.7.5.2 0 11/19 /2 00-2 Title: PLANT SYSTEMS MAIN CONDENSER OFFGAS EXPLOSIVE GAS MIXTURE TEXT 3.7.5.3 1 04/26/2006 Title: PLANT SYSTEMS LIQUID HOLDUP TANKS TEXT 3.7.6 3 06/04/2012 Title: PLANT SYSTEMS ESSW PUMPHOUSE VENTILATION TEXT 3.7.7 2 09/05/2008 Title: PLANT SYSTEMS MAIN CONDENSER OFFGAS PRETREATMENT LOGARITHMIC RADIATION MONITORING INSTRUMENTATION TEXT 3.7.8 9 03/05/2015 Title: PLANT SYSTEMS SNUBBERS TEXT 3.7.9 1 08/28/2006 Title: PLANT SYSTEMS CONTROL STRUCTURE HVAC TEXT 3.7.10 2 04/29/2014 Title: PLANT SYSTEMS SPENT FUEL STORAGE POOLS (SFSPS) TEXT 3.7.11 1 10/02/2009 Title: PLANT SYSTEMS TEXT 3.8.1 3 06/20/2012 Title: ELECTRICAL POWER PRIMARY CONTAINMENT PENETRATION CONDUCTOR OVERCURRENT PROTECTIVE DEVICES TEXT 3.8.2.1 2 11/09/2007 Title: ELECTRICAL POWER MOTOR OPERATED VALVES. (MOV) THERMAL OVERLOAD PROTECTION
-CONTINUOUS TEXT 3.8.2.2 2 12/14/2004 Title: ELECTRICAL POWER MOTOR OPERATED VALVES (MOV) THERMAL OVERLOAD PROTECTION
-AUTOMATIC Page .5. of 15 Report Date: 09/08/16 SSES MANUAL Manua1 Name: TRM2
- Manual Tit1e: TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT 3.8.3 2 06/20/2012 Tit1e: ELECTRICAL POWER DIESEL GENERATOR (DG)' MAINTENANCE ACTIVITIES TEXT 3.8.4 1 02/04/2005 Tit1e: ELECTRICAL POWER 24 VDC ELECTRICAL SUBSYSTEM TEXT 3.8.5 1 11/14/2013 Title: ELECTRICAL POWER DEGRADED VOLTAGE PROTECTION TEXT 3.8.6 2 12/14/2006 Tit1e: ELECTRICAL POWER EMERGENCY SWITCHGEAR ROOM COOLING TEXT 3.8.7 2 10/22/2009 Tit1e: BATTERY MAINTENANCE AND.MONITORING PROGRAM TEXT 3.9.1 0 11/19/2002
- Title: REFUELING OPERATIONS DECAY TIME TEXT 3.9.2 0. 11/19/2002 Tit1e: REFUELING OPERATIONS COMMUNICATIONS TEXT 3.9.3 0 11/19/2002 Tit1e: REFUELING OPERATIONS REFUELING PLATFORM TEXT 3.10.1 1 04/26/2006 MISCELLANEOUS SEALED SOURCE CONTAMINATION TEXT 3.10.2 1 04/09/2007 Tit1e: MISCELLANEOUS SHUTDOWN MARGIN TEST RPS INSTRUMENTATION TEXT 3.10.3 2 06/15/2010 Tit1e: MISCELLANEOUS INDEPENDENT SPENT FUEL STORAGE INSTALLATION (ISFSI) TEXT 3.11.1.1 1 04/26/2006
- Tit1e: RADIOACTIVE EFFLUENTS LIQUID EFFLUENTS CONCENTRATION Page Q. of 15 Report Date: 09/08/16
,-*(. ( . -* SSES MANUAL
- Manual Name: TRM2 Manual Title: TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT 3 .11. l. 2 1 04/26/2006 Title: RADIOACTIVE EFFLUENTS LIQUID EFFLUENTS DOSE TEXT 3 . 11 . 1. 3 1 04/26/2006 Title: RADIOACTIVE EFFLUENTS LIQUID WASTE TREATMENT SYSTEM TEXT 3 . 11 . 1. 4 2 10/09/2012 Title: RADIOACTIVE EFFLUENTS LIQUID RADWASTE EFFLUENT MONITORING INSTRUMENTATION TEXT 3 .11.1. 5 3 03/05/2015 Title: RADIOACTIVE EFFLUENTS RADIOACTIVE LIQUID PROCESS MONITORING INSTRUMENTATION TEXT 3 .11. 2 .1 3 04/26/2006 Title: RADIOACTIVE EFFLUENTS DOSE RATE TEJCT 3.11.2.2 1 04/26/2006 Title: RADIOACTIVE EFFLUENTS DOSE -NOBLE GASES TEXT 3.11.2.3 1 04/26/2006 Title: RADIOACTIVE EFFLUENTS DOSE -IODINE, TRITIUM, AND RADIONUCLIDES IN PARTICULATE FORM TEXT 3.11.2.4 0 11/19/2002 Title: RADIOACTIVE EFFLUENTS GASEOUS RADWASTE TREATMENT SYSTEM TEXT 3.11.2.5 4 07 /03/2013 Title: RADIOACTIVE EFFLUENTS VENTILATION EXHAUST TREATMENT SYSTEM TEXT 3.11.2.6 6 09/08/2016 Title: RADIOACTIVE EFFLUENTS RADIOACTIVE GASEOUS EFFLUENT MONITORING INSTRUMENTATION TEXT 3.11.3 1 04/26/2006 Title: RADIOACTIVE EFFLUENTS TOTAL DOSE TEXT 3.11.4.1 4 03/05/2015 Title: RADIOACTIVE EFFLUENTS MONITORING PROGRAM Page]_ of 15 Report Date: 09/08/16 SSES MANUAL \ .... ,,, Manual Name: TRM2 * \(";_;:;;'
Manual Title: TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT 3.11.4.2 2 04/26/2006 Title: RADIOACTIVE EFFLUENTS LAND USE CENSUS TEXT 3.11.4.3 1 04/26/2006 Title: RADIOACTIVE EFFLUENTS INTERLABORATORY COMPARISON PROGRAM TEXT 3.12.1 0 11/19/2002 Title: LOADS CONTROL PROGRAM CRANE TRAVEL-SPENT FUEL STORAGE POOL TEXT 3.12.2 4 04/17/2008 Title: LOADS CONTROL PROGRAM HEAVY LOADS REQUIREMENTS TEXT 3.12.3 0 11/19/2002 Title: LOADS CONTROL PROGRAM LIGHT LOADS REQUIREMENTS
?*' TEXT 4.1 0 09/27/2003
- Title: ADMINISTRATIVE CONTROLS ORGANIZATION TEXT 4.2 0 09/27/2003 Title: ADMINISTRATIVE CONTROLS REPORTABLE EVENT ACTION TEXT 4.3 0 . 09/27 /2003 Title: ADMINISTRATIVE CONTROLS SAFETY LIMIT VIOLATION TEXT 4.4 1 12/18/2008 Title: ADMINISTRATIVE CONTROLS PROCEDURES
& PROGRAMS TEXT 4.5 0 09/27/2003 Title: ADMINISTRATIVE CONTROLS REPORTING REQUIREMENTS TEXT 4.6 0 09/27/2003 Title: ADMINISTRATIVE CONTROLS RADIATION PROTECTION PROGRAM TEXT 4.7 0 09/27/2003
- Title: ADMINISTRATIVE CONTROLS TRAINING Page .S. of 1-5. Report Date: 09/08/16
':
- SSES MANUAL Manual Name: TRM2 Manual Title: TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT B3.0 6 03/05/2015 Title: APPLICABILITY BASES TECHNICAL REQUIREMENT FOR OPERATION (TRO) APPLICABILITY TEXT B3 .1.1 2 04/29/2014 Title: REACTIVITY CONTROL SYSTEM BASES ANTICIPATED TRANSIENT WITHOUT SCRAM ALTERNATE ROD INJECTION (ATWS-ARI)
INSTRUMENTATION TEXT B3 .1.2 0 11/19/2002 Title: REACTIVITY CONTROL SYSTEM BASES CONTROL ROD DRIVE (CRD) HOUSING SUPPORT TEXT B3 .1. 3 3 04/10/2007 Title: REACTIVITY CONTROL SYSTEM BASES CONTROL ROD BLOCK INSTRUMENTATION TEXT B3.1.4 0 11/19/2002 Title: REACTIVITY CONTROL SYSTEM BASES CONTROL ROD SCRAM ACCUMULATORS INSTRUMENTATION AND CHECK VALVE TEXT B3.2.1 0 11/19/2002 Title: CORE OPERATING LIMITS BASES CORE OPERATING LIMITS REPORT (COLR) TEXT B3.3.1 1 01/31/2014 Title: INSTRUMENTATION BASES RADIATION MONITORING INSTRUMENTATION TEXT B3.3.2 2 03/31/2011 Title:
BASES SEISMIC MONITORING INSTRUMENTATION TEXT B3 .. 3 .3 2 11/09/2007 Title: INSTRUMENTATION BASES METEOROLOGICAL MONITORING INSTRUMENTATION TEXT B3.3.4 5 10/14/2015 Title: INSTRUMENTATION BASES TRM POST ACCIDENT MONITORING (PAM) INSTRUMENTATION TEXT B3.3.5 2 11/09/2007 Title: INSTRUMENTATION BASES THIS PAGE INTENTIONALLY LEFT BLANK TEXT B3.3.6 5 01/31/2014 Title: INSTRUMENTATION BASES TRM ISOLATION*ACTUATION INSTRUMENTATION Page .2 of 15 Report Date: 09/08/16 SSES MANUAL Manual Name: TRM2
- Manual Title: TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT B3.3.7 2 11/10/2015 Title: INSTRUMENTATION BASES MAIN TURBINE OVERSPEED PROTECTION SYSTEM TEXT B3.3.8 1 10/22/2003 Title: INSTRUMENTATION BASES TRM RPS INSTRUMENTATION TEXT B3.3.9 3 05/14/2009 Title: INSTRUMENTATION BASES LPRM UPSCALE ALARM INSTRUMENTATION TEXT B3.3.10 3 02/22/2012 Title: INSTRUMENTATION BASES REACTOR RECIRCULATION PUMP MG SET STOPS TEXT B3.3.11 1 10/22/2003 Title: INSTRUMENTATION BASES MVP ISOLATION INSTRUMENTATION TEXT B3.3.12 0 04/16/2009
- Title: WATER MONITORING INSTRUMENTATION TEXT B3.4.1 0 11/19/2002 Title: REACTOR COOLANT SYSTEM BASES REACTOR COOLANT SYSTEM CHEMISTRY TEXT B3.4.2 1 04/16/2009 Title: REACTOR COOLANT SYSTEM BASES STRUCTURAL INTEGRITY TEXT B3.4.3 1 11/09/2007 Title: REACTOR COOLANT SYSTEM BASES HIGH/LOW PRESSURE INTERFACE LEAKAGE MONITOR TEXT B3.4.4 0 11/19/2002 Title: REACTOR COOLANT SYSTEM BASES REACTOR RECIRCULATION FLOW AND ROD LINE LIMIT TEXT B3.4.5 0 11/19/2002 Title: REACTOR COOLANT SYSTEM BASES REACTOR VESSEL MATERIALS TEXT B3.4.6 1 04/25/2013
- Title: REACTOR RECIRCULATION SINGLE LOOP OPERATION SLO FLOW RATE RESTRICTION Page 1Q of 15 Report Date: 09/08/16
- *
- SSES MANUAL Manua1 Noone : TRM2 Manual Tit1e: TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT B3.5.l 0 11/19/2002 Tit1e: ECCS AND RCIC BASES ADS MANUAL INHIBIT TEXT B3.5.2 1 11/09/2007 Tit1e: ECCS AND RCIC BASES ECCS AND RCIC SYSTEM MONITORING INSTRUMENTATION TEXT B3.5.3 1 11/09/2007 Title: ECCS AND RCIC BASES LONG TERM NITROGEN SUPPLY TO ADS TEXT B3.6.l 0 11/19/2002 Tit1e: CONTAINMENT BASES VENTING OR PURGING TEXT B3.6.2 0 11/19/2002 CONTAINMENT BASES SUPPRESSION CHAMBER-TO-DRYWELL VACUUM BREAKER POSITION INDICATION TEXT B3.6.3 1 04/19/2007 Tit1e: CONTAINMENT BASES SUPPRESSION POOL ALARM INSTRUMENTATION TEXT B3.6.4 1 12/14/2004 Tit1e: CONTAINMENT BASES PRIMARY CONTAINMENT CLOSED SYSTEM BOUNDARIES TEXT B3.7.l 0 11/19/2002 PLANT SYSTEMS BASES EMERGENCY SERVICE WATER SYSTEM (SHUTDOWN)
TEXT B3.7.2 0 11/19/2002 Title: PLANT SYSTEMS BASES ULTIMATE HEAT SINK (UHS) GROUND WATER LEVEL TEXT B3.7.3.1 3 06/15/2010 Title: PLANT SYSTEMS BASES FIRE SUPPRESSION WATER SUPPLY SYSTEM TEXT B3.7.3.2 2 04/26/2006 Title: PLANT SYSTEMS BASES SPRAY AND SPRINKLER SYSTEMS TEXT B3.7.3.3 0 11/19/2002 Title: PLANT SYSTEMS BASES C02 SYSTEMS Page 11 of .15. Report Date: 09/08/16 SSES MANUAL Manual Name: TRM2 Manual Title: TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT B3.7.3.4 2 04/29/2014 Title: PLANT SYSTEMS BASES HALON SYSTEMS TEXT B3.7.3.5 1 04/26/2006 Title: PLANT SYSTEMS BASES FIRE HOSE STATIONS TEXT B3.7.3.6 1 04/26/2006 Title: PLANT SYSTEMS BASES YARD FIRE HYDRANTS AND HYDRANT HOSE HOUSES TEXT B3.7.3.7 0 11/19/2002 Title: PLANT SYSTEMS BASES FIRE RATED ASSEMBLIES TEXT B3.7.3.8 3 09/27/2012 Title: PLANT SYSTEMS BASES FIRE DETECTION INSTRUMENTATION TEXT B3.7.4 0 11/19/2002 Title: PLANT SYSTEMS BASES SOLID RADWASTE SYSTEM TEXT B3.7.5.1 0 11/19/2002 Title: PLANT SYSTEMS BASES MAIN CONDENSER OFFGAS HYDROGEN MONITOR TEXT B3.7.5.2 0 11/19/2002 Title: PLANT SYSTEMS BASES MAIN CONDENSER OFFGAS EXPLOSIVE GAS MIXTURE TEXT B3.7.5.3 0 11/19/2002 Title: PLANT SYSTEMS BASES LIQUID HOLDUP TANKS TEXT B3.7.6 4 06/04/2013 Title: PLANT SYSTEMS BASES ESSW PUMPHOUSE VENTILATION TEXT B3.7.7 2 01/31/2008 Title: PLANT SYSTEMS BASES MAIN CONDENSER OFFGAS PRETREATMENT LOGARITHMIC RADIATION MONITORING INSTRUMENTATION TEXT B3.7.8 4 01/31/2014 Title: PLANT SYSTEMS BASES SNUBBERS
- *
- Page 12 of 15 Report Date: 09/08/16
- *
- SSES MANUAL Manual Name: TRM2 Manual Title: TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT B3.7.9 2 12/08/2011 Title: PLANT SYSTEMS BASES CONTROL STRUCTURE HVAC TEXT B3.7.10 1 12/14/2004 Title: PLANT SYSTEMS BASES SPENT FUEL STORAGE POOLS TEXT B3.7.11 2 04/14/2010 Title: STRUCTURAL INTEGRITY TEXT B3.8.1 2 03/10/2010 Title: ELECTRICAL POWER BASES PRIMARY CONTAINMENT PENETRATION CONDUCTOR OVERCURRENT PROTECTIVE DEVICES TEXT B3.8.2.1 0 11/19/2002 Title: ELECTRICAL POWER BASES MOTOR OPERATED VALVES (MOV) THERMAL OVERLOAD PROTECTION
-CONTINUOUS TEXT B3.8.2.2 1 09/17/2004 Title: ELECTRICAL POWER BASES MOTOR OPERATED VALVES (MOV) THERMAL OVERLOAD PROTECTION
-AUTOMATIC TEXT B3.8.3 0 11/19/2002 Title: ELECTRICAL POWER BASES DIESEL GENERATOR (DG) MAINTENANCE ACTIVITIES TEXT B3.8.4 0 11/19/2002 Title: ELECTRICAL POWER BASES 24 VDC ELECTRICAL POWER SUBSYSTEM TEXT B3.8.5 1 11/14/2013 Title: ELECTRICAL POWER BASES DEGRADED VOLTAGE PROTECTION TEXT B3.8.6 3 06/20/2012 Title: ELECTRICAL POWER BASES EMERGENCY SWITCHGEAR ROOM COOLING TEXT B3.8.7 2 06/04/2013 Title: BATTERY MAINTENANCE AND MONITORING PROGRAM TEXT B3.9.1 0 11/19/2002 Title: REFUELING OPERATIONS BASES DECAY TIME Page 13 of 15 Report Date: 09/08/16
SSES MANUAL Manual Name: TRM2
- Manual Title: TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT B3.9.2 0 11/19/2002 Title: REFUELING OPERATIONS BASES COMMUNICATIONS TEXT B3.9.3 0 11/19/2002 Title: REFUELING OPERATIONS BASES REFUELING PLATFORM TEXT B3.10.1 0 11/19/2002 Title: MISCELLANEOUS BASES SEALED SOURCE CONTAMINATION TEXT B3.10.2 1 04/10/2007 Title: MISCELLANEOUS BASES SHUTDOWN MARGIN TEST RPS INSTRUMENTATION TEXT B3 . 10 . 3 0 11/19/2002 Title: MISCELLANEOUS BASES INDEPENDENT SPENT FUEL STORAGE INSTALLATION (ISFSI) TEXT B3.11.1.1 1 05/10/2016
- Title: RADIOACTIVE EFFLUENTS BASES LIQUID EFFLUENTS CONCENTRATION TEXT B3 . 11 . 1. 2 0 _11/19/2002 Title: RADIOACTIVE EFFLUENTS BASES LIQUID EFFLUENTS DOSE TEXT B3 . 11 . 1. 3 0 11/19/2002 Title: RADIOACTIVE EFFLUENTS BASES LIQUID WASTE TREATMENT SYSTEM TEXT B3.11.1.4 0 11/19/2002 Title: RADIOACTIVE EFFLUENTS BASES LIQUID RADWASTE EFFLUENT MONITORING INSTRUMENTATION TEXT B3.11.1.5 0 11/19/2002 Title: RADIOACTIVE EFFLUENTS BASES RADIOACTIVE LIQUID PROCESS MONITORING INSTRUMENTATION TEXT B3.11.2.1 1 12/14/2004 Title: RADIOACTIVE EFFLUENTS BASES DOSE RATE TEXT B3.11.2.2 0 11/19/2002 Title: RADIOACTIVE EFFLUENTS BASES DOSE -NOBLE GASES
- Page 14 of 15 Report Date: 09/08/16
- ... SSES MANUAL Manual Name: TRM2 Manual Title: TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT B3.11.2.3 0 11/19/2002 Title: RADIOACTIVE EFFLUENTS BASES DOSE -IODINE, TRITIUM, AND RADIONUCLIDES IN PARTICULATES FORM TEXT B3.11.2.4 0 11/19/2002 Title: RADIOACTIVE EFFLUENTS BASES GASEOUS RADWASTE TREATMENT SYSTEM TEXT B3.11.2.5 5 07 /03/2013 Title: RADIOACTIVE EFFLUENTS BASES VENTILATION EXHAUST TREATMENT SYSTEM TEXT B3.11.2.6 2 09/08/2016 Title: RADIOACTIVE EFFLUENTS BASES RADIOACTIVE GASEOUS EFFLUENT MONITORING INSTRUMENTATION TEXT B3.11.3 0 11/19/2002 Title: RADIOACTIVE EFFLUENTS BASES TOTAL DOSE TEXT B3.11.4.1 5 03/05/2015 Title: RADIOACTIVE EFFLUENTS BASES MONITORING PROGRAM TEXT B3.11.4.2 0 11/19/2002 Title: RADIOACTIVE EFFLUENTS BASES LAND USE CENSUS TEXT B3.11.4.3 0 11/19/2002 Title: RADIOACTIVE EFFLUENTS BASES INTERLABORATORY COMPARISON PROGRAM TEXT B3.12.1 1 10/04/2007 Title: LOADS CONTROL PROGRAM BASES CRANE TRAVEL-SPENT FUEL STORAGE POOL TEXT B3.12.2 1 12/03/2010 Title: LOADS CONTROL PROGRAM BASES HEAVY LOADS REQUIREMENTS TEXT B3.12.3 0 11/19/2002 Title: LOADS CONTROL PROGRAM BASES LIGHT LOADS REQUIREMENTS Page 15 of 12 Report Date: 09/08/16 SUSQUEHANNA STEAM ELECTRIC STATION Rev. 90 *. LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL) Section Title TOG 1.0 2.0 3.0 3.1 3.2 3.3 TABLE OF CONTENTS USE AND APPLICATION Page TRM I 1.0-1 Page TRM I 1.0-2 Page TRM I 1.0-3 PLANT PROGRAMS Page 2.0-1 Pages TRM I 2.0-2 and TRM 2.0-3 Page TRM I 2.0-4 Page TRM I 2.0-5 Page TRM I 2.0-6 Page TRM I 2.0-7 Pages TRM I 2.0-8 and TRM I 2.0-9 Page TRM I 2.0-10 Page TRM I 2.0-11 Page TRM I 2.0-12 Pages TRM I 2.0-13 and TRM I 2.0.:14'{.:',:>
.. /:'"!) Page TRM I 2.0-15 8/ :*'( ;'1 *. y APPLICABILITY
.
Pages TRM I 3.0-1 and Page TRM I 3.0-3 <.'.f *.v: Page TRM I 3 0-4
°"'H
.. REACTIVITY COJ}q_:**H.*.
__ TEMS Page TRMf Pages TRM / 3.1-5 Page
.
.... ;>.,
1';;8 ,.Pages tRM.//3.1-9 and TRM I 3.1-9a /J* .... *, "* '. ""*"' **!'. (-,;,.Page
- r.Ri\.114 3.1-1 o *** .. _i.
k[:'.\ \ *,'1 ft.QR_6;.QPERATING LIMITS REPORT TRM / 3.2-1 *Pages TRM / 3.2-2 through TRM / 3.2-63 INSTRUMENTATION Pages TRM I 3.3-1 through TRM / 3.3-3 Pages TRM I 3.3-4 and TRM / 3.3-5 Page TRM / 3.3-6 Page TRM 3.3-7 Page 3.3-8 SUSQUEHANNA
-UNIT 2 TRM I LOES-1 Effective Date 04/28/2016 08/31/1998 10/04/2002 08/31/1998 08/31/1998 01/28/2005 p612512002
\:$tb1/21/2014 j;, w v,:/04/15/2009 05/15/2008 01/07/2011 02/02/2010 11/15/2004 04/15/2009 11/15/2004 11/15/2005 02/19/2015
03/15/2002 02/19/2015 10/31/2007 08/31/1998 03/27/2007 04/15/2009 03/27/2007 02/18/1999 02/18/1999 08/31/1998 11/04/2015 07/16/1999 10/31/2007 03/10/2011 10/31/2007 08/31/1998 EFFECTIVE DA TE 08/18/2016
- SUSQUEHANNA STEAM ELECTRIC STATION Rev. 90 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL) Section Title 3.4 3.5 3.6 Page TRM I 3.3-9 Page TRM I 3.3-9a Page TRM I 3.3-:10 Page TRM I 3.3-11 Page TRM I 3.3-11a Page TRM I 3.3-12 Page TRM I 3.3-13 Page TRM I 3.3-14 Page TRM I 3.3-15 Page TRM I 3.3-16 Page TRM I 3.3-17 Page TRM I 3.3-17a Page TRM I 3.3-18 Pages TRM I 3.3-19 and TRM I 3.3-20 Page TRM I 3.3-21 Page TRM I 3.3-21a Pages TRM /3:3-21b through TRM I 3.3-21d Page TRM I 3. 3-22 Pages TRM I 3.3-23 and TRM I 3.3-24 Page TRM I 3.3-25 Page TRM I 3.3-26 Page TRM I 3.3-27 REACTOR COOLANT SYSTEM Page TRM I 3.4-1 Pages 3.4-2 through 3.4-5 Pages TRM I 3.4-6 through TRM I 3.4-8 Page Page 3.4-10 Page 3.4-11 Page TRM I 3.4-12 Page TRM I 3.4-13 Page TRM I 3.4-14 EMERGENCY CORE COOLING AND RCIC Page TRM I 3.5-1 Pages 3.5-2 and 3.5-3 Page TRM I 3.5-4 Pages 3.5-5 through 3.5-7 CONTAINMENT Pages 3.6-1 and 3.6-2 Pages TRM I 3.6-3 and TRM I 3.6-3a Page 3.6-4 Page TRM I 3.6-5 Page 3.6-6 Pages TRM / 3.6-7 through TRM I 3.6-9 SUSQUEHANNA
-UNIT 2 -TRM I LOES-2 Effective Date 10/07/2015 06/30/2010 10/31/2007 10/07/2015 08/11/2016 03/30/2001 01/07/2011 12/14/1998 04/11/2014 01/07/2011 11/04/2015 11/04/2015 10/31/2007 10/22/2003 04/15/2009 11/15/2004 03/27/2007 12/03/2004 05/16/2003 10/22/20d3 02/19/2015 04/07/2009 03/31/2006 10/23/1998 04/01/2009 08/31/1998 10/31/2007 08/31/1998 04/17/2009 03/31/2006 04/25/2013 01/28/2005 08/31/1998 10/31/2007 08/31/1998 08/31/1998 04/16/2014 08/31/1998 01/07/2002 08/31/1998 12/31/2002 EFFECTIVE DA TE 08/18/2016
- I I
- SUSQUEHANNA STEAM ELECTRIC STATION Rev. 90 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL) Section Title 3.7 PLANT SYSTEMS Pages TRM I 3.7-1 and TRM I 3.7-2 Page 3.7-3 Page TRM I 3.7-4 Pages TRM i 3.7-5 through TRM I 3.7-7 Page TRM I 3.7-8 Pages TRM I 3.7-9 and TRM I 3.7-10 Page TRM I 3.7-11 Page TRM I 3.7-12 Page TRM/ 3.7-13 Page TRM I 3.7-14 Pages TRM I 3.7-15 and TRM /3.7-16 Page TRM I 3.7-17 Page TRM I 3:7-18 Page TRM I 3.7-19 Pages.TRM I 3.7-20 through TRM I 3.7-22 Page TRM I 3.7-23 Page TRM I 3.7-24 Page TRM I 3.7-25 Page TRM I 3.7-26 Page TRM I 3.7-27 Pages TRM I 3.7-28 through TRM I 3.7-32a Page TRM I 3.7-33 Page TRM I 3.7-34 Pages TRM I 3.7-35 and TRM I 3.7-36 Page TRM I 3.7-37 Page TRM I 3.7-38 Page TRM I 3.7-39 Page TRM I 3. 7-40 Pages TRM I 3. 7-40a through TRM I 3. 7-40c Page TRM I 3.7-41 Page TRM I 3.7-42 Pages TRM I 3.7-43 Pages TRM I 3.7-44 and TRM I 3.7-45 Page TRM I 3. 7-46 Page TRM I 3,7-47 Page TRM I 3. 7-48 Page TRM I 3.7-49 Page TRM I 3.7-50 Page TRM I 3.7-51 Page TRM I 3.7-52 Page TRM I 3.7-53 Page TRM I 3.7-54 Page TRM I 3. 7-55 Page TRM I 3.7-56 SUSQUEHANNA
-UNIT 2 TRM I LOES-3 Effective Date 07/29/1999 08/31/1998 03/31/2006 08/18/2016 08/02/1999
. 0410712009 01/21/2000 08/02/1999 05/09/2016 08/09/2005 08/02/1999 04/07/2009 08/02/1999 04/07/2009 08/02/1999 04/07/2009 03/31/2006 08/02/1999 09/25/2012 11/24/2011 09/25/2012 09/25/2012 03/31/2006 02/01/1999 02/19/2015 08/31/1998 03/31/2006 05/24/2012 05/24/2012 09/04/2008 08/31/1998 02/19/2015 10/05/2006 06/07/2007 09/05/2012 0610712007 03/09/2001 08/16/2006 12/03/2004 04/15/2003 07/29/1999 04/01/2009*
-* 09/25/2009 04/01/2009 EFFECTIVE DA TE 08/18/2016
- SUSQUEHANNA STEAM ELECTRIC STATION Rev.90 *** LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL) Section Title Effective Date 3.8 ELECTRICAL POWER Page TRM / 3.8-1 04/02/2002 Page TRM I 3.8-2 , 01/28/2005 Pages TRM / 3.8-3 and TRM / 3.8-4 06/12/2012 Pages TRM / 3.8-5 and TRM / 3.8-6 04/02/2002 Pages TRM / 3.8-7 through TRM / 3.8-10 10/31/2007 Page TRM / 3.8-11 09/03/2004 Page TRM / 3.8-12 12/03/2004 Page TRM / 3.8-13 06/12/2012 Page TRM / 3.8-14 08/31/1998 Page TRM / 3.8-15 01/28/2005 Pages TRM / 3.8-16 and TRM / 3.8-17 04/02/2002 Page 3.8-18 02/01/1999 Page TRM / 3.8-19 04/02/2002 Page TRM I 3.8-20 02/01/1999 Pages TRM / 3.8-21 and TRM / 3.8-22 06/06/1999 Page TRM I 3.8-23 11/07/2013 Page TRM / 3.8-24 11/30/2011 Page TRM / 3.8-25 06/11/2012 Pages TRM I 3.8-25a and TRM I 3.8-25b 11/30/2011 Page TRM / 3.8-26 05/28/2009
- Page TRM / 3.8-27 11/29/2006 Page TRM / 3.8-28 05/28/2009 Page TRM / 3.8-29 10/20/2009 3.9 REFUELING OPERATIONS Pages 3.9-1 through 3.9-3 08/31/1998 3.10 MISCELLANEOUS Page TRM / 3.10-1 03/31/2006 Pages 3.10-2 through 3.10-4 08/30/1998 Pages TRM I 3.10-5 and TRM I 3.10-6 03/27/2007 Page TRM / 3.10-7 06/10/2010 3.11 RADIOACTIVE EFFLUENTS Page TRM / 3.11-1 03/31/2006 Pages 3.11-2 through 3.11-3 08/31/1998 Page TRM / 3.11-4 03/31/2006 Page 3.11-5 08/31/1998 Page TRM / 3.11-6 03/31/2006 Pages 3.11-7 and TRM / 3.11-8 08/31/1998 Pages TRM / 3.11-9 and TRM / 3.11-10 10/09/2012 Pages TRM / 3.11-11 and TRM / 3.11-12 08/31/1998
- SUSQUEHANNA
-UNIT 2 TRM/ LOES-4 EFFECTIVE DATE 08/18/2016 SUSQUEHANNA STEAM ELECTRIC STATION Rev. 90 ** LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL) Section Title Effective Date
- Page TRM / 3.11-13 02/19/2015 Page TRM / 3.11-14 12/03/2004 Pages 3.11-15 and 3.11-16 09/01/1998 Page TRM / 3.11-17 03/31/2006 Page 3.11-18 08/31/1998 Page TRM / 3.11-19 08/15/2005 Pages TRM / 3.11-20 and TRM / 3.11-21 03/31/2006 Page TRM / 3.11-22 04/02/2002 Page TRM I 3.11-23 11 /14/2006
. Page TRM / 3.11-24 06/18/2013 Page TRM / 3.11-25 04/12/2007 Page TRM / 3.11-26 01/21/2004 Page TRM / 3.11-27 08/11/2016 Page TRM / 3.11-28 09/08/2009 Page TRM / 3.11-29 12/03/2004 Page TRM I 3.11-30 01/21/2004 Page TRM / 3.11-31 08/11/2016 Page TRM / 3.11-32 02/19/2015 Page TRM / 3.11-33 03/31/2006 Page 3.11-34 08/31/1998
. Page TRM/ 3.11-35 03/31/2006
- Pages TRM I 3.11-41 through TRM I 3. 11-44 08/31/1998 Page TRM / 3.11-45 03/31/2006 Page 3.11-46 08/31/1998 Page TRM / 3.11-47
- 03/31/2006 3.12 LOADS CONTROL PROGRAM Pages TRM / 3.12-1 through TRM / 3.12-3 02/05/1999 Page TRM I 3.12-4 03/14/2008 Page TRM I 3.12-5 02/05/1999 4.0 ADMINISTRATIVE CONTROLS Pages TRM I 4.0-1 through TRM I 4.0-3 08/31/1998 Page TRM I 4.0-4 12/11/2008 Pages TRM I 4.0-5 through TRM I 4.0-8 08/31/1998
- SUSQUEHANNA-UNIT 2 TRM I LOES-5 EFFECTIVE DATE 08/18/2016
- * *.y. SUSQUEHANNA STEAM ELECTRIC STATION Rev. 90 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL) Section Title B 3.0 B3.1 B 3.2 B 3.3 APPLICABILITY BASES Pages TRM I B 3.0-1 through TRM I B 3.0-3 Page TRM I B 3.0-4 Pages TRM I B 3.0-4a and TRM I B 3.0-4b Page TRM I B 3.0-5 Page TRM I B 3.0-6 Pages TRM I B 3.0-7 through TRM I B 3.0-9 Pages TRM I B 3.0-10 and TRM I B 3.0-11 Page TRM I B 3.0-12 Pages TRM I B 3.0-13 through TRM I B 3.0-15 REACTIVITY CONTROL SYSTEMS BASES Page TRM I B 3.1-1 Page TRM I B 3.1-2 Page TRM I B 3.1-3 Page B 3.1-4 Pages TRM I B 3.1-5 through TRM I B 3.1-7 Page TRM I B 3.1-8 CORE OPERA TING LIMITS BASES Page B 3.2-1 INSTRUMENTATION BASES Page TRM I B 3.3-1 Page TRM I B 3.3-2 Page TRM I B-3.3-2a Pages TRM I B 3.3-3 and TRM I B 3.3-3a . Page TRM I B 3.3-4 Pages TRM I B 3.3-5 through TRM I B 3.3-7 Page TRM I B 3.3-8 Page TRM I B 3.3-9 Page TRM I B 3.3-10 Page TRM I B 3.3-11 Pages TRM I B 3.3-12 and TRM /"B 3.3-13 Page TRM I B 3.3-14 Page TRM I B 3.3-14a Page TRM I B 3.3-14b Page TRM I B 3.3-14c Pages TRM I B 3.3-15 through TRM I B 3.3-17 Pages TRM I B 3.3-18 and TRM I B 3.3-19 .. Pages TRM I B 3.3-19a and TRM I B 3.3-19b Page TRM I B 3.3-19c SUSQUEHANNA
-UNIT 2 TRM I LOES-6 Effective Date 08/3.1/1998 02/19/2015 02/19/2015 02/19/2015 06/12/2012 08/31/1998 03/15/2002 11/30/2005 02/19/2015 07/13/1999 04/16/2014 10/31/2007 08/31/1998 03/27/2007 02/18/1999 08/31/1998 01/21/2014 03/10/2011 10/31/2007 10/31/2007 06/30/2010 10/07/2015 06/30/2010 10/31/2007 01/07/2011 02/21/2014 01/07/2011 06/25/2002 11/04/2015 11/04/2015 11/04/2015 10/22/2003 03/27/2007 03/27/2007 04/17/2009 EFFECTIVE DATE 08/18/2016
.
SUSQUEHANNA STEAM ELECTRIC STATION Rev.90
- LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL) Section Title Effective Date Pages TRM I B 3.3-19d and TRM I B 3.3-19e 03/27/2007 Page TRM I B 3.3-20 02/16/2012 Page TRM I B 3.3-21 08/03/2010 Page TRM I B 3.3-22 10/22/2003 Page TRM I B 3.3-23 05/16/2003 Pages TRM I B 3.3-24 and TRM I B 3.3-25 04/07/2009 B 3.4 REACTOR COOLANT SYSTEM BASES Page TRM I B 3.4-1 08/31/1998 Pages TRM I B 3.4-2 and TRM I B3.4-3 04/01/2009 Pages TRM I B 3.4-4 and TRM I B 3.4-4a 10/31/2007 Page TRM I B 3.4-5 10/15/1999 Page B 3.4-6. 08/31/1998 Page TRM I B 3.4-7 04/25/2013 B 3.5 ECCS AND RCIC BASES Pages B 3.5-1 and B 3.5-2 08/31/1998 Pages TRM I B 3.5-3 and TRM I B 3.5-3a 10/31/2007 Page B 3.5-4 08/31/1998 Page TRM I B 3.5-5 10/31/2007
- B 3.6 CONTAINMENT BASES Page TRM I B 3.6-1 07/26/2001 Page TRM I B 3.6-2 02/01/1999 Page B 3.6-3 08/3.1 /1998 Page TRM I B 3.6-4 03/29/2007 Page TRM I B 3.6-5 04/04/2007 Page TRM I B 3:6-6 12/03/2004 Pages TRM I B 3.6-7 through TRM I B 3.6-11 12/31/2002 B 3.7 PLANT SYSTEMS BASES Pages B 3.7-1 and B 3.7-2 08/31/1998 Page TRM I B 3.7-3 06/10/2010 Page TRM I B 3.7-3a 12/27/2007 Page TRM I B 3.7-4 03/31/2006 Page TRM I B 3.7-5 08/02/1999 Pages TRM I B 3.7-6 and TRM I B 3.7-6a 03/31/2006 Pages TRM I B 3.7-7 and TRM I B 3.7-7a 08/02/1999 Page TRM I B 3 .. 7-8 . 08/02/1999 Page TRM I B 3.7-9 04/11/2014 Page TRM I B 3.7-10 08/02/1999 SUSQUEHANNA
-UNIT 2 TRM/ LOES-7 EFFECTIVE bA TE 08/18/2016
- SUSQUEHANNA STEAM ELECTRIC STATION Rev. 90 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL) Section Title B 3.8 Pages TRM I B 3.7-10a through TRM I B 3.7-11a Pages TRM I B 3.7-12 and TRM I B 3.7-13 Pages TRM I B 3.7-14 through TRM I B 3.7-14b Pages TRM I B 3.7-15 and TRM I B 3.7-16 Pages B 3.7-17 through B 3.7-20 Page TRM I B 3.7-21 PagesTRM I B 3.7-21a through TRM I B 3.7-21d Pages TRM I B 3.7-21e through TRM I B 3.7-21g Pages TRM/ B 3.7-22 and TRM I B 3.7-23 Page TRM I B 3. 7-24 Page TRM I B 3.7-25 Pages TRM I B 3.7-26 through TRM I B 3.7-29 Page TRM I B 3.7-30 Page TRM I B 3.7-30a Page TRM I B 3. 7-30b Page TRM I B 3.7-31 Page TRM I B 3.7-32 Page TRM I B 3. 7-33 Page TRM I B 3.7-34 Page TRM I B 3.7-35 Pages TRM I B 3. 7-36 and TRM I B 3. 7-37 Page TRM I B 3.7-38 Page TRM I B 3.7-39 Page TRM I B 3.7-40 ELECTRICAL POWER BASES Page TRM I B 3.8-1 Pages TRM I B 3.8-2 Page TRM I B 3.8-2a Pages TRM I B 3.8-3 and TRM I B 3.8-3a Page TRM I B 3.8-4 Page TRM I B 3.8-4a Page TRM I B 3.8-5 Pages TRM I B 3.8-6 through TRM I B 3.8-15 Page TRM I B 3.8-16 Page TRM I B 3.8-17 .., Page TRM I B 3.8-17a Page TRM I B 3.8-17b Pages TRM I B 3.8-18 through TRM I B 3.8-20 Pages TRM I B 3.8-21 and TRM I B 3.8-22 Page TRM I B 3.8-23 Page TRM I B 3.8-24 SUSQUEHANNA
-UNIT 2 TRM I LOES-8 Effective Date 03/31/2006 08/02/1999 09/25/2012 02/01/1999 08/31/1998 05/29/2013 05/24/2012 05/29/2013 01/30/2008 10/05/2006 01/21/2014 10/05/2006 0610712007 10/05/2006 01/21/2014 11/30/2011 03/09/2001 04/15/2003 12/03/2004 0710512000 04/01/2009 09/25/2009 04/01/2009 04/08/2010 04/02/2002 01/28/2005 03/01/2010 04/02/2002 09/03/2004 04/02/2002 08/31/1998 04/02/2002 11/07/2013 11/30/2011 06/11/2012 11/30/2011 05/29/2013 05/28/2009 05/29/2013 05/28/2009 EFFECTIVE DA TE 08/18/2016 SUSQU!=HANNA STEAM ELECTRIC STATION Rev. 90
- LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL) Section Title Effective Date B.3.9 REFUELING OPERATIONS BASES Pages B 3.9-1 and B 3.9-2 08/31/1998 Pages B 3.9-3 through B 3.9-7 10/23/1998
) 83.10 MISCELLANEOUS BASES Page B 3.10-1 08/31/1998 Pages TRM I B 3.10-2 and TRM I B 3.10-3 03/27/2007 Pages TRM I B 3.10-4 and TRM I B 3.10-5 08/23/1999 B 3.11 RADIOACTIVE EFFLUENTS BASES Pages TRM I B 3.11-1 and TRM I B 3.11-2 08/31/1998 Page TRM I B 3.11-3 04/28/2016 Pages B 3.11-4 through B 3.11-9 08/31/1998 Page TRM I B 3.11-10 02/01/1999 Pages TRM I B 3.11-11 and TRM I B 3.11-11 a 0410712000 TRM I B 3.11-12 and TRM I B 3.11-13 02/01/1999 Page TRM I B 3.11-14 12/03/2004 Page TRM I B 3.11-15 02/01/1999 Pages B 3.11-16 through B 3.11-19 08/31/1998 Pages TRM I B 3.11-20 and TRM I B 3.11-20a 0410212002 Page TRM I B 3.11-21 05/13/2005 Pages TRM I B 3.11-22 and TRM I B 3.11-23 11/14/2006
- . .*-.. -Pages TRM I B 3.11-23a and TRM I B 3.11-23b 06/18/2013 Pages TRM I B 3.11-24 and TRM I B 3.11-24a 08/11/2016 Page TRM I B 3.11-25 01/21/2004 Pages B 3.11-26 through B 3.11-27 08/31/1998 Page TRM I B 3.11-28 11/30/2005 Page TRM I B 3.11-29 02/19/2015 Pages TRM I B 3.11-30 and TRM I B 3.11-31 05/29/2013 Page TRM I B 3.11-32 08/31/1998 Page TRM I B 3.11-33 06/30/2010 Pages TRM I B 3.11-34 and TRM I B 3.11-35 08/31/1998 Page TRM I B 3.11-36 02/12/1999 8.3.12 LOADS CONTROL PROGRAM BASES Page TRM I B 3.12-1 09/19/2007 Page TRM I B 3.12-2 11/29/2010 Page TRM I B 3.12-3 02/05/1999 SUSQUEHANNA-UNIT 2 TRM I LOES-9 EFFECTIVE DATE 08/18/2016
- * :. --***----
__ ......:_
- ------
___ . Rev.9 TRM Post Accident Monitoring Instrumentation 3.3.4 3.3 Instrumentation 3.3.4 TRM Post-Accident Monitoring Instrumentation TRO 3.3.4 The TRM post-accident monitoring instrumentation channels shown in Table 3.3.4-1 shall be OPERABLE.
APPLICABILITY:
According to Table 3.3.4-1 ACTIONS . -------------------------------------------------------------N 0 TES--------------------------------------------------------
- 1. Separate condition entry is allowed for each Function.
- 2. The provisions of TRO 3.06 are not applicable.
CONDITION REQUIRED ACTION COMPLETION TIME A. One or more required A.1 Enter the Condition Immediately channel inoperable.
referenced in Table 3.3.4-1 for the channel.
- B . As required by Required B.1 Initiate the preplanned 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> Action A.1 and referenced alternate method of ' in Table 3.3.4-1.
monitoring the appropriate parameter(s).
AND B.2 Restore the required channel 7 days I 30 days Cc) to OPERABLE status. C. As required by Required C. 1 Restore the required 30 days Action A.1 and referenced channel(s) to OPERABLE in Table 3.3.4-1 status. D. As required by Required D.1 Verify a minimum 14 of the Immediately Action A.1 and referenced associated acoustic monitor in Table 3.3.4-1 channels and 5 of the ADS AND SRV acoustic monitor channels are operable.
Once per 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> thereafter
\CJ COMPLETION TIME for REQUIRED ACTION B.2 is extended from 7 days to 30 days during construction activities associated with the replacement of SPING equipment with VERMS equipment.
SUSQUEHANNA
-UNIT 2 TRM / 3.3-9 EFFECTIVE DATE 10/07/2015 I
Rev. 9
- ACTIONS (continued)
CONDITION
- SUSQUEHANNA
-UNIT 2 OR D.2 OR D.3 AND D.4. TRM Post Accident Monitoring Instrumentation 3.3.4 REQUIRED ACTION COMPLETION TIME Verify SRV tailpipe Immediately
- temperature indication and alarm are available for the AND tailpipe associated with the inoperable acoustic monitor.
Once per 24 hour$ thereafter Verify that the following Immediately alternate monitoring methods in TS Table 3.3.3.1-1 are OPERABLE:
AND
- Function 1
- Function 2
- Function 3 Once per 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> Et Function 1 O thereafter Restore the required 30 days channel(s) to OPERABLE OR status. At next outage with containment entry, not to exceed the next refueling outage for in-accessible containment components
. TRM I 3.3-9a EFFECTIVE DA TE 06/30/2010
- * ,::-.. ' -Rev.9 TRM Post Accident Monitoring Instrumentation 3.3.4 TECHNICAL REQUIREMENT SURVEILLANCE
NOTES--------------------------------------------------------
- 1. Refer to Table 3.3.4-1 to determine which TRSs apply for each Post Accident Monitoring Function.
- 2. When a channel is placed in an inoperable status solely for performance of required Surveillances, entry into associated Conditions and Required Actions may be delayed for up to 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> provided an alternate means of monitoring the parameter or an associated function is available.
SURVEILLANCE FREQUENCY TRS 3.3.4.1 Perform CHANNEL CHECK 31 days TRS 3.3.4.2 Perform CHANNEL FUNCTIONAL TEST 92 days TRS 3.3.4.3 Perform a CHANNEL CALIBRATION.
The Trip 24 months Setpoint shall be less than or equal to 0.25 of the full open noise level. TRS 3.3.4.4 Perform CHANNEL CALIBRATION 24 months TRS 3.3.4.5 Perform CHANNEL CALIBRATION of the Primary 92 days Containment H2 and 02 Analyzers.
SUSQUEHANNA
-UNIT 2 TRM I 3.3-10 EFFECTIVE DATE 10/31/2007
- 1. 2. 3. * .. 4. 5.
- Rev. 9 ---------
TRM Post Accident Monitoring Instrumentation 3.3.4 TABLE 3.3.4-1 TRM POST-ACCIDENT MONITORING INSTRUMENTATION APPLICABLE CONDITIONS MODES OR OTHER REFERENCED SPECIFIED REQUIRED FROM REQUIRED REQUIRED FUNCTION CONDITIONS CHANNELS ACTION A.1 SURVEILLANCE Suppression Chamber Air 1,2 2 c TRS 3.3.4.1 Temperature TRS 3.3.4.4 Main Steam Safety/Relief Valve 1,2 1/valve D TRS 3.3.4.1 Position Indicator (Acoustic TRS 3.3.4.2 Monitor)
TRS 3.3.4.3 Reactor Building Vent Noble Gas Monitor a. Mid RangeCbl 1,2, (a) 1 B TRS 3.3.4.1 TRS 3.3.4.4 b. High Range(b) 1,2, (a) 1 B TRS 3.3.4.1 TRS 3.3.4.4 Standby Gas Treatment System Vent Noble Gas Monitor a. Mid RangeCbl 1,2, (a) 1 B TRS 3.3.4.1 TRS 3.3.4.4 b. High RangeCbl 1,2, (a) 1 B TRS 3.3.4.1 TRS 3.3.4.4 Turbine Building Vent. Noble Gas Monitor a. Mid RangeCbl 1,2 1 B TRS 3.3.4.1 TRS 3.3.4.4 b. High RangeCbl 1,2 B TRS 3.3.4.1 TRS 3.3.4.4 (continued)
SUSQUEHANNA
-UNIT 2 TRM I 3.3-11 EFFECTIVE DA.TE 10/07/2015
- 6. 7.
- 8. Rev. 9 TRM Post Accident Monitoring Instrumentation 3.3.4 TABLE 3.3.4-1 (continued)
TRM POST-ACCIDENT MONITORING INSTRUMENTATION APPLICABLE CONDITIONS MODES OR OTHER REFERENCED SPECIFIED REQUIRED FROM REQUIRED REQUIRED FUNCTION CONDITIONS CHANNELS ACTION A.1 SURVEILLANCE Standby Gas Treatment System Vent Stack Sampling System Flow a. Effluent System 1,2, (a) c TRS 3.3.4.1 flow rate monitor<bl TRS 3.3.4.4 b. Sampler flow rate 1,2, (a) c TRS 3.3.4.1 monitor<bl TRS 3.3.4.4 Turbine Building Vent Stack Sampling System Flow a. Effluent System 1,2 c TRS 3.3.4.1 flow rate monitorbl TRS 3.3.4.4 b. Sample flow rate monitor<bl 1,2 1 c TRS 3.3.4.1 * (Mid/High Range & TRS 3.3.4.4 Bypass) Containment H2 and 02 1,2 2 c TRS 3.3.4.1 Analyzer<bl TRS 3.3.4.5 (a) When moving irradiated fuel in the secondary containment.
(b) TRO 3.0.4.c is applicable:
SUSQUEHANNA
-UNIT 2 TRM I 3.3-11a EFFECTIVE DATE 08/11/2016
- *
- Rev.4 3. 7.3
- Fire Protection Fire Suppression Water Supply System 3.7.3.1 3. 7.3.1 Fire Suppression Water Supply System TRO 3.7.3.1 Two Fire Suppression Water Supply Subsystems shall be OPERABLE APPLICABILITY:
At all times ACTIONS -----------------------------------:.----------------------
NOTE
- 1. The provisions of TRO 3.0.4 are not applicable.
CONDITION REQUIRED ACTION COMPLETION TIME A. One fire suppression A.1 Restore the inoperable
?days water supply subsystem fire suppression water inoperable.
supply subsystem to OPERABLE status OR A.2 Establish an alternate fire 7 days suppression water supply subsystem.
B. Both fire. suppression water B.1 Establish an alternate fire 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> supply subsystems suppression water supply inoperable.
subsystem AND B.2 Restore an inoperable 7 days fire suppression water supply subsystem to OPERABLE status . SUSQUEHANNA
-UNIT 2 TRM I 3.7-4 EFFECTIVE DATE 03/31/2006
- * ** Rev. 4 Fire Suppression Water Supply System 3.7.3.1 TECHNICAL REQUIREMENT SURVEILLANCE
-,--------------------------------------------------:------'NOTE
When a system is placed in an inoperable status solely for the performance of required Surveillances, entry into associated Conditions and required Actions may be delayed up to 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. SURVEILLANCE FREQUENCY TRS 3.7.3.1.1 Verify the minimum contained fire suppression water 7 days supply volume. TRS 3.7.3.1.2, Verify that the overall diesel driven fire pump diesel 31 days engine starting battery bank and charger battery voltage is greater than or equal to 12 volts. TRS 3.7.3.1.3 Verify that the diesel driven fire pump diesel engine 31 days starting battery bank and charger pilot cell specific
- gravity, corrected to 77°F, is greater than or equal to 1.200 . TRS 3.7.3.1.4 Verify that the diesel driven fire pump diesel engine 31 days starting battery bank and charger electrolyte level of each pilot cell is above the plates. TRS 3.7.3.1.5 Start the electric motor driven fire pump and operate 31 days it for at least 15 minutes on recirculation flow. TRS 3.7.3.1.6 Verify that each manual, power operated or automatic 92 days valve, in the fire suppression water supply system flow path is in its correct position.
TRS 3.7.3.1.7 Verify the diesel driven fire pump fuel storage tank 31 days contains at least 250 gallons of fuel. " TRS 3.7.3.1.8 Start the diesel driven fire pump from ambient 31 days conditions and operate for greater than or equal to 30 minutes on recirculation flow. (continued)
SUSQUEHANNA
-UNIT 2 TRM I 3.7-5 , EFFECTIVE DATE 08/18/2016
- ** Rev.4 Fire Suppression Water Supply System 3.7.3.1 TECHNICAL REQUIREMENT SURVEILLANCE (continued)
SURVEILLANCE
- FREQUENCY TRS 3.7.3.1.9 Verify that a sample of the diesel driven fire pump 92 days diesel fuel from the fuel storage tank is within the acceptable limits when checked for viscosity, water and sediment.
TRS 3.7.3.1.10
. Verify that the diesel driven fire pump diesel engine 92 days battery bank specific gravity is appropriate for continued service of the battery.
TRS 3.7.3.1.11 Cycle each fire suppression water supply system 12 months testable valve in the flow path through at least one complete cycle of full travel. TRS 3.7.3.1.12 Perform a system flush of the fire suppression water 12 months supply system. TRS 3.7.3.1.13 Perform a system functional test of the fire 18 months suppression water supply system. TRS 3.7.3.1.14 This TRS is not used. ' TRS 3.7.3.1.15 Verify that each fire pump develops at least 18 months 2500 gpm at a system head of 125 psig. TRS 3.7.3.1.16 Verify that the diesel engine driven fire pump diesel 18 months engine battery bank cell and battery racks show no visual indication of physical damage or abnormal deterioration.
TRS 3.7.3.1.17 Verify that each fire pump starts sequentially to 18 months *maintain the fire suppression water supply system pressure greater than or equal to 85 psig. (continued)
SUSQUEHANNA
-UNIT 2 TRM / 3.7-6 EFFECTIVE DATE 08/18/2016
- *
- Rev. 4 Fire Suppression Water Supply System 3.7.3.1 TECHNICAL REQUIREMENT SURVEILLANCE (continued)
SURVEILLANCE FREQUENCY TRS 3.7.3.1.18 Verify that the diesel driven fire pump diesel engine 18 months starting battery bank Terminal connections are clean, tight, free of corrosion and coated with anti-corrosion material.
- TRS 3.7.3.1.19 Perform diesel driven fire pump diesel engine 18 months inspection.
TRS 3.7 .3.1.20 Perform a fire suppression water supply system flow 3 years test. SUSQUEHANNA
-UNIT 2 TRM / 3.7-7 EFFECTIVE DATE 08/18/2016
- *
- Rev. 6 Radioactive Gaseous Effluent Monitoring Instrumentation 3.11.2.6 3.11 Radioactive Effluents 3.11.2 Gaseous Effluents 3.11.2.6 Radioactive Gaseous Effluent Monitoring Instrumentation TRO 3.11.2.6 The radioactive gaseous effluent monitoring instrumentation channels shown in Table 3.11.2.6-1 shall be OPERABLE with their setpoints established in accordance with the ODCM to ensure that the limits of Requirement 3.11.2.1 are not exceeded.
APPLICABILITY:
According to Table 3.11.2.6-1 ACTIONS ------------------------------------------------------------NOTE---------------------------------------------------------
- 1. Separate entry is allowed for each channel.
- 2. The provisions of TRO 3.0.6 are not applicable
. CONDITION A Radioactive gaseous effluent monitoring instrumentation channel alarm/trip setpoint less conservative than required to ensure that the limits of Requirement 3.11.2.1 are not exceeded REQUIRED ACTION A.1 Suspend the release of radioactive gaseous effluents monitored by the affected channel A.2 Declare the channel inoperable COMPLETION TIME Immediately Immediately
- (continued)
SUSQUEHANNA
-UNIT 2 TRM I 3.11-25 EFFECTIVE DATE 04/12/2007
- Rev.6 ACTIONS (continued)
CONDITION B. Reactor Building 8.1 Ventilation System Noble Gas Activity Monitor low range channel inoperable AND 8.2 AND 8.3 C . Deleted
- D. Reactor Building D.1 Ventilation Monitoring System Effluent System Flow Rate Monitor or AND Sampler Flow Rate Monitor inoperable D.2 SUSQUEHANNA
-UNIT 2 Radioactive Gaseous Effluent Monitoring Instrumentation 3.11.2.6 REQUIRED ACTION COMPLETION TIME Take grab samples Once per 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> while release is in progress.
Analyze grab samples for Within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> of isotopic activity to the grab sample required LLDs for principal noble gas gamma emitters (Table 3.11.2.1-1)
Restore monitoring 30 days instrumentation.
Estimate flow rate. Once per 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> while release is in progress Restore monitoring 30 days instrumentation.
-(continued)
TRM / 3.11-26 EFFECTIVE DATE 01/21/2004
- Rev.6 ACTIONS (continued)
CONDITION E. Turbine Building Ventilation System Noble Gas Activity Monitor low range channel inoperable F. Deleted G. Turbine Building Ventilation Monitoring System: Effluent Flow Rate Monitor or Sample (Bypass or Low Range) Flow Rate Monitor inoperable
- SUSQUEHANNA
-UNIT 2 Radioactive Gaseous Effluent Mon,itoring Instrumentation 3.11.2.6 REQUIRED ACTION COMPLETION TIME E.1 Verify mechanical vacuum Immediately
. pump is not in operation.
AND E.2 Take grab samples.
Once per 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> while release is in progress AND E.3 Analyze graq, samples for Within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> after isotopic activity to the sample required LLDs for principal noble gas gamma emitters (Table 3.11.2.1-1).
AND E.4 Restore monitoring 30 days instrumentation G.1 Estimate flow rate. Once per 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> while release is in progress.
AND G.2 Restore monitoring 30 days instrumentation (continued)
TRM / 3.11-27 EFFECTIVE DATE 08/11/2016
- Rev. 6 ACTIONS (continued)
CONDITION H. Standby Gas Treatment System Noble Gas Activity Monitor low range channel inoperable
- I. Deleted J. SGTS Ventilation Monitoring System Effluent flow rate monitor or sample flow rate monitor Inoperable.
8 -*.* SUSQUEHANNA
-UNIT 2 Radioactive Gaseous Effluent Monitoring Instrumentation 3.11.2.6 REQUIRED ACTION COMPLETION TIME H.1 Take grab samples.
Once per 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> during operation of SGTS AND H.2 Analyze grab samples for Within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> of isotopic activity to the required grab sample being LLDs for principal noble gas taken. gamma emitters (Table 3.11.2.1-1).
AND H.3 Restore monitoring 30 days* instrumentation
. J.1 Estimate flow rate. Once per 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> during operation of SGTS AND J.2 Restore monitoring 30 days Instrumentation.
(continued)
TRM / 3.11-28 EFFECTIVE DA TE 09/08/2009 I l**--.:...'.>."..'...;._*
- *
- Radioactive Gaseous Effluent Monitoring Instrumentation 3.11.2.6 Rev. 6 ACTIONS (continued)
CONDITION K. Required Actions and Completion Times not met for Conditions B through J. REQUIRED ACTION K.1 Explain why this inoperability was not corrected in a timely manner. TECHNICAL REQUIREMENT SURVEILLANCE COMPLETION TIME In the next Radioactive Effluent Release Report per TS Section 5.6.
Refer to Table 3.11.2.6-1 to determine which TRSs apply for each Monitoring Function.
SURVEILLANCE FREQUENCY
' TRS 3.11.2.6.1 Perform CHANNEL CHECK 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> TRS 3.11.2.6.2 Deleted TRS 3.11.2.6.3 Perform Source Check 31 days TRS 3.11.2.6.4 Perform CHANNEL FUNCTIONAL TEST 92 days TRS 3.11.2.6.5 Perform CHANNEL CALIBRATION 24 months SUSQUEHANNA
-UNIT 2 TRM / 3.11-29 EFFECTIVE DATE 12/03/2004
- *
- Rev.6 Radioactive Gaseous Effluent Monitoring Instrumentation 3.11.2.6 TABLE 3.11.2.6-1 (Page 1 of 3) RADIOACTIVE GASEOUS EFFLUENT MONITORING INSTRUMENTATION REQUIRED SURVEILLANCE FUNCTION APPLICABILITY CHANNELS REQUIREMENTS
- 1. REACTOR BUILDING VENTILATION MONITORING SYSTEM a. Noble Gas Activity Monitor At all Times TRS 3.11.2.6.1 (Low Range) TRS 3.11.2.6.3 TRS 3.11.2.6.4 TRS 3.11.2.6.5
- b. Deleted c. Deleted d Effluent System Flow Rate Monitor At all Times TRS 3.11.2.6.1 TRS 3.11.2.6.4 TRS 3.11.2.6.5
- e. Sampler Flow Rate Monitor At all Times 1 TRS 3.11.2.6.1 TRS 3.11.2.6.4 TRS 3.11.2.6.5 (continued)
SUSQUEHANNA
-UNIT 2 TRM / 3.11-30 EFFECTIVE DATE 01/21/2004
- Rev. 6 Radioactive Gaseous Effluent Monitoring Instrumentation 3.11.2.6 TABLE3.11.2.6-1 (Page2of3)
RADIOACTIVE GASEOUS EFFLUENT MONITORING INSTRUMENTATION FUNCTION
- 2. TURBINE BUILDING VENTILATION MONITORING SYSTEM a. Noble Gas Activity Monitor (Low Range) b. Deleted c. Deleted d. e. f. Effluent System Flow Rate Monitor Sample Flow Rate Monitor (Bypass)*
Sample Flow Rate Monitor.
(Low Range) fl SUSQUEHANNA
-UNIT 2 REQUIRED APPLICABILITY CHANNELS At all Times At all Times At all Times .. At all Times SURVEILLANCE REQUIREMENTS TRS 3.11.2.6.1 TRS 3.11.2.6.3 TRS 3.11.2.6.4 TRS 3.11.2.6.5 TRS 3.11.2.6.1 TRS 3.11.2.6.4 TRS 3.11.2.6.5 TRS 3.11.2.6.1 TRS 3.11.2.6.4 TRS 3.11.2.6.5 TRS 3.11.2.6.1 TRS 3.11.2.6.4 TRS 3. 11. 2. 6. 5 (continued)
TRM I 3.11-31 EFFECTIVE DATE 08/11/2016
- ' .
- Rev. 6 Radioactive Gaseous Effluent Monitoring Instrumentation 3.11.2.6 TABLE 3.11.2.6-1(Page3 of3) RADIOACTIVE GASEOUS EFFLUENT MONITORING INSTRUMENTATION FUNCTION
- 3. STANDBY GAS TREATMENT SYSTEM (SGTS) MONITOR (a) a. Noble Gas Activity Monitor (Low Range) b. Deleted c. Deleted d. Effluent System Flow Rate Monitor e. Sampler Flow Rate Monitor TRO 3.0.4.c is applicable.
SUSQUEHANNA
-UNIT 2 REQUIRED APPLICABILITY CHANNELS During operation of SGTs<al During operation of SGTs<al During operation of SGTS(a) SURVEILLANCE REQUIREMENTS TRS 3.11.2.6.1 TRS 3.11.2.6.3 TRS 3.11.2.6.4 TRS 3.11.2.6.5 TRS 3.11.2.6.1 TRS 3.11.2.6.4 TRS 3.112.6.5 TRS 3.11.2.6.1 TRS 3.11.2. 6.4 TRS 3.11.2.6.5 TRM I 3.11-32 EFFECTIVE DATE 02/19/2015
- *
- Rev. 2 Radioactive Gaseous Effluent Monitoring Instrumentation B 3.11.2.6 B 3.11.2.6 Radioactive Gaseous Effluent Monitoring Instrumentation BASES TRO The radioactive gaseous effluent instrumentation is provided to monitor and control, as applicable, the releases of radioactive materials in gaseous effluents during actual or potential releases of gaseous effluents.
The alarm/trip setpoints for these instruments shall be calculated in accordance with the procedures in the ODCM (Reference
- 2) to ensure that the alarm/trip will occur prior to exceeding the release rate limits corresponding to dose rates above background to a member of the public at or beyond the site boundary to 500 mrem/yr to the total body or to 3000 mrem/yr to the skin. The OPERABILITY and use of this instrumentation is consistent with the requirements of General Design Criteria 60, 63, and 64 of Appendix A to 1 O CFR Part 50. (References 3 and 4) OPERABILITY requires their alarm/trip setpoints set to ensure that the limits of Requirement 3.11.2.1 are not exceeded.
The alarm/trip setpoints of these channels shall be tjetermined in accordance with the methodology and parameters in trye ODCM. This section of-the TRM is also part of the ODCM (Reference
- 2) . The vent effluent monitor for the Turbine Building and Standby Gas Treatment System (SGTS) is a wide range noble gas monitor, The Effluent channel #4 for each of the Turbine and SGTS displays the release rate in uCi/min using the best detector in range. Upscale and failure alarms originate from the Effluent channel.
There are 3 detectors for each wide range gas monitor, low; mid and high range. During normal plant operations, the low range channel will be selected for Effluent channel calculation.
The mid and high range detectors are in standby mode. The mid and high range detectors are activated and selected automatically based upon the monitored noble gas concentration.
During high range noble gas releases, the mid and high range detectors are activated and the low range noble gas detector loop is selected in standby mode. Faults detected by the vent effluent monitor will be annunciated in the main control room overhead annunciator via the Effluent channel.
These loops can be considered Operable if the Effluent release rate channel is not alarmed.
(continued)
SUSQUEHANNA
-UNIT 2 TRM I B 3.11-24 EFFECTIVE DATE 08/11/2016
- * ** '*:*. . Rev.2 l ---. .,__ .............
-"' ----*-_*,:. ----
--' J -* ** .. : ;_ ..... -------* Radioactive Gaseous Effluent Monitoring lnstru.mentation B 3.11.2.6 B 3.11.2.6 Radioactive Gaseous Effluent Monitoring Instrumentation BASES TRO The Turbine Building and SGTS vent sample flow system operates to (continued) support the detector selection requirements.
Normally the low range sample flow is operating to support the low range detector.
On ACTIONS detection of an upscale noble gas release, the mid/high range sample pump that is normally in standby mode. is activated to draw a sample through the mid and high range noble gas detectors and low range sample flow system is in standby mode. The mid I high range sample is then selected and low range sample flow is activated automatically when noble gas concentrations return to normal levels. The bypass sample
- flow system is designed to make up the proper sample flow rate from the isokinetic nozzle array. For the Turbine Building
- monitor, the bypass system is required to operate continuously.
For the SGTS, the bypass system is in standby mode until high range noble gas is sensed and the bypass system is automatically activated and selected as required.
These loops can be considered Operable if the Effluent release rate channelis not alarmed.
The Actions are defined to ensure proper corrective measures are taken in response to the inoperable components.
Low range Noble Gas channel readings from the local vent monitor may be used to meet the requirement for a Noble Gas grab sample and grab sample analysis.
- Noble Gas release grab samples are not required to be taken when there are no releases via that pathway.
Effluent flow is to be determined by vent flow instrumentation or by a vent flow estimate every 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />. Continuous sample collection shall be on the same basis as described in the Bases for TRO 3.11.2.1 Monitoring may be interrupted for up to 30 minutes to perform particulate filter/iodine cartridge changeout required by TRM Table 3.11.2-1 without entering the TRO ACTIONS.
(continued)
SUSQUEHANNA
-UNIT 2 TRM I B 3.11-24a EFFECTIVE DATE 08/11/2016
- **' --.. -. -.--. Rev.2 Radioactive Gaseous Effluent Monitoring Instrumentation 8 3.11.2.6 B 3.11.2.6 Radioactive Gaseous Effluent Monitoring Instrumentation BASES (continued)
TRS The TRSs are defined to be performed at the specified Frequency to ensure that the monitoring instrumentation is maintained OPERABLE.
The TRSs shall be performed in accordance with the Technical Specification definition for the test with the following additional requirements:
The CHANNEL FUNCTIONAL TEST for all noble gas activity monitors shall also demonstrate that control room alarm annunciation occurs if any of the following conditions exists: 1. Instrument indicates measured levels above the alarm/trip
- setpoint,
- 2. Circuit failure, and 3. Instrument indicates a downscale failure.
The initial CHANNEL CALIBRATION for all noble gas activity monitors shall be performed using one or more of the reference standards certified by the National Institute of Standards and Technology (NIST) or using standards that have been obtained from suppliers that participate in measurement assurance activities with NIST. These standards shall permit calibrating the system over its intended range of energy and measurement range. For subsequent CHANNEL CALIBRATION, sources that have been related to the initial calibration may be used in lieu of reference standards associated with the initial calibration.
Particulate or iodine sampling required to be in continuous service will be considered to remain and have been in continuous service when its service is interrupted for a period of time not to exceed 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> per sampling period. For particulate and iodine sampling, this is a small fraction of the normal minimum analysis frequency.
REFERENCES
- 1. Technical Specification 5.5.4 -Radioactive Effluent Controls program.
- 2. Technical Specification 5.5.1 -Offsite Dose Calculation Manual. 3. 1 O CFR Part 20. 4. 10 CFR Part 50. SUSQUEHANNA